Notice_to_Proceed.docx

DOCX document 16 KB Posted

Attached to
Parkview Loop Waterline Replacement
Solicitation number
26-060
Issued by
Washington County, Barlow City, Oregon

About this file

This is a Notice to Proceed template document issued by the City of Beaverton, Oregon, for the Parkview Loop Waterline Replacement project. The document serves as official authorization for a contractor to commence work on a specified date in accordance with an executed contract. The project involves installing approximately 3,000 linear feet of new 8-inch water main and 1,500 linear feet of new 6-inch water main, along with associated hydrant and service line replacements in a residential neighborhood along SW Parkview Loop, spanning from Greenway to Murphy Lane and all connecting cul-de-sacs. The contractor must substantially complete all work within a specified number of consecutive calendar days from the notice date, with the exact completion deadline to be filled in upon issuance.

The Notice to Proceed template includes provisions for documenting contractor performance bonds and general liability insurance requirements. The document establishes a three-notification system for tracking project commencement, interim completion of remaining tasks, and final project completion, with each milestone requiring project manager certification and contractor acknowledgment. The template requires identification of the project manager, contract number, purchase order number, and contractor information, along with submission deadlines for any claims for additional compensation. Distribution copies are provided to the prime contractor at each notification stage, ensuring documented acknowledgment of project timeline milestones and contractual obligations.

View the file

Other files

File Type Posted
Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf PDF
Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf PDF
Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf PDF
Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf PDF
LABOR_AND_MATERIAL_PAYMENT_BOND.docx DOCX document
Laws_to_be_Observed.docx DOCX document
Construction_Contract_-_Sample.docx DOCX document
Construction_Contract_-_Sample.docx DOCX document
Performance_Bond.docx DOCX document
Locates.docx DOCX document
Locates.docx DOCX document
BLANK_Sole_Source_Justification_Form.pdf PDF
LABOR_AND_MATERIAL_PAYMENT_BOND.docx DOCX document
Performance_Bond.docx DOCX document
BLANK_Sole_Source_Justification_Form.pdf PDF
Laws_to_be_Observed.docx DOCX document
Notice_to_Proceed.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO PROCEED

Project: _______________________________________________________Contract No. _________________
Project Manager Name: __________________________________________Contract P.O. No. _____________

To: __________________________________________________________

You are hereby given official Notice to Proceed (Notice) to commence Work on _______________, 20__, in accordance with the Contract dated ________________________, 20__. All Work must be Substantially Completed within ___ consecutive Calendar Days following the date of this Notice. Therefore, the date of Substantial Completion for the Work is _____________________, 20__.

The City of Beaverton

By: ______________________________________ Name: ___________________________________ Title: ____________________________________

ACCEPTANCE OF NOTICE TO PROCEED

Receipt of this Notice is hereby acknowledged on __________________, 20__.

Contractor

By: ______________________________________ Name: ___________________________________ Title: ____________________________________

Contractor’s Performance Bond Co.:

Bond No.: ________________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________

Contractor’s General Liability Ins. Co.:

Policy No.: _______________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________

NOTIFICATION OF COMMENCEMENT AND COMPLETION DATES FOR CONTRACT

Project Name:________________________________________________________________________
Contractor Name:________________________________________________________________________
Contract No.__________________________________________Fiscal Year: ____________
Project Manager Name:__________________________________________Date of Award:_______

FIRST NOTIFICATION

Date: ____________________________ Project Manager: Enter the date when the performance of Contract began.

_______________________________________________________
Project Manager SignatureDate

SECOND NOTIFICATION

Project Manager: Enter the date the time charges stopped, any final trimming and cleanup tasks, equipment to be removed from the Project Site, any minor corrective work not involving additional payment to be completed; and any submittals, including, but not limited to any required certifications, bills, forms, and other documents. See 00180.50(g) for more information.

Date Time Charges Stopped:

Remaining Tasks for Contractor:

All claims for additional compensation must be submitted by: ____________________________, 20______.

(See 00199.30 for additional requirements)

_______________________________________________________
Project Manager SignatureDate of Signature

THIRD NOTIFICATION

Date: ____________________________Project Manager: Enter the date when all Contract Work was completed,
including corrective work, equipment and plant removal, site cleanup, and
receipt of all certifications, bills, and other documents required under the
Contract.
_______________________________________________________
Project Manager SignatureDate of Signature

Distribution

Prime Contractor:
· 1st Notification:______ (Place initials here) _______ Date

· 2nd Notification: ______ (Place initials here) _______ Date

· 3rd Notification: ______ (Place initials here) _______ Date