TE 6.5_Laboratory Personnel Staffing Requirements.pdf

PDF 61 KB Posted

Attached to
Army Oil Analysis Program (AOAP) Worldwide Laboratory Management and Operations
Solicitation number
PANRSA-24-P-0000-015570
Issued by

About this file

This is a Technical Exhibit detailing laboratory personnel staffing requirements for the Army Oil Analysis Program (AOAP) Worldwide Laboratory Management and Operations contract. The document specifies staffing levels across six locations: Fort Liberty, Fort Cavazos, Joint Base Lewis-McChord, Redstone Arsenal, Camp Doha, and Semarang.

The staffing requirements include Laboratory Managers, Assistant Laboratory Managers, and Laboratory Technicians at the main U.S. locations, with specialized positions at Redstone Arsenal (Senior Condition Monitoring Analysts and Condition Monitoring Analyst). Key requirements include maintaining minimum staffing of 2 personnel at Fort Liberty, Fort Cavazos, and Joint Base Lewis-McChord, with at least one LLA II certified staff member at each location. Laboratory technicians at Camp Doha, Kuwait and Semarang, Indonesia must have LLA II certification. The document includes payment deduction provisions for unstaffed or understaffed positions, requiring regular communication between the contractor and AOAP PMO staff through the Contracting Officer's Representative (COR).

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LABORATORY PERSONNEL STAFFING REQUIREMENTS

Fort

Liberty

Fort

Cavazos

Joint Base

Lewis-McChord

Redstone

Arsenal

Camp

Doha Semarang

Laboratory Manager 1 1 1

Assistant Laboratory

Manager

1 1 1

Laboratory Technicians 1 2 1 11 11

Senior Condition

Monitoring Analyst

(CMA)

Condition Monitoring

Analyst

NOTE: At Fort Liberty, Fort Cavazos and Joint Base Lewis-McChord, the contractor shall maintain at all times a minimum of 2 personnel at each lab, one of whom must be LLA II certified.

The Government will deduct payment from contractor invoices for any positions which are unstaffed or understaffed during any given billing period. The

Government will calculate the decrement and provide the contractor with a spreadsheet showing its derivation, along with instructions on how the contractor shall invoice for the billing period. It is therefore imperative that the contractor communicate with the AOAP PMO staff on a regular and frequent basis regarding unstaffed or understaffed positions. Frequent communication will prevent the Government from making erroneous deductions. Questions regarding the deduction or its derivation should be directed to the AOAP PMO staff through the Contracting Officer’s Representative (COR).

1 Laboratory technicians assigned to Camp Doha, Kuwait and Semarang, Indonesia must have LLA II certification.

File details come from the government source that posted it. Updated .