CDRL A0005 Manuals.docx
DOCX document 29 KB Posted
- Attached to
- Non-Ferrous Metal Plate Saw and Chip Collector
- Solicitation number
- PANDTA-23-P-0000-006729
About this file
This document is a Contract Data Requirements List (CDRL) outlining the requirements for manuals to be provided by the contractor under contract number B411. The contractor shall provide three hard copies and one electronic copy on CD/DVD of operations sequences, system programs, bills of materials, wiring diagrams, schematics, and maintenance manuals for all contractor-installed equipment. The manuals shall include calibration information and procedures where applicable. The manuals will be delivered to the Production Engineering Division POC, Jay Oliver, upon completion of all work under the contract. The manuals are required for administrative and operational use by the government and will have distribution limited to the POC and Repro for electronic delivery to the Production Engineering Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 2 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 1 Comb Synop Sol Final 1.docx | DOCX document | |
| Combined Synop Metal Plate Saw Final1.docx | DOCX document | |
| CDRL A0002 Lock Out Tag Out.docx | DOCX document | |
| CDRL A0003 Final Acceptance Test.docx | DOCX document | |
| CDRL A0001 Installation Schedule.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Metal Plate Saw B411 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 005 |
| Manuals |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.5 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The contractor shall provide three (3) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. Reference PD 3.5
Per block 8. POC will receive all hard copies and electronic copies at the completion of contract.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Manuals will be required one time only upon completion of all work.
Per block 11. Manuals will be required one time only upon completion of all work.
Per block 12. Manuals will be required one time only upon completion of all work.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 10 Oct 2023 |
| Andy Graves, Chief Facilitization Team |
| 10 Oct 2023 |
File details come from the government source that posted it. Updated .