CDRL A0003 Final Acceptance Test.docx
DOCX document 29 KB Posted
- Attached to
- Non-Ferrous Metal Plate Saw and Chip Collector
- Solicitation number
- PANDTA-23-P-0000-006729
About this file
This document is a Contract Data Requirements List (CDRL) outlining final acceptance testing requirements for a metal plate saw system under Solicitation PANDTA-23-P-0000-006729 issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The contractor must perform final acceptance testing to demonstrate the saw system can cut various metal types through each process without failure. The test consists of ten cuts designed by RRAD personnel, with no allowed failures, and must be completed prior to work conclusion. The test results will be submitted to RRAD Contracting and Production Engineering Division for administrative and operational use.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 2 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 1 Comb Synop Sol Final 1.docx | DOCX document | |
| Combined Synop Metal Plate Saw Final1.docx | DOCX document | |
| CDRL A0002 Lock Out Tag Out.docx | DOCX document | |
| CDRL A0001 Installation Schedule.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document | |
| CDRL A0005 Manuals.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Metal Plate Saw B411 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 003 |
| Final Acceptance Testing |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.3 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. Contractor shall perform a final acceptance test. The test shall demonstrate the system’s ability to cut various types of metal through every process without failures. The test shall consist of the operation of ten (10) cuts designed by RRAD personnel with no failures. Reference PD 3.3
Per block 8. Final Acceptance test shall be performed prior to work completion.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Final Acceptance test will be required one time only prior to work completion.
Per block 11. Final Acceptance test will be performed prior to work completion.
Per block 12. . Final Acceptance test will be performed prior to work completion.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 10 Oct 2023 |
| Andy Graves, Chief Facilitization Team |
| 10 Oct 2023 |
File details come from the government source that posted it. Updated .