CDRL A0002 Lock Out Tag Out.docx
DOCX document 30 KB Posted
- Attached to
- Non-Ferrous Metal Plate Saw and Chip Collector
- Solicitation number
- PANDTA-23-P-0000-006729
About this file
This document is a Contract Data Requirements List (CDRL) outlining requirements for a Lockout/Tagout procedure for a Metal Plate Saw. The CDRL requires the contractor to furnish a machine-specific graphical LOTO procedure clearly describing the steps to establish a zero-energy state for the equipment in accordance with OSHA Regulation 1910.147. The procedure must be printed on durable laminated material suitable for posting on the equipment, and all LOTO locations must be clearly identified with durable labels keyed to the procedure. The contractor must also furnish the procedure in an electronic format for easy transfer to a maintenance management system. The LOTO must be submitted one time prior to work completion and is for administrative and operational use only, with distribution to the Production Engineering Division POC and RRAD Contracting office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 2 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 1 Comb Synop Sol Final 1.docx | DOCX document | |
| Combined Synop Metal Plate Saw Final1.docx | DOCX document | |
| CDRL A0003 Final Acceptance Test.docx | DOCX document | |
| CDRL A0001 Installation Schedule.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document | |
| CDRL A0005 Manuals.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Metal Plate Saw B411 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 002 |
| Lockout/Tagout (LOTO) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.2 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. Contractor shall furnish a graphical, machine specific LOTO procedure that clearly and specifically describes the steps necessary to establish a zero-energy state for the equipment in accordance with the requirements of OSHA Regulation CFR 1910.147. This procedure shall be printed on a durable laminated material suitable for posting on the equipment. All LOTO locations on the equipment shall be clearly identified with a durable label keyed to the LOTO procedure. Contractor shall furnish the procedure in an electronic format so the information can be easily transferred into a maintenance management. Reference PD 3.2
Per block 8. Contractor shall furnish LOTO as listed in the PD 3.1 one time prior to work completion.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. LOTO will be required one time prior to work completion.
Per block 11. LOTO will be required one time prior to work completion.
Per block 12. LOTO will be required one time prior to work completion.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 10 Oct 2023 |
| Andy Graves, Chief Facilitization Team |
| 10 Oct 2023 |