CDRL A0001 Installation Schedule.docx
DOCX document 29 KB Posted
- Attached to
- Non-Ferrous Metal Plate Saw and Chip Collector
- Solicitation number
- PANDTA-23-P-0000-006729
About this file
This document is a Contract Data Requirements List (CDRL) outlining the requirements for an Installation Schedule to be provided by the contractor awarded the contract for a Non-Ferrous Metal Plate Saw and Chip Collector. The contractor must coordinate the proposed installation schedule with the requiring activity point of contact within sixty days prior to delivery of the system. The point of contact will review the contractor's intended design per the performance documents and inform contracting of any necessary changes within seven working days. The Installation Schedule must be submitted one time only, sixty days prior to delivery of the system, and is for administrative and operational use of the requiring activity and contracting office. The solicitation was issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal for solicitation number PANDTA-23-P-0000-006729.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 2 Comb Synop Sol Final 1.docx | DOCX document | |
| Amendment 1 Comb Synop Sol Final 1.docx | DOCX document | |
| Combined Synop Metal Plate Saw Final1.docx | DOCX document | |
| CDRL A0002 Lock Out Tag Out.docx | DOCX document | |
| CDRL A0003 Final Acceptance Test.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document | |
| CDRL A0005 Manuals.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Metal Plate Saw B411 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 001 |
| Installation Schedule |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.1.1 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The Contractor shall coordinate the proposed installation schedule with RRAD POC within sixty (60 days) prior to delivery of the system. Reference PD 3.1.1
Per block 8. POC will review design prior to the start of any fabrication to review the contractors intended design as noted IAW the PD and will inform contracting on necessary changes to be made if any within seven (7) working days.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Installation Schedule will be required one time 60 days prior to delivery of the system.
Per block 11. Installation Schedule will be required one time only 60 days prior to delivery of the system.
Per block 12. . Installation Schedule will be required one time only 60 days prior to delivery of the system.
Distribution addresses:
POC – Jay Oliver, Production Engineering Division Luke Letschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Jay Oliver |
| 10 Oct 2023 |
| Andy Graves, Chief Facilitization Team |
| 10 Oct 2023 |
File details come from the government source that posted it. Updated .