This is a Women-Owned Small Business (WOSB) Request for Quote (RFQ) for maintenance and repair services for the US Army Vessel (USAV) Q-7860, a 65-foot harbor ferry at the United States Military Academy at West Point, New York.
The solicitation (W911SD26QA118) seeks firm fixed-price quotes for on-condition cyclic maintenance (OCCM) of the vessel, with performance from September 14, 2026 through April 30, 2027. The work comprises five primary line items: (1) drydocking and propulsion system replacement; (2) electrical repairs including battery relocation and bilge pump replacement; (3) engine room repairs encompassing fire suppression system installation, transmission and shaft replacement, and generator replacement; (4) hull repair and painting; and (5) launch, sea trials, and stability testing. The Government will evaluate quotes on a lowest-price-technically-acceptable basis, considering technical capability (certifications, licenses, marine systems expertise, ABYC standards compliance) and price reasonableness. Offerors must submit detailed transit plans addressing vessel transport logistics, crew qualifications, and route feasibility from West Point to their maintenance facility. The contract requires contractors to obtain commercial marine liability and property damage insurance covering full replacement value, maintain the vessel in drydock with utilities provided, conduct mandatory quality assurance hold points throughout performance, and deliver comprehensive as-built drawings in native CAD and PDF formats. All work must meet or exceed American Boat and Yacht Council (ABYC), 46 CFR Subchapter T, and ABS rules. Questions must be submitted by August 28, 2026, with quotes due by August 31, 2026. The Government will make one award for all work and intends to evaluate without discussions, making initial quotes critical.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Created On:
17 Aug 2026, 12:48 PM Central Daylight Time
Section A - Solicitation/Contract Form
Harbor Q-Boat LRCInstrument Name:
Product Service Code : J020
W911SD26QA118
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 Product Service Description: CLIN 1
- D.1 Drydock/Replace Propulsion
Universal Product Number: 012345
Product Service Code: J020
North American Industry Classification System (NAICS):
336612
Pricing Arrangement: Firm Fixed Price
1 Task
0002 Product Service Description: CLIN 2
- D.2 Electrical Surveys/Repairs
Universal Product Number: 012345
Product Service Code: J020
Pricing Arrangement: Firm Fixed Price
1 Task
0003 Product Service Description: CLIN 3
- D.3 Engine Room Repairs
Universal Product Number: 012345
Product Service Code: J020
Pricing Arrangement: Firm Fixed Price
1 Task
0004 Product Service Description: CLIN 4
- D.4 Hull Repair and Painting
Universal Product Number: 012345
Product Service Code: J020
Pricing Arrangement: Firm Fixed Price
1 Task
0005 Product Service Description: CLIN 5
- D.5 Launch, Trials/Stabilility
Universal Product Number: 012345
Product Service Code: J020
Pricing Arrangement: Firm Fixed Price
1 Task
Section C - Description/Specifications/Statement of Work
Requirements Harbor Q-Boat Maintenance Contract FY 26 PANMCC-26-P-0000 042597
Section E - Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Destination Instructions: SEE PWS
DoDAAC: W16XYA
W1FB US MILITARY ACADEMY
USCC S4, WASHINGTON HALL ROOM 4116
WEST POINT, NY 10996-1595
UNITED STATES
0002 Inspection and Acceptance Location
Both Destination Instructions: SEE PWS
DoDAAC: W16XYA
W1FB US MILITARY ACADEMY
USCC S4, WASHINGTON HALL ROOM 4116
WEST POINT, NY 10996-1595
UNITED STATES
0003 Inspection and Acceptance Location
Both Destination Instructions: SEE PWS
DoDAAC: W16XYA
W1FB US MILITARY ACADEMY
USCC S4, WASHINGTON HALL ROOM 4116
WEST POINT, NY 10996-1595
UNITED STATES
0004 Inspection and Acceptance Location
Both Destination Instructions: SEE PWS
DoDAAC: W16XYA
W1FB US MILITARY ACADEMY
USCC S4, WASHINGTON HALL ROOM 4116
WEST POINT, NY 10996-1595
UNITED STATES
0005 Inspection and Acceptance Location
Both Destination Instructions: SEE PWS
DoDAAC: W16XYA
W1FB US MILITARY ACADEMY
USCC S4, WASHINGTON HALL ROOM 4116
WEST POINT, NY 10996-1595
UNITED STATES
Section F - Deliveries or Performance
0001 Delivery Schedule Delivery On Or Before Delivery Date 30 Apr 2027
1 TaskQuantity
Address and POC Ship To DoDAAC: W16XX9
W6X1 USALRCTR US MIL WESTPOINT
US MILITARY ACADEMY SSA WARHOUSE, BLDG 913 WASHINGTON RD WEST
POINT, NY 10996-1535 UNITED STATES
Period of Performance From 14 Sep 2026 To 30 Apr 2027
0002 Delivery Schedule Delivery On Or Before Delivery Date 30 Apr 2027
1 TaskQuantity
Address and POC Ship To DoDAAC: W16XX9
W6X1 USALRCTR US MIL WESTPOINT
US MILITARY ACADEMY SSA WARHOUSE, BLDG 913 WASHINGTON RD WEST
POINT, NY 10996-1535 UNITED STATES
Period of Performance From 14 Sep 2026
To 30 Apr 2027
0003 Delivery Schedule Delivery On Or Before Delivery Date 30 Apr 2027
1 TaskQuantity
Address and POC Ship To DoDAAC: W16XX9
W6X1 USALRCTR US MIL WESTPOINT
US MILITARY ACADEMY SSA WARHOUSE, BLDG 913 WASHINGTON RD WEST
POINT, NY 10996-1535 UNITED STATES
Period of Performance From 14 Sep 2026 To 30 Apr 2027
0004 Delivery Schedule Delivery On Or Before Delivery Date 30 Apr 2027
1 TaskQuantity
Address and POC Ship To DoDAAC: W16XX9
W6X1 USALRCTR US MIL WESTPOINT
US MILITARY ACADEMY SSA WARHOUSE, BLDG 913 WASHINGTON RD WEST
POINT, NY 10996-1535 UNITED STATES
Period of Performance
From 14 Sep 2026 To 30 Apr 2027
0005 Delivery Schedule Delivery On Or Before Delivery Date 30 Apr 2027
1 TaskQuantity
Address and POC Ship To DoDAAC: W16XX9
W6X1 USALRCTR US MIL WESTPOINT
US MILITARY ACADEMY SSA WARHOUSE, BLDG 913 WASHINGTON RD WEST
POINT, NY 10996-1535 UNITED STATES
Period of Performance From 14 Sep 2026 To 30 Apr 2027
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored)
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2-n-1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
HQ0490
Issue By DoDAAC
W911SD
Admin DoDAAC
W911SD
Inspect By DoDAAC
W16XX9
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC)
Service Acceptor (DoDAAC)
W16XX9
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes Payment request.
documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD TBD TBD
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-13 Contractor Code of Business Ethics and Conduct.
2021-11
52.203-17 Contractor Employee Whistleblower Rights.
2023-11
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-91 Contractor Identification.
(Deviation 2026-O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-
2026-02
O0038)
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-35 Equal Opportunity for Veterans.
(Deviation 2026-O0038)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026- O0038)
2026-02
52.222-41 Service Contract Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-54 Employment Eligibility Verification. (Deviation 2026- O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.224-3 Privacy Training. 2017-01
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7010 Levies on Contract Payments. 2006-12
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.222-42 Statement of Equivalent Rates for Federal Hires.
2014-05
Statement of Equivalent Rates for Federal Hires (May 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.
5341 or 5332.
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits
52.252-2 Clauses Incorporated by Reference. (Tailored)
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov
(End of clause)
52.252-6 Authorized Deviations in Clauses. (Tailored)
2020-11
Authorized Deviations in Clauses (Nov 2020)
The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
The use in this solicitation or contract of any Defense Federal Acquisition Regulation (b) Supplement [insert regulation name] (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section J - List of Attachments
PWS
ON-CONDITION CYCLIC MAINTENANCE (OCCM) - 2026-2027
MAINTENANCE AND REPAIR OF WEST POINT FERRY US ARMY VESSEL (USAV) Q-7860
CONTRACT SECTIONS
A. BACKGROUND AND INTENT 2
B. GENERAL INFORMATION AND REQUIREMENTS 3
C. SPECIAL CONDITIONS 8
D. PERFORMANCE WORK SPECIFICATIONS (PWS)
D.1 DRYDOCKING 13
Drydocking
D.2 ELECTRICAL REPAIRS 13
Rewire house batteries, bilge pump replacement, wheelhouse heater
D.3 ENGINE ROOM REPAIRS 15
Ventilation, fire suppression, exhaust replacement, generator replacement, transmission replacement, shaft replacement, stern tube repair, prop reconditioning
D.4 HULL REPAIR AND PAINTING 17
Rubrail repair, hull repair, zinc replacement, painting
D.5 LAUNCH, TRIALS, AND STABILITY TEST 19
Launch, sea trial, stability test
D.6 OVER AND ABOVE WORK 20
E. CONTRACT REFERENCES 20
F. ABBREVIATIONS 21
A. BACKGROUND AND INTENT:
The US Army Vessel (USAV) Q-7860 (Q-Boat) is a military passenger ferry assigned to the United States Military Academy (USMA) at West Point. The vessel is due for On-Condition Cyclic Maintenance (OCCM) in accordance with Army Regulation 750-1.
This will include drydocking, painting, and additional repairs according to the specifications outlined herein. Built in 1981 as a fishing vessel, the Q-7860 operates as a seasonal passenger vessel, providing transportation to USMA cadets and military personnel. The vessel is owned, inspected, and operated by the US Army and crewed by Army civilian mariners. The intent of this contract is to extend the vessel's life cycle by modernizing equipment, systems, and ensuring the vessel's continued seaworthiness and passenger safety.
The work objectives for this OCCM consist of five categories:
1. Drydock
2. Electrical Repairs
3. Engine room repairs
4. Hull repair and painting
5. Launch and trials
The Scope of Work is defined in Section B.5 and specified in the PWS, Section D. These requirements, and the additional repairs and maintenance tasks defined herein, will satisfy this OCCM and extend the vessel's serviceable life cycle.
The government intends to award a contract to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The total price shall include all labor, equipment, shipping charges, professional services, materials, overhead, profit, insurance, warranty, and all other expenses necessary to deliver the required specifications. No additional sums will be payable on account of any escalations in the cost of materials, equipment, or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract.
The following factors shall be used to evaluate offers:
(i) Technical capability of the service offered to meet the Government requirements.
(ii) Reasonableness of bids
(iii) Total price
(iv) Quality Control Plan
The offeror's proposal shall demonstrate proof of technical acceptability through detailed descriptions and/or plans, if requested by the Government. The offeror shall submit a comprehensive Quality Control Plan (QCP) demonstrating their methodology for ensuring workmanship standards and outline the contractor's internal inspection processes, as well as designating a dedicated QC representative. The lowest priced offer will be evaluated for technical acceptability by Government subject matter experts.
Offers that fail to furnish required representations or information or reject the terms and conditions of the solicitation may be excluded from consideration.
B. GENERAL INFORMATION AND REQUIREMENTS:
1. Definition: This Statement of Work (SOW) contains the Government requirements for vessel refit, repair, modernization, and other services required on the USAV Q-7860. This SOW section will also define Contractor requirements and responsibilities.
2. Vessel Scantlings: The general characteristics of the vessel are as follows: Year Built: 1981
Builder: Stapleton Marine, Fort Lauderdale, Florida
Hull Material: Fiberglass Length Overall: 65'
Beam: 19' 06"
Draft: 5'-05"
Displacement: 26.5 tons
3. Contractor Scope: The Contractor shall be responsible for the successful completion of all specifications within the performance period. The Contractor must be able to perform all work requirements and shall provide all facilities, labor, materials, tools, trade and professional services, supplies, testing and equipment to complete all work requirements. Services include but are not limited to supplying the vessel with power, water, heat, access, and security, as applicable. The Contractor is responsible for determining and sourcing all equipment, materials, methods, and planning required to perform all specifications. The Contractor shall also provide any professional and/or trade services (i.e., naval architects, marine electricians, shipwrights, marine engineers, fiberglass technicians etc.), to include subcontracted work deemed necessary to complete all specifications. All work is required to be completed no later than April 30, 2027.
4. Government Scope: The Government's responsibility under this contract is limited to providing the Contractor with safe access to the vessel at its berth in West Point, NY, for pickup, providing necessary vessel documentation/keys, and performing quality assurance inspections, trials, and final acceptance. The Government will not provide transport, crewing, or towing services for the vessel to or from the Contractor's facility. The Government will provide no additional services, labor, materials, or supplemental documentation--to include docking plans, designs, blueprints, drawings, photos, scantlings, or schematics. No Government Furnished Equipment (GFE) shall be provided.
5. Scope of Work: Drydocking, cleaning, and winter storage shall be provided for the duration of the performance period. Underwater propulsion components (bearings, seals, shafts, props) shall be reconditioned or replaced as per the performance work statement (PWS). Repairs are to be made to the vessel's electrical system and specified equipment shall be replaced. Engine room repairs include: replacing the exhaust thru-hulls and installing a new generator, marine transmissions and fire suppression systems. Damage to hull surfaces shall be repaired and the hull shall be painted per the PWS. Launching includes in-water berthing, sea-and-dock trials, and a stability test. The breadth and complexity of work specifications requires the contractor be proficient in designing, building, refitting, surveying, and testing commercial vessels and related marine systems.
6. Contract Oversight and Representatives:
a. The Contracting Officer (KO) is the only government official with the authority to modify the contract, direct changes, or execute final acceptance of all work and authorize final payment. The Contracting Officer's Representative (COR) is delegated by the KO to perform the technical administration of this contract, conduct inspections, and recommend final acceptance to the KO upon successful completion of all work specifications.
b. Technical Representative / QA Specialist: The COR may designate a technical representative or Quality Assurance (QA) Specialist to provide oversight throughout the performance period. This individual may be a government Small Craft Operator, Harbor Craft Supervisor, or another designated Government subject matter expert (SME). This representative is authorized to witness tests, conduct on-site inspections at designated Hold Points, and report progress to the COR, but does not have the authority to modify the terms, conditions, or pricing of the contract.
7. Vessel Transit and Logistics: The Contractor is solely responsible for the safe transit of the vessel from its current berth at West Point, NY (Building 682, Ernst Road, West Point, NY 10996) to the Contractor's facility, and for its return to West Point upon acceptable completion of the contract. Transit may be accomplished under the vessel's own power (crewed by the Contractor), by towing, or by other commercial transport methods (e.g., barge or trailer) at the Contractor's discretion and expense.
Offerors must include a detailed Transit Plan in their proposal addressing the following:
a) The physical address of the facility where the work will be performed.
b) The proposed method of transit (e.g., self-propelled, towed, or hauled).
i. Any safeguards/procedures for dead-ship towing.
c) A detailed description of the proposed route from West Point, NY, to the facility.
d) A risk mitigation plan for weather, navigation hazards, or mechanical issues during transit.
e) Confirmation that the proposed route and facility can safely accommodate a 65-foot vessel with a 5'5" draft.
f) Crew Qualifications: If the vessel is transported under its own power or towed, the Contractor must provide proof that the vessel (or the towing vessel) will be operated by personnel holding current and appropriate United States Coast Guard (USCG) merchant mariner credentials (e.g., Master's License appropriate for the vessel's tonnage and the route navigated).
The Government will evaluate the feasibility, safety, and risk level of the Contractor's proposed Transit Plan as a factor under the Technical Evaluation. Plans that do not clearly demonstrate a safe and viable method of transport will be deemed technically unacceptable.
8. Vessel Custody, Liability, and Insurance: The Contractor shall assume full custody, care, and liability for the vessel, its equipment, and systems the moment the Contractor (or their designated transport agent) takes physical possession of the vessel at the West Point Dock.
Insurance Requirement: Prior to taking physical custody of the vessel, the Contractor must provide the Contracting Officer (KO) and COR with a valid Certificate of Insurance (COI) demonstrating adequate commercial marine liability and property damage coverage. This insurance must be sufficient to cover the full replacement value of the vessel against loss or damage, and protect against third-party liabilities, continuously from the moment the Contractor takes custody at West Point until final acceptance and return of the vessel. The Contractor's custody and liability shall remain in effect continuously throughout transit, drydocking, repairs, and return transit. Custody and liability shall only transfer back to the Government upon the vessel's successful return to West Point, NY, and the formal, written execution of final acceptance by the KO or COR.
9. Regulatory Compliance: The Q-7860 is not subject to US Coast Guard (USCG) inspections and does not carry a Certificate of Inspection. The Contractor is not required to submit any documentation or undergo inspections with the USCG. Nonetheless, the Government requires that all work performed under this SOW, including all technical specifications herein will meet or exceed all current requirements of the American Boat and Yacht Council (ABYC), 46 CFR 175-187 (Subchapter T), and ABS rules as applicable to this size and type of vessel, in addition to any specific requirements stated below. Additionally, all work will be performed in accordance with (IAW) all listed contract references, as applicable.
10. Environmental Compliance: The Contractor shall comply with all Federal, state, and local environmental standards pertaining to marine paints, painting processes, and the handling, storing, and disposal of hazardous waste. The Contractor shall responsibly dispose of all waste during the performance period.
11. Condition Found Report: In the event defects or damage unrelated to the completion of the work specifications defined below are discovered, the Contractor will submit a Condition Found Report in writing to the COR within five working days. The Report shall define the condition and will include the corrective actions needed, the cost for that work (separated into labor, materials, services, and total), and any impact to the scheduled performance period. All changes must be mutually agreed upon and accepted by the Contracting Officer.
12. Planning: Offerors must have demonstrated experience in marine diesel engine installation, design, and replacement. The Contractor shall investigate the existing condition of the vessel to obtain all necessary information, measurements, methodology, compatibility requirements, reconnaissance, and surveys, as required to complete all work specifications. The Contractor shall be responsible for 100% of any design work that may be required to complete all work requirements. The Contractor shall be solely responsible for verifying and validating the existing condition of the vessel. Any additional information provided by the Government, such as photos, measurements, or diagrams, will be used for informational purposes only and shall not preclude the Contractor from all due diligent duties. It is the offeror's responsibility to prove that all products, materials, and services meet the specification requirements.
The Contractor shall develop and maintain a complete set of "As-Built" drawings, plans, and designs documenting all structural, mechanical, electrical, and systems modifications completed under this contract. All such drawings, plans, and designs shall be considered property of the Government and shall be delivered to the COR in both their native, editable CAD format (e.g., .
dwg) and as high-resolution PDFs prior to contract closeout.
13. Substitutions: All equipment, material, instruments, and items explicitly identified in the PWS are to be used. Any substitution or alternative to the specified item shall be proposed to the COR /KO prior to purchase and installation. All alternative/substituted items shall be of equal or superior quality and performance to the item identified in the PWS. The Contractor is responsible for any additional costs associated in acquiring appropriate materials and equipment.
14. Interferences: Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. All interference and access removals shall be reinstalled by the Contractor at their expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor's expense
15. Warranties: All work shall be performed in strict accordance with the manufacturers' specifications and recommendations. Upon completion of the contract, the Contractor shall provide the COR with all owner's/operator's manuals and warranty documentation for all installed parts and systems.
The Contractor shall provide a minimum of a one (1) year warranty on all workmanship and operational performance. Additionally, the Contractor shall register and transfer all transferable manufacturer-provided warranties for new equipment (including, but not limited to, the main engines, transmissions, generator, and electronics) directly in the name of the U.S. Government.
16. Master Agreement: Prior to award of this contract, the Contractor may be required to sign a "Master Agreement for Repair and Alteration of Vessels." For more information see DFARS Subpart 252.217-71, Master Agreement and Repair and Alteration of Vessels.
17. Technical Evaluation: Government subject matter experts (SME) are government employees serving as crewmembers, surveyors, inspectors, or managers of Army watercraft. Prior to contract award, SMEs may request additional documentation (past work, degrees/licenses, facility capabilities, etc.) to ensure that the offeror can complete each work requirement. The SME may request additional documentation to support each and every PWS. Should additional documentation be required during the technical evaluation process, the offeror shall produce the requested material/satisfying documentation within 10 calendar days of the request.
18. Pre-bid Inspections: Pre-bid inspections may be held to allow all prospective offerors an opportunity to inspect the vessel. The pre-bid inspections will take place onboard the Q-7860 at West Point, NY. Representatives of prospective bidders wishing to attend should contact the Contract Officer for additional information. Potential bidders may use this opportunity to submit questions to the Contracting Office. The Contracting Office shall record all questions. Following the inspection, the Contracting Office shall make available all questions and answers in writing on request from bidders. Photos from previous dry-docks may be provided upon request to assist potential offerors.
C. SPECIAL CONDITIONS
1. Pre-Award Survey and Delivery
a. A Pre-Award Survey may be requested by the Contracting Officer to evaluate the apparent successful Offeror's technical capability and facility readiness.
b. To minimize the vessel's time out of service and to allow for flexibility in scheduling, the Contractor shall coordinate with the COR to establish a mutually agreed-upon date to take physical custody of the vessel at West Point, NY.
c. Upon taking custody of the vessel at the West Point Dock, the Contractor shall immediately transport the vessel via the most direct and safest navigable route to their maintenance facility. No unauthorized stops, detours, or delays during transit are permitted. The Contractor shall commence the specified maintenance and repair work immediately upon the vessel's arrival at the Contractor's facility. All contract work, including final trials and return delivery to West Point, must be completed no later than April 30, 2027.
2. Quality Control and Hold Points:
a. General QC Requirements: The Contractor is responsible for day-to-day quality control and ensuring all work meets the standards defined in the PWS and applicable regulations. The Government reserves the right to inspect all work throughout the Period of Performance (POP).
b. Mandatory Hold Points: To facilitate Government Quality Assurance (QA), the Contractor shall integrate the following mandatory "Hold Points" into their production schedule.
Hold Point
(HP)
Associated
PWS
Milestone Trigger
Government Inspection Focus
HP-1:
Hull Prep
D.1 & D.4 Post-Haul Out & Surface Prep
Hull cleaned, fiberglass damage prepped repaired, old shafts removed. Inspect for damage.
HP-2:
Alignment
D.3 Running Gear Installation
New transmissions, shafts, and bearings fitted. Prior to final coupling and torquing.
Verify precision alignment tolerances.
HP-3:
Routing
D.2 & D.3 Electrical & Fire Systems
Wiring routed, fire suppression piped. Prior to closing panels, ceilings, or bulkheads.
Verify compliance.
HP-4:
Paint
D.4 Coatings Application
Primer applied and cured. Prior to topcoat and anti-fouling application.
Verify dry film thickness (DFT) and adhesion.
HP-5: Pre-
Launch
D.5 Launch & Trials
All systems are mechanically ready.
Prior to launch. Verify thru-hulls, zincs, and prepare for dock/sea trials and Stability Test.
c. Notification and 5-Day Hold Protocol: The Contractor must adhere to the following workflow for every designated Hold Point:
Protocol Step Contractor Action Required
Written Report Submit a formal, written QC report (email) to the COR detailing the completed work, internal measurements (if applicable), and readiness for inspection.
5-Day Stand- Down
Halt all subsequent work on the specific system for a minimum of five (5) business days upon submission of the QC report to allow COR/SME to travel and conduct on-site inspections.
Government Sign-Off
Do not proceed to the next phase of work on that system without explicit, written acceptance from the
COR.
Rework Correct any discrepancies identified by the Government during the Hold Point at no additional cost or schedule delay prior to moving forward.
3. Drydocking and Storage Services:
a. The Contractor shall dry-dock the vessel for such time that will be necessary to complete all underwater work included in these specifications. The vessel may remain dry-docked to facilitate the completion of other specifications as the Contractor deems necessary.
b. Following completion of all work, the Contractor shall be prepared to haul the vessel again in case of unforeseen circumstances, emergencies, or to make additional repairs and/or warranty work. Contract delays resulting from unavailability of a dry-dock or lift shall be the Contractor's responsibility.
c. Prior to hauling and launching the vessel, the Contractor shall notify the COR/technical representative. The COR/SME may request to be present during haul-out/launching.
d. The Contractor shall use either a drydock, marine railway, crane, or travel lift to remove the vessel from the water.
e. Upon completion of all work specifications, the Contractor shall provide storage of the vessel until the final acceptance by the Government is complete. The Contractor shall provide a safe berth and take care to protect the vessel from damage due to ice, freezing temperatures, and environmental hazards. There will be no charges for additional storage or "lay days" during the performance period. The contractor shall store the vessel until no later than April 30, 2027.
4. Prescence of Potential Hazardous Materials (HAZMAT)
The Government has no knowledge of existing HAZMAT onboard the vessel. However, the absence of identified HAZMAT does not preclude its potential presence. If the Contractor encounters suspected hazardous materials during performance, they shall immediately stop work in the affected area and notify the COR in writing. The Government will be responsible for the testing and abatement of such materials, and the Contractor shall be entitled to an equitable adjustment to the contract price and/or performance schedule for any verified delays or additional costs incurred.
5. Workmanship
a. General
i. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.
ii. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.
iii. All resin-based/fiberglass repairs and glasswork shall be finished and faired smooth with no sharp edges, air voids, or other deficiencies.
b. Welding - if required
i. All welding procedures shall conform to American Bureau of Shipping standards where applicable.
ii. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned to minimize locked up stresses, shrinkage and distortion.
c. Standard Parts
i. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.
ii. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.
6. Vessel Appearance and Appendages
a. Throughout the performance of work specifications, care shall be taken to ensure the vessel's appearance is retained. This shall include modifications that impact the vessel's sight lines, shape, and/or other protrusions that could obstruct operator and crew access and vessel operations.
b. The impact of the addition of modifications and appendages shall be reduced to maintain the vessel's lines and profile as much as practical. Any installations or modifications that may impact the appearance or overall use of the vessel must be reviewed by the COR/technical representative.
7. Completion and Acceptance
a. The Contractor shall provide and conduct dock and sea trials (in accordance with PWS D.5.2 LAUNCH, TRIALS, AND STABILITY TEST) on the USAV Q-7860 to demonstrate functional operation and performance testing. The Contractor shall safely operate the vessel with their own licensed crew during all sea trials.
Government crew and SMEs shall be onboard solely as passengers to witness and verify performance. Any discrepancies discovered during trials will be noted in writing. All discrepancies shall be repaired at the Contractor's expense prior to Government acceptance of the vessel. Any additional work falling outside the authorized scope of work to resolve these discrepancies must be approved by the Contracting Officer (KO). A copy of all sea trial documentation and performance data shall be provided to the COR. The vessel shall be returned to the West Point Dock in a fully operational state, with all QCP standards met, no later than April 30, 2027.
D. PERFORMANCE WORK SPECIFICATIONS (PWS)
D.1: DRYDOCKING
1. Drydocking: Drydocking, as used below, is defined as the Contractor's responsibility to furnish all labor, material, equipment, plans, and services to remove the vessel from the water in order to perform the work required by these specifications.
a. The Contractor is responsible for determining the actual drydock blocking arrangement. The vessel will be blocked in a manner that reduces stress on the hull and safely supports the vessel.
b. The Contractor shall remove and relocate drydocking blocks/stands, or refloat and re-drydock the vessel, as needed and at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein.
c. The Contractor shall store the boat for the duration of the performance period.
d. The Contractor shall provide safe access to the vessel and all utilities (power, water, heat, etc.)
necessary to safely complete all specifications.
1. The Contractor shall ensure that power sources are compatible with the vessel and properly connected.
2. The Contractor shall ensure the vessel is appropriately grounded to protect the vessel from any stray currents that may be present from shore side power source.
3. The Contractor shall secure power sources to any sensitive onboard electronics (VHF radios, chartplotters, etc.) to prevent damage.
D.2: ELECTRICAL REPAIRS
1. Scope of Work: The Contractor shall provide the services of a qualified marine electrical engineer/marine electrician during the performance of work as described in this specification item.
The vessel 24V DC "house" battery bank and associated components shall be relocated. A heater shall be installed in the wheelhouse. The Contractor shall replace all bilge pumps, hoses, and install a bilge alarm panel in the wheelhouse.
2. The Contractor shall remove the vessel 24V DC battery banks (2 4d batteries in total) from the engine room, including battery chargers and all relevant switches and boxes. The house system shall be relocated to the cabin space below the wheelhouse and reinstalled. The intent is to remove all extraneous/emergency power sources from the engine room and install new switches and connections. The main engine/generator starting battery banks/switches/chargers shall remain in place.
a. The Contractor shall propose the exact location of the new installation, and the COR shall approve prior to commencing work.
b. The new house installation shall include new transfer switches for switching between banks and chargers.
c. A new DC switch panel shall be installed in the wheelhouse with new switches and proper fuse protection.
d. All power shall be reconnected and circuitry verified to be working properly.
e. All holes shall be filled, and no materials (cables, etc.) will be abandoned in place or otherwise left in the engine room.
3. Bilge Pump Replacement
a. The Contractor shall replace the current bilge pumps with new pumps, float switches, hoses, and a master alarm panel.
i. The alarm panel will replace the current panel located at the helm station. The panel must be capable of remote operation to activate and secure each pump. The switch panel must be capable of manual and automatic (float-switched) operation. If the panel location must be moved, the COR must approve the location of the panel prior to installation.
ii. All hoses will be smooth bore and compatible with pump capacity ratings. Hose will be installed IAW proper marine practices, including ensuring protections from backflow/siphoning.
iii. An additional pump shall be installed in the lounge/salon bilge (the space at the foot of the stairwell).
iv. The location of the installation of each pump shall be approved by the COR/QA prior to installation.
b. Each new pump shall be a minimum of 4000 GPH and installed with a float switch for automatic operation.
4. Wheelhouse Heater
a. A "Webasto Air Top Evo 55" forced air diesel furnace shall be installed to provide heat to the wheelhouse and defrost capability to the forward windows.
i. A similar or equivalent manufacturer/model may be used with approval from the Contract Officer prior to purchase.
b. A 5-gallon diesel tank shall be installed and piped to the heater.
i. The proposed location of the auxiliary tank will be approved by the COR prior to installation.
ii. Alternatively, the Contractor may route fuel line from vessel fuel tanks.
1. The installation of this configuration requires COR approval prior to commencement.
c. DC power (24V) will be supplied from the distribution panel to the unit.
d. Controls shall be installed in the wheelhouse and easily accessible.
e. Ducting shall be installed and routed to provide heat to the wheelhouse and directed to the forward windows for defrost capability.
D.3: ENGINE ROOM REPAIRS
1. Scope of Work: The Contractor shall install a new fire suppression system in the engine room.
The Contractor shall replace the port and starboard transmissions and main engine shafts with new. New shaft seal and cutlass bearings will be installed. The generator will be replaced with new. The port and starboard propellers shall be removed and reconditioned, balanced, and reinstalled. Additionally, the main engine exhaust piping and thru hulls shall be replaced and repairs made to the transom. The Contractor shall furnish all labor, materials, equipment, and provide any design work deemed necessary to acceptably complete each specification. The Contractor shall use government-specified equipment where defined and be responsible for determining and sourcing appropriate materials not specified but needed to complete all specifications. All installations and repairs shall be fully operational and installed in accordance with manufacturer's specifications and applicable regulations. All repairs and modifications will be tested and trialed. Following trials, the Contractor shall be responsible for any additional adjustments, corrections, or repairs.
2. Fire Suppression System
a. The Contractor shall replace the existing CO2 fire suppression system in the ER with a system capable of protecting the space.
b. The current CO2 system (Fire Boy MA21050227) does not provide adequate extinguishing agent for the size of the ER.
c. The Contractor shall determine the interior volume of the ER--including all air boxes, voids, and other spaces--and select a fire suppression system of appropriate size. For bidding purposes, the ER is estimated at 2,000 cu ft.
d. The Contractor shall submit the proposed system to the COR for approval prior to purchase and installation.
e. Following installation, the Contractor shall provide for inspection, servicing, and certification by a certified technical facility/inspector.
f. The system must be capable of remote activation. The COR must approve the location of the remote activation station prior to installation.
3. Main Engine Exhaust Replacement
a. The Contractor shall replace the main engine exhaust piping on both engines from the main engine turbo aft, through the bulkhead and through the transom.
b. The mufflers shall be reinstalled.
c. The transom exhaust thru-hulls shall be replaced, and the exhaust shall be re-piped with new pipe and fitted to the mufflers on each side, adding fixed support to the pipe as needed.
d. The transom repairs shall be finished, faired smooth, and painted to match, as before.
4. Marine Transmission Replacement
a. The Contractor shall procure materials, labor, and expertise to remove two
(2) P/S existing marine transmissions and install two (2) new Twin Disc MG-5065SC (or equivalent approved by COR) marine transmissions.
b. The Contractor shall ensure complete integration, precision alignment, and all necessary adjustment and installation to make operational.
c. Used components (i.e. damper plates) shall be replaced with new.
d. Perform a precision engine-to-shaft alignment mating the transmission output flanges to the shafts.
5. Shaft Replacement, Seal and Bearing Repair
a. The Contractor shall furnish and install new port and starboard (P&S) shafts in kind. Shafts shall be of correct dimensions and taper.
b. The Contractor shall remove and dispose of existing shafts and seals.
c. Upon removal of shafts, the Contractor shall verify the configuration and alignment of stern tube and strut bearings.
d. Shafts shall be installed and coupled to marine transmissions in accordance with manufacturer specification and within appropriate tolerances.
e. The current P&S dripless shaft seals shall be replaced in-kind (PSS) or with equivalent or superior seals. Substitutions must be approved by the COR prior to purchase by the Contractor.
f. The P&S cutlass bearings shall be removed and replaced with new.
g. Any necessary or additional modification to the hull (shaft thru-hulls) or appendages (struts) shall be considered and included in this item.
6. Propeller Reconditioning
a. The Contractor shall be responsible for removing the P&S propellers. Defects and distortions shall be corrected and propellers returned to original standards of diameter, pitch, and blade width.
The…