PAN 038171 W911SD-26-Q-A028 PRS Billeting FY 2026.pdf

PDF 93 KB Posted

Attached to
SOLICITATION U. S. Army West Point Temporary Billeting, Training, Shower Structures, and Equipment Rental
Solicitation number
W911SD-26-Q-A028
Issued by

About this file

This is a Service Performance Work Statement (PWS) surveillance and quality assurance table that establishes performance standards and monitoring requirements for temporary structure and equipment services.

The PWS defines performance metrics across 18 service categories with acceptable quality levels ranging from 95% to 100% compliance. Major service deliverables include turnkey provision of temporary billeting structures, shower trailers, and latrine trailers (each weighted at 12% of contract price), temporary structure and generator support for training sites (8%), and conditional services for water/waste management and generator connections (8% each). Supporting services include site proposals, mobilization and demobilization, site management with qualified personnel, equipment operation, emergency servicing with 24-hour point of contact and 12-hour maintenance response, operation briefs, inspections, and debris removal. Each service is linked to specific PWS paragraph numbers and requires surveillance through methods ranging from contractor reporting tracked by the Contracting Officer's Representative (COR) to 100% inspections at task performance or random sampling inspections. Inspections utilize a Green/Amber/Red rating system based on Army Inspections Policy (AR 1-201 and AR 290-5). The complete service portfolio totals 100% of the contract price, with individual service allocations weighted by operational importance and inspection intensity required.

View the file

Other files

File Type Posted
PAN 038171 W911SD-26-Q-A028 Solicitation Site Visit ATTENDEE RESULTS Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0006 D.FINAL Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0007 DRAFT Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0006 Photo Reference-Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0006 DRAFT Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0005 D.Final Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0004 D.Final Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0005 DRAFT POST Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0003 D.Final Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0004 DRAFT POST Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0003 DRAFT Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0002 D.FINAL Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0003 DRAFT Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0002 DRAFT Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND 0001 D.FINAL Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation D.FINAL Billeting FY 2026.pdf PDF
PAN 038171 W911SD-26-Q-A028 PWS Billeting FY 2026-WTPTW6QM43NB025.pdf PDF
PAN 038171 W911SD-26-Q-A028 PWS Ver 0002 MAP Billeting FY 2026 POST DB.pdf PDF
PAN 038171 W911SD-26-Q-A028 Solicitation AMEND DRAFT 0001 Billeting FY 2026.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICE PWS

PARAGRAPH

NUMBER

STANDARD ACCEPTABLE

QUALITY

LEVEL

SURVEILLANCE

METHOD

% OF

SERVICE

TO TOTAL

CONTRACT

PRICE

Reports 1.6.1.1.2 Provide COR with Reports upon request

95% of reports received

COR tracks reports received

1.00%

Inspections 5.2.4. AR 1-201, Army Inspections Policy, AR 290-5.

Ratings in each area will be captured as Green, Amber, Red or Not Applicable.

Based on a random sampling walk- through of the temporary structures.

10.00%

Site Proposal 5.2.5.1 Provide temporary structure site proposal to

COR.

100% of services meet performance specifications.

100% inspection each time task is performed.

6%

Mobilization & Demobilization

5.2.5.2. Provide setup

and breakdown services IAW timeline in

PWS.

100% of temporary structures meet performance specifications.

100% inspection each time task is performed.

6%

Site Management

5.2.5.3. Provide site

manager and qualified power technician during installation.

100% of services meet performance specifications.

100% inspection each time task is performed.

4%

Operation 5.2.5.2.

5.2.5.3.

Ensure equipment is operational IAW timeline specified in

PWS;

operate shower trailers if required.

100% of services meet performance specifications.

100% inspection each time task is performed.

6%

Operation Brief

5.2.5.3 Provide initial

operation brief to government.

95% meets performance specifications.

95% inspection each time task is performed.

1.00%

Emergency Servicing

5.2.5.4. Provide 24-hr

point of contact for 12-hr maintenance response time.

100% meets performance specifications.

100% inspection each time task is performed.

4.00%

Clear equipment from public hazards

5.2.5.5 Ensure

entryways and paths are free from public hazards.

95% meets performance specifications.

95% inspection each time task is performed.

1.00%

Temporary Billeting Structures

5.2.1 Provide

turnkey delivery, setup, operation, break down, removal, maintenance, and emergency servicing of a billeting site for personnel in weather resistant temporary structures IAW the timeline and requirements specified in the PWS

95% meets performance specifications.

95% inspection each time task is performed.

12.00%

Temporary Shower Trailers

5.2.2 Provide

turnkey delivery, setup, operation, break down, removal, maintenance, and emergency servicing of temporary shower trailers for personnel IAW the timeline and requirements specified in the PWS

95% meets performance specifications.

95% inspection each time task is

12.00%

Temporary Latrine Trailers

5.2.3 Provide

turnkey delivery, setup, operation, break down, removal, maintenance, and emergency servicing of temporary latrine trailers for personnel IAW the timeline and requirements specified in the PWS

95% meets performance specifications.

95% inspection each time task is performed.

12.00%

ESTII

Temporary Structure and Generator

5.2.4. Provide

turn-key delivery, setup, operation, break down, removal, maintenance, and emergency servicing of a training site for personnel in weather resistant temporary structure with generator IAW the timeline / requirements specified in the PWS

95% meets performance specifications.

95% inspection each time task is performed.

8.00%

Conditional Water and Waste/Water Services

4.2.6. Provide

services to fill shower trailers and latrine trailers with water and dump shower and latrine waste-water off-site

95% meets performance specifications.

50% inspection each time task is

8.00%

Conditional Generators

4.2.7. Provide

connection services from structures to generators, generators, cables, power distribution equipment, trailer variants to power the billeting tent structures, shower trailers, and latrine trailers

95% meets performance specifications.

95% inspection each time task is performed.

8.00%

Debris pickup (Policing)

4.2.1.

4.2.2.

4.2.3.

4.2.4.

4.2.5.

Remove debris, contractor garbage, materials, and/or uncontracted equipment after installation and upon breakdown

95% of grounds meet performance specifications.

Weekly inspection of a random sample of walkways and grounds

1.00%

Total: 100%