Palm_Harbor_UHS_Permit_Set_19_pgs.pdf
PDF 6 MB Posted
- Attached to
- Chiller Replacement State and local contract opportunity
- Solicitation number
- 25-CR-052
- Issued by
- Pinellas County, Florida
About this file
The document is a comprehensive mechanical and electrical engineering permit set for chiller replacements at Palm Harbor University High School, prepared by Phoenix Engineering Group for the Pinellas County Schools Office of Facilities Design & Construction. The project involves a complete renovation of the existing chiller plant, including the demolition of current water-cooled and air-cooled chillers, pumps, cooling tower fill, expansion tanks, and air separators, and their replacement with three new water-cooled chillers (two 500-ton and one 260-ton), one air-cooled chiller (303 tons), seven new pumps, three expansion tanks, two air separators, and a refrigerant detection system. The chillers will use R-513A refrigerant and feature variable speed screw technology, with a focus on energy efficiency and system reliability.
The project is designed to provide redundant cooling capacity for the school's infrastructure, with detailed engineering drawings specifying precise mechanical and electrical installation requirements. The design includes comprehensive piping schematics, electrical system plans, and renovation details across multiple system components. While the exact contract value is not explicitly stated in the permit set, the AI summary suggests an estimated contract value of approximately $750,000. The implementation will require careful coordination with school operations to minimize disruptions, with a projected 150-day completion timeline. The engineering documents specify stringent technical requirements for equipment installation, including specific pipe materials, insulation schedules, vibration isolation, and comprehensive testing and commissioning protocols.
View the file
Other files for this state and local contract opportunity
Show all 50
Chiller Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
Suite 102 www.phoenixeng.us t.813.963.0888 f.866.335.0109
Engineering License No. 26858
10012 N. Dale Mabry
Tampa, FL 33618
PHOENIX
ENGINEERING GROUP
Mechanical Electrical Plumbing Fire Protection Process Construction Administration
TM
C H
IL
LE
R R
EP
LA
C
EM
EN
TS
PA
LM
H A
R B
O R
U N
IV
ER
SI
TY
H
IG
H S
C H
O O
L
O M
A H
A S
T, P
A
LM
H A
R B
O R
, F L
1112 Channelside Drive Suite CU3 Tampa, FL 33602
p. 813 . 922 . 2804 Florida Lic. No. AA26002908
A A1.01
SCALE: 1/16" = 1'-0"CHILLER YARD - LOCATION PLAN
STRUCTURAL
NOTES &
LOCATION PLAN
A1.01
AutoCAD SHX Text ALL REPORTS, PLANS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER DOCUMENTS AND INSTRUMENTS PREPARED BY PHOENIX ENGINEERING GROUP INC. (PHOENIX) AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF PHOENIX. PHOENIX SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING, WITHOUT LIMITATION, THE COPYRIGHT THERETO.
AutoCAD SHX Text
CONFIDENTIAL
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text 1'
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text 02-25-25
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text 20-045
AutoCAD SHX Text
PROJECT #:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
REVISION HISTORY:
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
02-25-2025 100% OWNER REVIEW
AutoCAD SHX Text
04-10-2025 PERMIT SUBMITTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RMH
AutoCAD SHX Text
AutoCAD SHX Text A,B.C
AutoCAD SHX Text A3.01
AutoCAD SHX Text STRUCTURAL NOTES: 1. WORK DETAILED ON THE DRAWINGS AND APPLICABLE ITEMS DESCRIBED IN THE GENERAL STRUCTURAL NOTES. WORK DETAILED ON THE DRAWINGS AND APPLICABLE ITEMS DESCRIBED IN THE GENERAL STRUCTURAL NOTES. DRAWINGS AND SPECIFICATIONS 1. DO NOT SCALE DRAWINGS FOR DIMENSIONS NOT GIVEN. DO NOT SCALE DRAWINGS FOR DIMENSIONS NOT GIVEN. 2. ADVISE ENGINEER OF DIMENSIONAL DISCREPANCIES. ADVISE ENGINEER OF DIMENSIONAL DISCREPANCIES. 3. VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING CONSTRUCTION. VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING CONSTRUCTION. 4. THE CONTRACTOR SHALL PERFORM NO PORTION OF THE WORK AT ANY TIME WITHOUT CONTRACT DOCUMENTS OR, THE CONTRACTOR SHALL PERFORM NO PORTION OF THE WORK AT ANY TIME WITHOUT CONTRACT DOCUMENTS OR, WHERE REQUIRED, APPROVED SHOP DRAWINGS, PRODUCT DATA OR SAMPLES FOR SUCH PORTION OF THE WORK. CONSTRUCTION SAFETY 1. THESE DRAWINGS DO NOT INCLUDE PROVISIONS TO SATISFY SAFETY REQUIREMENTS. CONTRACTOR IS SOLELY THESE DRAWINGS DO NOT INCLUDE PROVISIONS TO SATISFY SAFETY REQUIREMENTS. CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING SAFETY DURING CONSTRUCTION AND FOR CONFORMANCE TO ALL APPLICABLE OSHA STANDARDS. JOBSITE VISITS BY ENGINEER SHALL NOT CONSTITUTE APPROVAL, AWARENESS OR LIABILITY FOR ANY HAZARDOUS CONDITIONS. SHORING AND SUPPORT 1. WHEN REMOVAL OF STRUCTURAL ELEMENTS FOR MODIFICATIONS MAY CAUSE TEMPORARY WEAKNESS, EXCESSIVE WHEN REMOVAL OF STRUCTURAL ELEMENTS FOR MODIFICATIONS MAY CAUSE TEMPORARY WEAKNESS, EXCESSIVE DEFLECTIONS OR STRUCTURAL INSTABILITY, SHORING OR OTHER SUITABLE SUPPORTS SHALL BE PROVIDED UNTIL COMPLETION AND ADEQUATE CURING OF MODIFICATIONS. 2. THE CONTRACTOR SHALL SUBMIT CUT SHEETS WITH CERTIFIED CAPACITIES FOR SHORING TO BE USED. SHORING PLANS THE CONTRACTOR SHALL SUBMIT CUT SHEETS WITH CERTIFIED CAPACITIES FOR SHORING TO BE USED. SHORING PLANS SHALL BE PREPARED, SIGNED AND SEALED BY AN ENGINEER REGISTERED IN THE STATE OF FLORIDA. VALUE ENGINEERING 1. ANY CHANGES TO THE STRUCTURE SHALL HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE ENGINEER PRIOR ANY CHANGES TO THE STRUCTURE SHALL HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING WORK ON ITEMS AFFECTED. FIELD MODIFICATIONS 1. ANY CHANGES TO THE STRUCTURE SHALL HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE ENGINEER PRIOR ANY CHANGES TO THE STRUCTURE SHALL HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING WORK ON ITEMS AFFECTED. 2. ANY CHANGES MADE WITHOUT PRIOR APPROVAL ARE SUBJECT TO REVIEW BY THE ENGINEER. CONTRACTOR SHALL ANY CHANGES MADE WITHOUT PRIOR APPROVAL ARE SUBJECT TO REVIEW BY THE ENGINEER. CONTRACTOR SHALL PROVIDE SKETCHES, PHOTOGRAPHS AND WRITTEN DESCRIPTION OF EACH DEVIATION FROM THE PLANS FOR THE ENGINEER'S REVIEW. BUILDING CODES AND SPECIFICATIONS 1. FLORIDA BUILDING CODE 8TH EDITION (2023). FLORIDA BUILDING CODE 8TH EDITION (2023). 2. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7-22. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7-22. 3. BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES ACI 530-13 / ASCE 5-13 / TMS 402/602-16. BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES ACI 530-13 / ASCE 5-13 / TMS 402/602-16. 4. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE ACI 318-19. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE ACI 318-19. 5. AISC MANUAL OF STEEL CONSTRUCTION, 15TH EDITION. AISC MANUAL OF STEEL CONSTRUCTION, 15TH EDITION. 6. AWS STRUCTURAL WELDING CODE D1.1-2020. AWS STRUCTURAL WELDING CODE D1.1-2020. 7. ALUMINUM DESIGN MANUAL, FEBRUARY 2020. ALUMINUM DESIGN MANUAL, FEBRUARY 2020. 18. FLORIDA BUILDING CODE EXISTING BUILDING, ALTERATION LEVEL: REPAIR FLORIDA BUILDING CODE EXISTING BUILDING, ALTERATION LEVEL: REPAIR DESIGN LOADS 1. DEAD LOADS DEAD LOADS a. TABLE C3-1: MINIMUM DESIGN LOADS, ASCE 7-22 TABLE C3-1: MINIMUM DESIGN LOADS, ASCE 7-22 2. LIVE LOADS LIVE LOADS a. ROOF ..........................................................20 PSF ROOF ..........................................................20 PSF 3. WIND LOAD WIND LOAD a. ULTIMATE DESIGN WIND SPEED, V …………...152 MPH (3 SECOND GUST) ULTIMATE DESIGN WIND SPEED, V …………...152 MPH (3 SECOND GUST) ULT...152 MPH (3 SECOND GUST) b. NOMINAL DESIGN WIND SPEED, V ……….....118 MPH (3 SECOND GUST) NOMINAL DESIGN WIND SPEED, V ……….....118 MPH (3 SECOND GUST) ASD.....118 MPH (3 SECOND GUST) c. EXPOSURE CATEGORY…….…………C EXPOSURE CATEGORY…….…………C .…………C C d. ASCE 7-22 RISK CATEGORY……….…III ASCE 7-22 RISK CATEGORY……….…III .…III III 4. SNOW LOADS SNOW LOADS a. GROUND - SNOW LOAD………………..Pg = 4 PSF GROUND - SNOW LOAD………………..Pg = 4 PSF ..Pg = 4 PSF b. SNOW LOAD IMPORTANCE CATEGORY……..Is = 1.0 SNOW LOAD IMPORTANCE CATEGORY……..Is = 1.0 ..Is = 1.0 5. SEISMIC SEISMIC a. MAPPED SPECTRAL RESPONSE ACCELERATIONS, Ss=0.067, S1=0.031 MAPPED SPECTRAL RESPONSE ACCELERATIONS, Ss=0.067, S1=0.031 b. SITE CLASS = DEFAULT SITE CLASS = DEFAULT c. SPECTRAL RESPONSE COEFFICIENTS, SDS=0.0, SD1=0.044 SPECTRAL RESPONSE COEFFICIENTS, SDS=0.0, SD1=0.044 d. SEISMIC DESIGN CATEGORY = A SEISMIC DESIGN CATEGORY = A SHALLOW SPREAD FOUNDATIONS 1. SHALLOW FOUNDATION DESIGN BASED ON 2000 PSF MINIMUM ALLOWABLE BEARING PRESSURE. THIS VALUE SHALL BE SHALLOW FOUNDATION DESIGN BASED ON 2000 PSF MINIMUM ALLOWABLE BEARING PRESSURE. THIS VALUE SHALL BE VERIFIED BY THE CONTRACTOR. 2. NOTIFY ENGINEER IF FOOTING EXCAVATION REVEALS UNSUITABLE OR UNSTABLE SOILS OR MATERIALS OR CONDITIONS NOTIFY ENGINEER IF FOOTING EXCAVATION REVEALS UNSUITABLE OR UNSTABLE SOILS OR MATERIALS OR CONDITIONS NOT PREVIOUSLY ANTICIPATED. 3. CONTRACTOR SHALL CONSIDER THE POSSIBLE IMPACT OF GROUNDWATER ON CONSTRUCTION TECHNIQUES, SEASONAL CONTRACTOR SHALL CONSIDER THE POSSIBLE IMPACT OF GROUNDWATER ON CONSTRUCTION TECHNIQUES, SEASONAL VARIATIONS, ANY OTHER SITE INDICATORS AND HIS OWN JUDGMENT. 4. SOIL DIRECTLY BELOW FOUNDATIONS AND SLAB ON GRADE SHALL BE COMPACTED TO 98% OF THE ASTM D 1557 SOIL DIRECTLY BELOW FOUNDATIONS AND SLAB ON GRADE SHALL BE COMPACTED TO 98% OF THE ASTM D 1557 (MODIFIED PROCTOR) MAXIMUM DRY DENSITY. 5. PREPARE SITE AND SOILS IN ACCORDANCE WITH A GEOTECHNICAL INVESTIGATION REPORT. PREPARE SITE AND SOILS IN ACCORDANCE WITH A GEOTECHNICAL INVESTIGATION REPORT. 6. A QUALIFIED LICENSED PROFESSIONAL GEOTECHNICAL ENGINEER SHALL BE RETAINED DURING CONSTRUCTION TO A QUALIFIED LICENSED PROFESSIONAL GEOTECHNICAL ENGINEER SHALL BE RETAINED DURING CONSTRUCTION TO INSPECT FOUNDATION EXCAVATION AND INSPECT AND MONITOR PLACEMENT OF COMPACTED FILL. CONCRETE SLAB ON GRADE 1. THE INTENDED USE OF THE SLAB ON GRADE IS FOR LIGHT INDUSTRIAL ONLY. THE INTENDED USE OF THE SLAB ON GRADE IS FOR LIGHT INDUSTRIAL ONLY. 2. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: 4000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: 4000 PSI 3. MINIMUM THICKNESS: 6 INCHES MINIMUM THICKNESS: 6 INCHES 4. MAXIMUM SLUMP AT POINT OF DELIVERY: 5 INCHES MAXIMUM SLUMP AT POINT OF DELIVERY: 5 INCHES 5. MAXIMUM AGGREGATE SIZE: 1 INCH MAXIMUM AGGREGATE SIZE: 1 INCH 6. ENTRAINED AIR CONTENT: 4.5% ENTRAINED AIR CONTENT: 4.5% 7. WELDED WIRE FABRIC SHALL BE WWF 6X6-W2.9XW2.9, UNLESS OTHERWISE NOTED, CONFORMING TO ASTM A 185. WELDED WIRE FABRIC SHALL BE WWF 6X6-W2.9XW2.9, UNLESS OTHERWISE NOTED, CONFORMING TO ASTM A 185. 8. THE WELDED WIRE FABRIC SHALL BE PLACED IN THE CENTER OF THE DEPTH OF SLAB ON GRADE UNLESS OTHERWISE THE WELDED WIRE FABRIC SHALL BE PLACED IN THE CENTER OF THE DEPTH OF SLAB ON GRADE UNLESS OTHERWISE NOTED. ALL MESH JOINTS SHALL BE LAPPED TWO FULL MESHES. 9. INTERRUPT TYPICAL SLAB REINFORCEMENT AT ALL CONSTRUCTION AND EXPANSION JOINTS. INTERRUPT TYPICAL SLAB REINFORCEMENT AT ALL CONSTRUCTION AND EXPANSION JOINTS. 10. CUT ALTERNATE WIRES ALONG THE LINE OF SAW CUT CONTROL JOINTS PRIOR TO PLACING CONCRETE. MAKE SAW CUT ALTERNATE WIRES ALONG THE LINE OF SAW CUT CONTROL JOINTS PRIOR TO PLACING CONCRETE. MAKE SAW CUTS WITHIN 12 HOURS OF CONCRETE PLACEMENT, OR AS SOON AS CUTTING CAN BE DONE SUCH THAT THE SAW BLADE DOES NOT DISLODGE AGGREGATE AND THE EDGES OF THE CUT DO NOT RAVEL. 11. PROVIDE ½" PREFORMED EXPANSION JOINT MATERIAL WHERE SLAB ABUTS VERTICAL SURFACES SUCH AS WALLS AND PROVIDE ½" PREFORMED EXPANSION JOINT MATERIAL WHERE SLAB ABUTS VERTICAL SURFACES SUCH AS WALLS AND COLUMNS. 12. PROVIDE TERMITE PROTECTION TO SOIL PER FLORIDA BUILDING CODE 8 EDITION (2023) BEFORE SLAB PLACEMENT. PROVIDE TERMITE PROTECTION TO SOIL PER FLORIDA BUILDING CODE 8 EDITION (2023) BEFORE SLAB PLACEMENT. TH EDITION (2023) BEFORE SLAB PLACEMENT. 13. PROVIDE VAPOR RETARDER UNDER ALL SLABS ON GRADE IN ENCLOSED SPACE. PROVIDE VAPOR RETARDER UNDER ALL SLABS ON GRADE IN ENCLOSED SPACE. 14. APPLY CURING COMPOUND TO SLAB WITHIN TWO HOURS OF COMPLETION OF FINISHING OPERATIONS. USE LIQUID APPLY CURING COMPOUND TO SLAB WITHIN TWO HOURS OF COMPLETION OF FINISHING OPERATIONS. USE LIQUID MEMBRANE FORMING COMPOUND COMPLYING WITH ASTM C 309 TYPE 1 CLASS A. THE COMPOUND SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 15. THE CONTRACTOR SHALL CONFIRM THAT THE CURING COMPOUND WILL NOT INTERFERE WITH THE BONDING OF ANY THE CONTRACTOR SHALL CONFIRM THAT THE CURING COMPOUND WILL NOT INTERFERE WITH THE BONDING OF ANY APPLIED FLOOR SURFACE. IF THE CURING COMPOUND IS FOUND TO INTERFERE WITH BONDING, THE USE OF WET BURLAP AND TRICKLE HOSES IS ACCEPTABLE. 16. FOR LARGE SLABS, IT IS RECOMMENDED THAT THE SLAB BE CAST IN ALTERNATING LONG STRIPS AND SAW CUT FOR LARGE SLABS, IT IS RECOMMENDED THAT THE SLAB BE CAST IN ALTERNATING LONG STRIPS AND SAW CUT TRANSVERSELY TO MINIMIZE SHRINKAGE CRACKING. PORTLAND CEMENT CONCRETE 1. CONCRETE PROPERTIES CONCRETE PROPERTIES a. MINIMUM 28-DAY COMPRESSIVE STRENGTH, f'c = 4,000 PSI MINIMUM 28-DAY COMPRESSIVE STRENGTH, f'c = 4,000 PSI b. WATER CEMENT RATIO, W/C NOT TO EXCEED 0.50 WATER CEMENT RATIO, W/C NOT TO EXCEED 0.50 c. 1 ½” MAX. NOMINAL DIAMETER OF COARSE AGGREGATE 1 ½” MAX. NOMINAL DIAMETER OF COARSE AGGREGATE MAX. NOMINAL DIAMETER OF COARSE AGGREGATE d. CEMENT TYPE I OR II CEMENT TYPE I OR II e. FOUNDATIONS 4000 PSI, 3" TO 5" SLUMP FOUNDATIONS 4000 PSI, 3" TO 5" SLUMP f. FILLED CELLS IN CMU 3000 PSI, 8" TO 11" SLUMP, 3/8" PEA GRAVEL FILLED CELLS IN CMU 3000 PSI, 8" TO 11" SLUMP, 3/8" PEA GRAVEL g. SLABS ON GRADE 4000 PSI, 3" TO 5" SLUMP (LIGHT INDUSTRIAL TRAFFIC USE ONLY) SLABS ON GRADE 4000 PSI, 3" TO 5" SLUMP (LIGHT INDUSTRIAL TRAFFIC USE ONLY) 2. FLY ASH SHALL NOT EXCEED 20 PERCENT BY WEIGHT OF TOTAL CEMENT, IF USED. FLY ASH SHALL NOT EXCEED 20 PERCENT BY WEIGHT OF TOTAL CEMENT, IF USED. 3. CONTRACTOR SHALL STRICTLY ADHERE TO SLUMP LIMITS. SUPERPLASTICIZER MAY BE USED AT THE CONTRACTORS CONTRACTOR SHALL STRICTLY ADHERE TO SLUMP LIMITS. SUPERPLASTICIZER MAY BE USED AT THE CONTRACTORS OPTION TO INCREASE WORKABILITY. 4. MAXIMUM MIXING TIME (FROM BATCHING TO PLACEMENT) MAXIMUM MIXING TIME (FROM BATCHING TO PLACEMENT) a. AIR TEMPERATURE LESS THAN 85° F: 90 MINUTES AIR TEMPERATURE LESS THAN 85° F: 90 MINUTES b. AIR TEMPERATURE 85° F TO 90° F: 75 MINUTES AIR TEMPERATURE 85° F TO 90° F: 75 MINUTES c. AIR TEMPERATURE OVER 90° F: 60 MINUTES AIR TEMPERATURE OVER 90° F: 60 MINUTES 5. MINIMUM COVER FOR REINFORCEMENT MINIMUM COVER FOR REINFORCEMENT a. FOOTINGS, 3 INCHES TO BOTTOM AND UNFORMED SIDES, 2 INCHES TO FORMED SIDES FOOTINGS, 3 INCHES TO BOTTOM AND UNFORMED SIDES, 2 INCHES TO FORMED SIDES b. OTHER, 2 INCHES TO MAIN REINFORCING, 1 ½" INCHES TO TIES AND STIRRUPS. OTHER, 2 INCHES TO MAIN REINFORCING, 1 ½" INCHES TO TIES AND STIRRUPS. 6. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE BY STANDARD ACCESSORIES DURING CONCRETE PLACEMENT. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE BY STANDARD ACCESSORIES DURING CONCRETE PLACEMENT. 7. REINFORCEMENT SHALL BE GRADE 60 CONFORMING TO ASTM A615. REINFORCEMENT SHALL BE GRADE 60 CONFORMING TO ASTM A615. 8. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. 9. DETAIL AND FABRICATE REINFORCEMENT IN ACCORDANCE WITH "MANUAL OF STANDARD PRACTICE FOR DETAILING DETAIL AND FABRICATE REINFORCEMENT IN ACCORDANCE WITH "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES," ACI 315. 10. PROVIDE MINIMUM LAP SPLICES PER ACI 318-11 FOR ALL REINFORCING BARS, UNLESS OTHERWISE NOTED. STAGGER PROVIDE MINIMUM LAP SPLICES PER ACI 318-11 FOR ALL REINFORCING BARS, UNLESS OTHERWISE NOTED. STAGGER SPLICES IN ADJACENT BARS AT LEAST 24 INCHES, EXCEPT IN BEAMS AND COLUMNS. 11. IN WALL FOOTINGS, GRADE BEAMS AND BOND BEAMS, PROVIDE BENT BARS AT CORNERS AND INTERSECTIONS OF THE IN WALL FOOTINGS, GRADE BEAMS AND BOND BEAMS, PROVIDE BENT BARS AT CORNERS AND INTERSECTIONS OF THE SAME NUMBER AND SIZE AS STRAIGHT BARS. 12. APPLY CURING COMPOUND TO SLAB WITHIN TWO HOURS OF COMPLETION OF FINISHING OPERATIONS. USE LIQUID APPLY CURING COMPOUND TO SLAB WITHIN TWO HOURS OF COMPLETION OF FINISHING OPERATIONS. USE LIQUID MEMBRANE FORMING COMPOUND COMPLYING WITH ASTM C309 TYPE 1 CLASS A. APPLY IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 13. PROVIDE BENT BARS AT CORNERS OF THE SAME NUMBER AND SIZE AS STRAIGHT BARS. PROVIDE BENT BARS AT CORNERS OF THE SAME NUMBER AND SIZE AS STRAIGHT BARS.
A A3.01
SCALE: 1/4" = 1'-0"CHILLER YARD - DEMOLITION PLAN
Suite 102 www.phoenixeng.us t.813.963.0888 f.866.335.0109
Engineering License No. 26858
10012 N. Dale Mabry
Tampa, FL 33618
PHOENIX
ENGINEERING GROUP
Mechanical Electrical Plumbing Fire Protection Process Construction Administration
TM
C H
IL
LE
R R
EP
LA
C
EM
EN
TS
PA
LM
H A
R B
O R
U N
IV
ER
SI
TY
H
IG
H S
C H
O O
L
O M
A H
A S
T, P
A
LM
H A
R B
O R
, F L
1112 Channelside Drive Suite CU3 Tampa, FL 33602
p. 813 . 922 . 2804 Florida Lic. No. AA26002908
B A3.01
SCALE: 1/4" = 1'-0"CHILLER YARD - SLAB PLAN
CHILLER YARD
PLAN AND
DETAILS
A3.01
NN
C A3.01
SCALE: 1/4" = 1'-0"CHILLER YARD - PROPOSED PLAN
N
A3.01
SCALE: N.T.S.ASPHALT DRIVE PATCH DETAIL
A3.01
SCALE: 3/4" = 1'-0"NEW CHAIN LINK POST FOOTING
A3.01
SCALE: 3/4" = 1'-0"COLUMN BASE DETAIL
A3.01
SCALE: 3/4" = 1'-0"CONTRACTION JOINT DETAIL
AutoCAD SHX Text
EXISTING FENCE TO REMAIN. PROTECT AS REQUIRED
AutoCAD SHX Text EXISTING ASPHALT AND BASE TO BE REMOVED/EXCAVATED TO RECEIVE NEW CHILLER EQUIPMENT PAD.
AutoCAD SHX Text
2/A3.01(TYP.)
AutoCAD SHX Text
EXISTING MASONRY WALL TO REMAIN (TYP.)
AutoCAD SHX Text HIDDEN LINE INDICATES EXIST. TO NEW ASPHALT PAVING PATCH. (TYP.) SEE DETAIL 1/A3.01
AutoCAD SHX Text
SLOPE 18"/FT.
AutoCAD SHX Text
SLOPE 18"/FT.
AutoCAD SHX Text
LINE OF THICKENED SLAB EDGE
AutoCAD SHX Text 4'W GALV. CHAIN LINK GATE WITH (3) BULLDOG HINGES. PROVIDE PRIVACY SLATS - SLAT COLOR C-3
AutoCAD SHX Text PROVIDE COMMERCIAL STRONG ARM FULCRUM LATCH FOR SINGLE GATE WITH PADLOCK RECEIVER.
AutoCAD SHX Text
NEW GALV. CHAIN LINK FENCE AND POSTS. MATCH ADJACENT FENCE HEIGHT.
AutoCAD SHX Text
EXISTING MASONRY WALL TO REMAIN (TYP.)
AutoCAD SHX Text
EXISTING FENCE TO REMAIN. PROTECT AS REQUIRED
AutoCAD SHX Text
NEW CHILLER. SEE MECHANICAL DWGS.
AutoCAD SHX Text ASPHALTIC CONCRETE. THICKNESS TO MATCH EXISTING. (1 " MIN.) 14" MIN.) FDOT SP-9.5
AutoCAD SHX Text
MATCH EXIST. (6" MIN.) LIMEROCK BASE (LBR 100) COMPACTED TO 98% MAX. DENSITY
AutoCAD SHX Text
STABILIZE SUB BASE 6" DEEP 75 P.S.I. FBV (LBR 40) COMPACTED TO 98% MAX. DENSITY
AutoCAD SHX Text
CHAIN LINK FENCE POST
AutoCAD SHX Text
12" X 30" DEEPCONC. FOOTING IN SONOTUBE
AutoCAD SHX Text
PROVIDE SEALANT AT PIPE SLEEVE
AutoCAD SHX Text
8" CONC. SLAB ON GRADE WITH 2 ROWS TOP & BOT. W/ #5 BARS 12" O.C. EA. WAY
AutoCAD SHX Text
COMPACTED EARTH
AutoCAD SHX Text
(2) #5 REBAR#5 REBAR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3/4" CHAMFER (TYP.)
AutoCAD SHX Text
NEW ASPHALT
AutoCAD SHX Text
EXIST. ASPHALT
AutoCAD SHX Text
4 INCHES *
AutoCAD SHX Text
MAXIMUM SPACING OF CONTRACTION JOINTS IN FEET
AutoCAD SHX Text
* 3/4 INCHES AND LARGER MAXIMUM SIZE AGGREGATE
AutoCAD SHX Text
THAN 3/4 INCHES
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INCHES AND LARGER
AutoCAD SHX Text
THICKNESS,
AutoCAD SHX Text
AGGREGATE LESS
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
MAXIMUM-SIZE
AutoCAD SHX Text
AGGREGATE 3/4
AutoCAD SHX Text
MAXIMUM-SIZE
AutoCAD SHX Text
THE TOP OF SLAB.
AutoCAD SHX Text
NOTE : MAKE CONTRACTION JOINTS IN SLABS ON
AutoCAD SHX Text
GRADE BY SAWING A CONTINUOUS CUT IN
AutoCAD SHX Text
COMPACTED EARTH
AutoCAD SHX Text
CONCRETE SLAB-ON-GRADE
AutoCAD SHX Text
MOISTURE BARRIER
AutoCAD SHX Text
(AS REQUIRED)
AutoCAD SHX Text t
AutoCAD SHX Text t/4 (1" MIN.)
AutoCAD SHX Text
FILL WITH SEALANT
AutoCAD SHX Text 1/8"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LESS THAN
AutoCAD SHX Text
SLUMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text ALL REPORTS, PLANS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER DOCUMENTS AND INSTRUMENTS PREPARED BY PHOENIX ENGINEERING GROUP INC. (PHOENIX) AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF PHOENIX. PHOENIX SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING, WITHOUT LIMITATION, THE COPYRIGHT THERETO.
AutoCAD SHX Text
CONFIDENTIAL
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text 1'
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text 02-25-25
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text 20-045
AutoCAD SHX Text
PROJECT #:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
REVISION HISTORY:
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
02-25-2025 100% OWNER REVIEW
AutoCAD SHX Text
04-10-2025 PERMIT SUBMITTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RMH
RMH
PIPING ELEMENTS/VALVINGDUCTWORK REFERENCE SYMBOLS
EQUIPMENT IDENTITY
INDICATES DRAWING ON
WHICH DETAIL APPEARS
INDICATES TYPICAL DETAIL
(APPLIES TO ALL CONTRACT
DRAWINGS)
INDICATES DRAWING ON
WHICH DETAIL APPEARS
SYSTEM NUMBER (IF
APPLICABLE)
INDICATES DETAIL LETTER
(APPLIES ONLY WHERE
INDICATED ON DRAWINGS)
OUTSIDE AIR
RETURN OR
EXHAUST AIR
SUPPLY AIR
UNDERCUT
SMOKE DETECTOR
SINGLE LINE
NUMBER
CFM
SIZE
NUMBER
SUPPLY AIR GRILLE (G) OR SUPPLY AIR
REGISTER (R)
NUMBER
H HUMIDISTAT
MOTORIZED DAMPER
RADIATION DAMPER
FIRE/SMOKE DAMPER
RETURN AND/OR EXHAUST AIR GRILLE
(G) OR REGISTER (R)
T
MD
FSD
RD
THERMOSTAT
CFM
SIZE
FD
NUMBER
SIZE
CFM
FIRE DAMPER SD
UC
SIZE
CFM
CEILING RETURN/EXHAUST REGISTER (R)
OR GRILLE (G)
RISE OR DROP DIRECTION OF AIR FLOW
BRANCH DUCT TAKE-OFF
DIFFUSER
NUMBER
CFM
SIZE
D R D
VANED ELBOW
RADIUS ELBOW
NEW DUCTWORK - DUCT SIZE INDICATED
INCLUDES ALLOWANCE FOR ACOUSTIC
LINING WHERE APPLICABLE
EXISTING DUCTWORK TO BE REMOVED
EXISTING DUCTWORK TO REMAIN
DOUBLE LINE
NUMBER GAUGE WITH GAUGE COCK &
SYPHON (STEAM)
CFM
SIZE
MV
AV
FLOW METER-ORIFICE
FLOW METER-VENTURI
AUTOMATIC AIR VENT
(EXTEND DISCHARGE TO
DRAIN)
AUTOMATIC FILL VALVE
MANUAL AIR VENT
EXPANSION LOOP (WxH)W H
GAUGE WITH GAUGE COCK
ELECTRICALLY TRACED PIPING
FLOAT OPERATED CONTROL
VALVE
BASKET STRAINER
VB
TDV TRIPLE DUTY VALVE
VACUUM BREAKER
STEAM TRAP
AQUASTAT
GLOBE VALVE, ANGLE
SI
ZE
CF
M
N
UM
BE
R
R
S
CBV
RELIEF/SAFETY VALVE
FLEXIBLE CONNECTION
TEMPERATURE/PRESSURE
RELIEF VALVE
PRESSURE REDUCING VALVE
(PRV)
SOLENOID VALVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
CIRCUIT SETTING BALANCING
VALVE
BALANCING VALVE
GATE VALVE, ANGLE
SWING CHECK VALVE
LIFT CHECK VALVE
BALL VALVE
PLUG VALVE & GAS COCK
BUTTERFLY VALVE
GLOBE VALVE
GATE VALVE
ECCENTRIC REDUCER
PRESSURE TRANSMITTER OR
PRESSURE SWITCH
TEMPERATURE TRANSMITTER
UNION - SCREWED OR
FLANGED
PT/PS
TT
THERMOMETER
FLOW SWITCH
EJ
FS
G
A
EXPANSION JOINT
GUIDE
ANCHOR
TYP
X
STRAINER WITH BLOW OFF
VALVE
DIRECTION OF PITCH-RISE OR
DROP
CONCENTRIC REDUCER
PIPE DROPPING DOWN
TEE OUTLET DOWN
PIPE RISING UP
R
STRAINER
DIRECTION OF FLOW
X
X
X
X-X
EXISTING TO BE DEMOLISHED
PIPE WITH SERVICE ABBREVIATION
NEW WORK
VENT
XX
NOTE: NOT ALL SYMBOLS, NOTES, ABBREVIATIONS AND EQUIPMENT
ABBREVIATIONS INDICATED APPEAR ON THESE CONTRACT DRAWINGS
SHEET NOTE NUMBER
PREPURCHASED EQUIPMENT
TERMINATION POINT OF
DEMOLITION
EXISTING TO REMAIN
X
CONNECT NEW TO
EXISTING
INDICATES REVISION &
NUMBER
INDICATES SECTION NUMBER
INDICATES ON WHICH
DRAWING SECTION APPEARS
LOCATION POINT FOR
COORDINATION BETWEEN
FLOOR PLANS & PIPING
DIAGRAMS (NUMBER)
A
X
X X
EQUIPMENT NUMBER
SI
ZE
CF
M
N
UM
BE
R
D
LINE SYMBOLS
A
A/D ACCESS DOOR
AAV AUTOMATIC AIR VENT
ABV ABOVE
ACC AIR COOLED CHILLER
AD AREA DRAIN (SEE SYMBOLS)
ADR AIR DEVICE TERMINAL
AFF ABOVE FINISHED FLOOR
AFM AIR FILTER MODULE
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AM AIR MEASURING DEVICE
AP ACCESS PANEL
ATC AUTOMATIC TEMPERATURE CONTROL
AVG AVERAGE
AWT AVERAGE WATER TEMPERATURE
B
B BOILER
BD BOILER BLOWDOWN
BDD BACK DRAFT DAMPER
BF BOILER FEEDWATER
BFP BACK FLOW PREVENTOR
BFS BOILER FEED SET
BG BLAST GATE
BLDG BUILDING
BLW BELOW
BM BELL MOUTH
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
C
CAB CIRCUIT BALANCING VALVE
CAP CAPACITY
CBV CONSTANT AIR VOLUME UNIT
CC COOLING COIL
CF CHEMICAL FEED
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFU CHEMICAL FEED UNIT
CH CHILLER
CHP CONCRETE HOUSEKEEPING PAD
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CIP CLEAN IN PLACE
CL CENTER LINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMP COMPRESSOR
CON CONCENTRIC
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
ABBREVIATIONS GENERAL NOTES
CONSULTANTS:
Suite 102 www.phoenixeng.us t.813.963.0888 f.866.335.0109
Engineering License No. 26858
10012 N. Dale Mabry
Tampa, FL 33618
PHOENIX
ENGINEERING GROUP
Mechanical Electrical Plumbing Fire Protection Process Construction Administration
CONFIDENTIAL
ALL REPORTS, PLANS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER
DOCUMENTS AND INSTRUMENTS PREPARED BY PHOENIX ENGINEERING GROUP INC. (PHOENIX) AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF PHOENIX. PHOENIX SHALL RETAIN ALL
COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING, WITHOUT LIMITATION,
THE COPYRIGHT THERETO.
SEAL:
DRAWING TITLE:
DRAWING NUMBER:
DATE:
DRAWN BY: CHECKED BY:
PROJECT #:
GRAPHIC SCALE:
L I CENSE
PROFESS I ONAL ENGI N
EE
R
FLOR IDA
STATE OF
No. 81353CH
AD
DAV ID WEST
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY CHAD DAVID WEST, PE ON THE
DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
P A
LM
H
A R
B O
R U
N
IV
E R
S
IT
Y H
IG
H
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T S
O m ah a
S t, P al m H ar bo r, F
L
M0.01
24-04304/10/2025
JM CDW
MECHANCIAL
LEAD-IN SHEET
CONT' CONTINUATION
CONTR CONTRACTOR
CT COOLING TOWER
CTF COOLING TOWER FILTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV AUTOMATIC CONTROL VALVE
CVS CONTROL VALVE STATION
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D
D DRAIN
DA DEAERATOR
DAMP DAMPER
DB DRY BULB
DC DUST COLLECTOR
DEPT DEPARTMENT
DHU DEHUMIDIFICATION UNIT
DIA DIAMETER
DIAG DIAGRAM
DIFF DIFFERENTIAL
DISCH DISCHARGE
DIV DIVISION
DIW DOWN IN WALL
DL DOOR LOUVER
DN DOWN
DWG DRAWING
DX DIRECT EXPANSION
E
(E) EXISTING
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
ECC ECCENTRIC
ECC ENCLOSURE END CAP
ECG EGGCRATE GRILLE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EFF EFFICIENCY
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
ENT ENTERING
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERC ENERGY RECLAIM COIL
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETC AND SO FORTH
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXPAN EXPANSION
EXT EXTERNAL
F
F FILTER
FA FROM ABOVE
FB FROM BELOW
FC FAIL CLOSED
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FD FLOOR DRAIN
FG FILTER GRILLE
FIN FINISHED
FL FLANGE
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLR FLOOR
FM FLOW METER
FO FAIL OPEN
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FP FIRE PROTECTION
FPH FEET PER HOUR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRICT FRICTION
FS FLOW SWITCH
FT FEET
FT FLASH TANK
FTB FLOOR TO BOTTOM
FTC FLOOR TO CENTERLINE
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
FXC FLEXIBLE CONNECTION
°F DEGREES FAHRENHEIT
G
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRS/LB GRAINS PER POUND
GWR GLYCOL WATER RETURN
GWS GLYCOL WATER SUPPLY
H
H HUMIDIFIER
H2O WATER
HB HOSE BIBB
HC HEATING COIL
HD HEAD (SEE SCHEDULES)
HP HORSEPOWER
HP HEAT PUMP
HPC HIGH PRESSURE CONDENSATE
HPS HIGH PRESSURE STEAM
HR HOUR
HT HEIGHT
HTP HEAT TRANSFER PACKAGE
HTR HEATER
HWC HOT WATER CONVERTER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
I
ID INSIDE DIMENSION
IN INCHES
INCL INCLUDING
INT INTERNAL
INV INVERT
IRH INFRARED HEATER
K
KW KILOWATT
L
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB POUND
LBS/HR POUNDS PER HOUR (#/HR)
LD LINEAR DIFFUSER
LFM LAMINAR FLOW MODULE
LIN LINEAR
LIQ LIQUID
LPC LOW PRESSURE CONDENSATE
LPS LOW PRESSURE STEAM
LRA LOCK ROTOR AMPS
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDIUM
MFG MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MPC MEDIUM PRESSURE CONDENSATE
MPS MEDIUM PRESSURE STEAM
MTD MOUNTED
MVD MANUAL VOLUME DAMPER
N
N NEW
NC NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
No NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OUTSIDE AIR
OB OFF BOTTOM
OC ON CENTER
OCC OCCUPIED
OD OUTSIDE DIMENSION
OGH OUTSIDE GROUND HYDRANT
OPG OPENING
OS OPEN SITE
OT OFF TOP
OV OUTLET VELOCITY
OZ OUNCE
P
P-BF PUMP - BOILER FEED
P-C PUMP - CONDENSER WATER
P-CF PUMP - CHEMICAL FEED
P-CH PUMP - CHILLED WATER
P-CO PUMP - CONDENSATE
P-CR PUMP - CONDENSATE REMOVAL
P-ER PUMP - ENERGY RECLAIM
P-H PUMP - HOT WATER
P-S PUMP - SPARE
P-TR PUMP - TRANSFER
PART PARTIAL
PC PUMPED CONDENSATE
PCHWR PROCESS CHILLED WATER RETURN
PCHWS PROCESS CHILLED WATER SUPPLY
PD PRESSURE DROP (SEE SCHEDULE)
PDR PLENUM DRAIN
PERF PERFORATED
PH PHASE
PHC PREHEAT COIL
PHE PENTHOUSE
PNEU PNEUMATIC
POS POSITIVE
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PT PRESSURE TRANSMITTER
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PVS POLYVINYL COATED STEEL
Q
QUAN QUANTITY
R
R REGISTER
R RELIEF PIPING
RA RETURN AIR
RAC RUN ABOVE CEILING
RAF RUN ABOVE FLOOR
RAF RETURN AIR FAN
RAH RADIANT HEATER
RATC RUN AT CEILING
RBC RUN BELOW CEILING
RBF RUN BELOW FLOOR
RBG RUN BELOW GRADE
RBJ RUN BETWEEN JOIST
RCP REINFORCED CONCRETE PIPE
RD REFRIGERANT DISCHARGE
RE ROUNDED ENTRANCE/EXIT
REL RELIEF
REQD REQUIRED
RET RETURN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RICW RUN IN CASEWORK
RIE RUN IN ENCLOSURE
RIW RISE IN WALL
RL REFRIGERANT LIQUID
RLA RATED LOAD AMPS
RM ROOM
ROD ROOF OVERFLOW DRAIN
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
S
SA SUPPLY AIR
SCH SCHEDULE
SCHEM SCHEMATIC
SF SUPPLY FAN
SH SENSIBLE HEAT
SIP STERILIZE IN PLACE
SP STATIC PRESSURE
SPEC SPECIFICATION
SPHF-R SELF POWERED HEPA FILTER-RETURN
SPHF-S SELF POWERED HEPA FILTER-SUPPLY
SPHR-E SELF POWERED HEPA
FILTER-EXHAUST
SQ SQUARE
SRV SAFETY RELIEF VALVE
SS STAINLESS STEEL
SST SUPPORT STEEL
ST STORAGE TANK
STD STANDARD
STL STEEL
STM STEAM
STP SOUND TRAP
STR STRUCTURAL
SUCT SUCTION
SUP SUPPLY
SYS SYSTEM
T
TAD TRANSFER AIR DUCT
TAF TERMINAL AIR FILTER
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TF TRANSFER FAN
THT TOTAL HEAT
TOT TOTAL
TP TOTAL PRESSURE
TS TEMPERATURE SWITCH
TSP TOTAL STATIC PRESSURE
TT TEMPERATURE TRANSMITTER
TUE TERMINAL UNIT - EXHAUST
TUR TERMINAL UNIT - RETURN
TUS TERMINAL UNIT - SUPPLY
TYP TYPICAL
U
UC UNDERCUT
UH UNIT HEATER
UNOCC UNOCCUPIED
V
V VOLTS OR VENT
VA VALVE
VAV VARIABLE AIR VOLUME UNIT
VB VACUUM BREAKER
VD VOLUME DAMPER
VEL VELOCITY
VI VIBRATION ISOLATOR
VOLT VOLTAGE
VTR VENT THRU ROOF
W
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WT WEIGHT
GENERAL
1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES. THIS IS TO INCLUDE:
- FLORIDA BUILDING CODE-BUILDING, 8TH EDITION (2023)
- FLORIDA BUILDING CODE-ENERGY CONSERVATION, 8TH EDITION (2023)
- FLORIDA BUILDING CODE-MECHANICAL, 8TH EDITION (2023)
- APPLICABLE NFPA CODES, EDITIONS AS REFERRED TO IN THE FLORIDA CODES
- 21 CFR PARTS 210 & 211, CURRENT GOOD MANUFACTURING PRACTICES
- AUTHORITY HAVING JURISDICTION, INCLUDING ADDS/MOVES/CHANGES AS DIRECTED
- OWNER'S INSURANCE CARRIER GUIDELINES
2. ALL ELECTRICAL EQUIPMENT SHALL BE UL CLASSIFIED OR LISTED.
3. THE MECHANICAL CONTRACTOR REFERRED TO HEREAFTER, AS THE "CONTRACTOR" SHALL PROVIDE
COMPLETE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS AND SPECIFIED HEREIN.
4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, AND INSPECTIONS REQUIRED TO
COMMENCE AND COMPLETE MECHANICAL WORK.
5. CONTRACTOR SHALL CONDUCT A THOROUGH SITE INSPECTION TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS AND ALL ASPECTS OF HIS SCOPE OF WORK. INSPECTION SHALL BE CONDUCTED
PRIOR TO SUBMITTING A BID.
6. THIS CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK. IF DISCREPANCIES OCCUR BETWEEN THESE DOCUMENTS AND EXISTING, THE CONTRACTOR SHALL REPORT SAID DISCREPANCY TO THE OWNER AND/OR ENGINEER FOR EXPEDITING
AND RESOLUTION. CONTINUATION OF WORK BEFORE RESOLUTION IS GIVEN SHALL BE AT THE
CONTRACTORS RISK.
7. THE CONTRACTOR SHALL PROVIDE DROP CLOTHS, RUBBER MATS AND PLYWOOD COVERS FOR OWNERS EQUIPMENT SUSCEPTIBLE TO DAMAGE DURING CONSTRUCTION. VERIFY SPECIFIC LOCATIONS WITH
OWNER'S REPRESENTATIVE.
8. ALL WORK SHALL BE PERFORMED DURING PERIODS ACCEPTABLE TO THE OWNER. SCHEDULE ALL WORK
WITH THE OWNER'S REPRESENTATIVE BEFORE PROCEEDING.
9. ALL ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF THIS FACILITY SHALL COMPLY WITH OSHA
GUIDELINES.
10. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS CAUSED BY
PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
11. USE OF THE OWNER'S BUILDING CORRIDORS AND ELEVATORS FOR HANDLING AND TRANSPORT OF MATERIALS SHALL BE AT THE DIRECTION OF THE OWNER AND SHALL BE COORDINATED WITH THEIR
OPERATIONS.
12. REFER TO ELECTRICAL DRAWINGS (E DRAWINGS) WHERE APPLICABLE FOR MECHANICAL SCOPE
ASSOCIATED WITH INSTALLATION OF EACH RESPECTIVE SYSTEM.
13. EACH CONTRACTOR SHALL PROVIDE OPENINGS THROUGH THE CONSTRUCTION AND SLEEVES AS REQUIRED FOR HIS WORK. ANY DUCTWORK OR PIPING PASSING THROUGH MASONRY OR CONCRETE WALLS OR FLOORS SHALL BE PROVIDED WITH SLEEVES AS PER CONTRACT DOCUMENTS. FILL THE ANNULAR VOIDS AND MAINTAIN FIRE RATINGS OF ALL PENETRATIONS. PROVIDE UL LISTED SEALANTS AND
DAMPERS AS REQUIRED.
14. IT IS THE INTENTION OF THE DRAWINGS TO CALL FOR FINISHED WORK, TESTED AND READY FOR OPERATION. ANY APPARATUS, APPLIANCE, MATERIAL OR WORK NOT INDICATED ON THE DRAWINGS OR ANY INCIDENTAL ACCESSORIES REQUIRED TO MAKE THE WORK COMPLETE TO ALL RESPECTS AND READY FOR OPERATION SHALL BE FURNISHED, DELIVERED AND INSTALLED WITHOUT ADDITIONAL EXPENSE OR TIME TO
THE PROJECT.
15. COORDINATE ALL FINAL CONNECTIONS WITH THE OTHER TRADES AND OWNER FURNISHED EQUIPMENT.
IF THIS CONTRACTOR INSTALLS HIS WORK BEFORE COORDINATION WITH OTHER TRADES OR THE OWNER SO AS TO CAUSE INTERFERENCE WITH THE WORK OF OTHER TRADES, HE SHALL MAKE ALL NECESSARY
CHANGES IN HIS WORK AND CORRECT THE CONDITION WITHOUT EXTRA CHARGE OR SCHEDULE
EXTENSION.
16. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. ALL ABANDONED PIPE AND EQUIPMENT SHALL BE REMOVED UNLESS
OTHERWISE INDICATED.
17. NO DUCTWORK, PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT ADVANCE NOTICE MUST BE GIVEN TO THE OWNER INDICATING WHICH AREAS WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW LONG A PERIOD OF TIME. ALL ITEMS REMOVED SHALL BECOME PROPERTY OF THE OWNER AND SHALL BE DISPOSED OF AS PER THE OWNER'S INSTRUCTIONS, UNLESS INDICATED OTHERWISE.
18. IF CONTRACTOR ENCOUNTERS WHAT APPEARS TO BE A HAZARDOUS OR QUESTIONABLE MATERIAL, HE
SHALL DISCONTINUE WORK IMMEDIATELY AND CONTACT THE OWNERS REPRESENTATIVE.
DEFINITIONS
1. APPROVED EQUAL: EQUAL IN QUALITY, FEATURES, AND PERFORMANCE AS DETERMINED BY THE DESIGN PROFESSIONAL AND OWNER. EQUALS ARE NOT CONSIDERED APPROVED UNLESS ACKNOWLEDGED IN
WRITING BY THE ENGINEER.
2. FURNISH: UNLESS OTHERWISE NOTED, TO SUPPLY AND DELIVER TO JOB SITE READY FOR INSTALLATION.
3. INSTALL: TO SET IN PLACE FOR USE OR SERVICE. INSTALLATION SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING, AND MISCELLANEOUS APPURTENANCES REQUIRED TO UNCRATE, ASSEMBLE, INSTALL AND PLACE INTO SATISFACTORY OPERATION.
4. PROVIDE: TO FURNISH AND INSTALL COMPLETE AND READY FOR USE.
5. "LISTED AND LABELED": AS DEFINED BY ARTICLE 100 AND 110.3 OF THE NATIONAL ELECTRICAL CODE.
UNLESS OTHERWISE NOTED, UNDERWRITER'S LABORATORIES SHALL BE THE ONLY APPROVED
INDEPENDENT TESTING AGENCY.
QUALITY
1. WORKMANSHIP SHALL BE HIGH QUALITY AND FOLLOW INDUSTRY STANDARDS. SUBSTANDARD WORK WILL BE REJECTED AND REPLACED. THE CONTRACTOR IS LIABLE FOR REPAIR AND REWORK TO RECTIFY SUBSTANDARD WORK. QUALITY OF WORK SHALL BE DETERMINED BY THE OWNER'S REPRESENTATIVE
AND/OR ENGINEER OF RECORD.
2. TAKE PRECAUTION AGAINST DAMAGE TO ANY EXISTING UTILITIES, FURNISHINGS AND CONSTRUCTION
NOT INCLUDED WITHIN THE SCOPE OF THIS WORK. ANY DAMAGE CAUSED BY THE CONTRACTORS
OPERATION SHALL BE REPAIRED AT HIS EXPENSE COMPLETE AND TO THE SATISFACTION OF THE OWNER.
3. MAINTAIN THE INTEGRITY OF ALL EXISTING SYSTEMS. PRIOR TO CONNECTING NEW WORK TO ANY EXISTING SYSTEM, CONFIRM SYSTEM IDENTIFICATION AND DIRECTION OF FLOW. VERIFY THAT EXISTING DUCTWORK OR PIPING IDENTIFICATION LABELS ARE CORRECT AND PROVIDE ALL INSTALLATION
REQUIREMENTS FOR PROPER CONNECTION TO THE EXISTING SYSTEMS.
4. ALL EQUIPMENT AND MATERIAL SHALL BE LISTED FOR ITS INTENDED APPLICATION. LISTING SHALL BE PROVIDED BY AN INDEPENDENT TESTING COMPANY SUCH AS UNDERWRITERS LABORATORIES (UL).
5. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR DUCTWORK AND PIPING.
DO NOT LEAVE DUCTS OR PIPES OPEN ENDED.
WIND RESISTANCE
1. MECHANICAL EQUIPMENT, APPLIANCES AND SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT, SUPPORTS AND ANCHORS AS REQUIRED BY THE FLORIDA BUILDING CODE, SPECIFICALLY CHAPTERS 15 & 16 AND
FLORIDA BUILDING CODE: MECHANICAL, CHAPTER 3. FOR HIGH VELOCITY HURRICANE ZONES,
EQUIPMENT SUBMITTALS MUST INCLUDE THE PROPER WIND RESISTANCE CERTIFICATION AND
ANCHORING DETAILS SIGNED & SEALED BY A LICENSED PROFESSIONAL ENGINEER.
2. ALL FASTENERS AND ANCHORING COMPONENTS MATERIALS SHALL BE STAINLESS STEEL. FIELD
REINFORCING OF EQUIPMENT CASINGS, FAN HOUSINGS AND VENT HOODS MAY BE REQUIRED BY
THE AHJ, THESE DOCUMENTS AND/OR BY WIND CERTIFICATION REQUIREMENTS. TWO (2) TO FOUR
(4) STAINLESS STEEL CABLES ARE RECOMMENDED, DEPENDING ON THE ITEM SIZE AND THE DESIGN WIND CONDITIONS IN THE BUILDING CODE. ALTERNATIVELY, 14 GAUGE, 1-1/2" STRAPS CAN BE USED WITH STAINLESS STEEL LAG SCREWS AS APPROPRIATE FOR THE WIND LOADING. COORDINATE WITH
THE DETAILS PROVIDED HEREIN.
TESTING
1. OWNER SHALL BE RESPONSIBLE FOR TESTING AND BALANCING COORDINATION.
2. TEST AND BALANCE SHALL BE PERFORMED BY A TEST & BALANCE COMPANY WHICH IS A MEMBER OF AABC OR NEBB. THE MECHANICAL CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY INSTALLED AND OPERATIONAL, WITH CLEAN FILTERS, PRIOR TO TEST & BALANCE AND PROVIDE ASSISTANCE
WITH OPERATION AND ACCESS.
3. WHERE EXISTING AIR HANDLING SYSTEMS ARE AFFECTED BY THIS PROJECT (ADDED TO,
PARTIALLY DEMOLISHED OR OTHERWISE MODIFIED) BALANCING CONTRACTOR SHALL TAKE AIR
FLOW (CFM) READINGS ON ALL DUCT WORK SERVING AREAS NOT DIRECTLY AFFECTED BY WORK OF THIS PROJECT BEFORE THE START OF CONSTRUCTION. AFTER CONSTRUCTION, AS PART OF THE AIR
BALANCING FOR NEW WORK, BALANCING CONTRACTOR SHALL BALANCE DUCT SERVING THESE
AREAS TO ORIGINAL CFM QUANTITIES.
4. SUCCESSFULLY PRESSURE TEST ALL REROUTED PIPING SYSTEMS. TEST SHALL BE PERFORMED AT NORMAL SYSTEM OPERATING PRESSURES. REPAIR AND RETEST AS REQUIRED UNTIL SYSTEMS
PROVE TIGHT.
COMMISSIONING
1. THE MECHANICAL CONTRACTOR AND ASSOCIATED SUBCONTRACTOR(S), INCLUDING TEST &
BALANCE AND CONTROLS CONTRACTORS, ARE RESPONSIBLE FOR START-UP OF ALL AFFECTED
HVAC&R SYSTEMS INSTALLED UNDER THIS PROJECT AND SHOWN IN THE CONTRACT DOCUMENTS.
2. COORDINATE START UP AND COMMISSIONING EFFORTS WITH THE OWNER, OWNER'S
COMMISSIONING AGENT, GENERAL CONTRACTOR AND OTHER TRADES INVOLVED IN THE PROJECT.
3. PROVIDE ONE (1) COMPLETE SET OF COMMISSIONING DOCUMENTS FOR EACH HVAC&R SYSTEM TO THE OWNER (I.E. O&M MANUALS, MANUFACTURER'S START UP CHECKLISTS, REPORTS, ETC.).
GUARANTEE
1. CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR FROM DATE OF OWNER'S
ACCEPTANCE. THE CONTRACTOR SHALL RECTIFY ANY DEFECTS DUE TO FAULTY MATERIALS OR
WORKMANSHIP AND PAY FOR DAMAGE CAUSED BY FAILURE AND REWORK. THE OWNER WILL GIVE
NOTICE OF DEFECTS WITH REASONABLE PROMPTNESS AFTER DISCOVERY. THE CONTRACTOR SHALL START REWORK WITHIN TEN (10) WORKING DAYS OF NOTIFICATION AND COMPLETE REPAIRS IN A
TIMELY MANNER.
SUBMITTAL DATA AND RECORD DRAWINGS
1. THE MECHANICAL DESIGN IS BASED ON SPECIFIC MANUFACTURERS. WHEREAS SUBSTITUTIONS
ARE PROVIDED IN LIEU OF THAT WHICH IS SPECIFIED, THE CONTRACTOR ASSUMES FULL
RESPONSIBILITY FOR ANY IMPACT TO THE INSTALLATION. CONTRACTOR SHALL VERIFY THAT
SUBSTITUTIONS CAN FUNCTION SATISFACTORILY IN THEIR DESIGNATED SPACE AND CHANGES IN OPERATING CHARACTERISTICS DO NOT DEGRADE THE INSTALLATION OR DEVIATE FROM THE DESIGN
INTENT.
2. SUBMIT MANUFACTURER'S DATA FOR DUCTWORK, PIPE, FITTINGS, VALVES, DAMPERS,
EQUIPMENT, AND OTHER EQUIPMENT SPECIFIED HEREIN. SUBMIT MANUFACTURER'S DATA IN
ELECTRONIC FORMAT (PDF, MS WORD, OR MS EXCEL). SUBMIT SHOP DRAWINGS IN BOOKLET FORM WITH SEPARATE SHEET FOR EACH DEVICE. PROVIDE EQUIPMENT IDENTIFICATION AS DESIGNATED
ON PLANS FOR EACH SHOP DRAWING CUT SHEET SUBMITTED.
3. AT PROJECT COMPLETION THE CONTRACTOR SHALL PROVIDE ONE (1) COMPLETE SET OF REDLINE
RECORD DRAWINGS TO THE ENGINEER FOR TRANSCRIPTION INTO ELECTRONIC FORMAT.
DEMOLITION:
1. PROVIDE MECHANICAL DEMOLITION INCLUDING REMOVAL AND REINSTALLATION OF MECHANICAL ITEMS AS REQUIRED TO EXECUTE WORK BY ALL TRADES RELATED TO THE PROJECT. COORDINATE
WITH THE GENERAL CONTRACTOR.
2. AT THE OWNER'S DISCRETION THE CONTRACTOR SHALL DISPOSE OF REMOVED OR DEMOLISHED
ITEMS NOT TO BE RETAINED BY THE OWNER. THE CONTRACTOR SHALL PROPERLY STORE THOSE
ITEMS TO BE RETAINED BY THE OWNER.
REVISION HISTORY:
(E)HWP
(E)HWP
(E)ET
(E)ET
(E)EF
(E)SCHP
(E)SCHP
(E)SCHP
(E)CHP
(E)CHP
(E)CHP
(E)CHP
(E)HRP
(E)CP
(E)CP
(E)CP
(E)CH
(E)CH
(E)CH
(E)CT
(E)CT
(E)CT
(E)B
(E)EF
(E)ET
(E)HX
(E)CH
(E)AS
(E)BP
3 3
CONSULTANTS:
Suite 102 www.phoenixeng.us t.813.963.0888 f.866.335.0109
Engineering License No. 26858
10012 N. Dale Mabry
Tampa, FL 33618
PHOENIX
ENGINEERING GROUP
Mechanical Electrical Plumbing Fire Protection Process Construction Administration
CONFIDENTIAL
ALL REPORTS, PLANS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER
DOCUMENTS AND INSTRUMENTS PREPARED BY PHOENIX ENGINEERING GROUP INC. (PHOENIX) AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF PHOENIX. PHOENIX SHALL RETAIN ALL
COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING, WITHOUT LIMITATION,
THE COPYRIGHT THERETO.
SEAL:
DRAWING TITLE:
DRAWING NUMBER:
DATE:
DRAWN BY: CHECKED BY:
PROJECT #:
GRAPHIC SCALE:
L I CENSE
PROFESS I ONAL ENGI N
EE
R
FLOR IDA
STATE OF
No. 81353CH
AD
DAV ID WEST
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY CHAD DAVID WEST, PE ON THE
DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
P A
LM
H
A R
B O
R U
N
IV
E R
S
IT
Y H
IG
H
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T S
O m ah a
S t, P al m H ar bo r, F
L
M1.01
24-04304/10/2025
JM CDW
MECHANICAL
DEMOLTION PLAN
— GENERAL DEMOLITION NOTES:
1. THE WORK HEREIN CONSISTS OF PROVIDING EQUIPMENT,
MATERIALS, LABOR AND SERVICES; AND PERFORMING OPERATIONS
REQUIRED TO DEMOLISH EXISTING SYSTEMS SERVING SPACES AS
INDICATED. REMOVALS SHOWN ON THE DRAWINGS GIVE GENERAL
INDICATION ONLY, AND MAY NOT INDICATE FULL EXTENT OF
DEMOLITION REQUIRED.
2. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE BIDDING
DOCUMENTS PRIOR TO VISITING THE SITE, TAKE THE BIDDING
DOCUMENTS TO THE SITE, AND THOROUGHLY EXPLORE EXISTING
CONDITIONS AS RELATED TO FULFILLING REQUIREMENTS OF THE
CONTRACT.
3. IF DISCREPANCIES ARE DISCOVERED BETWEEN REQUIREMENTS OF
THE BIDDING DOCUMENTS AND EXISTING CONDITIONS, THE BIDDER
SHALL SO INDICATE TO THE ARCHITECT/ENGINEER A MINIMUM OF
FIVE (5) BUSINESS DAYS PRIOR TO BID SUBMISSION AND AS SUCH
INCORPORATE ANY CLARIFICATIONS INTO THE CONTRACTORS BID.
4. EXTRAS WILL NOT BE CONSIDERED FOR WORK RELATING TO
CONNECTIONS TO OR INTERFERENCE WITH EXISTING SYSTEMS OR
ADAPTABILITY OF NEW SYSTEMS TO EXISTING STRUCTURE.
5. SUBMISSIONS OF PROPOSALS SHALL BE CONSIDERED AS EVIDENCE
THAT THE BIDDERS HAVE VISITED AND EXAMINED THE SITE AS
REQUIRED HEREIN.
6. INCLUDED HEREUNDER, EVEN THOUGH NOT SPECIFICALLY DETAILED
OR DESCRIBED, IS PROVIDING OF EQUIPMENT, LABOR AND SERVICES
TO ENABLE CONTINUED FUNCTIONING OF SERVICES PASSING
THROUGH, OR ORIGINATING IN, THIS PROJECT AREA, BUT SERVE
PORTIONS OF THE FACILITY WHICH ARE TO REMAIN IN OPERATION
OUTSIDE SAID AREA.
7. WHERE SUCH REMOVAL AFFECTS SERVICES TO FIXTURES, OR
EQUIPMENT OUTSIDE CONTRACT AREA, REROUTE SERVICES TO
AFFECTED EQUIPMENT TO ENABLE ITS CONTINUED NORMAL
OPERATION.
a) DEMOLITION WORK SHALL BE SUBJECT TO DIRECTION AND
APPROVAL OF THE ARCHITECT/ENGINEER, OWNER, AND/OR
THE OWNER'S REPRESENTATIVE. DEMOLITION ACTIVITIES
SHALL NOT INTERFERE WITH ACTIVITIES IN OTHER
OPERATIONAL AREAS OF THE FACILITY. REMOVED MATERIALS,
UNLESS OTHERWISE SPECIFICALLY DESIGNATED, SHALL BE
PROMPTLY DISPOSED OF.
b) SHUTDOWNS OR SERVICE INTERRUPTIONS REQUIRED SHALL
BE COORDINATED WITH AND APPROVED BY THE
ARCHITECT/ENGINEER AND OWNER NO LESS THAN TWO (2)
WEEKS BEFORE THEY ARE IMPLEMENTED. SUFFICIENT
ADVANCE NOTICE MUST BE PROVIDED IN WRITING TO THE
OWNER.
8. REMOVED MATERIALS NOT DESIRED BY THE OWNER OR NOT TO BE
RESET BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED FROM THE SITE. UNLESS OTHERWISE NOTED REMOVED
ITEMS REMOVED FOR TURN OVER TO THE OWNER SHALL BE KEPT
CLEAN AND PROPERLY STORED UNTIL RELEASE TO THE OWNER.
9. TEMPORARY BARRIERS WILL BE REQUIRED TO ISOLATE THE
CONSTRUCTION AREAS FROM AREAS TO REMAIN IN OPERATION.
10. PROVIDE HEPA FILTERED EXHAUST UNIT FOR THE CONSTRUCTION
AREA, AND DISCHARGE DIRECTLY TO OUTDOORS, AWAY FROM
EQUIPMENT OUTSIDE AIR INTAKES. MAINTAIN WORK AREA UNDER
NEGATIVE PRESSURE. PROVIDE TEMPORARY ROOM DIFFERENTIAL
PRESSURE GAUGE AND SENSOR FOR THE CONSTRUCTION AREA.
— GENERAL NOTES:
1. FOR PROJECT NOTES, LIST OF SYMBOLS AND ABBREVIATIONS, REFER
TO DRAWING M0.01.
- SHEET NOTES:
1. DEMOLISH PIPING TO POINT INDICATED. LEAVE REMAINING PIPE END
IN SUITABLE CONDITION FOR RECONNECTION.
2. DEMOLISH PIPING BACK TO POINT INDICATED AND CAP REMAINING
OPENING.
3. DEMOLISH EXISTING CHILLER. CAPTURE REFRIGERANT PRIOR TO
DEMOLITION. OWNER TO HAVE FIRST RIGHT OF REFUSAL TO ALL
CAPTURED REFRIGERANT. REFRIGERANT PURGE PIPING TO REMAIN
TO BE REUSED. EXISTING EQUIPMENT PAD SHALL REMAIN.
4. DEMOLISH EXISTING PUMP AND ALL ASSOCIATED PUMP TRIM
INCLUDING ISOLATION VALVES. EXISTING EQUIPMENT PAD SHALL
REMAIN.
5. DEMOLISH EXISTING AIR SEPARATOR.
6. DEMOLISH EXISTING EXPANSION TANK. LEAVE ASSOICATED PIPING
FOR CONNECTION TO REPLACEMENT.
7. DEMOLISH EXISTING CHEMICAL POT FEEDER AND ASSOCIATED PIPING
TO MAINS.
8. ADDITIVE ALTERNATE #1: DEMOLISH EXISTING PUMP AND ALL
ASSOCIATED PUMP TRIM INCLUDING ISOLATION VALVES. EXISTING
EQUIPMENT PAD SHALL REMAIN.
9. ADDITIVE ALTERNATE #2: DEMOLISH EXISTING PUMP AND ALL
ASSOCIATED PUMP TRIM INCLUDING ISOLATION VALVES. EXISTING
EQUIPMENT PAD SHALL REMAIN.
SCALE: 3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN − CHILLED WATER PIPING
A
ADD ALTERNATE #1
ADD ALTERNATE #2
(E)HWP
(E)ET
(E)ET
(E)EF
(E)SCHP
(E)SCHP
(E)SCHP
(E)CHP
(E)CHP
(E)CHP
(E)CHP
(E)HRP
(E)CP
(E)CP
(E)CP
(E)CH
(E)CH
(E)CH
(E)CT
(E)CT
(E)CT
(E)B
(E)EF
(E)ET
(E)HX
(E)CH
(E)AS
(E)AS
(E)BP
2 2
5 5
CONSULTANTS:
Suite 102 www.phoenixeng.us t.813.963.0888 f.866.335.0109
Engineering License No. 26858
10012 N. Dale Mabry
Tampa, FL 33618
PHOENIX
ENGINEERING GROUP
Mechanical Electrical Plumbing Fire Protection Process Construction Administration
CONFIDENTIAL
ALL REPORTS, PLANS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER
DOCUMENTS AND INSTRUMENTS PREPARED BY PHOENIX ENGINEERING GROUP INC. (PHOENIX) AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF PHOENIX. PHOENIX SHALL RETAIN ALL
COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING, WITHOUT LIMITATION,
THE COPYRIGHT THERETO.
SEAL:
DRAWING TITLE:
DRAWING NUMBER:
DATE:
DRAWN BY: CHECKED BY:
PROJECT #:
GRAPHIC SCALE:
L I CENSE
PROFESS I ONAL ENGI N
EE
R
FLOR IDA
STATE OF
No. 81353CH
AD
DAV ID WEST
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY CHAD DAVID WEST, PE ON THE
DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
P A
LM
H
A R
B O
R U
N
IV
E R
S
IT
Y H
IG
H
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T S
O m ah a
S t, P al m H ar bo r, F
L
M1.02
24-04304/10/2025
JM CDW
MECHANICAL
DEMOLTION PLAN
— GENERAL DEMOLITION NOTES:
1. THE WORK HEREIN CONSISTS OF PROVIDING EQUIPMENT,
MATERIALS, LABOR AND SERVICES; AND PERFORMING OPERATIONS
REQUIRED TO DEMOLISH EXISTING SYSTEMS SERVING SPACES AS
INDICATED. REMOVALS SHOWN ON THE DRAWINGS GIVE GENERAL
INDICATION ONLY, AND MAY NOT INDICATE FULL EXTENT OF
DEMOLITION REQUIRED.
2. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE BIDDING
DOCUMENTS PRIOR TO VISITING THE SITE, TAKE THE BIDDING
DOCUMENTS TO THE SITE, AND THOROUGHLY EXPLORE EXISTING
CONDITIONS AS RELATED TO FULFILLING REQUIREMENTS OF THE
CONTRACT.
3. IF DISCREPANCIES ARE DISCOVERED BETWEEN REQUIREMENTS OF
THE BIDDING DOCUMENTS AND EXISTING CONDITIONS, THE BIDDER
SHALL SO INDICATE TO THE ARCHITECT/ENGINEER A MINIMUM OF
FIVE (5) BUSINESS DAYS PRIOR TO BID SUBMISSION AND AS SUCH
INCORPORATE ANY CLARIFICATIONS INTO THE CONTRACTORS BID.
4. EXTRAS WILL NOT BE CONSIDERED FOR WORK RELATING TO
CONNECTIONS TO OR INTERFERENCE WITH EXISTING SYSTEMS OR
ADAPTABILITY OF NEW SYSTEMS TO EXISTING STRUCTURE.
5. SUBMISSIONS OF PROPOSALS SHALL BE CONSIDERED AS EVIDENCE
THAT THE BIDDERS HAVE VISITED AND EXAMINED THE SITE AS
REQUIRED HEREIN.
6. INCLUDED HEREUNDER, EVEN THOUGH NOT SPECIFICALLY DETAILED
OR DESCRIBED, IS PROVIDING OF EQUIPMENT, LABOR AND SERVICES
TO ENABLE CONTINUED FUNCTIONING OF SERVICES PASSING
THROUGH, OR ORIGINATING IN, THIS PROJECT AREA, BUT SERVE
PORTIONS OF THE FACILITY WHICH ARE TO REMAIN IN OPERATION
OUTSIDE SAID AREA.
7. WHERE SUCH REMOVAL AFFECTS SERVICES TO FIXTURES, OR
EQUIPMENT OUTSIDE CONTRACT AREA, REROUTE SERVICES TO
AFFECTED EQUIPMENT TO ENABLE ITS CONTINUED NORMAL
OPERATION.
a) DEMOLITION WORK SHALL BE SUBJECT TO DIRECTION AND
APPROVAL OF THE ARCHITECT/ENGINEER, OWNER, AND/OR
THE OWNER'S REPRESENTATIVE. DEMOLITION ACTIVITIES
SHALL NOT INTERFERE WITH ACTIVITIES IN OTHER
OPERATIONAL AREAS OF THE FACILITY. REMOVED MATERIALS,
UNLESS OTHERWISE SPECIFICALLY DESIGNATED, SHALL BE
PROMPTLY DISPOSED OF.
b) SHUTDOWNS OR SERVICE INTERRUPTIONS REQUIRED SHALL
BE COORDINATED WITH AND APPROVED BY THE
ARCHITECT/ENGINEER AND OWNER NO LESS THAN TWO (2)
WEEKS BEFORE THEY ARE IMPLEMENTED. SUFFICIENT
ADVANCE NOTICE MUST BE PROVIDED IN WRITING TO THE
OWNER.
8. REMOVED MATERIALS NOT DESIRED BY THE OWNER OR NOT TO BE
RESET BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED FROM THE SITE. UNLESS OTHERWISE NOTED REMOVED
ITEMS REMOVED FOR TURN OVER TO THE OWNER SHALL BE KEPT
CLEAN AND PROPERLY STORED UNTIL RELEASE TO THE OWNER.
9. TEMPORARY BARRIERS WILL BE REQUIRED TO ISOLATE THE
CONSTRUCTION AREAS FROM AREAS TO REMAIN IN OPERATION.
10. PROVIDE HEPA FILTERED EXHAUST UNIT FOR THE CONSTRUCTION
AREA, AND DISCHARGE DIRECTLY TO OUTDOORS, AWAY FROM
EQUIPMENT OUTSIDE AIR INTAKES. MAINTAIN WORK AREA UNDER
NEGATIVE PRESSURE. PROVIDE TEMPORARY ROOM DIFFERENTIAL
PRESSURE GAUGE AND SENSOR FOR THE CONSTRUCTION AREA.
— GENERAL NOTES:
1. FOR PROJECT NOTES, LIST OF SYMBOLS AND ABBREVIATIONS, REFER
TO DRAWING M0.01.
- SHEET NOTES:
1. DEMOLISH PIPING TO POINT INDICATED. LEAVE REMAINING PIPE END
IN SUITABLE CONDITION FOR RECONNECTION.
2. DEMOLISH EXISTING CHILLER. CAPTURE REFRIGERANT PRIOR TO
DEMOLITION. OWNER TO HAVE FIRST RIGHT OF REFUSAL TO ALL
CAPTURED REFRIGERANT. REFRIGERANT PURGE PIPING TO REMAIN
TO BE REUSED. EXISTING EQUIPMENT PAD SHALL REMAIN.
3. DEMOLISH EXISTING PUMP AND ALL ASSOCIATED PUMP TRIM
INCLUDING ISOLATION VALVES. EXISTING EQUIPMENT PAD SHALL
REMAIN.
4. DEMOLISH EXISTING AIR SEPARATOR.
5. DEMOLISH EXISTING COOLING TOWER FILL.
6. ADDITIVE ALTERNATE #1: DEMOLISH EXISTING PUMP AND ALL
ASSOCIATED PUMP TRIM INCLUDING ISOLATION VALVES. EXISTING
EQUIPMENT PAD SHALL REMAIN.
7. ADDITIVE ALTERNATE #2: DEMOLISH EXISTING PUMP AND ALL
ASSOCIATED PUMP TRIM INCLUDING ISOLATION VALVES. EXISTING
EQUIPMENT PAD SHALL REMAIN.
SCALE: 3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN − CONDENSER AND HEAT RECOVERY PIPING
A
ADD ALTERNATE #1
ADD ALTERNATE #2
(E)HWP
(E)EF
(E)SCHP
(E)SCHP
CH
CH
(E)CT
(E)CT
(E)CT
(E)B
(E)EF
(E)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .