This document is a solicitation for the upgrade of the medical gas system in buildings 1, 28, and 29 at a Veterans Affairs medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 seeking construction services. Offerors must submit proposals by July 15th, 2022. The selected contractor will be awarded a firm fixed-price contract to remove and replace the existing medical gas piping systems with new brazed copper tube type K piping. The contractor must have a minimum of 5 years experience performing medical gas system installations. The work is to be completed within 365 calendar days of the notice to proceed.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. GI100 SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTANCE RATED WALLS AND AREA DATA AS PROVIDED BY THE VHA.

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR

SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF

WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

GI121

LIFE SAFETY PLAN - BLDG 01 & 28

2ND FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

01 & 28

TW MP

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

NTS

LIFE SAFETY PLAN - BLDG 01 & 28 2ND FLOOR

F2

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR

SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF

WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

GI122

LIFE SAFETY PLAN - BLDG 29 2ND

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

TW MP

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

NTS

LIFE SAFETY PLAN - BLDG 29 2ND FLOOR

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR

SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF

WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

GI131

LIFE SAFETY PLAN - BLDG 01 & 28

3RD FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

01 & 28

TW MP

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

NTS

LIFE SAFETY PLAN - BLDG 01 & 28 3RD FLOOR

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR

SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF

WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

GI141

LIFE SAFETY PLAN - BLDG 01 & 28

4TH FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

01 & 28

TW MP

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

NTS

LIFE SAFETY PLAN - BLDG 01 & 28 4TH FLOOR

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR

SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF

WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

GI151

LIFE SAFETY PLAN - BLDG 01 5TH

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

TW MP

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

NTS

LIFE SAFETY PLAN - BLDG 01 5TH FLOOR

12 1312.4 181716151413121110987654321

D

E

F

G

H

J

K

C

B

A

TUB

DENTAL

LAB

OPERATORY

OPERATORY

OPERATORY

OPERATORY

OPERATORY

X-RAY

X-RAY

OPERATORY

OFFICE

MED GAS ZONE LEGEND

ZONE: 01 1ST FLOOR DENTAL

ZONE: 01 1ST FLOOR FORMER PHYSICAL THERAPY

42"

MIN

48"

MIN

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_A

R C

H _R

_d ei tz en 4S

A Z

T .r vt 3/

/2

:4

6:

A M

01GC111

PHASING PLAN - BLDG 01 1ST

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/2023

1/16" = 1'-0"

PHASING PLAN - BLDG 01 1ST FLOOR

F4

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 01 1ST FLOOR DENTAL

1154 X-RAY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1152 X-RAY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1150 OFFICE

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1146 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1142 OFFICE

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1137 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1139 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1141 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1143 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1145 OPERATORY

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

1158 DENTAL LAB

SELF ONLY (ISOLATE

ON 2ND FLOOR)

1 IV 6PM-6AM

ZONE: 01 1ST FLOOR FORMER PHYSICAL THERAPY

1112 TUB

SELF AND 01 3RD

FLOOR EAST (ISOLATE

IN RESTROOM 3760A)

2 IV N/A

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING NOTES:

1. DENTAL AREA:

A. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 7 DAYS TO PERFORM

SCOPE OF WORK.

B. WORK DURING SCHEDULED

PHASING WORK HOURS ONLY.

C. PROVIDE BOTTLED AIR AND

OXYGEN DURING OUTAGE.

D. COMPLETE MV WORK AND

RETURN TO SERVICE PRIOR TO

REPLACING DENTAL VACUUM.

2. FORMER THERAPY AREA:

A. OUTAGE TO AFFECTED ZONES

ALLOWABLE FOR UP TO 2 DAYS

TO CUT IN VALVE AT

DISCONNECTION POINT.

B. REMAINING DEMO WORK

ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

SSadler Snapshot

12 1312.4 181716151413121110987654321

D

E

F

G

H

J

K

C

B

A

PATIENT

ROOM 13

PATIENT

ROOM 15

PATIENT

ROOM 14

3727A

PATIENT

ROOM 12

3733A

PATIENT

ROOM 10

PATIENT

ROOM 11

PATIENT

ROOM 9

PATIENT

ROOM 8

PATIENT

ROOM 4

PATIENT

ROOM 5

PATIENT

ROOM 6

PATIENT

ROOM 7

PATIENT

ROOM 3

PATIENT

ROOM 2

PATIENT

ROOM 1

MED GAS ZONE LEGEND

ZONE: 01 3RD FLOOR MEDSURG EAST

ZONE: 01 3RD FLOOR MEDSURG NORTHWEST

ZONE: 01 3RD FLOOR MEDSURG SOUTHWEST

ZONE: 01 3RD FLOOR MEDSURG WEST

M

IN

48"

MIN

M

IN

18"

MIN

M

IN

MEDS

HAC

01-3

STAIR 3

COUNSELING

3742A

RESTROOM

3729A

PRINTERS

STORAGE

POS

3729B

CLEAN

UTILITIES

NOURISHMENT

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

01GC113

PHASING PLAN - BLDG 01 3RD

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 01 3RD FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING NOTES:

1. 01 3RD FLOOR MEDSURG EAST:

A. ISOLATE INDIVIDUAL ROOMS

FOR UP TO 24 HOURS FOR

OUTLET REPLACEMENT.

B. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

REMAINING SCOPE OF WORK.

C. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

2. 01 3RD FLOOR MEDSURG WEST,

NORTHWEST, SOUTHWEST:

A. ISOLATE INDIVIDUAL ROOMS

FOR UP TO 24 HOURS FOR

OUTLET REPLACEMENT.

B. OUTAGE TO AFFECTED ZONES

ALLOWABLE FOR UP TO 2 DAYS

TO CUT IN ISOLATION VALVES

FOR ZONE BOXES.

C. OUTAGE TO INDIVIDUAL ZONES

ALLOWABLE FOR UP TO 3 DAYS

TO PERFORM REMAINING

SCOPE OF WORK.

D. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 01 3RD FLOOR MEDSURG EAST

3723 PATIENT ROOM 14

SELF ONLY (ISOLATE

AT RISER TAKEOFF IN

CHASE)

1 IV N/A

3724 PATIENT ROOM 15

SELF ONLY (ISOLATE

AT RISER TAKEOFF IN

CHASE)

1 IV N/A

3726 PATIENT ROOM 13

SELF ONLY (ISOLATE

AT RISER TAKEOFF IN

CHASE)

1 IV N/A

3727A PATIENT ROOM 12

SELF ONLY (ISOLATE

AT RISER TAKEOFF IN

CHASE)

1 IV N/A

ZONE: 01 3RD FLOOR MEDSURG NORTHWEST

3742 PATIENT ROOM 3

SELF AND 01 3RD

FLOOR WEST AND

SOUTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

3744 PATIENT ROOM 2

SELF AND 01 3RD

FLOOR WEST AND

SOUTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

3746 PATIENT ROOM 1

SELF AND 01 3RD

FLOOR WEST AND

SOUTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

ZONE: 01 3RD FLOOR MEDSURG SOUTHWEST

3745 PATIENT ROOM 4

SELF AND 01 3RD

FLOOR WEST AND

NORTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

3747 PATIENT ROOM 5

SELF AND 01 3RD

FLOOR WEST AND

NORTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

3749 PATIENT ROOM 6

SELF AND 01 3RD

FLOOR WEST AND

NORTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

3751 PATIENT ROOM 7

SELF AND 01 3RD

FLOOR WEST AND

NORTHWEST (ISOLATE

IN TR 3738)

2 IV N/A

ZONE: 01 3RD FLOOR MEDSURG WEST

3734 PATIENT ROOM 11

SELF AND 01 3RD

FLOOR SOUTHWEST

AND NORTHWEST

(ISOLATE IN TR 3738)

2 IV N/A

3735 PATIENT ROOM 8

SELF AND 01 3RD

FLOOR SOUTHWEST

AND NORTHWEST

(ISOLATE IN TR 3738)

2 IV N/A

3736 PATIENT ROOM 9

SELF AND 01 3RD

FLOOR SOUTHWEST

AND NORTHWEST

(ISOLATE IN TR 3738)

2 IV N/A

3733A PATIENT ROOM 10

SELF AND 01 3RD

FLOOR SOUTHWEST

AND NORTHWEST

(ISOLATE IN TR 3738)

2 IV N/A

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.

J

12 13

H

G

F

E

D

F.3

12.4

E.4

181716151413121110987654321

D

E

F

G

H

J

K

C

B

A

WORK ROOM

MED GAS ZONE LEGEND

ZONE: 01 5TH FLOOR BIOMED

48"

MIN

TR

RESTROOM

HAC

STORAGE

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

01GC115

PHASING PLAN - BLDG 01 5TH

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 01 5TH FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING NOTES:

1. 01 5TH FLOOR BIOMED:

A. OUTAGE TO AFFECTED ZONES

ALLOWABLE FOR UP TO 2 DAYS

TO CUT IN ISOLATION VALVES

FOR ZONE BOX.

B. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

REMAINING SCOPE OF WORK.

C. REPLACE OUTLETS DURING

SCHEDULED PHASING WORK

HOURS ONLY.

D. ZONE VALVE & ALARM WORK

ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 01 5TH FLOOR BIOMED

5100 WORK ROOM ALL BLDG 01 1 III 6PM-6AM

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

10 11 12 1396 7 852 3 41

H

G

F

E

D

C

B

A

F.3

3.2 10.31.2 12.4

E.4

MECHANICAL ROOM

CRAWLSPACE

MED GAS ZONE LEGEND

ZONE: 28 BASEMENT COMPRESSOR ROOM

TO BLDG 29

TO BLDG 28

& 01

(E

M A

C

O M

P R

E S

S O

R

TO BLDG 29

TO BLDG 28

& 01

(E

M

P R

E S

S O

R

TO BLDG 29

TO BLDG 28

& 01

(E

M

P R

E S

S O

R

(N

M

P R

E S

S O

R (N

M P

R E

S S

O R

TO BLDG 29

TO BLDG 28

& 01

(E

M

P R

E S

S O

R

(N

M

P R

E S

S O

R

TO BLDG 29

TO BLDG 28

& 01

(N

M

P R

E S

S O

R

NOTE: DIAGRAMS INTENDED TO GRAPHICALLY DEPICT SEQUENCE OF CRITICAL

STEPS ONLY. REFER TO MEP FOR COMPLETE SCOPE DETAILS INCLUDING BUT

NOT LIMITED TO DETAILED PIPE ROUTING PLANS, ADDITIONAL VALVES AND PIPE

ACCESSORIES, CONTROLS, POWER, ETC.

MEDICAL AIR COMPRESSOR PHASING DIAGRAMS

(E) STEAM PIPE

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

28GC110

PHASING PLAN - BLDG 28

BASEMENT & CRAWLSPACE

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 28 BASEMENT & CRAWLSPACE

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 28 BASEMENT COMPRESSOR ROOM

0001 MECHANICAL ROOM ALL MA; BLDG 28 MV 1,2 IV SEE NOTES

PHASING NOTES:

1. MA COMPRESSOR:

A. REFER TO MA COMPRESSOR

PHASING DIAGRAMS BELOW

WITH ASSOCIATED SEQUENTIAL

KEYNOTES.

B. UNLESS NOTED OTHERWISE,

WORK IN MECH ROOM ALLOWED

AT ANY TIME PROVIDED ICRA

AND INTERIM LIFE SAFETY

PROVISIONS PER THE

CONTRACT DOCUMENTS.

2. MV PUMP CONTROLS & PARALLEL

MV MAIN:

A. COMPLETE BLDG 29 MV PUMP

REPLACEMENT FIRST.

B. COORDINATE WITH FACILITY TO

TEMPORARILY DISABLE NON-

CRITICAL MV OUTLETS OVER A

WEEKEND. OPEN CROSS

CONNECTION VALVE TO SERVE

REMAINING BLDG 1, 28, 29

OUTLETS FROM BLDG 29 MV

PUMP.

C. PERFORM CONTROLS

REPLACEMENT SCOPE ON BLDG

28 MV PUMP AND PARALLEL

MAIN TIE-IN BEFORE EXISTING 28

SOURCE VALVE, THEN PLACE

SYSTEM BACK TO NORMAL

OPERATION.

1. REVISE STEAM PIPING PER MECHANICAL PLANS. LIMIT ASSOCIATED STEAM

SYSTEM OUTAGE TO 4 HOURS MAXIMUM. REVISE DOMESTIC HOT WATER

PIPING PER PLUMBING PLANS. LIMIT ASSOCIATED DOMESTIC HOT WATER

OUTAGE TO 4 HOURS MAXIMUM.

2. PROVIDE NEW MA COMPRESSOR AND SOURCE PIPING PER P SHEET

SERIES WHILE ORIGINAL IN SERVICE.

3. ISOLATE BRANCH TO BLDG 29. PROVIDE BOTTLED MEDICAL AIR FOR BLDG

29 OUTLET LOCATIONS. OUTAGE SHALL NOT EXCEED 3 DAYS.

4. TIE IN NEW MA COMPRESSOR TO ISOLATED BLDG 29 MAIN.

5. DURING COORDINATED WEEKEND NIGHT OUTAGE NOT TO EXCEED 24

HOURS, CUT IN NEW VALVE & AUX CONNECTION AFTER EXISTING MA

COMPRESSOR. PROVIDE BOTTLED MEDICAL AIR FOR CRITICAL BLDG 28 & 1

OUTLET LOCATIONS.

6. OPEN BLDG 29 ISO VALVE TO SERVE WHOLE SYSTEM FROM NEW MA

COMPRESSOR.

7. ISOLATE AND REMOVE EXISTING MA COMPRESSOR.

8. PROVIDE FINAL MAIN SOURCE PIPING FROM NEW MA COMPRESSOR TO MA

MAIN.

9. OPEN NEW MAIN PIPING TO SYSTEM.

10. CLOSE BLDG 29 CONNECTION FOR NORMAL OPERATION.

H

G

F

E

D

C

B

A

F.3

3.2 10.31.2 12.4

E.4

J

K

TRIAGE/

ISOLATION/EXAM

EXAM

EXAM

EXAM

WOMENS

HEALTH

TRAUMA

TRAUMA

TRAUMA

MRI

EKG

PF

STRESS

LAB

ECHO

CARDIO

NEURO

EEG

CHEMO

GAMMA

CAMERA

GAMMA

CAMERA

X-RAY #4

X-RAY #2

CT SCAN

X-RAY#1

CT SCAN

A

PHARMACY

PHARMACY

MED GAS ZONE LEGEND

ZONE: 28 1ST FLOOR CHEMO

ZONE: 28 1ST FLOOR ED CT

SCAN RM

ZONE: 28 1ST FLOOR ED EXAM 1

ZONE: 28 1ST FLOOR ED EXAM 2

ZONE: 28 1ST FLOOR ED EXAM 3

ZONE: 28 1ST FLOOR ED EXAM 4

(WOMENS)

ZONE: 28 1ST FLOOR ED MRI

ZONE: 28 1ST FLOOR ED

TRAUMA 1

ZONE: 28 1ST FLOOR ED

TRAUMA 2

ZONE: 28 1ST FLOOR ED

TRAUMA 3

ZONE: 28 1ST FLOOR ED TRIAGE

ZONE: 28 1ST FLOOR ED X-RAY

ZONE: 28 1ST FLOOR

RADIOLOGY CT SCAN

ZONE: 28 1ST FLOOR

RADIOLOGY FORMER CT SCAN

ZONE: 28 1ST FLOOR

RADIOLOGY GAMMA CAMERA O2

ZONE: 28 1ST FLOOR

RADIOLOGY X-RAY 1

ZONE: 28 1ST FLOOR

RADIOLOGY X-RAY 2

ZONE: 28 1ST FLOOR

RADIOLOGY X-RAY 4

ZONE: 28 1ST FLOOR

RESPIRATORY/CARDIO

48"

MIN

48"

MIN

48"

MIN

48"

MIN

48"

MIN

48"

MIN

48"

MIN

48"

MIN

48"

MIN

PREP

ROOM

NURSE

STATION/NOURISH

48"

MIN

48"

MIN

1 48

M

IN

42"

MIN

48"

MIN

M

IN

12"

MIN

M

IN1

CLERK

1230A

RESTROOM

WORK STATIONS

1309A

RESTROOM

CT SCAN ROOM

PATIENT

RESTROOM

PATIENT

RESTROOM

TR

X-RAY

1334B

RECEPTION

DESK

RADIOLOGY

CHIEF

OFFICE

WAITING

NUCLEAR

MEDICINE

LAB

SOILED

LINEN

OX FULL

OX EMPTY

CLEAN

SUPPLY

CLEAN

LINEN

NURSE

STATION

WAITING

RESTROOM

1292A

STORAGE

1288A

RESTROOM

WAITING

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

28GC111

PHASING PLAN - BLDG 28 1ST

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 28 1ST FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 28 1ST FLOOR CHEMO

1288 CHEMO

SELF ONLY (ISOLATE

IN CORRIDOR)

1 IV WEEKENDS

NURSE

STATION/NOURISH

SELF ONLY (ISOLATE

IN CORRIDOR)

1 IV WEEKENDS

1292 PREP ROOM

SELF ONLY (ISOLATE

IN CORRIDOR)

1 IV WEEKENDS

ZONE: 28 1ST FLOOR ED EXAM 1

1374 EXAM

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED EXAM 2

1376 EXAM

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED EXAM 3

1378 EXAM

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED EXAM 4 (WOMENS)

1230 WOMENS HEALTH

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED MRI

1351 MRI

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED TRAUMA 1

1381 TRAUMA

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED TRAUMA 2

1383 TRAUMA

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED TRAUMA 3

1385 TRAUMA

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR ED TRIAGE

TRIAGE/

ISOLATION/EXAM

ALL ED AND

RESPIRATORY/CARDIO

ZONES (ISOLATE IN

PHARMACY 1208)

2 IV N/A

ZONE: 28 1ST FLOOR RADIOLOGY CT SCAN

1316 CT SCAN ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RADIOLOGY FORMER CT SCAN

1332 CT SCAN ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RADIOLOGY GAMMA CAMERA O2

1308 GAMMA CAMERA ALL RADIOLOGY 4 IV 6PM-6AM

1310 GAMMA CAMERA ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 1

1321 X-RAY#1 ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 2

1309 X-RAY #2 ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 4

1313 X-RAY #4 ALL RADIOLOGY 4 IV 6PM-6AM

ZONE: 28 1ST FLOOR RESPIRATORY/CARDIO

1278 EKG SEE NOTES 3 IV 6PM-6AM

1280 PF SEE NOTES 3 IV 6PM-6AM

1282 STRESS LAB SEE NOTES 3 IV 6PM-6AM

1289 NEURO EEG SEE NOTES 3 IV 6PM-6AM

1287 ECHO CARDIO SEE NOTES 3 IV 6PM-6AM

PHASING NOTES:

1. CHEMO:

A. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

SCOPE OF WORK.

B. WORK DURING SCHEDULED

PHASING WORK HOURS ONLY.

2. EMERGENCY DEPARTMENT (ED)

ZONES:

A. PROVIDE NEW PIPING (REF

PLUMBING PLANS) FIRST WHILE

EXISTING PIPING REMAINS IN

SERVICE.

B. OUTAGE TO AFFECTED ZONES

ALLOWABLE FOR UP TO 2 DAYS

TO TIE IN NEW PIPING AT MAINS

AND AT ROOM RUNOUTS.

C. AFTER NEW ZONE BOXES

COMPLETED, ISOLATE

INDIVIDUAL ROOMS FOR UP TO

24 HOURS FOR OUTLET

REPLACEMENT.

D. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

3. RESPIRATORY/CARDIO:

A. CUT IN ISOLATION VALVES FOR

ZONE BOX DURING OUTAGE FOR

NEW ED PIPING TIE-INS.

B. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

REMAINING SCOPE OF WORK.

C. REPLACE OUTLETS DURING

SCHEDULED PHASING WORK

HOURS ONLY.

D. ZONE VALVE & ALARM WORK

ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

4. RADIOLOGY:

A. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

SCOPE OF WORK.

B. WORK DURING SCHEDULED

PHASING WORK HOURS ONLY.

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.

2. WORK IN THE PHARMACY AS INDICATED BY DASHED LINES REQUIRES

SUPERVISION BY VA PHARMACY STAFF.

UP

10 11 12 1396 7 852 3 41

H

G

F

E

D

C

B

A

F.3

3.2 10.31.2 12.4

E.4

LABORATORY

MICROBIOLOGY

HISTOLOGY

2255D

BLOOD BANK

A

48"

MIN

MED GAS ZONE LEGEND

ZONE: 28 2ND FLOOR LAB

CUBICLE

OFFICE

XXX

CORRIDOR

SUPERVISOR 2237

LOCKERS

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

28GC112

PHASING PLAN - BLDG 28 2ND

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 28 2ND FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 28 2ND FLOOR LAB

2239 HISTOLOGY

SELF ONLY (ISOLATE

OUTSIDE LAB

SUPERVISOR OFFICE

2242)

1 IV N/A

2236 MICROBIOLOGY

SELF ONLY (ISOLATE

OUTSIDE LAB

SUPERVISOR OFFICE

2242)

1 IV N/A

2255 LABORATORY

SELF ONLY (ISOLATE

OUTSIDE LAB

SUPERVISOR OFFICE

2242)

1 IV N/A

2255D BLOOD BANK

SELF ONLY (ISOLATE

OUTSIDE LAB

SUPERVISOR OFFICE

2242)

1 IV N/A

PHASING NOTES:

1. LAB:

A. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

SCOPE OF WORK.

B. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

H

G

F

E

D

C

B

A

F.3

3.2 10.31.2 12.4

E.4

PATIENT

ROOM

(ISO)

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

(BAR)

PATIENT

ROOM

SPS EQUIPMENT

STORAGE

PATIENT

ROOM

(BAR)

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

(ISO)

A

MED GAS ZONE LEGEND

ZONE: 28 3RD FLOOR MEDSURG NORTHWEST

ZONE: 28 3RD FLOOR MEDSURG SOUTHWEST

ZONE: 28 3RD FLOOR SPS STORAGE

48"

MIN

3862A

STERILE/NONSTERILE

STORAGE

48"

MIN

48"

MIN

CLEAN

RECEIVING3850

NURSE

STATION

NURSE STATION

3825B

ANTE

ROOM

MEDICATION

NURSE

STATION

STORAGE

ENG STOR

WOMEN

MEN

3816A

VOLUNTEER

LOCKER

ROOM 3803

BREAK

ROOM

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

28GC113

PHASING PLAN - BLDG 28 3RD

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 28 3RD FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES ICRA CLASS

PHASING

WORK

HOURS

ZONE: 28 3RD FLOOR MEDSURG NORTHWEST

3836 PATIENT ROOM (ISO)

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

3837 PATIENT ROOM

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

3838 PATIENT ROOM

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

3839 PATIENT ROOM (BAR)

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

3840 PATIENT ROOM

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

3841 PATIENT ROOM

SELF ONLY (ISOLATE

ABOVE NURSE

STATION 3850)

1 IV N/A

ZONE: 28 3RD FLOOR MEDSURG SOUTHWEST

3825 PATIENT ROOM (ISO)

SELF ONLY (ISOLATE

IN CORRIDOR OUTSIDE

MEDICATION RM 3833)

1 IV N/A

3829 PATIENT ROOM

SELF ONLY (ISOLATE

IN CORRIDOR OUTSIDE

MEDICATION RM 3833)

1 IV N/A

3831 PATIENT ROOM (BAR)

SELF ONLY (ISOLATE

IN CORRIDOR OUTSIDE

MEDICATION RM 3833)

1 IV N/A

3832 PATIENT ROOM

SELF ONLY (ISOLATE

IN CORRIDOR OUTSIDE

MEDICATION RM 3833)

1 IV N/A

ZONE: 28 3RD FLOOR SPS STORAGE

3862A

STERILE/NONSTERILE

STORAGE

2 IV

SPS EQUIPMENT

STORAGE

SELF, 28 3RD FLOOR

MEDSURG, 28 4TH

FLOOR PACU (ISOLATE

ABOVE CLEAN

RECEIVING 3815)

2 IV N/A

PHASING NOTES:

1. BLDG 28 MEDSURG:

A. OUTAGE TO ZONE ALLOWABLE

FOR UP TO 3 DAYS TO PERFORM

SCOPE OF WORK.

B. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

2. SPS:

A. OUTAGE TO AFFECTED ZONES

ALLOWABLE FOR UP TO 2 DAYS

TO CUT IN ISOLATION VALVES

FOR ZONE BOXES. CUT IN

VALVES FOR PACU BRANCH

DURING THIS OUTAGE.

B. OUTAGE TO INDIVIDUAL ZONES

ALLOWABLE FOR UP TO 3 DAYS

TO PERFORM REMAINING

SCOPE OF WORK.

C. WORK ALLOWED AT ANY TIME

PROVIDED ICRA AND INTERIM

LIFE SAFETY PROVISIONS PER

THE CONTRACT DOCUMENTS.

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA

CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE

H

G

F

E

D

C

B

A

F.3

3.2 10.31.2 12.4

E.4

ISOLATION

ROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

ICU

BEDROOM

CYSTOSCOPY

OR

OR

OR

ANESTHESIA

4225B1

BED

4225B2

BED

4225B3

BED

BED

BED

BED

4218B2

BED

4219B1

BED

4219B2

BED

BED

BED

DIALYSIS

BED

CUBICLE

4271A

INSTR.

PROCEDURE

ROOM

EQMT

A

MED GAS ZONE LEGEND

ZONE: 28 4TH FLOOR ICU 1

ZONE: 28 4TH FLOOR ICU 2

ZONE: 28 4TH FLOOR ICU 3

ZONE: 28 4TH FLOOR ICU 4

ZONE: 28 4TH FLOOR ICU 5

ZONE: 28 4TH FLOOR ICU 6

ZONE: 28 4TH FLOOR ICU 7

ZONE: 28 4TH FLOOR ICU 8

ZONE: 28 4TH FLOOR ICU 9

ZONE: 28 4TH FLOOR ICU 10

ZONE: 28 4TH FLOOR ICU 11

ZONE: 28 4TH FLOOR ICU 12

ZONE: 28 4TH FLOOR ICU 13

ZONE: 28 4TH FLOOR ICU 14

ZONE: 28 4TH FLOOR ICU

PROCEDURE RM

ZONE: 28 4TH FLOOR OR 1

ZONE: 28 4TH FLOOR OR 2

ZONE: 28 4TH FLOOR OR 3

ZONE: 28 4TH FLOOR OR 4

ZONE: 28 4TH FLOOR PACU

ZONE: 28 4TH FLOOR RMS 4261, 4250,

M

IN

M

IN1

48"

MIN

M

IN

48"

MIN

48"

MIN

M

IN

48"

MIN

48"

MIN

M

IN

M

IN

M

IN

48"

MIN

48"

MIN

M

IN

M

IN

48"

MIN

4214A

ANTE

ROOM 1

36"

MIN

NURSE STATION

CLEAN

M

IN

48"

MIN

RESTROOM

WAITING

RESTROOM4226

NURSE

STATION 4247

CLEAN

STORAGE

MED

ROOM

MEDICATION

28-1

STAIR 1

CLEAN LINEN

SOILED 4242

ASST. NURSE

MANAGER

NURSE

MANAGER

TRAINING

RESTROOM

CLOSET

4269A

STORAGE 4263

HAC

CLEAN CORE

SCRUB

4267A

SUB STERILE

STORAGE

CLEAN

CART REC

SOILED

ELECTRICAL

HAC

STORAGE

NOUR.

4226A

NURSE

STN

28-4

STAIR 4

28-5

STAIR 5

S-2

ELEV.

60"

MIN

48"

MIN

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e

Nor th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\d jo hn so n\ D oc um en ts

\2 2.

_A

R C

H _R

_d jo hn so nQ

P A

E 4.

rv t

4/ 3/

:1

3:

P M

28GC114

PHASING PLAN - BLDG 28 4TH

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TW MP/DJ

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1/16" = 1'-0"

PHASING PLAN - BLDG 28 4TH FLOOR

F4

A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE

AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED

RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND

APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.

B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST

BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED

CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR

MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE

REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING

BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE

OR NEXT STEP WITHIN A PHASE.

D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF

THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR

BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS

SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.

ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"

MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED

RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM

SYSTEMS IN SERVICE.

E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK

AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND

OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.

COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA

COR AND THE VHA INFECTION CONTROL OFFICER.

F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL

COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,

CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH

PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY

WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS

OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER

SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF

WORK.

G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO

AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN

CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST

RESTRICTIVE TIME LIMITATION.

PHASING SCHEDULE

RM# NAME AFFECTED ZONES

PHASING

NOTES

ICRA

CLASS

PHASING

WORK

HOURS

ZONE: 28 4TH FLOOR ICU 1

4201 DIALYSIS

28 4TH FLOOR ICU 1, 2, AND

PROCEDURE RM

1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 2

4202 BED CUBICLE

28 4TH FLOOR ICU 1, 2, AND

PROCEDURE RM

1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 3

4203 ISOLATION ROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 4

4204 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 5

4205 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 6

4206 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 7

4207 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 8

4208 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 9

4209 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 10

4210 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 11

4211 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 12

4212 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 13

4213 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU 14

4214 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A

ZONE: 28 4TH FLOOR ICU PROCEDURE RM

PROCEDURE

ROOM

28 4TH FLOOR ICU 1, 2, AND

PROCEDURE RM

1,2 IV N/A

ZONE: 28 4TH FLOOR OR 1

4270 OR

SELF ONLY FOLLOWING NEW

ZONE BOX ISO VALVE CUT-IN

3 IV

6PM-6AM &

WEEKENDS

ZONE: 28 4TH FLOOR OR 2

4269 OR

SELF ONLY FOLLOWING NEW

ZONE BOX ISO VALVE CUT-IN

3 IV

6PM-6AM &

WEEKENDS

ZONE: 28 4TH FLOOR OR 3

4267 OR

SELF ONLY FOLLOWING NEW

ZONE BOX ISO VALVE CUT-IN

3 IV

6PM-6AM &

WEEKENDS

ZONE: 28 4TH FLOOR OR 4

4271 CYSTOSCOPY

SELF ONLY FOLLOWING NEW

ZONE BOX ISO VALVE CUT-IN

3 IV

6PM-6AM &

WEEKENDS

ZONE: 28 4TH FLOOR PACU

4216 BED

SELF AND 28 3RD FLOOR

MEDSUR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .