Pages 6-30 from 504-22-108 VEG 22 08 100pct STAMPED - Drawings.pdf
PDF 20 MB Posted
- Solicitation number
- 36C25723B0057
About this file
This document is a solicitation for the upgrade of the medical gas system in buildings 1, 28, and 29 at a Veterans Affairs medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 seeking construction services. Offerors must submit proposals by July 15th, 2022. The selected contractor will be awarded a firm fixed-price contract to remove and replace the existing medical gas piping systems with new brazed copper tube type K piping. The contractor must have a minimum of 5 years experience performing medical gas system installations. The work is to be completed within 365 calendar days of the notice to proceed.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. GI100 SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-
RESISTANCE RATED WALLS AND AREA DATA AS PROVIDED BY THE VHA.
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR
SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF
WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
GI121
LIFE SAFETY PLAN - BLDG 01 & 28
2ND FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
01 & 28
TW MP
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
NTS
LIFE SAFETY PLAN - BLDG 01 & 28 2ND FLOOR
F2
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR
SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF
WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
GI122
LIFE SAFETY PLAN - BLDG 29 2ND
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
TW MP
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
NTS
LIFE SAFETY PLAN - BLDG 29 2ND FLOOR
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR
SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF
WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
GI131
LIFE SAFETY PLAN - BLDG 01 & 28
3RD FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
01 & 28
TW MP
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
NTS
LIFE SAFETY PLAN - BLDG 01 & 28 3RD FLOOR
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR
SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF
WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
GI141
LIFE SAFETY PLAN - BLDG 01 & 28
4TH FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
01 & 28
TW MP
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
NTS
LIFE SAFETY PLAN - BLDG 01 & 28 4TH FLOOR
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR
SCOPE OF WORK. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF
WORK THAT AFFECTS FIRE-RESISTANCE RATED CONSTRUCTION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
GI151
LIFE SAFETY PLAN - BLDG 01 5TH
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
TW MP
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
NTS
LIFE SAFETY PLAN - BLDG 01 5TH FLOOR
12 1312.4 181716151413121110987654321
D
E
F
G
H
J
K
C
B
A
TUB
DENTAL
LAB
OPERATORY
OPERATORY
OPERATORY
OPERATORY
OPERATORY
X-RAY
X-RAY
OPERATORY
OFFICE
MED GAS ZONE LEGEND
ZONE: 01 1ST FLOOR DENTAL
ZONE: 01 1ST FLOOR FORMER PHYSICAL THERAPY
42"
MIN
48"
MIN
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_d ei tz en 4S
A Z
T .r vt 3/
/2
:4
6:
A M
01GC111
PHASING PLAN - BLDG 01 1ST
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/2023
1/16" = 1'-0"
PHASING PLAN - BLDG 01 1ST FLOOR
F4
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 01 1ST FLOOR DENTAL
1154 X-RAY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1152 X-RAY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1150 OFFICE
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1146 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1142 OFFICE
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1137 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1139 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1141 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1143 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1145 OPERATORY
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
1158 DENTAL LAB
SELF ONLY (ISOLATE
ON 2ND FLOOR)
1 IV 6PM-6AM
ZONE: 01 1ST FLOOR FORMER PHYSICAL THERAPY
1112 TUB
SELF AND 01 3RD
FLOOR EAST (ISOLATE
IN RESTROOM 3760A)
2 IV N/A
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING NOTES:
1. DENTAL AREA:
A. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 7 DAYS TO PERFORM
SCOPE OF WORK.
B. WORK DURING SCHEDULED
PHASING WORK HOURS ONLY.
C. PROVIDE BOTTLED AIR AND
OXYGEN DURING OUTAGE.
D. COMPLETE MV WORK AND
RETURN TO SERVICE PRIOR TO
REPLACING DENTAL VACUUM.
2. FORMER THERAPY AREA:
A. OUTAGE TO AFFECTED ZONES
ALLOWABLE FOR UP TO 2 DAYS
TO CUT IN VALVE AT
DISCONNECTION POINT.
B. REMAINING DEMO WORK
ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
SSadler Snapshot
12 1312.4 181716151413121110987654321
D
E
F
G
H
J
K
C
B
A
PATIENT
ROOM 13
PATIENT
ROOM 15
PATIENT
ROOM 14
3727A
PATIENT
ROOM 12
3733A
PATIENT
ROOM 10
PATIENT
ROOM 11
PATIENT
ROOM 9
PATIENT
ROOM 8
PATIENT
ROOM 4
PATIENT
ROOM 5
PATIENT
ROOM 6
PATIENT
ROOM 7
PATIENT
ROOM 3
PATIENT
ROOM 2
PATIENT
ROOM 1
MED GAS ZONE LEGEND
ZONE: 01 3RD FLOOR MEDSURG EAST
ZONE: 01 3RD FLOOR MEDSURG NORTHWEST
ZONE: 01 3RD FLOOR MEDSURG SOUTHWEST
ZONE: 01 3RD FLOOR MEDSURG WEST
M
IN
48"
MIN
M
IN
18"
MIN
M
IN
MEDS
HAC
01-3
STAIR 3
COUNSELING
3742A
RESTROOM
3729A
PRINTERS
STORAGE
POS
3729B
CLEAN
UTILITIES
NOURISHMENT
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
01GC113
PHASING PLAN - BLDG 01 3RD
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 01 3RD FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING NOTES:
1. 01 3RD FLOOR MEDSURG EAST:
A. ISOLATE INDIVIDUAL ROOMS
FOR UP TO 24 HOURS FOR
OUTLET REPLACEMENT.
B. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
REMAINING SCOPE OF WORK.
C. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
2. 01 3RD FLOOR MEDSURG WEST,
NORTHWEST, SOUTHWEST:
A. ISOLATE INDIVIDUAL ROOMS
FOR UP TO 24 HOURS FOR
OUTLET REPLACEMENT.
B. OUTAGE TO AFFECTED ZONES
ALLOWABLE FOR UP TO 2 DAYS
TO CUT IN ISOLATION VALVES
FOR ZONE BOXES.
C. OUTAGE TO INDIVIDUAL ZONES
ALLOWABLE FOR UP TO 3 DAYS
TO PERFORM REMAINING
SCOPE OF WORK.
D. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 01 3RD FLOOR MEDSURG EAST
3723 PATIENT ROOM 14
SELF ONLY (ISOLATE
AT RISER TAKEOFF IN
CHASE)
1 IV N/A
3724 PATIENT ROOM 15
SELF ONLY (ISOLATE
AT RISER TAKEOFF IN
CHASE)
1 IV N/A
3726 PATIENT ROOM 13
SELF ONLY (ISOLATE
AT RISER TAKEOFF IN
CHASE)
1 IV N/A
3727A PATIENT ROOM 12
SELF ONLY (ISOLATE
AT RISER TAKEOFF IN
CHASE)
1 IV N/A
ZONE: 01 3RD FLOOR MEDSURG NORTHWEST
3742 PATIENT ROOM 3
SELF AND 01 3RD
FLOOR WEST AND
SOUTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
3744 PATIENT ROOM 2
SELF AND 01 3RD
FLOOR WEST AND
SOUTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
3746 PATIENT ROOM 1
SELF AND 01 3RD
FLOOR WEST AND
SOUTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
ZONE: 01 3RD FLOOR MEDSURG SOUTHWEST
3745 PATIENT ROOM 4
SELF AND 01 3RD
FLOOR WEST AND
NORTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
3747 PATIENT ROOM 5
SELF AND 01 3RD
FLOOR WEST AND
NORTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
3749 PATIENT ROOM 6
SELF AND 01 3RD
FLOOR WEST AND
NORTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
3751 PATIENT ROOM 7
SELF AND 01 3RD
FLOOR WEST AND
NORTHWEST (ISOLATE
IN TR 3738)
2 IV N/A
ZONE: 01 3RD FLOOR MEDSURG WEST
3734 PATIENT ROOM 11
SELF AND 01 3RD
FLOOR SOUTHWEST
AND NORTHWEST
(ISOLATE IN TR 3738)
2 IV N/A
3735 PATIENT ROOM 8
SELF AND 01 3RD
FLOOR SOUTHWEST
AND NORTHWEST
(ISOLATE IN TR 3738)
2 IV N/A
3736 PATIENT ROOM 9
SELF AND 01 3RD
FLOOR SOUTHWEST
AND NORTHWEST
(ISOLATE IN TR 3738)
2 IV N/A
3733A PATIENT ROOM 10
SELF AND 01 3RD
FLOOR SOUTHWEST
AND NORTHWEST
(ISOLATE IN TR 3738)
2 IV N/A
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.
J
12 13
H
G
F
E
D
F.3
12.4
E.4
181716151413121110987654321
D
E
F
G
H
J
K
C
B
A
WORK ROOM
MED GAS ZONE LEGEND
ZONE: 01 5TH FLOOR BIOMED
48"
MIN
TR
RESTROOM
HAC
STORAGE
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
01GC115
PHASING PLAN - BLDG 01 5TH
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 01 5TH FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING NOTES:
1. 01 5TH FLOOR BIOMED:
A. OUTAGE TO AFFECTED ZONES
ALLOWABLE FOR UP TO 2 DAYS
TO CUT IN ISOLATION VALVES
FOR ZONE BOX.
B. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
REMAINING SCOPE OF WORK.
C. REPLACE OUTLETS DURING
SCHEDULED PHASING WORK
HOURS ONLY.
D. ZONE VALVE & ALARM WORK
ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 01 5TH FLOOR BIOMED
5100 WORK ROOM ALL BLDG 01 1 III 6PM-6AM
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
10 11 12 1396 7 852 3 41
H
G
F
E
D
C
B
A
F.3
3.2 10.31.2 12.4
E.4
MECHANICAL ROOM
CRAWLSPACE
MED GAS ZONE LEGEND
ZONE: 28 BASEMENT COMPRESSOR ROOM
TO BLDG 29
TO BLDG 28
& 01
(E
M A
C
O M
P R
E S
S O
R
TO BLDG 29
TO BLDG 28
& 01
(E
M
P R
E S
S O
R
TO BLDG 29
TO BLDG 28
& 01
(E
M
P R
E S
S O
R
(N
M
P R
E S
S O
R (N
M P
R E
S S
O R
TO BLDG 29
TO BLDG 28
& 01
(E
M
P R
E S
S O
R
(N
M
P R
E S
S O
R
TO BLDG 29
TO BLDG 28
& 01
(N
M
P R
E S
S O
R
NOTE: DIAGRAMS INTENDED TO GRAPHICALLY DEPICT SEQUENCE OF CRITICAL
STEPS ONLY. REFER TO MEP FOR COMPLETE SCOPE DETAILS INCLUDING BUT
NOT LIMITED TO DETAILED PIPE ROUTING PLANS, ADDITIONAL VALVES AND PIPE
ACCESSORIES, CONTROLS, POWER, ETC.
MEDICAL AIR COMPRESSOR PHASING DIAGRAMS
(E) STEAM PIPE
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
28GC110
PHASING PLAN - BLDG 28
BASEMENT & CRAWLSPACE
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 28 BASEMENT & CRAWLSPACE
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 28 BASEMENT COMPRESSOR ROOM
0001 MECHANICAL ROOM ALL MA; BLDG 28 MV 1,2 IV SEE NOTES
PHASING NOTES:
1. MA COMPRESSOR:
A. REFER TO MA COMPRESSOR
PHASING DIAGRAMS BELOW
WITH ASSOCIATED SEQUENTIAL
KEYNOTES.
B. UNLESS NOTED OTHERWISE,
WORK IN MECH ROOM ALLOWED
AT ANY TIME PROVIDED ICRA
AND INTERIM LIFE SAFETY
PROVISIONS PER THE
CONTRACT DOCUMENTS.
2. MV PUMP CONTROLS & PARALLEL
MV MAIN:
A. COMPLETE BLDG 29 MV PUMP
REPLACEMENT FIRST.
B. COORDINATE WITH FACILITY TO
TEMPORARILY DISABLE NON-
CRITICAL MV OUTLETS OVER A
WEEKEND. OPEN CROSS
CONNECTION VALVE TO SERVE
REMAINING BLDG 1, 28, 29
OUTLETS FROM BLDG 29 MV
PUMP.
C. PERFORM CONTROLS
REPLACEMENT SCOPE ON BLDG
28 MV PUMP AND PARALLEL
MAIN TIE-IN BEFORE EXISTING 28
SOURCE VALVE, THEN PLACE
SYSTEM BACK TO NORMAL
OPERATION.
1. REVISE STEAM PIPING PER MECHANICAL PLANS. LIMIT ASSOCIATED STEAM
SYSTEM OUTAGE TO 4 HOURS MAXIMUM. REVISE DOMESTIC HOT WATER
PIPING PER PLUMBING PLANS. LIMIT ASSOCIATED DOMESTIC HOT WATER
OUTAGE TO 4 HOURS MAXIMUM.
2. PROVIDE NEW MA COMPRESSOR AND SOURCE PIPING PER P SHEET
SERIES WHILE ORIGINAL IN SERVICE.
3. ISOLATE BRANCH TO BLDG 29. PROVIDE BOTTLED MEDICAL AIR FOR BLDG
29 OUTLET LOCATIONS. OUTAGE SHALL NOT EXCEED 3 DAYS.
4. TIE IN NEW MA COMPRESSOR TO ISOLATED BLDG 29 MAIN.
5. DURING COORDINATED WEEKEND NIGHT OUTAGE NOT TO EXCEED 24
HOURS, CUT IN NEW VALVE & AUX CONNECTION AFTER EXISTING MA
COMPRESSOR. PROVIDE BOTTLED MEDICAL AIR FOR CRITICAL BLDG 28 & 1
OUTLET LOCATIONS.
6. OPEN BLDG 29 ISO VALVE TO SERVE WHOLE SYSTEM FROM NEW MA
COMPRESSOR.
7. ISOLATE AND REMOVE EXISTING MA COMPRESSOR.
8. PROVIDE FINAL MAIN SOURCE PIPING FROM NEW MA COMPRESSOR TO MA
MAIN.
9. OPEN NEW MAIN PIPING TO SYSTEM.
10. CLOSE BLDG 29 CONNECTION FOR NORMAL OPERATION.
H
G
F
E
D
C
B
A
F.3
3.2 10.31.2 12.4
E.4
J
K
TRIAGE/
ISOLATION/EXAM
EXAM
EXAM
EXAM
WOMENS
HEALTH
TRAUMA
TRAUMA
TRAUMA
MRI
EKG
PF
STRESS
LAB
ECHO
CARDIO
NEURO
EEG
CHEMO
GAMMA
CAMERA
GAMMA
CAMERA
X-RAY #4
X-RAY #2
CT SCAN
X-RAY#1
CT SCAN
A
PHARMACY
PHARMACY
MED GAS ZONE LEGEND
ZONE: 28 1ST FLOOR CHEMO
ZONE: 28 1ST FLOOR ED CT
SCAN RM
ZONE: 28 1ST FLOOR ED EXAM 1
ZONE: 28 1ST FLOOR ED EXAM 2
ZONE: 28 1ST FLOOR ED EXAM 3
ZONE: 28 1ST FLOOR ED EXAM 4
(WOMENS)
ZONE: 28 1ST FLOOR ED MRI
ZONE: 28 1ST FLOOR ED
TRAUMA 1
ZONE: 28 1ST FLOOR ED
TRAUMA 2
ZONE: 28 1ST FLOOR ED
TRAUMA 3
ZONE: 28 1ST FLOOR ED TRIAGE
ZONE: 28 1ST FLOOR ED X-RAY
ZONE: 28 1ST FLOOR
RADIOLOGY CT SCAN
ZONE: 28 1ST FLOOR
RADIOLOGY FORMER CT SCAN
ZONE: 28 1ST FLOOR
RADIOLOGY GAMMA CAMERA O2
ZONE: 28 1ST FLOOR
RADIOLOGY X-RAY 1
ZONE: 28 1ST FLOOR
RADIOLOGY X-RAY 2
ZONE: 28 1ST FLOOR
RADIOLOGY X-RAY 4
ZONE: 28 1ST FLOOR
RESPIRATORY/CARDIO
48"
MIN
48"
MIN
48"
MIN
48"
MIN
48"
MIN
48"
MIN
48"
MIN
48"
MIN
48"
MIN
PREP
ROOM
NURSE
STATION/NOURISH
48"
MIN
48"
MIN
1 48
M
IN
42"
MIN
48"
MIN
M
IN
12"
MIN
M
IN1
CLERK
1230A
RESTROOM
WORK STATIONS
1309A
RESTROOM
CT SCAN ROOM
PATIENT
RESTROOM
PATIENT
RESTROOM
TR
X-RAY
1334B
RECEPTION
DESK
RADIOLOGY
CHIEF
OFFICE
WAITING
NUCLEAR
MEDICINE
LAB
SOILED
LINEN
OX FULL
OX EMPTY
CLEAN
SUPPLY
CLEAN
LINEN
NURSE
STATION
WAITING
RESTROOM
1292A
STORAGE
1288A
RESTROOM
WAITING
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
28GC111
PHASING PLAN - BLDG 28 1ST
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 28 1ST FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 28 1ST FLOOR CHEMO
1288 CHEMO
SELF ONLY (ISOLATE
IN CORRIDOR)
1 IV WEEKENDS
NURSE
STATION/NOURISH
SELF ONLY (ISOLATE
IN CORRIDOR)
1 IV WEEKENDS
1292 PREP ROOM
SELF ONLY (ISOLATE
IN CORRIDOR)
1 IV WEEKENDS
ZONE: 28 1ST FLOOR ED EXAM 1
1374 EXAM
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED EXAM 2
1376 EXAM
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED EXAM 3
1378 EXAM
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED EXAM 4 (WOMENS)
1230 WOMENS HEALTH
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED MRI
1351 MRI
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED TRAUMA 1
1381 TRAUMA
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED TRAUMA 2
1383 TRAUMA
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED TRAUMA 3
1385 TRAUMA
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR ED TRIAGE
TRIAGE/
ISOLATION/EXAM
ALL ED AND
RESPIRATORY/CARDIO
ZONES (ISOLATE IN
PHARMACY 1208)
2 IV N/A
ZONE: 28 1ST FLOOR RADIOLOGY CT SCAN
1316 CT SCAN ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RADIOLOGY FORMER CT SCAN
1332 CT SCAN ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RADIOLOGY GAMMA CAMERA O2
1308 GAMMA CAMERA ALL RADIOLOGY 4 IV 6PM-6AM
1310 GAMMA CAMERA ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 1
1321 X-RAY#1 ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 2
1309 X-RAY #2 ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RADIOLOGY X-RAY 4
1313 X-RAY #4 ALL RADIOLOGY 4 IV 6PM-6AM
ZONE: 28 1ST FLOOR RESPIRATORY/CARDIO
1278 EKG SEE NOTES 3 IV 6PM-6AM
1280 PF SEE NOTES 3 IV 6PM-6AM
1282 STRESS LAB SEE NOTES 3 IV 6PM-6AM
1289 NEURO EEG SEE NOTES 3 IV 6PM-6AM
1287 ECHO CARDIO SEE NOTES 3 IV 6PM-6AM
PHASING NOTES:
1. CHEMO:
A. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
SCOPE OF WORK.
B. WORK DURING SCHEDULED
PHASING WORK HOURS ONLY.
2. EMERGENCY DEPARTMENT (ED)
ZONES:
A. PROVIDE NEW PIPING (REF
PLUMBING PLANS) FIRST WHILE
EXISTING PIPING REMAINS IN
SERVICE.
B. OUTAGE TO AFFECTED ZONES
ALLOWABLE FOR UP TO 2 DAYS
TO TIE IN NEW PIPING AT MAINS
AND AT ROOM RUNOUTS.
C. AFTER NEW ZONE BOXES
COMPLETED, ISOLATE
INDIVIDUAL ROOMS FOR UP TO
24 HOURS FOR OUTLET
REPLACEMENT.
D. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
3. RESPIRATORY/CARDIO:
A. CUT IN ISOLATION VALVES FOR
ZONE BOX DURING OUTAGE FOR
NEW ED PIPING TIE-INS.
B. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
REMAINING SCOPE OF WORK.
C. REPLACE OUTLETS DURING
SCHEDULED PHASING WORK
HOURS ONLY.
D. ZONE VALVE & ALARM WORK
ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
4. RADIOLOGY:
A. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
SCOPE OF WORK.
B. WORK DURING SCHEDULED
PHASING WORK HOURS ONLY.
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
DEPARTMENTS AS INDICATED IN PHASING SCHEDULE.
2. WORK IN THE PHARMACY AS INDICATED BY DASHED LINES REQUIRES
SUPERVISION BY VA PHARMACY STAFF.
UP
10 11 12 1396 7 852 3 41
H
G
F
E
D
C
B
A
F.3
3.2 10.31.2 12.4
E.4
LABORATORY
MICROBIOLOGY
HISTOLOGY
2255D
BLOOD BANK
A
48"
MIN
MED GAS ZONE LEGEND
ZONE: 28 2ND FLOOR LAB
CUBICLE
OFFICE
XXX
CORRIDOR
SUPERVISOR 2237
LOCKERS
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
28GC112
PHASING PLAN - BLDG 28 2ND
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 28 2ND FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 28 2ND FLOOR LAB
2239 HISTOLOGY
SELF ONLY (ISOLATE
OUTSIDE LAB
SUPERVISOR OFFICE
2242)
1 IV N/A
2236 MICROBIOLOGY
SELF ONLY (ISOLATE
OUTSIDE LAB
SUPERVISOR OFFICE
2242)
1 IV N/A
2255 LABORATORY
SELF ONLY (ISOLATE
OUTSIDE LAB
SUPERVISOR OFFICE
2242)
1 IV N/A
2255D BLOOD BANK
SELF ONLY (ISOLATE
OUTSIDE LAB
SUPERVISOR OFFICE
2242)
1 IV N/A
PHASING NOTES:
1. LAB:
A. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
SCOPE OF WORK.
B. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
H
G
F
E
D
C
B
A
F.3
3.2 10.31.2 12.4
E.4
PATIENT
ROOM
(ISO)
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
(BAR)
PATIENT
ROOM
SPS EQUIPMENT
STORAGE
PATIENT
ROOM
(BAR)
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
(ISO)
A
MED GAS ZONE LEGEND
ZONE: 28 3RD FLOOR MEDSURG NORTHWEST
ZONE: 28 3RD FLOOR MEDSURG SOUTHWEST
ZONE: 28 3RD FLOOR SPS STORAGE
48"
MIN
3862A
STERILE/NONSTERILE
STORAGE
48"
MIN
48"
MIN
CLEAN
RECEIVING3850
NURSE
STATION
NURSE STATION
3825B
ANTE
ROOM
MEDICATION
NURSE
STATION
STORAGE
ENG STOR
WOMEN
MEN
3816A
VOLUNTEER
LOCKER
ROOM 3803
BREAK
ROOM
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
28GC113
PHASING PLAN - BLDG 28 3RD
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 28 3RD FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES ICRA CLASS
PHASING
WORK
HOURS
ZONE: 28 3RD FLOOR MEDSURG NORTHWEST
3836 PATIENT ROOM (ISO)
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
3837 PATIENT ROOM
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
3838 PATIENT ROOM
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
3839 PATIENT ROOM (BAR)
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
3840 PATIENT ROOM
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
3841 PATIENT ROOM
SELF ONLY (ISOLATE
ABOVE NURSE
STATION 3850)
1 IV N/A
ZONE: 28 3RD FLOOR MEDSURG SOUTHWEST
3825 PATIENT ROOM (ISO)
SELF ONLY (ISOLATE
IN CORRIDOR OUTSIDE
MEDICATION RM 3833)
1 IV N/A
3829 PATIENT ROOM
SELF ONLY (ISOLATE
IN CORRIDOR OUTSIDE
MEDICATION RM 3833)
1 IV N/A
3831 PATIENT ROOM (BAR)
SELF ONLY (ISOLATE
IN CORRIDOR OUTSIDE
MEDICATION RM 3833)
1 IV N/A
3832 PATIENT ROOM
SELF ONLY (ISOLATE
IN CORRIDOR OUTSIDE
MEDICATION RM 3833)
1 IV N/A
ZONE: 28 3RD FLOOR SPS STORAGE
3862A
STERILE/NONSTERILE
STORAGE
2 IV
SPS EQUIPMENT
STORAGE
SELF, 28 3RD FLOOR
MEDSURG, 28 4TH
FLOOR PACU (ISOLATE
ABOVE CLEAN
RECEIVING 3815)
2 IV N/A
PHASING NOTES:
1. BLDG 28 MEDSURG:
A. OUTAGE TO ZONE ALLOWABLE
FOR UP TO 3 DAYS TO PERFORM
SCOPE OF WORK.
B. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
2. SPS:
A. OUTAGE TO AFFECTED ZONES
ALLOWABLE FOR UP TO 2 DAYS
TO CUT IN ISOLATION VALVES
FOR ZONE BOXES. CUT IN
VALVES FOR PACU BRANCH
DURING THIS OUTAGE.
B. OUTAGE TO INDIVIDUAL ZONES
ALLOWABLE FOR UP TO 3 DAYS
TO PERFORM REMAINING
SCOPE OF WORK.
C. WORK ALLOWED AT ANY TIME
PROVIDED ICRA AND INTERIM
LIFE SAFETY PROVISIONS PER
THE CONTRACT DOCUMENTS.
1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION
SHOWN. REFER TO SPECIFICATION SECTION 01 35 26. COMPLY WITH ICRA
CLASSIFICATION AND ALLOWABLE WORK HOURS OF RESPECTIVE
H
G
F
E
D
C
B
A
F.3
3.2 10.31.2 12.4
E.4
ISOLATION
ROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
ICU
BEDROOM
CYSTOSCOPY
OR
OR
OR
ANESTHESIA
4225B1
BED
4225B2
BED
4225B3
BED
BED
BED
BED
4218B2
BED
4219B1
BED
4219B2
BED
BED
BED
DIALYSIS
BED
CUBICLE
4271A
INSTR.
PROCEDURE
ROOM
EQMT
A
MED GAS ZONE LEGEND
ZONE: 28 4TH FLOOR ICU 1
ZONE: 28 4TH FLOOR ICU 2
ZONE: 28 4TH FLOOR ICU 3
ZONE: 28 4TH FLOOR ICU 4
ZONE: 28 4TH FLOOR ICU 5
ZONE: 28 4TH FLOOR ICU 6
ZONE: 28 4TH FLOOR ICU 7
ZONE: 28 4TH FLOOR ICU 8
ZONE: 28 4TH FLOOR ICU 9
ZONE: 28 4TH FLOOR ICU 10
ZONE: 28 4TH FLOOR ICU 11
ZONE: 28 4TH FLOOR ICU 12
ZONE: 28 4TH FLOOR ICU 13
ZONE: 28 4TH FLOOR ICU 14
ZONE: 28 4TH FLOOR ICU
PROCEDURE RM
ZONE: 28 4TH FLOOR OR 1
ZONE: 28 4TH FLOOR OR 2
ZONE: 28 4TH FLOOR OR 3
ZONE: 28 4TH FLOOR OR 4
ZONE: 28 4TH FLOOR PACU
ZONE: 28 4TH FLOOR RMS 4261, 4250,
M
IN
M
IN1
48"
MIN
M
IN
48"
MIN
48"
MIN
M
IN
48"
MIN
48"
MIN
M
IN
M
IN
M
IN
48"
MIN
48"
MIN
M
IN
M
IN
48"
MIN
4214A
ANTE
ROOM 1
36"
MIN
NURSE STATION
CLEAN
M
IN
48"
MIN
RESTROOM
WAITING
RESTROOM4226
NURSE
STATION 4247
CLEAN
STORAGE
MED
ROOM
MEDICATION
28-1
STAIR 1
CLEAN LINEN
SOILED 4242
ASST. NURSE
MANAGER
NURSE
MANAGER
TRAINING
RESTROOM
CLOSET
4269A
STORAGE 4263
HAC
CLEAN CORE
SCRUB
4267A
SUB STERILE
STORAGE
CLEAN
CART REC
SOILED
ELECTRICAL
HAC
STORAGE
NOUR.
4226A
NURSE
STN
28-4
STAIR 4
28-5
STAIR 5
S-2
ELEV.
60"
MIN
48"
MIN
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e
Nor th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\U se rs
\d jo hn so n\ D oc um en ts
\2 2.
_A
R C
H _R
_d jo hn so nQ
P A
E 4.
rv t
4/ 3/
:1
3:
P M
28GC114
PHASING PLAN - BLDG 28 4TH
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TW MP/DJ
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1/16" = 1'-0"
PHASING PLAN - BLDG 28 4TH FLOOR
F4
A. PHASING DRAWINGS HEREIN ARE INTENDED FOR GENERAL GUIDANCE
AND RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE
DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT
AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED
METHOD OF PROCEDURE FOR EACH PHASE, INCLUDING SCHEDULED
RECERTIFICATIONS OF MEDICAL GAS PIPING, FOR REVIEW AND
APPROVAL BY THE VHA PRIOR TO COMMENCING WORK.
B. CONCERNS OR OBJECTIONS TO PHASING REQUIREMENTS HEREIN MUST
BE PROVIDED IN WRITING PRIOR TO BIDDING. OTHERWISE, THE AWARDED
CONTRACTOR IS RESPONSIBLE FOR MEETING SAID REQUIREMENTS, OR
MAKING ALTERNATIVE ARRANGEMENTS TO MEET THE INTENT OF THE
REQUIREMENTS TO THE SATISFACTION OF THE VHA COR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
C. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE
PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING
BY THE VHA COR. TEST AND RECERTIFY ALTERED MEDICAL GAS PIPING
BEFORE PUTTING BACK INTO SERVICE AND ENTERING THE NEXT PHASE
OR NEXT STEP WITHIN A PHASE.
D. CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND CLEANING OF
THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS SHALL OCCUR
BETWEEN THE WORK HOURS NOTED FOR EACH PHASING ZONE, UNLESS
SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY THE VHA COR.
ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS NOTED "N/A"
MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE FOOTNOTED
RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING DOWNSTREAM
SYSTEMS IN SERVICE.
E. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION
CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE WORK
AREAS. REFER TO SPECIFICATION SECTION 01 35 26 FOR BARRIER AND
OTHER REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS.
COORDINATE BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA
COR AND THE VHA INFECTION CONTROL OFFICER.
F. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION
PARTITIONS ARE INDICATED ON DRAWINGS FOR GENERAL
COORDINATION ONLY. SUBMIT PROPOSED FINAL LOCATIONS, TYPES,
CONSTRUCTIONS, DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH
PHASING PLAN FOR VHA APPROVAL PRIOR TO START OF WORK. COMPLY
WITH SPECIFICATION SECTION 01 35 26 AND APPLICABLE REQUIREMENTS
OF INTERIM LIFE SAFETY MEASURES (ILSM) EVALUATION PER
SPECIFICATION SECTION 01 00 02 AS COMPLETED FOR EACH AREA OF
WORK.
G. UNLESS NOTED OTHERWISE, CROSS-REFERENCE OUTAGES TO
AFFECTED ZONES AND PERFORM WORK REQUIRED THEREIN
CONCURRENTLY DURING A SINGLE OUTAGE NOT TO EXCEED THE MOST
RESTRICTIVE TIME LIMITATION.
PHASING SCHEDULE
RM# NAME AFFECTED ZONES
PHASING
NOTES
ICRA
CLASS
PHASING
WORK
HOURS
ZONE: 28 4TH FLOOR ICU 1
4201 DIALYSIS
28 4TH FLOOR ICU 1, 2, AND
PROCEDURE RM
1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 2
4202 BED CUBICLE
28 4TH FLOOR ICU 1, 2, AND
PROCEDURE RM
1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 3
4203 ISOLATION ROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 4
4204 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 5
4205 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 6
4206 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 7
4207 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 8
4208 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 9
4209 ICU BEDROOM 28 4TH FLOOR ICU 3 THROUGH 9 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 10
4210 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 11
4211 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 12
4212 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 13
4213 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU 14
4214 ICU BEDROOM 28 4TH FLOOR ICU 10 THROUGH 14 1,2 IV N/A
ZONE: 28 4TH FLOOR ICU PROCEDURE RM
PROCEDURE
ROOM
28 4TH FLOOR ICU 1, 2, AND
PROCEDURE RM
1,2 IV N/A
ZONE: 28 4TH FLOOR OR 1
4270 OR
SELF ONLY FOLLOWING NEW
ZONE BOX ISO VALVE CUT-IN
3 IV
6PM-6AM &
WEEKENDS
ZONE: 28 4TH FLOOR OR 2
4269 OR
SELF ONLY FOLLOWING NEW
ZONE BOX ISO VALVE CUT-IN
3 IV
6PM-6AM &
WEEKENDS
ZONE: 28 4TH FLOOR OR 3
4267 OR
SELF ONLY FOLLOWING NEW
ZONE BOX ISO VALVE CUT-IN
3 IV
6PM-6AM &
WEEKENDS
ZONE: 28 4TH FLOOR OR 4
4271 CYSTOSCOPY
SELF ONLY FOLLOWING NEW
ZONE BOX ISO VALVE CUT-IN
3 IV
6PM-6AM &
WEEKENDS
ZONE: 28 4TH FLOOR PACU
4216 BED
SELF AND 28 3RD FLOOR
MEDSUR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .