Pages 176-216 from 504-22-108 VEG 22 08 100pct STAMPED - Drawings.pdf

PDF 19 MB Posted

Attached to
Y1DZ--504-22-108; Upgrade Med Gas System Bldg 1, 28, 29 (Construction) (VA-24-00002287)
Solicitation number
36C25723B0057
Issued by

About this file

This document provides details for a federal contract opportunity to upgrade medical gas systems at three buildings for the Department of Veterans Affairs. The solicitation number is 36C25723B0057 to upgrade the medical gas systems at Buildings 1, 28, and 29 for the Veterans Integrated Service Network 17. Responses are due by July 22, 2022 based on the file name. The opportunity is for construction services with the award date to be determined. The 19MB file attached contains drawings related to the required upgrades.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

MAC-1

LAC

28-EF18

DHW

PUMP

BHBL

MV

RCVR

HWS

PUMP

HWS

PUMP

SUMP

HW

PUMP

HW

PUMP

A. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED103

POWER DEMOLITION PLAN - BLDG

28 BASEMENT FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITIONPLAN - BLDG 28 BASEMENT REGION 3F1

1. DISCONNECT EXISTING POWER FEED TO PUMP BEING RELOCATED.

PROTECT EXISTING CIRCUITRY AND RACEWAY FOR EXTENSION TO NEW

LOCATION. REFER TO SHEET 28EP103 FOR MORE INFORMATION.

2. DISCONNECT EXISTING POWER FEED TO MEDICAL AIR COMRESSOR BEING

REPLACED AFTER NEW UNIT IS IN PLACE AND OPERATIONAL. REMOVE

EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND RELABEL AS

SPARE.

3. DISCONNECT EXISTING POWER FEED TO MEDICAL VACUUM PUMP

CONTROL PANEL BEING REPLACED. PROTECT EXISTING RACEWAY AND

CIRCUITRY FOR EXTENSION TO NEW CONTROL PANEL AT SAME LOCATION,

REFER TO SHEET 28EP103 FOR MORE INFORMATIKON.

4. REMOVE EXISTING CONDUIT AND JUNCTION BOX STUBBED UP THROUGH

EQUIPMENT HOUSEKEEPING PAD. REMOVE ANY CIRCUITRY BACK TO

SOURCE AND RELABEL AS SPARE . CONDUITS TO BE CUT FLUSH WITH

EXISTING PAD.

5. DISCONNECT EXISTING POWER FEED TO MVP. PROTECT EXISTING

RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW LOCATION ON

OPPOSITE SIDE OF EQUIPMENT. REFER TO SHEET 28EP103 FOR MORE

INFORMATIKON.

6. DISCONNECT EXISTING POWER FEED TO EXISTING EXHAUST FAN BEING

REMOVED. REMOVE ANY CIRCUITRY BACK TO SOURCE AND RELABEL AS

SPARE . REFER TO SHEET 28EP103 FOR MORE INFORMATION.

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

MV

MA

O

M

VO

D

AO M

V

D

A OM

V

D

AO M

V

O M V

O

DA

J

10 11 12 1397 8

H

G

F

E

F.3

10.3 12.4

E.4

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED111

POWER DEMOLITION PLAN - BLDG

28 1ST FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 1F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 28EP111 FOR MORE

INFORMATION.

O

MV

MA

MV

O

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

M A

O

MV

M A

O

MV

M A

O

MV

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

MGAP

MGAP

MGAP

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED112

POWER DEMOLITION PLAN - BLDG

28 1ST FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL LOCATION. REFER TO SHEE 28EP112 FOR MORE INFORMATION.

LVO

M V

M

AO

M V

M A O

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

X

LALV LALV LA

M A

X

LA

LV

M V O

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED113

POWER DEMOLITION PLAN - BLDG

28 1ST FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 3F1

1. DISCONNECT POWER FEED TO MED-GAS MANIFOLD AND ALARMS.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION AND

RECONNECTION TO NEW MANIFOLD AND ALARMS. REFER TO SHEET

28EP113 FOR MORE INFORMATION.

M V

M A O

M V

M

AO

MA

MV

O

M A

M

VO

MA

MV

O

M V

M

AO

6 752 3 41

E

D

C

B

A

3.21.2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED114

POWER DEMOLITION PLAN - BLDG

28 1ST FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 4F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 28EP114 FOR MORE

MV

MA

O

MV

MA

O

MV

MA

O

MV

M

AO M

V

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED132

POWER DEMOLITION PLAN - BLDG

28 3RD FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 3RD FLOOR REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 28EP132 FOR MORE

AO M

V

M

AO M

V

MA

O

MV

MA

O

MV

MA

O

MV

6 752 3 41

E

D

C

B

A

3.21.2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED134

POWER DEMOLITION PLAN - BLDG

28 3RD FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 3RD FLOOR REGION 4F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 28EP134 FOR MORE

M

AO

M V

M

AO

MV

MA

O

M

AO M

V

M

A OM

V

MA

O

MV

O

MA

MV

M

A OM

V

M A

M

V OOM

V

M

AOM

V

M A

J

10 11 12 1397 8

H

G

F

E

F.3

10.3 12.4

E.4

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED141

POWER DEMOLITION PLAN - BLDG

28 4TH FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 1F1

1. REMOVE POWER FEED TO EXISTING MED-GAS ALARM PANEL BEING

REMOVED. PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION

TO NEW PANEL AT SAME LOCATION. REFER TO SHEET 28EP141 FOR MORE

INFORMATION.

2. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 28EP141 FOR MORE

M

AO

M V

M

AO

MV

MA

O

MV

MA

O

MV

MA

O

MA

MV

O

MV

MA

O

MV

MA

O

O

MA

MV

MA

O

O

MA

MV

M A

MV

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

?1 1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED142

POWER DEMOLITION PLAN - BLDG

28 4TH FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL LOCATION. REFER TO SHEET 28EP142 FOR MORE INFORMATION.

MV

O

MA

MV

O

MA

MV

MV

O

O

MA

N

M A

MANO

O

MV

NO

MV

NO

O

MV

MANO

O

MV

MA

MV

MA

MA

6 752 3 41

E

D

C

B

A

3.21.2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28ED144

POWER DEMOLITION PLAN - BLDG

28 4TH FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 4F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REMOVED.

REMOVE EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND

RELABEL AS SPARE

2. DISCONNECT POWER FEED TO MED-GAS PEDESTAL BEING REMOVED.

PROTECT EXISTING CIRCUITRY AND RACEWAY FOR CONNECTION TO NEW

PEDESTAL AT SAME LOCATION.

N

O

M V

M V

M

AO

M A

M A

M

V OM

A

M V O

MA

MV

O

MA

MV

O

M A

N O

N

MV

O

M A

N O

N

MV

O

M A

N O

N

MV

O

M A

N O

N

MV

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

J

K

L

I.1

I

H

G4

G3

G2

G1.2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29ED102

POWER DEMOLITION PLAN - BLDG

29 BASEMENT FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 29 BASEMENT REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL LOCATION. REFER TO SHEET 29EP102 FOR MORE INFORMATION.

2. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REMOVED.

.REMOVE EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND

RELABEL AS SPARE

3. DISCONNECT POWER FEED TO MED-GAS PEDESTAL BEING REMOVED.

PROTECT EXISTING CIRCUITRY AND RACEWAY FOR CONNECTION TO NEW

PEDESTAL AT SAME LOCATION.

O

MA

M A

M V

M V

M A O

O M A

M V

M V

M A O

MV

MA

O

O

MA

MV

O M A

M V

O M V

M A O M A

M V

16 18

19 20 21 22 23 24 25 26 27 28 29 30 31

J

K

L

I.1

I

H

G4

G3

G2

G1.2

MASTER

MGAP

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29ED103

POWER DEMOLITION PLAN - BLDG

29 BASEMENT FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 29 BASEMENT REGION 3F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT SAME LOCATION. REFER TO SHEET 29EP103 FOR MORE

INFORMATION.

2. DISCONNECT POWER FEED TO MED-GAS MASTER ALARM PANEL BEING

REMOVED. REMOVE EXISTING RACEWAY AND CIRCUITRY BACK TO SOURCE

AND LABEL AS SPARE.

O M A

M V

M A

M

VO

M V

M V

M

AO

M A

M A

M

VO M

A

M

VO M

A

M

VO

O M V

M A

5 6 7 8 9 10 11 12 13

14 15 16 17 18

L

O

P

Q

R

S

T

U

V

W

X

M N

1 1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29ED104

POWER DEMOLITION PLAN - BLDG

29 BASEMENT FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 29 BASEMENT FLOOR REGION 4F1

1. DISCONNECT POWER FEED TO MED-GAS MANIFOLD AND ALARMS.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION AND

RECONNECTION TO NEW MANIFOLD AND ALARMS. REFER TO SHEET

29EP104 FOR MORE INFORMATION.

2. REMOVE EXISTING POWER FEED TO MEDICAL VACUUM PUMP BEING

REPLACED. REMOVE EXISTING RACEWAY AND CIRCUITRY BACK TO

SOURCE. REFER TO SHEET 29EP104 FOR MORE INFORMATION.

O

O

O

O

O

OO

O

O

O

O

O O

OO

O

O

1.2

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

D

E

F

G

J

K

L

I.1

I

H

M

N

G.1

G4

G3

G2

MGAP1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29ED112

POWER DEMOLITION PLAN - BLDG

29 1ST FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 29 1ST FLOOR REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT NEW LOCATION. REFER TO SHEET 29EP113 FOR MORE

O

O

O

O

O

OO

O

O

O

O

O O

OO

O

O O

O

1.2

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

D

E

F

G

J

K

L

I.1

I

H

M

N

G.1

G4

G3

G2

MGAP 1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29ED122

POWER DEMOLITION PLAN - BLDG

29 2ND FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER DEMOLITION PLAN - BLDG 29 2ND FLOOR REGION 2F1

1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.

PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW

PANEL AT NEW LOCATION. REFER TO SHEETS 29EP122 AND 29EP123 FOR

MORE INFORMATION.

D

V

O

DA

D

A OM

V

D

AO M

V

D

A OM

V

D

AO M

V

D

A OM

V

D A

D

A OM

V

OM

V

OM

V

987654321

F

G

H

J

K

01-DAC-2

01-DAC-3

01-DAC-1

01-DVP-1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

01EP112

POWER PLAN - BLDG 01 1ST FLOOR

REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 01 1ST FLOOR REGION 2F2

1. PROVIDE POWER FEED TO NEW MEDICAL AIR COMPRESSORS. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION

WHERE POSSIBLE.REFER TO SHEET 01ED112 FOR MORE INFORMATION.

2. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 01ED112 FOR MORE INFORMATION.

3. RECONNECT POWER FEED TO NEW DENTAL VACUUM PUMP. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 01ED112 FOR MORE INFORMATION.

O

M V

M

AO

M V

M A O

M V

M

AO

M V

M A O

MV

MA

O

987654321

F

G

H

J

K

01-MGAP-3-1

01-MGAP-3-2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

01EP132

POWER PLAN - BLDG 01 3RD

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING

RACEWAY AND CIRCUITRY TO NEW LOCATION. REFER TO SHEETS 01ED131

AND 01ED132 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 01 3RD FLOOR REGION 2F2

OM

M V

M

A OM

V

M

A OM

V

M

A OM

V

M

A OM

V

M

A OM

V

131211109876

D

E

F

G

C

B

1-MGAP-5-1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

01EP151

POWER PLAN - BLDG 01 5TH

FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANEL. EXTEND EXISTING

RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW

LOCATION. REFER TO SHEET 01ED151 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 01 5TH FLOOR REGION 1F2

J

J

J

J

J

J

BH

EMCC

BH-1

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

HW

PUMP

HW

PUMP

28-LVP-1

28-FCU-1

28-EF-18

7 28-MAC-1

BL

BL-4

BH-7,9,11

DHWR

PUMP

HWS

PUMP

HWS

PUMP

COMP

A. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP103

POWER PLAN - BLDG 28 BASEMENT

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 BASEMENT REGION 3F1

1. PROVIDE POWER FEED TO NEW MEDICAL AIR COMPRESSOR. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION

WHERE POSSIBLE.REFER TO SHEET 01ED112 FOR MORE INFORMATION.

2. CONNECT NEW POWER CIRCUITRY TO NEW EXHAUST FAN. REFER TO

SHEET 28ED103 FOR MORE INFORMATION.

3. SUPPORT CONTROLS REPLACEMENT OF EXISTING VACUUM PUMP.

4. NEW VFD FOR EF. FURNISHED BY DIV.23, INSTALLED BY DIV.26.

5. PROVIDE NEW 100A3P CIRCUIT BREAKER IN EXISTING SPARE BUCKET iIN

EXISTING EMCC FOR FEED TO NEW AIR COMRESSOR 28-MAC-1. MAINTAIN

POWER FEED TO EXISTING COMPRESSOR UNTIL NEW ONE IS UP AND

RUNNING.

6. NEW LOCATION FOR EXISTING POWER FEED TO MVP REMOVED DURING

DEMOLITION. EXTEND EXISTING CIRCUITRY AND RACEWAY TO NEW

LOCATION.

7. NEW LOCATION FOR EXISTING HOT WATER PUMP REMOVED DURING

DEMOLITION. EXTEND EXISTING CIRCUITRY AND RACEWAY TO NEW

LOCATION. REFER TO SHEET 28ED103 FOR MORE INFORMATION.

8. PROVIDE NEW (3#1,#8G)1-1/2"C FROM NEW 100A3P CIRCUIT BREAKER IN

EXISTING EMCC FOR POWER FEED TO NEW AIR COMRESSOR 28-MAC-1.

D

V

O

DA

O M V

D

A OM

V

D

AO M

V

MV

MA

O

M

VO

J

10 11 12 1397 8

H

G

F

E

F.3

10.3 12.4

E.4

28-MGAP-1-1

1327A

ELECTRICAL

GCL GCLA

UPS

ELECTRICAL

1BL

1BH

EC1BH

EC1BL

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP111

POWER PLAN - BLDG 28 1ST FLOOR

REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 1ST FLOOR REGION 1F1

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 28ED111 FOR MORE INFORMATION.

MV

M A

M V O

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

OMV

M A

OMV

M A

O

MV

M A

O

MA

MV

O

MA

MV

MA

MV

O

MA

MV

O

M A

M

VO

J J

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

28-MGAP-1-8

28-MGAP-1-4

28-MGAP-1-5

28-MGAP-1-6

PATIENT RESTROOM

PATIENT RESTROOM

NURSE STATION

TRAUMA

TRAUMA

OX FULL

OX EMPTY

CLEAN LINEN

TR

NURSE STATION

ELECTRICAL

PSYCH

PSYCH

TRIAGE/

ISOLATION/EXAM

STORE

1369A

RESTROOM

ALCOVE

AMBULANCE VEST.

MRI

1351A

ELECTRICAL

CONTROL ROOM

ELEV. MECHANICAL

S-2

ELEV.

CLEAN SUPPLY

SOILED LINEN

EXAM

EXAM

1230A

RESTROOM

WOMENS HEALTH 1350

CORRIDOR

XXX

CORRIDOR

XXX

CORRIDOR

TRAUMA

SOILED UTILITY

HEAD NURSE

BREAK ROOM

CONSULT ROOM

OFFICE

ON-CALL

WAITING

CONSULTATION

RESTROOM

RESTROOM

XXX

CORRIDOR

CORRIDOR

X-RAY

WAITING

CHECK-IN

AGENT CASHIER

28-5

STAIR 5

PHARMACY

LINEN CHUTE

RESTROOM

1210A

INTERVIEW/PRESRIPTION

1255B

CT EQUIPMENT

CT SCAN ROOM

WAITING

1209A

BREAK ROOM

1255A

CT CONTROL ROOM

XXX

28-1

STAIR 1

ELEV. LOBBY

XXX

CORRIDOR

INFO DESK

SECURITY

RECEPTION

28-CG-1

CORRIDOR

EXAM

CORRIDOR

28-MGAP-1-7

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP112

POWER PLAN - BLDG 28 1ST FLOOR

REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 1ST FLOOR REGION 2F1

1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANEL. EXTEND EXISTING

RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW

LOCATION. REFER TO SHEET 28ED112 FOR MORE INFORMATION.

2. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT

LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.

LV

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

X

LALV LALV LA

X

LA

O LV

M V

M

AO

M V

M A O

O

M V

M

AO

J

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

28-IDU-N

EEDP

EDPX

ELECTRICAL

GAS STORAGE

STOR

MECH RM

133712

BUFFER RM

28-CG-31

CORRIDOR

28-CG-31

CORRIDOR

CHEMO

28-3

STAIR 3

13371

ANTEROOM

133711

BUFFER RM

1204D4 Room

XXX

CORRIDOR

PHARMACY

1337E

HAC

1337F

RESTROOM

IV/CHEMO

1337H

28-CG-34

CORRIDOR

NUCLEAR MEDICINE

LAB

OFFICE

28-CG-37

CORRIDOR

WAITING

28-CG-35

CORRIDOR

RESTROOM

STORAGE

ULTRA SOUND

GAMMA CAMERA

CHIEF TECH.

XXX

DRESSING

1313A

RESTROOM

OFFICE

BREAK ROOM

28-CG-43

CORRIDOR

X-RAY #4

X-RAY #2

X-RAY #2

FILM PROCESSING

VIEWING

MECHANICAL

SWITCHGEAR

CT SCAN

1309A

RESTROOM

1316A

RESTROOM

28-MGM-N2O

28-MGM-N2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP113

POWER PLAN - BLDG 28 1ST FLOOR

REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 1ST FLOOR REGION 3F1

1. PROVIDE POWER FEED TO NEW MINI SPLIT SYSTEM INDOOR UNIT FROM

OUTDOOR CONDENSING UNIT. REFER TO SHEET 28EP123 FOR MORE

INFORMATION.

2. RECONNECT POWER FEEDS TO MED-GAS MANIFOLD AND ALARMS

PROTECTED DURING DEMOLITION, REFER TO SHEER 28ED113 FOR MORE

M V O

M V

M A O

M V

M

AO

MA

MV

O

M A

M

VO

MA

MV

O

M V

M

AO

J

6 752 3 41

E

D

C

B

A

3.21.2

28-MGAP-1-91

28-MGAP-10

EC1AL

EL1HEC1AH

1AH

1AL

TR

1210A

INTERVIEW/PRESRIPTION

ELECTRICAL

XXX

CORRIDOR

SOCIAL WORKER

PATIENT ADVOCATE

XXX

CORRIDOR

WAITING

ON-CALL

OFFICE

PHARMACY

1228A

OFFICE1224

LIPID

LIPID

SEC/WAITING

1228C

SUPERVISOR

1228D

LIBRARY/CLINICAL

TECH.1228B

PHARMACY CHIEF

1292A

STORAGE

PREP ROOM

1288A

RESTROOM

CHEMO

EXAM 1

EXAM 2

EXAM 3

EXAM 4

28-CG-31

CORRIDOR

28-CG-31

CORRIDOR

XXX

CORRIDOR

28-2

STAIR 2

28-CG-19

CORRIDOR

NURSE

STATION/NOURISH

MECHANICAL

ECHO CARDIO

NEURO EEG

HOME 02

XXX

CORRIDOR

EQUIP. STORAGE

OFFICE

OFFICE

HAC

SOILED

CLEAN

BLOOD GAS

RESTROOM

RESTROOM

WAITING XXX

CORRIDOR

CLERK

EKG

PF

1231A

STORAGE

AW2

PATIENT REP.

PATIENT REP.

PATIENT ADVOCATE

CONSULT ROOM

BREAK ROOM

XXX

VENDING

1282A

PATIENT ADVOCATE

OFFICE

CONSULTATION

EC1AL-22

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP114

POWER PLAN - BLDG 28 1ST FLOOR

REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 1ST FLOOR REGION 4F1

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 28ED114 FOR MORE INFORMATION.

2. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT

LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.

O N

J

J

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

28-ODU-N

28-MGAP-2-1

LABORATORY

BLOOD COLLECTION

MICROBIOLOGY

28-C1-6

CORRIDOR2244

CUBICLE OFFICE

XXX

CORRIDOR

LOCKERS

STAFF RESTROOM

2238A

STAFF RESTROOM2242

SUPERVISOR2254

CHIEF

2255A

LAB TECH

2255B

ACCESSIONING

LAB TECH OFFICE2251B

MED RECORDS

PATHOLOGIST

2251A

RECEPTION

2251C

STORAGE

HISTOLOGY

28-3

STAIR 3

FLAMMABLE

STORAGE

XXX

1ST FLOOR ROOF

CONFERENCE

FILE ROOM

OFFICE

BREAK ROOM

2201A

CHIEF OFFICE

SECRETARY

CHIEF NURSE 2202

CHIEF NURSE

SECRETARY

ADP COORDINATION

PROGRAM ASST.

COPIER ROOM

2211A

INSTRUCTOR

XXX

1ST FLOOR ROOF

WATING AREA

TRAINGING ROOM

XXX

CORRIDOR

2213A

CPRS

CPRS

CPRS

2214A

OFFICE

2214B

OFFICE 2145

OFFICE

OFFICE

OFFICE

2217A Room

XXX

CORRIDOR

2216B

OFFICE

2214C

OFFICE

OFFICE

OFFICE

EC2AL-2-11

EC2AL-2-12,143

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP123

POWER PLAN - BLDG 28 2ND

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT

LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.

2. PROVIDE POWER FEED TO NEW MINI SPLIT SYSTEM OUTDOOR

CONDENSING UNIT. EXTEND CIRUITRY TO INDOOR UNIT. REFER TO SHEET

28EP113 FOR MORE INFORMATION.

3. PANEL EC2AL-2 LOCATED IN ELECTRICAL ROOM 2262.

3/16" = 1'-0"

POWER PLAN - BLDG 28 2ND FLOOR REGION 3F1

MV

MA

O

MV

MA

O

MV

MA

O

MV

M

AO M

V

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

28-MGAP-3-1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP132

POWER PLAN - BLDG 28 3RD

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 28ED132 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 28 3RD FLOOR REGION 2F1

V

M

AO M

V

MA

O

MV

MA

O

MV

MA

O

MV

6 752 3 41

E

D

C

B

A

3.21.2

28-MGAP-3-21

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP134

POWER PLAN - BLDG 28 3RD

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 28ED134 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 28 3RD FLOOR REGION 4F1

M

AO

M V

M

AO

MV

MA

O

M

AO M

V

M

A OM

V

MA

O

MV

O

MA

MV

M

A OM

V

M A

M

V OOM

V

M

AOM

V

M A

J

10 11 12 1397 8

H

G

F

E

F.3

10.3 12.4

E.4

28-MGAP-4-11

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP141

POWER PLAN - BLDG 28 4TH

FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 28ED141 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 28 4TH FLOOR REGION 1F1

M

AO

M V

M

AO

MV

MA

O

MV

MA

O

MV

MA

O

MA

MV

O

MV

MA

O

MV

MA

O

O

MA

MV

MA

O

O

MA

MV

M A

MV

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

28-MGAP-4-12

28-MGAP-4-1128-MGAP-4-10

28-MGAP-4-9 28-MGAP-4-8

28-MGAP-4-7

28-MGAP-4-2

28-MGAP-4-3

28-MGAP-4-4

28-MGAP-4-5

28-MGAP-4-6

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP142

POWER PLAN - BLDG 28 4TH

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING

RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW

LOCATIONS. REFER TO SHEET 28ED142 FOR MORE INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 28 4TH FLOOR REGION 2F1

MV

O

MA

MV

O

MA

MV

MV

O

O

MA

N

M A

MANO

O

MV

NO

MV

MANO

O

MV

MANO

O

MV

MA

MV

W A

W A

W A

W A

6 752 3 41

E

D

C

B

A

3.21.2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

28EP144

POWER PLAN - BLDG 28 4TH

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 Checker Author

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 28 4TH FLOOR REGION 4F1

1. RECONNECT POWER FEED TO NEW MED-GAS PEDESTAL. EXTEND EXISTING

CIRCUITRY AND RACEWAY PROTECTED DURING DEMOLITION. REFER TO

SHEET 28ED144 FOR MORE INFORMATION.

O

M V

M A

N O

N

MV

O

M A

N O

N

MV

O

M A

N O

N

MV

O

M A

N O

N

MV

WA WA

WA

WA

M V

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

J

K

L

I.1

I

H

G4

G3

G2

G1.2

29-MGAP-B-1 29-MGAP-B-4

29-MGAP-B-3

29-MGAP-B-2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP102

POWER PLAN - BLDG 29 BASEMENT

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 29 BASEMENT REGION 2F1

1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING

RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW

LOCATION. REFER TO SHEET 28ED102 FOR MORE INFORMATION.

2. RECONNECT POWER FEED TO NEW MED-GAS PEDESTAL. EXTEND EXISTING

CIRCUITRY AND RACEWAY PROTECTED DURING DEMOLITION. REFER TO

SHEET 29ED102 FOR MORE INFORMATION.

O

MA

M A

M V

M V

M A O

O M A

M V

M V

M A O

MV

MA

O

O

MA

MV

O M A

M V

O M V

M A O M A

M V

O

O

16 18 19 20 21 22 23 24 25 26 27 28 29 30 31

J

K

L

I.1

I

H

G4

G3

G2

G1.2

29-MGAP-B-51

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP103

POWER PLAN - BLDG 29 BASEMENT

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 29 BASEMENT REGION 3F1

1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE

EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.

REFER TO SHEET 29ED103 FOR MORE INFORMATION.

V O M A

M

VO M

V

M A

M A

M

VOM

A

M

VO M

A

M

VO M

A

M

VO

M V

ECBA-1

ECBA-2

5 6 7 8 9 10 11 12 13

14 15 16 17 18

L

O

P

Q

R

S

T

U

V

W

X

M

N

29-MVP-1

ECBA-2-25,27,29

29-MGM-N2

29-MGM-N20

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP104

POWER PLAN - BLDG 29 BASEMENT

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 29 BASEMENT REGION 4F1

1. RECONNECT POWER FEEDS TO MED-GAS MANIFOLD AND ALARMS

PROTECTED DURING DEMOLITION, REFER TO SHEET 29ED104 FOR MORE

INFORMATION.

2. CONNECT NEW POWER FEED TO NEW MEDICAL VACUUM PUMP. PROVIDE

NEW CONDUIT AND CIRCUITRY. REPLACE EXISTING 40A3P CIRCUIT

BREAKER WITH NEW 90A3P BREAKEWR IN SAME SPACE.

O

O

O

O

O

OO

O

O

O

O

O O

OO

O

O

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

D

E

F

G

J

K

L

I.1

I

H

M

N

G.1

G4

G3

G2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP112

POWER PLAN - BLDG 29 1ST FLOOR

REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 29 1ST FLOOR REGION 2F1

1. EXTEND EXISTING RACEWAY AND CIRCUITRY SERVING MED-GAS ALARM

PANEL TO NEW PANEL. REFER TO SHEET 29EP113. FOR MORE

O

O

OO

OO

O

O

OO

OO

O

O

OO

O

16 18

19 20 21 22 23 24 25 26 27 28 29 30 31

J

K

L

I.1

I

H

M

N

G4

G3

G2

29-MGAP-1-110

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP113

POWER PLAN - BLDG 29 1ST FLOOR

REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

POWER PLAN - BLDG 29 1ST FLOOR REGION 3F1

1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM

PANEL. REFER TO SHEETS 29ED112 AND 29EP112. FOR MORE

O

O

O

O

O

OO

O

O

O

O

O O

OO

O

O O

O

21 3 4 5 6 7 8 9 10 11 12 13 14 15 16

D

E

F

G

J

K

L

I.1

I

H

M

N

G.1

G4

G3

G2

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP122

POWER PLAN - BLDG 29 2ND

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM

PANEL. REFER TO SHEETS 29ED122 AND 29EP123. FOR MORE

INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 29 2ND FLOOR REGION 2F1

O

O

O

O

O

O

OO

OO

O

O

O

O

16 18

19 20 21 22 23 24 25 26 27 28 29 30 31

J

K

L

I.1

I

H

M

N

G4

G3

G2

29-MGAP-2-1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

KEY PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

0:

P M

29EP123

POWER PLAN - BLDG 29 2ND

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM

PANEL. REFER TO SHEETS 29ED122 AND 29EP122. FOR MORE

INFORMATION.

3/16" = 1'-0"

POWER PLAN - BLDG 29 2ND FLOOR REGION 3F1

7' -6

5'

1"

5'

3/

1'

8'

1/

1'

1/

1'

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

1' 8'

4' 2'

1/

4"

8' 4'

1/

8"

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_E

LE

C

_R

_k gr ie pe nt ro gJ G

H

.rv t

4/ 3/

:4

1:

P M

EP601

EQUIPMENT SCHEDULES UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

XX

03/22/2023 TM KEG

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

Notes:

Total Est. Demand: 57 A

Total Conn.: 57 A

Total Est. Demand: 20680 VA

Power 4660 VA 100.00% 4660 VA Total Conn. Load: 20680 VA

Spare 16020 VA 100.00% 16020 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 69 A 69 A 42 A

Total Load: 7840 VA 7840 VA 5000 VA

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 18

15 16

13 2080... -- -- -- 14

11 MED GAS ALRM PNL 28-MGAP-2-1 20 A 1 500 VA 2080... 2 30 A 28-ODU-N - ROOF 12

9 RCPT LABORATORY 2255 20 A 1 1920... 1920... 1 20 A RCPT LABORATORY 2255 10

7 RCPT LABORATORY 2255 20 A 1 1920... 0 VA 1 20 A RCPT LABORATORY 2255 8

5 POWER MICROBIOLOGY 2236 20 A 1 500 VA 1920... 1 20 A POWER HISTOLOGY 2239 6

3 -- -- -- 2080... 1920... 1 20 A RCPT LABORATORY 2255 4

1 RCPT LABORATORY 2255 20 A 2 1920... 1920... 1 20 A RCPT LABORATORY 2255 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 225 A

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: Phases: 3 Mains Type:

Location: LABORATORY 2255 Volts: 120/208 Wye A.I.C. Rating: 10,000

Branch Panel: EC2AL-2

ELECTRICAL ROOM 2262

Notes:

Total Est. Demand: 27 A

Total Conn.: 27 A

Total Est. Demand: 9652 VA

Power 1152…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .