Pages 176-216 from 504-22-108 VEG 22 08 100pct STAMPED - Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- 36C25723B0057
About this file
This document provides details for a federal contract opportunity to upgrade medical gas systems at three buildings for the Department of Veterans Affairs. The solicitation number is 36C25723B0057 to upgrade the medical gas systems at Buildings 1, 28, and 29 for the Veterans Integrated Service Network 17. Responses are due by July 22, 2022 based on the file name. The opportunity is for construction services with the award date to be determined. The 19MB file attached contains drawings related to the required upgrades.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
MAC-1
LAC
28-EF18
DHW
PUMP
BHBL
MV
RCVR
HWS
PUMP
HWS
PUMP
SUMP
HW
PUMP
HW
PUMP
A. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED103
POWER DEMOLITION PLAN - BLDG
28 BASEMENT FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITIONPLAN - BLDG 28 BASEMENT REGION 3F1
1. DISCONNECT EXISTING POWER FEED TO PUMP BEING RELOCATED.
PROTECT EXISTING CIRCUITRY AND RACEWAY FOR EXTENSION TO NEW
LOCATION. REFER TO SHEET 28EP103 FOR MORE INFORMATION.
2. DISCONNECT EXISTING POWER FEED TO MEDICAL AIR COMRESSOR BEING
REPLACED AFTER NEW UNIT IS IN PLACE AND OPERATIONAL. REMOVE
EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND RELABEL AS
SPARE.
3. DISCONNECT EXISTING POWER FEED TO MEDICAL VACUUM PUMP
CONTROL PANEL BEING REPLACED. PROTECT EXISTING RACEWAY AND
CIRCUITRY FOR EXTENSION TO NEW CONTROL PANEL AT SAME LOCATION,
REFER TO SHEET 28EP103 FOR MORE INFORMATIKON.
4. REMOVE EXISTING CONDUIT AND JUNCTION BOX STUBBED UP THROUGH
EQUIPMENT HOUSEKEEPING PAD. REMOVE ANY CIRCUITRY BACK TO
SOURCE AND RELABEL AS SPARE . CONDUITS TO BE CUT FLUSH WITH
EXISTING PAD.
5. DISCONNECT EXISTING POWER FEED TO MVP. PROTECT EXISTING
RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW LOCATION ON
OPPOSITE SIDE OF EQUIPMENT. REFER TO SHEET 28EP103 FOR MORE
INFORMATIKON.
6. DISCONNECT EXISTING POWER FEED TO EXISTING EXHAUST FAN BEING
REMOVED. REMOVE ANY CIRCUITRY BACK TO SOURCE AND RELABEL AS
SPARE . REFER TO SHEET 28EP103 FOR MORE INFORMATION.
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
MV
MA
O
M
VO
D
AO M
V
D
A OM
V
D
AO M
V
O M V
O
DA
J
10 11 12 1397 8
H
G
F
E
F.3
10.3 12.4
E.4
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED111
POWER DEMOLITION PLAN - BLDG
28 1ST FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 1F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 28EP111 FOR MORE
INFORMATION.
O
MV
MA
MV
O
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
M A
O
MV
M A
O
MV
M A
O
MV
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
MGAP
MGAP
MGAP
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED112
POWER DEMOLITION PLAN - BLDG
28 1ST FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL LOCATION. REFER TO SHEE 28EP112 FOR MORE INFORMATION.
LVO
M V
M
AO
M V
M A O
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
X
LALV LALV LA
M A
X
LA
LV
M V O
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED113
POWER DEMOLITION PLAN - BLDG
28 1ST FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 3F1
1. DISCONNECT POWER FEED TO MED-GAS MANIFOLD AND ALARMS.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION AND
RECONNECTION TO NEW MANIFOLD AND ALARMS. REFER TO SHEET
28EP113 FOR MORE INFORMATION.
M V
M A O
M V
M
AO
MA
MV
O
M A
M
VO
MA
MV
O
M V
M
AO
6 752 3 41
E
D
C
B
A
3.21.2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED114
POWER DEMOLITION PLAN - BLDG
28 1ST FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 1ST FLOOR REGION 4F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 28EP114 FOR MORE
MV
MA
O
MV
MA
O
MV
MA
O
MV
M
AO M
V
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED132
POWER DEMOLITION PLAN - BLDG
28 3RD FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 3RD FLOOR REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 28EP132 FOR MORE
AO M
V
M
AO M
V
MA
O
MV
MA
O
MV
MA
O
MV
6 752 3 41
E
D
C
B
A
3.21.2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED134
POWER DEMOLITION PLAN - BLDG
28 3RD FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 3RD FLOOR REGION 4F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 28EP134 FOR MORE
M
AO
M V
M
AO
MV
MA
O
M
AO M
V
M
A OM
V
MA
O
MV
O
MA
MV
M
A OM
V
M A
M
V OOM
V
M
AOM
V
M A
J
10 11 12 1397 8
H
G
F
E
F.3
10.3 12.4
E.4
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED141
POWER DEMOLITION PLAN - BLDG
28 4TH FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 1F1
1. REMOVE POWER FEED TO EXISTING MED-GAS ALARM PANEL BEING
REMOVED. PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION
TO NEW PANEL AT SAME LOCATION. REFER TO SHEET 28EP141 FOR MORE
INFORMATION.
2. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 28EP141 FOR MORE
M
AO
M V
M
AO
MV
MA
O
MV
MA
O
MV
MA
O
MA
MV
O
MV
MA
O
MV
MA
O
O
MA
MV
MA
O
O
MA
MV
M A
MV
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
?1 1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED142
POWER DEMOLITION PLAN - BLDG
28 4TH FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL LOCATION. REFER TO SHEET 28EP142 FOR MORE INFORMATION.
MV
O
MA
MV
O
MA
MV
MV
O
O
MA
N
M A
MANO
O
MV
NO
MV
NO
O
MV
MANO
O
MV
MA
MV
MA
MA
6 752 3 41
E
D
C
B
A
3.21.2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28ED144
POWER DEMOLITION PLAN - BLDG
28 4TH FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 28 4TH FLOOR REGION 4F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REMOVED.
REMOVE EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND
RELABEL AS SPARE
2. DISCONNECT POWER FEED TO MED-GAS PEDESTAL BEING REMOVED.
PROTECT EXISTING CIRCUITRY AND RACEWAY FOR CONNECTION TO NEW
PEDESTAL AT SAME LOCATION.
N
O
M V
M V
M
AO
M A
M A
M
V OM
A
M V O
MA
MV
O
MA
MV
O
M A
N O
N
MV
O
M A
N O
N
MV
O
M A
N O
N
MV
O
M A
N O
N
MV
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
J
K
L
I.1
I
H
G4
G3
G2
G1.2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29ED102
POWER DEMOLITION PLAN - BLDG
29 BASEMENT FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 29 BASEMENT REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING RELOCATED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL LOCATION. REFER TO SHEET 29EP102 FOR MORE INFORMATION.
2. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REMOVED.
.REMOVE EXISTING CIRCUITRY AND RACEWAY BACK TO SOURCE AND
RELABEL AS SPARE
3. DISCONNECT POWER FEED TO MED-GAS PEDESTAL BEING REMOVED.
PROTECT EXISTING CIRCUITRY AND RACEWAY FOR CONNECTION TO NEW
PEDESTAL AT SAME LOCATION.
O
MA
M A
M V
M V
M A O
O M A
M V
M V
M A O
MV
MA
O
O
MA
MV
O M A
M V
O M V
M A O M A
M V
16 18
19 20 21 22 23 24 25 26 27 28 29 30 31
J
K
L
I.1
I
H
G4
G3
G2
G1.2
MASTER
MGAP
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29ED103
POWER DEMOLITION PLAN - BLDG
29 BASEMENT FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 29 BASEMENT REGION 3F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT SAME LOCATION. REFER TO SHEET 29EP103 FOR MORE
INFORMATION.
2. DISCONNECT POWER FEED TO MED-GAS MASTER ALARM PANEL BEING
REMOVED. REMOVE EXISTING RACEWAY AND CIRCUITRY BACK TO SOURCE
AND LABEL AS SPARE.
O M A
M V
M A
M
VO
M V
M V
M
AO
M A
M A
M
VO M
A
M
VO M
A
M
VO
O M V
M A
5 6 7 8 9 10 11 12 13
14 15 16 17 18
L
O
P
Q
R
S
T
U
V
W
X
M N
1 1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29ED104
POWER DEMOLITION PLAN - BLDG
29 BASEMENT FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 29 BASEMENT FLOOR REGION 4F1
1. DISCONNECT POWER FEED TO MED-GAS MANIFOLD AND ALARMS.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION AND
RECONNECTION TO NEW MANIFOLD AND ALARMS. REFER TO SHEET
29EP104 FOR MORE INFORMATION.
2. REMOVE EXISTING POWER FEED TO MEDICAL VACUUM PUMP BEING
REPLACED. REMOVE EXISTING RACEWAY AND CIRCUITRY BACK TO
SOURCE. REFER TO SHEET 29EP104 FOR MORE INFORMATION.
O
O
O
O
O
OO
O
O
O
O
O O
OO
O
O
1.2
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D
E
F
G
J
K
L
I.1
I
H
M
N
G.1
G4
G3
G2
MGAP1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29ED112
POWER DEMOLITION PLAN - BLDG
29 1ST FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 29 1ST FLOOR REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT NEW LOCATION. REFER TO SHEET 29EP113 FOR MORE
O
O
O
O
O
OO
O
O
O
O
O O
OO
O
O O
O
1.2
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D
E
F
G
J
K
L
I.1
I
H
M
N
G.1
G4
G3
G2
MGAP 1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29ED122
POWER DEMOLITION PLAN - BLDG
29 2ND FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER DEMOLITION PLAN - BLDG 29 2ND FLOOR REGION 2F1
1. DISCONNECT POWER FEED TO MED-GAS ALARM PANEL BEING REPLACED.
PROTECT EXISTING RACEWAY AND CIRCUITRY FOR EXTENSION TO NEW
PANEL AT NEW LOCATION. REFER TO SHEETS 29EP122 AND 29EP123 FOR
MORE INFORMATION.
D
V
O
DA
D
A OM
V
D
AO M
V
D
A OM
V
D
AO M
V
D
A OM
V
D A
D
A OM
V
OM
V
OM
V
987654321
F
G
H
J
K
01-DAC-2
01-DAC-3
01-DAC-1
01-DVP-1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
01EP112
POWER PLAN - BLDG 01 1ST FLOOR
REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 01 1ST FLOOR REGION 2F2
1. PROVIDE POWER FEED TO NEW MEDICAL AIR COMPRESSORS. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION
WHERE POSSIBLE.REFER TO SHEET 01ED112 FOR MORE INFORMATION.
2. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 01ED112 FOR MORE INFORMATION.
3. RECONNECT POWER FEED TO NEW DENTAL VACUUM PUMP. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 01ED112 FOR MORE INFORMATION.
O
M V
M
AO
M V
M A O
M V
M
AO
M V
M A O
MV
MA
O
987654321
F
G
H
J
K
01-MGAP-3-1
01-MGAP-3-2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
01EP132
POWER PLAN - BLDG 01 3RD
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING
RACEWAY AND CIRCUITRY TO NEW LOCATION. REFER TO SHEETS 01ED131
AND 01ED132 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 01 3RD FLOOR REGION 2F2
OM
M V
M
A OM
V
M
A OM
V
M
A OM
V
M
A OM
V
M
A OM
V
131211109876
D
E
F
G
C
B
1-MGAP-5-1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
01EP151
POWER PLAN - BLDG 01 5TH
FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANEL. EXTEND EXISTING
RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW
LOCATION. REFER TO SHEET 01ED151 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 01 5TH FLOOR REGION 1F2
J
J
J
J
J
J
BH
EMCC
BH-1
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
HW
PUMP
HW
PUMP
28-LVP-1
28-FCU-1
28-EF-18
7 28-MAC-1
BL
BL-4
BH-7,9,11
DHWR
PUMP
HWS
PUMP
HWS
PUMP
COMP
A. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP103
POWER PLAN - BLDG 28 BASEMENT
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 BASEMENT REGION 3F1
1. PROVIDE POWER FEED TO NEW MEDICAL AIR COMPRESSOR. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION
WHERE POSSIBLE.REFER TO SHEET 01ED112 FOR MORE INFORMATION.
2. CONNECT NEW POWER CIRCUITRY TO NEW EXHAUST FAN. REFER TO
SHEET 28ED103 FOR MORE INFORMATION.
3. SUPPORT CONTROLS REPLACEMENT OF EXISTING VACUUM PUMP.
4. NEW VFD FOR EF. FURNISHED BY DIV.23, INSTALLED BY DIV.26.
5. PROVIDE NEW 100A3P CIRCUIT BREAKER IN EXISTING SPARE BUCKET iIN
EXISTING EMCC FOR FEED TO NEW AIR COMRESSOR 28-MAC-1. MAINTAIN
POWER FEED TO EXISTING COMPRESSOR UNTIL NEW ONE IS UP AND
RUNNING.
6. NEW LOCATION FOR EXISTING POWER FEED TO MVP REMOVED DURING
DEMOLITION. EXTEND EXISTING CIRCUITRY AND RACEWAY TO NEW
LOCATION.
7. NEW LOCATION FOR EXISTING HOT WATER PUMP REMOVED DURING
DEMOLITION. EXTEND EXISTING CIRCUITRY AND RACEWAY TO NEW
LOCATION. REFER TO SHEET 28ED103 FOR MORE INFORMATION.
8. PROVIDE NEW (3#1,#8G)1-1/2"C FROM NEW 100A3P CIRCUIT BREAKER IN
EXISTING EMCC FOR POWER FEED TO NEW AIR COMRESSOR 28-MAC-1.
D
V
O
DA
O M V
D
A OM
V
D
AO M
V
MV
MA
O
M
VO
J
10 11 12 1397 8
H
G
F
E
F.3
10.3 12.4
E.4
28-MGAP-1-1
1327A
ELECTRICAL
GCL GCLA
UPS
ELECTRICAL
1BL
1BH
EC1BH
EC1BL
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP111
POWER PLAN - BLDG 28 1ST FLOOR
REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 1ST FLOOR REGION 1F1
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 28ED111 FOR MORE INFORMATION.
MV
M A
M V O
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
OMV
M A
OMV
M A
O
MV
M A
O
MA
MV
O
MA
MV
MA
MV
O
MA
MV
O
M A
M
VO
J J
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
28-MGAP-1-8
28-MGAP-1-4
28-MGAP-1-5
28-MGAP-1-6
PATIENT RESTROOM
PATIENT RESTROOM
NURSE STATION
TRAUMA
TRAUMA
OX FULL
OX EMPTY
CLEAN LINEN
TR
NURSE STATION
ELECTRICAL
PSYCH
PSYCH
TRIAGE/
ISOLATION/EXAM
STORE
1369A
RESTROOM
ALCOVE
AMBULANCE VEST.
MRI
1351A
ELECTRICAL
CONTROL ROOM
ELEV. MECHANICAL
S-2
ELEV.
CLEAN SUPPLY
SOILED LINEN
EXAM
EXAM
1230A
RESTROOM
WOMENS HEALTH 1350
CORRIDOR
XXX
CORRIDOR
XXX
CORRIDOR
TRAUMA
SOILED UTILITY
HEAD NURSE
BREAK ROOM
CONSULT ROOM
OFFICE
ON-CALL
WAITING
CONSULTATION
RESTROOM
RESTROOM
XXX
CORRIDOR
CORRIDOR
X-RAY
WAITING
CHECK-IN
AGENT CASHIER
28-5
STAIR 5
PHARMACY
LINEN CHUTE
RESTROOM
1210A
INTERVIEW/PRESRIPTION
1255B
CT EQUIPMENT
CT SCAN ROOM
WAITING
1209A
BREAK ROOM
1255A
CT CONTROL ROOM
XXX
28-1
STAIR 1
ELEV. LOBBY
XXX
CORRIDOR
INFO DESK
SECURITY
RECEPTION
28-CG-1
CORRIDOR
EXAM
CORRIDOR
28-MGAP-1-7
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP112
POWER PLAN - BLDG 28 1ST FLOOR
REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 1ST FLOOR REGION 2F1
1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANEL. EXTEND EXISTING
RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW
LOCATION. REFER TO SHEET 28ED112 FOR MORE INFORMATION.
2. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT
LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.
LV
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
X
LALV LALV LA
X
LA
O LV
M V
M
AO
M V
M A O
O
M V
M
AO
J
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
28-IDU-N
EEDP
EDPX
ELECTRICAL
GAS STORAGE
STOR
MECH RM
133712
BUFFER RM
28-CG-31
CORRIDOR
28-CG-31
CORRIDOR
CHEMO
28-3
STAIR 3
13371
ANTEROOM
133711
BUFFER RM
1204D4 Room
XXX
CORRIDOR
PHARMACY
1337E
HAC
1337F
RESTROOM
IV/CHEMO
1337H
28-CG-34
CORRIDOR
NUCLEAR MEDICINE
LAB
OFFICE
28-CG-37
CORRIDOR
WAITING
28-CG-35
CORRIDOR
RESTROOM
STORAGE
ULTRA SOUND
GAMMA CAMERA
CHIEF TECH.
XXX
DRESSING
1313A
RESTROOM
OFFICE
BREAK ROOM
28-CG-43
CORRIDOR
X-RAY #4
X-RAY #2
X-RAY #2
FILM PROCESSING
VIEWING
MECHANICAL
SWITCHGEAR
CT SCAN
1309A
RESTROOM
1316A
RESTROOM
28-MGM-N2O
28-MGM-N2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP113
POWER PLAN - BLDG 28 1ST FLOOR
REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 1ST FLOOR REGION 3F1
1. PROVIDE POWER FEED TO NEW MINI SPLIT SYSTEM INDOOR UNIT FROM
OUTDOOR CONDENSING UNIT. REFER TO SHEET 28EP123 FOR MORE
INFORMATION.
2. RECONNECT POWER FEEDS TO MED-GAS MANIFOLD AND ALARMS
PROTECTED DURING DEMOLITION, REFER TO SHEER 28ED113 FOR MORE
M V O
M V
M A O
M V
M
AO
MA
MV
O
M A
M
VO
MA
MV
O
M V
M
AO
J
6 752 3 41
E
D
C
B
A
3.21.2
28-MGAP-1-91
28-MGAP-10
EC1AL
EL1HEC1AH
1AH
1AL
TR
1210A
INTERVIEW/PRESRIPTION
ELECTRICAL
XXX
CORRIDOR
SOCIAL WORKER
PATIENT ADVOCATE
XXX
CORRIDOR
WAITING
ON-CALL
OFFICE
PHARMACY
1228A
OFFICE1224
LIPID
LIPID
SEC/WAITING
1228C
SUPERVISOR
1228D
LIBRARY/CLINICAL
TECH.1228B
PHARMACY CHIEF
1292A
STORAGE
PREP ROOM
1288A
RESTROOM
CHEMO
EXAM 1
EXAM 2
EXAM 3
EXAM 4
28-CG-31
CORRIDOR
28-CG-31
CORRIDOR
XXX
CORRIDOR
28-2
STAIR 2
28-CG-19
CORRIDOR
NURSE
STATION/NOURISH
MECHANICAL
ECHO CARDIO
NEURO EEG
HOME 02
XXX
CORRIDOR
EQUIP. STORAGE
OFFICE
OFFICE
HAC
SOILED
CLEAN
BLOOD GAS
RESTROOM
RESTROOM
WAITING XXX
CORRIDOR
CLERK
EKG
PF
1231A
STORAGE
AW2
PATIENT REP.
PATIENT REP.
PATIENT ADVOCATE
CONSULT ROOM
BREAK ROOM
XXX
VENDING
1282A
PATIENT ADVOCATE
OFFICE
CONSULTATION
EC1AL-22
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP114
POWER PLAN - BLDG 28 1ST FLOOR
REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 1ST FLOOR REGION 4F1
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 28ED114 FOR MORE INFORMATION.
2. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT
LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.
O N
J
J
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
28-ODU-N
28-MGAP-2-1
LABORATORY
BLOOD COLLECTION
MICROBIOLOGY
28-C1-6
CORRIDOR2244
CUBICLE OFFICE
XXX
CORRIDOR
LOCKERS
STAFF RESTROOM
2238A
STAFF RESTROOM2242
SUPERVISOR2254
CHIEF
2255A
LAB TECH
2255B
ACCESSIONING
LAB TECH OFFICE2251B
MED RECORDS
PATHOLOGIST
2251A
RECEPTION
2251C
STORAGE
HISTOLOGY
28-3
STAIR 3
FLAMMABLE
STORAGE
XXX
1ST FLOOR ROOF
CONFERENCE
FILE ROOM
OFFICE
BREAK ROOM
2201A
CHIEF OFFICE
SECRETARY
CHIEF NURSE 2202
CHIEF NURSE
SECRETARY
ADP COORDINATION
PROGRAM ASST.
COPIER ROOM
2211A
INSTRUCTOR
XXX
1ST FLOOR ROOF
WATING AREA
TRAINGING ROOM
XXX
CORRIDOR
2213A
CPRS
CPRS
CPRS
2214A
OFFICE
2214B
OFFICE 2145
OFFICE
OFFICE
OFFICE
2217A Room
XXX
CORRIDOR
2216B
OFFICE
2214C
OFFICE
OFFICE
OFFICE
EC2AL-2-11
EC2AL-2-12,143
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP123
POWER PLAN - BLDG 28 2ND
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. PROVIDE POWER FEED TO NEW MED-GAS ALARM PANEL. VERIFY EXACT
LOCATION WITH MED-GAS CONTRACTOR PRIOR TO ROUGH-IN.
2. PROVIDE POWER FEED TO NEW MINI SPLIT SYSTEM OUTDOOR
CONDENSING UNIT. EXTEND CIRUITRY TO INDOOR UNIT. REFER TO SHEET
28EP113 FOR MORE INFORMATION.
3. PANEL EC2AL-2 LOCATED IN ELECTRICAL ROOM 2262.
3/16" = 1'-0"
POWER PLAN - BLDG 28 2ND FLOOR REGION 3F1
MV
MA
O
MV
MA
O
MV
MA
O
MV
M
AO M
V
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
28-MGAP-3-1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP132
POWER PLAN - BLDG 28 3RD
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 28ED132 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 28 3RD FLOOR REGION 2F1
V
M
AO M
V
MA
O
MV
MA
O
MV
MA
O
MV
6 752 3 41
E
D
C
B
A
3.21.2
28-MGAP-3-21
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP134
POWER PLAN - BLDG 28 3RD
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 28ED134 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 28 3RD FLOOR REGION 4F1
M
AO
M V
M
AO
MV
MA
O
M
AO M
V
M
A OM
V
MA
O
MV
O
MA
MV
M
A OM
V
M A
M
V OOM
V
M
AOM
V
M A
J
10 11 12 1397 8
H
G
F
E
F.3
10.3 12.4
E.4
28-MGAP-4-11
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP141
POWER PLAN - BLDG 28 4TH
FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 28ED141 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 28 4TH FLOOR REGION 1F1
M
AO
M V
M
AO
MV
MA
O
MV
MA
O
MV
MA
O
MA
MV
O
MV
MA
O
MV
MA
O
O
MA
MV
MA
O
O
MA
MV
M A
MV
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
28-MGAP-4-12
28-MGAP-4-1128-MGAP-4-10
28-MGAP-4-9 28-MGAP-4-8
28-MGAP-4-7
28-MGAP-4-2
28-MGAP-4-3
28-MGAP-4-4
28-MGAP-4-5
28-MGAP-4-6
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP142
POWER PLAN - BLDG 28 4TH
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING
RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW
LOCATIONS. REFER TO SHEET 28ED142 FOR MORE INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 28 4TH FLOOR REGION 2F1
MV
O
MA
MV
O
MA
MV
MV
O
O
MA
N
M A
MANO
O
MV
NO
MV
MANO
O
MV
MANO
O
MV
MA
MV
W A
W A
W A
W A
6 752 3 41
E
D
C
B
A
3.21.2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
28EP144
POWER PLAN - BLDG 28 4TH
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 Checker Author
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 28 4TH FLOOR REGION 4F1
1. RECONNECT POWER FEED TO NEW MED-GAS PEDESTAL. EXTEND EXISTING
CIRCUITRY AND RACEWAY PROTECTED DURING DEMOLITION. REFER TO
SHEET 28ED144 FOR MORE INFORMATION.
O
M V
M A
N O
N
MV
O
M A
N O
N
MV
O
M A
N O
N
MV
O
M A
N O
N
MV
WA WA
WA
WA
M V
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
J
K
L
I.1
I
H
G4
G3
G2
G1.2
29-MGAP-B-1 29-MGAP-B-4
29-MGAP-B-3
29-MGAP-B-2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP102
POWER PLAN - BLDG 29 BASEMENT
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 29 BASEMENT REGION 2F1
1. NEW LOCATION FOR EXISTING MED-GAS ALARM PANELS. EXTEND EXISTING
RACEWAY AND CIRCUITRY PROTECTED DURING DEMOLITION TO NEW
LOCATION. REFER TO SHEET 28ED102 FOR MORE INFORMATION.
2. RECONNECT POWER FEED TO NEW MED-GAS PEDESTAL. EXTEND EXISTING
CIRCUITRY AND RACEWAY PROTECTED DURING DEMOLITION. REFER TO
SHEET 29ED102 FOR MORE INFORMATION.
O
MA
M A
M V
M V
M A O
O M A
M V
M V
M A O
MV
MA
O
O
MA
MV
O M A
M V
O M V
M A O M A
M V
O
O
16 18 19 20 21 22 23 24 25 26 27 28 29 30 31
J
K
L
I.1
I
H
G4
G3
G2
G1.2
29-MGAP-B-51
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP103
POWER PLAN - BLDG 29 BASEMENT
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 29 BASEMENT REGION 3F1
1. RECONNECT POWER FEED TO NEW MED-GAS ALARM PANEL. UTILIZE
EXISTING CONDUIT AND CIRCUITRY PROTECTED DURING DEMOLITION.
REFER TO SHEET 29ED103 FOR MORE INFORMATION.
V O M A
M
VO M
V
M A
M A
M
VOM
A
M
VO M
A
M
VO M
A
M
VO
M V
ECBA-1
ECBA-2
5 6 7 8 9 10 11 12 13
14 15 16 17 18
L
O
P
Q
R
S
T
U
V
W
X
M
N
29-MVP-1
ECBA-2-25,27,29
29-MGM-N2
29-MGM-N20
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP104
POWER PLAN - BLDG 29 BASEMENT
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 29 BASEMENT REGION 4F1
1. RECONNECT POWER FEEDS TO MED-GAS MANIFOLD AND ALARMS
PROTECTED DURING DEMOLITION, REFER TO SHEET 29ED104 FOR MORE
INFORMATION.
2. CONNECT NEW POWER FEED TO NEW MEDICAL VACUUM PUMP. PROVIDE
NEW CONDUIT AND CIRCUITRY. REPLACE EXISTING 40A3P CIRCUIT
BREAKER WITH NEW 90A3P BREAKEWR IN SAME SPACE.
O
O
O
O
O
OO
O
O
O
O
O O
OO
O
O
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D
E
F
G
J
K
L
I.1
I
H
M
N
G.1
G4
G3
G2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP112
POWER PLAN - BLDG 29 1ST FLOOR
REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 29 1ST FLOOR REGION 2F1
1. EXTEND EXISTING RACEWAY AND CIRCUITRY SERVING MED-GAS ALARM
PANEL TO NEW PANEL. REFER TO SHEET 29EP113. FOR MORE
O
O
OO
OO
O
O
OO
OO
O
O
OO
O
16 18
19 20 21 22 23 24 25 26 27 28 29 30 31
J
K
L
I.1
I
H
M
N
G4
G3
G2
29-MGAP-1-110
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP113
POWER PLAN - BLDG 29 1ST FLOOR
REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
POWER PLAN - BLDG 29 1ST FLOOR REGION 3F1
1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM
PANEL. REFER TO SHEETS 29ED112 AND 29EP112. FOR MORE
O
O
O
O
O
OO
O
O
O
O
O O
OO
O
O O
O
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
D
E
F
G
J
K
L
I.1
I
H
M
N
G.1
G4
G3
G2
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP122
POWER PLAN - BLDG 29 2ND
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM
PANEL. REFER TO SHEETS 29ED122 AND 29EP123. FOR MORE
INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 29 2ND FLOOR REGION 2F1
O
O
O
O
O
O
OO
OO
O
O
O
O
16 18
19 20 21 22 23 24 25 26 27 28 29 30 31
J
K
L
I.1
I
H
M
N
G4
G3
G2
29-MGAP-2-1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
0:
P M
29EP123
POWER PLAN - BLDG 29 2ND
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. EXTEND EXISTING RACEWAY AND CIRCUITRY TO NEW MED-GAS ALARM
PANEL. REFER TO SHEETS 29ED122 AND 29EP122. FOR MORE
INFORMATION.
3/16" = 1'-0"
POWER PLAN - BLDG 29 2ND FLOOR REGION 3F1
7' -6
5'
1"
5'
3/
1'
8'
1/
1'
1/
1'
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
1' 8'
4' 2'
1/
4"
8' 4'
1/
8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_E
LE
C
_R
_k gr ie pe nt ro gJ G
H
.rv t
4/ 3/
:4
1:
P M
EP601
EQUIPMENT SCHEDULES UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
XX
03/22/2023 TM KEG
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
Notes:
Total Est. Demand: 57 A
Total Conn.: 57 A
Total Est. Demand: 20680 VA
Power 4660 VA 100.00% 4660 VA Total Conn. Load: 20680 VA
Spare 16020 VA 100.00% 16020 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 69 A 69 A 42 A
Total Load: 7840 VA 7840 VA 5000 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 16
13 2080... -- -- -- 14
11 MED GAS ALRM PNL 28-MGAP-2-1 20 A 1 500 VA 2080... 2 30 A 28-ODU-N - ROOF 12
9 RCPT LABORATORY 2255 20 A 1 1920... 1920... 1 20 A RCPT LABORATORY 2255 10
7 RCPT LABORATORY 2255 20 A 1 1920... 0 VA 1 20 A RCPT LABORATORY 2255 8
5 POWER MICROBIOLOGY 2236 20 A 1 500 VA 1920... 1 20 A POWER HISTOLOGY 2239 6
3 -- -- -- 2080... 1920... 1 20 A RCPT LABORATORY 2255 4
1 RCPT LABORATORY 2255 20 A 2 1920... 1920... 1 20 A RCPT LABORATORY 2255 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 225 A
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: Phases: 3 Mains Type:
Location: LABORATORY 2255 Volts: 120/208 Wye A.I.C. Rating: 10,000
Branch Panel: EC2AL-2
ELECTRICAL ROOM 2262
Notes:
Total Est. Demand: 27 A
Total Conn.: 27 A
Total Est. Demand: 9652 VA
Power 1152…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .