Pages 101-175 from 504-22-108 VEG 22 08 100pct STAMPED - Drawings.pdf

PDF 16 MB Posted

Attached to
Y1DZ--504-22-108; Upgrade Med Gas System Bldg 1, 28, 29 (Construction) (VA-24-00002287)
Solicitation number
36C25723B0057
Issued by

About this file

This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is soliciting proposals to upgrade the medical gas system in Buildings 1, 28, and 29 at an unspecified VA medical center. Responses are due under Solicitation Number 36C25723B0057 by August 22, 2022. The opportunity involves renovating and replacing medical gas piping and related equipment to current codes and standards. The estimated award date is September 30, 2022. The attached file provides construction drawings related to the required upgrades across the three buildings.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO SPECIFICATIONS 01 00 00 AND 22 05 11 FOR SELECTIVE

DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN

EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT

REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE

SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED

ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED

THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.

E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE

NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN

SERVICE FOLLOWING DEMOLITION.

H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

I. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

29PD702

MED GAS EXISTING REFERENCE

PHOTOS - BLDG 29

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB MLH

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

NTS

BUILDING 29 BASEMENT DECONTAMINATION MGAP IN 0522

F7

NTS

BUILDING 29 BASEMENT DECONTAMINATION MGZB IN PIPE CLOSET OUTSIDE 0518

F5NTS

BUILDING 29 NITROGEN MANIFOLD (O) DETAIL

F3

NTS

BUILDING 29 MEDICAL VACUUM PUMP DETAIL

F1

NTS

BUILDING 29 1ST FLOOR OXYGEN STORAGE 1576

D7NTS

BUILDING 29 1ST FLOOR MGAP & MGZB OUTSIDE 1530

D5

NTS

BUILDING 29 2ND FLOOR MGAP & MGZB TO THE RIGHT OF DOOR 2530

D1 NTS

BUILDING 29 OXYGEN OUTLET TYP

D3

04/03/2023

S M O K

IN

G

S H R

EN

G

IN

EE

R

IN

G

SHOPS

BOILER

G N D S

H B P C

F

IS

C A L/

CH

ILLER

S

°4 'O O E

.9

S M O K

IN

G

S H R

MAIN HOSPITAL

SERVICES

C

LC

MEDICAL ARTS

N E D M A N

W. EDMAN

L O D G E

Tank

HOSPITAL (ORIG.)

C

LC

REHAB & PROSTHETICS

LOT E

L O T

I

LOT J

LOT J

AREA 1

LOT G

LOT H

IN BOILER PLANT

CONTROL RM

IN ER

RECEPTION

PS101

B1

PS101

F1

1/

2" ø

O U

G

PS101

B1

PS101

D1

28PD702

F1

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

1 1/2"ø O

UG

1"ø O

NOTE: SCOPE OF THIS PLAN SHALL BE

BID AS ADD ALTERNATE #1

1"ø O

O2V-2 O2V-1

REF CIVIL FOR PAD AND

ENCLOSURE EXTENSION

NOTE: SCOPE OF THIS PLAN SHALL BE

BID AS ADD ALTERNATE #1

1 1/2"ø O

UG

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

SHEET KEYNOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:2

3:

P M

PS101

SITE PLAN UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

NA

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1" = 40'-0"

SITE PLAN

F4

1. PROVIDE NEW MED GAS MASTER ALARM PANEL. PROVIDE SOURCE

MONITORING SENSORS, CONNECT, AND PROGRAM FOR ANNUNCIATION IN

ACCORDANCE WITH NFPA 99.

2. ADD ALT 1: PROVIDE NEW VAPORIZER FOR EXISTING BULK OXYGEN

SYSTEM. REF CIVIL AND ELECTRICAL FOR REQUIRED SITE PREP WORK.

PROVIDE TEMPORARY BULK OXYGEN SOURCE DURING CONSTRUCTION.

ADD ALT 2: ADDITIONAL BULK OXYGEN TANK AND VAPORIZERS TO BE

PROVIDED UNDER SEPARATE CONTRACT, INCLUDING TEMPORARY BULK

OXYGEN SOURCE. REF CIVIL AND ELECTRICAL FOR REQUIRED SITE PREP

WORK.

3. LOCATION OF EXISTING AUXILIARY OXYGEN CONNECTION, FOR

TEMPORARY OXYGEN SOURCE TIE-IN AS REQUIRED.

4. PROVIDE AUTOMATIC VAPORIZER SWITCHOVER MANIFOLD. PROVIDE WITH

SENSORS AND CONTROLLER AS REQUIRED TO AUTOMATICALLY ROTATE

ACTIVE VAPORIZER BASED ON SENSED REDUCED CAPACITY DUE TO

FROSTING OR OTHER ADVERSE CONDITIONS. CONNECT NEW PIPING TO

VAPORIZERS AND FINAL LINE ASSEMBLY IN ACCORDANCE WITH MFR

RECOMMENDATIONS AND NFPA 55.

3/16" = 1'-0"

BULK OXYGEN DEMOLITION PLAN

B1

3/16" = 1'-0"

BULK OXYGEN NEW WORK PLAN

F1

NTS

BUILDING 11 BOILER PLANT MASTER MGAP

D1

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

D

AO M

V

O

DA

D

A OM

V

D

AO M

V

D

A OM

V

D

AO M

V

D

A OM

V

D A

D

A OM

V

OM

V

OM

V

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

F

P G

F

P G

F

P G

ALL PURPOSE

DENTAL LAB

1158A

MECH

WAITING

OPERATORY

X-RAY

X-RAY

OFFICE

OPERATORY

OPERATORY

OPERATORY

OPERATORY

CLEAN

FILES/SECRETARY/RECEP.

DENTIST OFFICE

CHIEF'S OFFICE

MEN LOCKERS

WOMEN LOCKERS

1134A

LOCKERS

1132A

LOCKERS

STORAGE

OPERATORY

SUCTION

MECHANICAL

STORAGE

OFFICE

SOILED UTILITY

TYP

01-MGAP-1-1

CORRIDOR

CORRIDOR

1/2"ø DA

1/2"ø DA

1/2"ø MV

1/2"ø O

1/

4" ø

M V

3/4"ø DA

1/2"ø DA

2" ø

D V

1/2"ø MV 1/2"ø O

1/2"ø DA 1/2"ø MV

1/2"ø O

1/

4" ø

M V

1" ø

O

1/2"ø DA

1/2"ø DA

1/2"ø O

1/

4" ø

M V

01-MGZB-1-1-1

01-DVP-1

3/ 4" ø D

A

1/2"ø MV

1/2"ø O

987654321

F

G

H

J

K

3/ 4" ø D

A

2" ø

D V

1 1/4"ø MV

3/4"ø DA

1"ø O

2"ø DV

1" ø

O

01-DAC-1

01-DAC-2

01-DAC-3

3/ 4" ø D

A

1" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG112

MED GAS PLAN - BLDG 01 1ST

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. RELABEL EXISTING DA PIPING ON THIS SHEET FOR DA, PER

SPECIFICATIONS.

2. IN ADDITION TO MED GAS AREA ALARMS FOR ASSOCIATED MGZB,

CONNECT DENTAL AIR AND VACUUM SOURCE ALARM POINTS AND

PROGRAM FOR DISPLAY AND ALARM IN ACCORDANCE WITH

SPECIFICATIONS.

3. PROVIDE REMOTE USER CONTROL INTERFACE FOR DENTAL AIR

EQUIPMENT. REFER TO SPECIFICATION 22 61 19.74.

4. PROVIDE INTERCONNECTING PIPING FOR MULTIPLEX DAC MODULES IN

ACCORDANCE WITH MFR IOM. PROVIDE INDIVIDUAL MODULE ISOLATION

VALVES AND PRESSURE GAUGES WITH DEMAND CHECKS. REFER TO MAC

DETAIL FOR ADDITIONAL FIELD CONNECTIONS AND ASSEMBLY

COMPONENTS.

5. PROVIDE CONNECTIONS FROM EXISTING DV SYSTEM AND EXISTING

EXHAUST PIPING, IN ACCORDANCE WITH DVP MFR IOM. REFER TO MVP

DETAIL FOR ADDITIONAL FIELD CONNECTIONS AND ASSEMBLY

COMPONENTS.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 1ST FLOOR REGION 2

F2

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

181716151413121110

D

E

C

B

A

TYP

1 1/2"ø MV 1"ø MA

1"ø O1 1/2"ø MV

1"ø MA

1"ø O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG113

MED GAS PLAN - BLDG 01 1ST

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 1ST FLOOR REGION 3

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

987654321

D

E

C

B

A

TYP

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 4/

3/

:1 0:

P

M

01PG114

MED GAS PLAN - BLDG 01 1ST

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/23 MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 1ST FLOOR REGION 4

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

987654321

F

G

H

J

K

1" ø

O

1/

4" ø

M V

TYP

F x0

1P G

F x0

1P G

F

P G

/F2 01PG124 /F2 01PG124

3/4"ø MA

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG122

MED GAS PLAN - BLDG 01 2ND

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 2ND FLOOR REGION 2

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

181716151413121110

D

E

C

B

A

1 1/2"ø MV 1"ø MA

1"ø O

TYP

/F2 x01PG121 /F2 x01PG121

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG123

MED GAS PLAN - BLDG 01 2ND

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 2ND FLOOR REGION 3

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

987654321

D

E

C

B

A

1 1/4"ø O

1 1/4"ø MA

2"ø MV

2"ø MV 1 1/4"ø MA

1 1/4"ø O

1 1/2"ø MV 3/4"ø MA

3/4"ø O

TYP

F

P G

F

P G

F

P G

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG124

MED GAS PLAN - BLDG 01 2ND

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 2ND FLOOR REGION 4

F2

M V

M

AO

MV

MA

O

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

/F2 01PG133

F

P

G

POS

3729B

CLEAN UTILITIES

3727A

PATIENT ROOM 12

ANTERM

ELECTRICAL

3727B

RESTROOM

3723A

RESTROOM

PATIENT ROOM 14

STORAGE

ELECTRICAL

CLEAN UTILITY

SOILED UTILITY

HAC

OFFICE

CONFERENCE

PHARMACIST

CONFERENCE

WOMEN'S

RESTROOM

MEN'S RESTROOM

F

P G

F

P G

/F2 01PG133 /F2 01PG133

CORRIDOR 1-3A-C7

CORRIDOR

1-3A-C5

CORRIDOR

1" ø

O

1" ø

M A

1/

2" ø

M V

1-MGZB-3-1-1

181716151413121110

F

G

H

J

K

1/

2" ø

M V

1" ø

M A

1" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG131

MED GAS PLAN - BLDG 01 3RD

FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 3RD FLOOR REGION 1

F2

MV

MA

O

M V

M

AO

M V

M A O

M V

M

AO

M V

M A O

MV

MA

O

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

/F2 01PG134

F

P G

F

P G

NOURISHMENT 3741

MEDS

HAC

ELECTRICAL

3745A

RESTROOM

SOILED UTILITIES

PATIENT ROOM 8

3735A

RESTROOM

3733B

RESTROOM

PATIENT ROOM 4

POS

PATIENT ROOM 5

3747A

RESTROOM

3751A

RESTROOM

PATIENT ROOM 7

3749A

RESTROOM

PATIENT ROOM 6

ANTE ROOM

STORAGE

3733A

PATIENT ROOM 10

F

P G

F

P G

/F2 01PG134/F2 01PG134

F

P G

F

P G

CORRIDOR

CORRIDOR

1-MGZB-3-2-1

3729A

PRINTERS

01-MGAP-3-1

1-MGZB-3-1-2

987654321

F

G

H

J

K

POS

01-MGAP-3-2

1 1/4"ø O

1 1/4"ø MA

2"ø MV

1/2"ø O

1/2"ø MA

3/4"ø MV

1 1/2"ø MV

3/4"ø MA

3/4"ø O

1/

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

1/2"ø O

1/2"ø MA

3/4"ø MV

1/2"ø O

1/2"ø MA

3/4"ø MV

1/

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

1/2"ø O

1/2"ø MA

3/4"ø MV

1 1/2"ø MV

3/4"ø MA

3/4"ø O

1 1/2"ø MV

3/4"ø MA

3/4"ø O

1/

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG132

MED GAS PLAN - BLDG 01 3RD

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 3RD FLOOR REGION 2

F2

O

MA

MV

O

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

/F2 01PG131

F

P G

3726A

RESTROOM

PATIENT ROOM 13

PATIENT ROOM 15

3724A

RESTROOM

3710A

LOCKERS

BREAK ROOM

NURSE MANAGER

OFFICE

DR SLEEP ROOM

3718A

RESTROOM

DR SLEEP ROOM

DR WORKROOM

3A-C6A

STORAGE

DR OFFICE

DR OFFICE

DR OFFICE

3760C

VISITOR KITCHEN

3760D

OXYGEN STORAGE

F

P G

F

P G

/F2 01PG131 /F2 01PG131

1-3A-C6

CORRIDOR

1-3A-C7

CORRIDOR

CORRIDOR

CORRIDOR

3760B

FAMILY ROOM

01-2

STAIR 2

01-1

STAIR 1

STORAGE

181716151413121110

D

E

C

B

A

1 1/2"ø MV

1"ø MA

1"ø O

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V 1 1/2"ø MV 1"ø MA

1"ø O

1"ø O

1"ø MA

1 1/2"ø MV

1/

2" ø

M V

1" ø

M A

1" ø

O

1/

2" ø

M V

1" ø

M A

1" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG133

MED GAS PLAN - BLDG 01 3RD

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 3RD FLOOR REGION 3

F2

O

MV

MA

O

O M A

M V

M V

M A O

O M A

M V

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

/F2 01PG132

F

P G

F

P G

3746A

RESTROOM

PATIENT ROOM 1

PATIENT ROOM 2

3744A

RESTROOM

POS

PATIENT ROOM 3

3742A

RESTROOM

FAMILY ROOM

COUNSELING 3738

TR

3736A

RESTROOM

PATIENT ROOM 9 3734

PATIENT ROOM 11

3734A

RESTROOM

3760B

FAMILY ROOM

3760A

RESTROOM

F

P G

F

P G

/F2 01PG132/F2 01PG132

F

P G

F

P G

F

P G

CORRIDOR

CORRIDOR

01-3

STAIR 3

S-1

ELEV.

P-1

ELEV.

P-2

ELEV.

1-MGZB-3-2-2

987654321

D

E

C

B

A

1 1/2"ø MV

1"ø MA

1"ø O

1 1/2"ø MV

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

3/ 4" ø M

V

1/ 2" ø M

A

1/ 2" ø O

1/

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

1/

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

3/ 4" ø O

3/ 4" ø M

A

1/

2" ø

M V

1 1/2"ø MV 3/4"ø MA

3/4"ø O

1/

4" ø

O

1/

4" ø

M A

2" ø

M V

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

1 1/2"ø MV 1"ø MA

1"ø O

3/4"ø MA

3/4"ø O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG134

MED GAS PLAN - BLDG 01 3RD

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 3RD FLOOR REGION 4

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

181716151413121110

D

E

C

B

A

TYP

1/

2" ø

M V

1" ø

M A

1" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 4/

3/

:1 6:

P

M

01PG143

MED GAS PLAN - BLDG 01 4TH

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/23 MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 4TH FLOOR REGION 3

F2

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

987654321

D

E

C

B

A

TYP

1/ 4" ø M

V

3/ 4" ø M

A

3/ 4" ø O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG144

MED GAS PLAN - BLDG 01 4TH

FLOOR REGION 4

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW

WORK ANTICIPATED.

0 100% CONSTRUCTION DOCUMENTS 03/22/2023

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 4TH FLOOR REGION 4

F2

OM

A

M V

M

A OM

V

M

A OM

V

M

A OM

V

M

A OM

V

M

A OM

V

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

STORAGE

RESTROOM

HAC

TR

5100A

OFFICE

STORAGE

STORAGE

STORAGE

WORK ROOM

LOBBY

CORRIDOR

P-2

ELEV.

P-1

ELEV.

S-1

ELEV.

01-2

STAIR 2

1-MGAP-5-1

1-MGZB-5-1-1

1/

2" ø

M V

3/4"ø MV

1/2"ø MA

1/2"ø O

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

131211109876

D

E

F

G

C

B

1/

4" ø

M V

3/ 4" ø M

A

3/ 4" ø O

3/4"ø MV

1/2"ø MA

1/2"ø O

1 1/4"ø MV

3/4"ø MA

3/4"ø O

3/4"ø MV

1/2"ø MA

1/2"ø O

1" ø

M A

1" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG151

MED GAS PLAN - BLDG 01 5TH

FLOOR

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 01 5TH FLOOR

F2

DEN

DEN

RAD

RAD

DEN

DEN

DEN

DEN

DEN

DEN

RAD

M G Z B

PRM

PRM

PRM

PRM

PRM

PRM

PRM

PRM

M G Z B

PRM

3733A

PRM

PRM

PRM

PRM

3727A

PRM

ETD

ETD

ETD

M G Z B

ETD

ETD

ETD

M G Z B

M G Z B

M G Z B

1ST FLOOR

2ND FLOOR

3RD FLOOR

SUB-BASEMENT

4TH FLOOR

5TH FLOOR

TO B28

DENTAL AIR

COMPRESSOR

MV

MA

O

MV

MA

O

1 1/4"

1"

2"

1 1/4"

3/4"

3/4"

3/4" 3/4"

1 1/2"

1" 1"

1 1/2"

1 1/2" 1"

1"

1" 1"

1 1/2"

1"

3/4"

3/4"

1 1/2"

2"

1 1/4"

1 1/4" 2"

1 1/4"

1 1/4"

1 1/4"

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO PLAN SHEETS FOR OUTLET QUANTITIES AND SCOPE IN ROOMS.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

01PG601

MED GAS PLAN - BLDG 01 RISER

DIAGRAM

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB MLH

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

NTS

MED GAS PLAN - BLDG 01 RISER DIAGRAM

F1

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

MECHANICAL ROOM

28-3

STAIR 3

WATER TREATMENT

STORAGE

STAIR

UTILITIES TUNNEL

1 1/2"ø O

1 1/2"ø O

1 1/2"ø MA

2 1/2"ø MV

/F4 PS101

28PK401

F2

1 1/2"ø O

1/

2" ø

O

1 1/2"ø O

1/

2" ø

M A

1/

2" ø

M V

1/

2" ø

O

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:2

0:

P M

28PG103

MED GAS PLAN - BLDG 28

BASEMENT REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 28 BASEMENT REGION 3

F1

D

AO M

V

O

DA

O M V

D

A OM

V

D

AO M

V

MV

MA

O

M

VO

J

10 11 12 1397 8

H

G

F

E

F.3

10.3 12.4

E.4

/F1 28PG113

F

P G

F

P G

28-5

STAIR 5

S-1

ELEV

P-1

ELEV

P-2

ELEV

ESCORT

RELEASE INFO

1204A

TVC

TRAVEL

1204A1

VIC

HAC

1204B

ELIGIBILITY

1204C

ELIGIBILITY

1204D

ELIGIBILITY

1204D1

BREAK ROOM

TR

STORAGE

ELECTRICAL

MEN'S RESTROOM

RESTROOM

LINEN CHUTE

BONE DENSITY

X-RAY#1

1327A

ELECTRICAL

WAITING

CONTROL ROOM

ULTRA SOUND1333

STORAGE

WORK STATIONS

HAC

1319A

STORAGE

CT SCAN

1334B

RECEPTION DESK

1342D

DAV

1342C

TVC

1342B

VBA

SECRETARY

ADMIN. OFFICE

1342A

HAS CHIEF

SUCTION

OPERATORY

OPERATORY

OPERATORY

OPERATORY

OPERATORY

ALL PURPOSE

DENTAL LAB

F

P G

F

P G

F

P G

F

P G

/F1 28PG113 /F1 28PG113

28-CG-1

CORRIDOR

28-CG-52

CORRIDOR

28-CG-54

CORRIDOR

28-CG-48

CORRIDOR

28-CG-43

CORRIDOR

28-CG-34

CORRIDOR

28-CG-51

CORRIDOR

28-MGZB-1-1-1

3/ 4" ø M

V

1/ 2" ø O

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

28-MGAP-1-1

28-MGZB-1-1-2

3/4"ø MV

1/2"ø O

1/ 2" ø O

3/ 4" ø M

V

28-MGAP-1-2

28-MGAP-1-3

3/4"ø LV

1/2"ø LA

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

28PG111

MED GAS PLAN - BLDG 28 1ST

FLOOR REGION 1

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 28 1ST FLOOR REGION 1

F1

O

MV

M A

M V O

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

O

MA

MV

OMV

M A

OMV

M A

O

MV

M A

O

MA

MV

O

MA

MV

MA

MV

O

MA

MV

O

M A

M

VO

J

6 752 3 41

H

G

F

E

F.3

3.21.2

E.4

TRIAGE/

ISOLATION/EXAM

/F1 28PG114

F

P G

28-5

STAIR 5

INFO DESK

SECURITY

RECEPTION

AGENT CASHIER

PHARMACY

WAITING

CONSULTATION

ELEV. MECHANICAL

HAC

S-2

ELEV.

CHECK-IN

ELEV. LOBBY

WAITING

1210A

INTERVIEW/PRESRIPTION

1209A

BREAK ROOM

CT SCAN ROOM

1255B

CT EQUIPMENT

XXX

1351A

ELECTRICAL

MRI

CONTROL ROOM

TRAUMA

1371A

ANTE.

1359A1

STORAGE

DECON/ANTE. ROOM

AMBULANCE VEST.

ALCOVE

1369A

RESTROOM

AOD

STORE

PUBLIC WAITING

NURSE STATION

WOMENS

ELECTRICAL

TR

PSYCH

PSYCH

EXAM

EXAM

EXAM

1230A

RESTROOM

WOMENS HEALTH

SOILED UTILITY

HAC

CLEAN SUPPLY

CLEAN LINEN

PATIENT

RESTROOM

PATIENT RESTROOM

OX FULL

OX EMPTY

SOILED LINEN

TRAUMA

TRAUMA

CORRIDOR

HEAD NURSE

BREAK ROOM

CONSULT ROOM

OFFICE

ON-CALL

WAITING

X-RAY

RESTROOM

RESTROOM

1255A

CT CONTROL ROOM

RESTROOM

LINEN CHUTE

/F1 28PG114/F1 28PG114

F

P G

F

P G

CORRIDOR

CORRIDOR

CORRIDOR

28-CG-1

CORRIDOR

28-MGAP-1-8

28-MGZB-1-5-1

28-MGZB-1-6-2

1/

4" ø

M A

1/

2" ø

O

3/4"ø O

3" ø

M V

28-MGAP-1-4

28-MGZB-1-7-1

28-MGAP-1-5

28-MGZB-1-5-2

28-MGZB-1-6-1

28-MGZB-1-8-1

28-MGZB-1-8-2

28-MGZB-1-4-1

28-MGZB-1-4-2

28-MGAP-1-6

1 1/2"ø MV

1/2"ø MA

1/2"ø O

1/

2" ø

M V

1/ 2" ø M

A

1/ 2" ø O

1/ 2" ø O

1" ø

M V

1/ 2" ø M

A

1/ 2" ø O

2"ø MV

2" ø M

V

1"ø O

3/4"ø O

1/2"ø MA

1"ø MV

1/2"ø MA

1"ø MV

1" ø

M V

28-MGAP-1-7

3/4"ø MV

1/2"ø MA

1/2"ø O

1/ 2" ø O

1/ 2" ø M

A

1" ø

M V

1/ 2" ø O

3/ 4" ø M

A

1" ø

M V

1/2"ø O

1/2"ø MA

1"ø MV

1/2"ø O

1/2"ø MA

1"ø MV

1/2"ø O

1/2"ø MA

1"ø MV

1/ 4" ø M

V

1/ 2" ø M

A

1/ 2" ø O

3/4"ø O

3/4"ø MA

2"ø MV

2" ø

M V

3/ 4" ø M

A

3/ 4" ø O

3/4"ø MA

3/4"ø O

3" ø

M V

1" ø

N O

1" ø

N

1/2"ø MA

1"ø MV

3/ 4" ø M A

3/ 4" ø O

3/4"ø O

3/4"ø MA

1"ø MV

1/2"ø O

1/2"ø MA

3/4"ø MV

1" ø

M A

3/ 4" ø O

1/ 2" ø M

A

1/

2" ø

M V

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 4/

3/

:2 7:

P

M

28PG112

MED GAS PLAN - BLDG 28 1ST

FLOOR REGION 2

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

03/22/23 MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08

3/16" = 1'-0"

MED GAS PLAN - BLDG 28 1ST FLOOR REGION 2

F1

LV

A

O

M V

M A

O

M V

M A

O

M V

M A

O

M V

X

LALV LALV LA

X

LA

O LV

M V

M

AO

M V

M A O

O

M V

M

AO

10 11 12 1397 8

E

D

C

B

A

10.3 12.4

/F1 28PG111

F

P G

MECH RM

13371

ANTEROOM

133711

BUFFER RM

133712

BUFFER RM

ROOM

GAS STORAGE

1204D4 Room

1337E

HAC

1337F

RESTROOM

IV/CHEMO

1337H

CHEMO

PHARMACY

NUCLEAR MEDICINE

LAB

OFFICE

MECHANICAL

WAITING

GAMMA CAMERA

X-RAY #2

GAMMA CAMERA

ENTRY

SWITCHGEAR

X-RAY #4

ELECTRICAL

1313A

RESTROOM

CT SCAN

RESTROOM

VIEWING

FILM PROCESSING

OFFICE

CHIEF TECH.

BREAK ROOM

1316A

RESTROOM

RESTROOM

ULTRA SOUND1333

STORAGE1335

RESTROOM

HAC

1309A

RESTROOM

XXX

DRESSING

1318A

VIEWING

/F1 28PG111 /F1 28PG111

F

P G

F

P G

28-CG-31

CORRIDOR

28-3

STAIR 3

CORRIDOR

28-CG-34

CORRIDOR

28-CG-35

CORRIDOR

28-CG-37

CORRIDOR

28-CG-43

CORRIDOR

28-MGZB-1-2-1

28-MGZB-1-3-2

1/ 2" ø L

A

3/ 4" ø L

V

1/2"ø O

28-MGZB-1-2-2

CORRIDOR

28-MGZB-1-3-1

28-IDU-N (REF MECH)

1/2"ø O

1/2"ø MA

1"ø MV

3/ 4" ø M

V

1/ 2" ø M

A

1/ 2" ø O

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

3/ 4" ø M

V

1/ 2" ø M

A

1/ 2" ø O

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

1/ 2" ø O

1/ 2" ø M

A

3/ 4" ø M

V

1/

2" ø

O

1/

4" ø

M A

3" ø

M V

1" ø

N

1" ø

N O

3/4"ø MV

1/2"ø MA

1/2"ø O

3"ø MV

1 1/2"ø MA

1 1/2"ø O 4"ø MAI

6"ø MVE

1/

2" ø

O

1/

2" ø

M A

3" ø

M V

1" ø

N

1" ø

N O

28-MGM-N2

28-MGM-N2O

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN

ACCORDANCE WITH THE SPECIFICATIONS.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:

a. MED GAS

G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING

AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,

HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF

ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK

PLANS.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

Tru e N or th

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

WALKER BLVD

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\2 2.

_M

E C

H -P

LU

M

B _R

_m bi bl e2 H

X D

7.

rv t 3/

/2

:1

7:

P M

28PG113

MED GAS PLAN - BLDG 28 1ST

FLOOR REGION 3

UPGRADE MED GAS BLDG 01, 28, &

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-22-108

MB JD

100% CONSTRUCTION

DOCUMENTS

VEG 22.08 03/22/23

3/16" = 1'-0"

MED GAS PLAN - BLDG 28 1ST FLOOR REGION 3

F1

V

M A O

M V

M

AO

MA

MV

O

M A

M

VO

MA

MV

O

M V

M

AO

6 752 3 41

E

D

C

B

A

3.21.2

/F1 28PG112

F

P G

1210A

INTERVIEW/PRESRIPTION

ELECTRICAL

SOCIAL WORKER

TR

1282A

PATIENT ADVOCATE

OFFICE

1228A

OFFICE

LIPID

OFFICE

LIPID

OFFICE

SEC/WAITING

1228C

SUPERVISOR

HEAD NURSE

BREAK ROOM

CONSULT ROOM

OFFICE

ON-CALL

WAITING

PATIENT ADVOCATE

PATIENT REP.1229

PATIENT REP.

AW2

1231A

STORAGE

WAITING

CLERK

EKG

PF

HAC

SOILED

CLEAN

BLOOD GAS

RESTROOM

RESTROOM

STRESS LAB

EQUIP. STORAGE

OFFICE

HOME 02 1289

NEURO EEG

ECHO CARDIO

MECHANICAL

VENDING

CORRIDOR

1228B

PHARMACY CHIEF

1228D

LIBRARY/CLINICAL

TECH.

EXAM 4

EXAM 3

EXAM 2

EXAM 1

NURSE

STATION/NOURISH

PREP ROOM

1288A

RESTROOM

1292A

STORAGE

/F1 28PG112 /F1 28PG112

F

P G

F

P G

/F1 29PG111 /F1 29PG111/F1 29PG111

CORRIDOR

28-CG-31

CORRIDOR

CHEMO

PHARMACY

CORRIDOR

CORRIDOR

CORRIDOR

28-2

STAIR 2

28-CG-19

CORRIDOR

28-MGAP-10

28-MGZB-1-9-1

1/

2" ø

O

1/

4" ø

M A

3" ø

M V

3/ 4" ø O

3/ 4" ø M

A

1"ø MV

1"ø MV

1/2"ø MA

1/2"ø O

28-MGAP-1-9

28-MGZB-10-1

3/4"ø O

3/4"ø MA

3/4"ø MV

3/4"ø O

3/4"ø MA

3/4"ø MV

1" ø

O

1" ø

O

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .