Pages 101-175 from 504-22-108 VEG 22 08 100pct STAMPED - Drawings.pdf
PDF 16 MB Posted
- Solicitation number
- 36C25723B0057
About this file
This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is soliciting proposals to upgrade the medical gas system in Buildings 1, 28, and 29 at an unspecified VA medical center. Responses are due under Solicitation Number 36C25723B0057 by August 22, 2022. The opportunity involves renovating and replacing medical gas piping and related equipment to current codes and standards. The estimated award date is September 30, 2022. The attached file provides construction drawings related to the required upgrades across the three buildings.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO SPECIFICATIONS 01 00 00 AND 22 05 11 FOR SELECTIVE
DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN
EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT
REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE
SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED
ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED
THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.
E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE
NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN
SERVICE FOLLOWING DEMOLITION.
H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
I. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
29PD702
MED GAS EXISTING REFERENCE
PHOTOS - BLDG 29
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB MLH
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
NTS
BUILDING 29 BASEMENT DECONTAMINATION MGAP IN 0522
F7
NTS
BUILDING 29 BASEMENT DECONTAMINATION MGZB IN PIPE CLOSET OUTSIDE 0518
F5NTS
BUILDING 29 NITROGEN MANIFOLD (O) DETAIL
F3
NTS
BUILDING 29 MEDICAL VACUUM PUMP DETAIL
F1
NTS
BUILDING 29 1ST FLOOR OXYGEN STORAGE 1576
D7NTS
BUILDING 29 1ST FLOOR MGAP & MGZB OUTSIDE 1530
D5
NTS
BUILDING 29 2ND FLOOR MGAP & MGZB TO THE RIGHT OF DOOR 2530
D1 NTS
BUILDING 29 OXYGEN OUTLET TYP
D3
04/03/2023
S M O K
IN
G
S H R
EN
G
IN
EE
R
IN
G
SHOPS
BOILER
G N D S
H B P C
F
IS
C A L/
CH
ILLER
S
°4 'O O E
.9
S M O K
IN
G
S H R
MAIN HOSPITAL
SERVICES
C
LC
MEDICAL ARTS
N E D M A N
W. EDMAN
L O D G E
Tank
HOSPITAL (ORIG.)
C
LC
REHAB & PROSTHETICS
LOT E
L O T
I
LOT J
LOT J
AREA 1
LOT G
LOT H
IN BOILER PLANT
CONTROL RM
IN ER
RECEPTION
PS101
B1
PS101
F1
1/
2" ø
O U
G
PS101
B1
PS101
D1
28PD702
F1
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
1 1/2"ø O
UG
1"ø O
NOTE: SCOPE OF THIS PLAN SHALL BE
BID AS ADD ALTERNATE #1
1"ø O
O2V-2 O2V-1
REF CIVIL FOR PAD AND
ENCLOSURE EXTENSION
NOTE: SCOPE OF THIS PLAN SHALL BE
BID AS ADD ALTERNATE #1
1 1/2"ø O
UG
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
SHEET KEYNOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:2
3:
P M
PS101
SITE PLAN UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
NA
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1" = 40'-0"
SITE PLAN
F4
1. PROVIDE NEW MED GAS MASTER ALARM PANEL. PROVIDE SOURCE
MONITORING SENSORS, CONNECT, AND PROGRAM FOR ANNUNCIATION IN
ACCORDANCE WITH NFPA 99.
2. ADD ALT 1: PROVIDE NEW VAPORIZER FOR EXISTING BULK OXYGEN
SYSTEM. REF CIVIL AND ELECTRICAL FOR REQUIRED SITE PREP WORK.
PROVIDE TEMPORARY BULK OXYGEN SOURCE DURING CONSTRUCTION.
ADD ALT 2: ADDITIONAL BULK OXYGEN TANK AND VAPORIZERS TO BE
PROVIDED UNDER SEPARATE CONTRACT, INCLUDING TEMPORARY BULK
OXYGEN SOURCE. REF CIVIL AND ELECTRICAL FOR REQUIRED SITE PREP
WORK.
3. LOCATION OF EXISTING AUXILIARY OXYGEN CONNECTION, FOR
TEMPORARY OXYGEN SOURCE TIE-IN AS REQUIRED.
4. PROVIDE AUTOMATIC VAPORIZER SWITCHOVER MANIFOLD. PROVIDE WITH
SENSORS AND CONTROLLER AS REQUIRED TO AUTOMATICALLY ROTATE
ACTIVE VAPORIZER BASED ON SENSED REDUCED CAPACITY DUE TO
FROSTING OR OTHER ADVERSE CONDITIONS. CONNECT NEW PIPING TO
VAPORIZERS AND FINAL LINE ASSEMBLY IN ACCORDANCE WITH MFR
RECOMMENDATIONS AND NFPA 55.
3/16" = 1'-0"
BULK OXYGEN DEMOLITION PLAN
B1
3/16" = 1'-0"
BULK OXYGEN NEW WORK PLAN
F1
NTS
BUILDING 11 BOILER PLANT MASTER MGAP
D1
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
D
AO M
V
O
DA
D
A OM
V
D
AO M
V
D
A OM
V
D
AO M
V
D
A OM
V
D A
D
A OM
V
OM
V
OM
V
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
F
P G
F
P G
F
P G
ALL PURPOSE
DENTAL LAB
1158A
MECH
WAITING
OPERATORY
X-RAY
X-RAY
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
CLEAN
FILES/SECRETARY/RECEP.
DENTIST OFFICE
CHIEF'S OFFICE
MEN LOCKERS
WOMEN LOCKERS
1134A
LOCKERS
1132A
LOCKERS
STORAGE
OPERATORY
SUCTION
MECHANICAL
STORAGE
OFFICE
SOILED UTILITY
TYP
01-MGAP-1-1
CORRIDOR
CORRIDOR
1/2"ø DA
1/2"ø DA
1/2"ø MV
1/2"ø O
1/
4" ø
M V
3/4"ø DA
1/2"ø DA
2" ø
D V
1/2"ø MV 1/2"ø O
1/2"ø DA 1/2"ø MV
1/2"ø O
1/
4" ø
M V
1" ø
O
1/2"ø DA
1/2"ø DA
1/2"ø O
1/
4" ø
M V
01-MGZB-1-1-1
01-DVP-1
3/ 4" ø D
A
1/2"ø MV
1/2"ø O
987654321
F
G
H
J
K
3/ 4" ø D
A
2" ø
D V
1 1/4"ø MV
3/4"ø DA
1"ø O
2"ø DV
1" ø
O
01-DAC-1
01-DAC-2
01-DAC-3
3/ 4" ø D
A
1" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG112
MED GAS PLAN - BLDG 01 1ST
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. RELABEL EXISTING DA PIPING ON THIS SHEET FOR DA, PER
SPECIFICATIONS.
2. IN ADDITION TO MED GAS AREA ALARMS FOR ASSOCIATED MGZB,
CONNECT DENTAL AIR AND VACUUM SOURCE ALARM POINTS AND
PROGRAM FOR DISPLAY AND ALARM IN ACCORDANCE WITH
SPECIFICATIONS.
3. PROVIDE REMOTE USER CONTROL INTERFACE FOR DENTAL AIR
EQUIPMENT. REFER TO SPECIFICATION 22 61 19.74.
4. PROVIDE INTERCONNECTING PIPING FOR MULTIPLEX DAC MODULES IN
ACCORDANCE WITH MFR IOM. PROVIDE INDIVIDUAL MODULE ISOLATION
VALVES AND PRESSURE GAUGES WITH DEMAND CHECKS. REFER TO MAC
DETAIL FOR ADDITIONAL FIELD CONNECTIONS AND ASSEMBLY
COMPONENTS.
5. PROVIDE CONNECTIONS FROM EXISTING DV SYSTEM AND EXISTING
EXHAUST PIPING, IN ACCORDANCE WITH DVP MFR IOM. REFER TO MVP
DETAIL FOR ADDITIONAL FIELD CONNECTIONS AND ASSEMBLY
COMPONENTS.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 1ST FLOOR REGION 2
F2
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
181716151413121110
D
E
C
B
A
TYP
1 1/2"ø MV 1"ø MA
1"ø O1 1/2"ø MV
1"ø MA
1"ø O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG113
MED GAS PLAN - BLDG 01 1ST
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 1ST FLOOR REGION 3
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
987654321
D
E
C
B
A
TYP
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 4/
3/
:1 0:
P
M
01PG114
MED GAS PLAN - BLDG 01 1ST
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/23 MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 1ST FLOOR REGION 4
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
987654321
F
G
H
J
K
1" ø
O
1/
4" ø
M V
TYP
F x0
1P G
F x0
1P G
F
P G
/F2 01PG124 /F2 01PG124
3/4"ø MA
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG122
MED GAS PLAN - BLDG 01 2ND
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 2ND FLOOR REGION 2
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
181716151413121110
D
E
C
B
A
1 1/2"ø MV 1"ø MA
1"ø O
TYP
/F2 x01PG121 /F2 x01PG121
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG123
MED GAS PLAN - BLDG 01 2ND
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 2ND FLOOR REGION 3
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
987654321
D
E
C
B
A
1 1/4"ø O
1 1/4"ø MA
2"ø MV
2"ø MV 1 1/4"ø MA
1 1/4"ø O
1 1/2"ø MV 3/4"ø MA
3/4"ø O
TYP
F
P G
F
P G
F
P G
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG124
MED GAS PLAN - BLDG 01 2ND
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 2ND FLOOR REGION 4
F2
M V
M
AO
MV
MA
O
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
/F2 01PG133
F
P
G
POS
3729B
CLEAN UTILITIES
3727A
PATIENT ROOM 12
ANTERM
ELECTRICAL
3727B
RESTROOM
3723A
RESTROOM
PATIENT ROOM 14
STORAGE
ELECTRICAL
CLEAN UTILITY
SOILED UTILITY
HAC
OFFICE
CONFERENCE
PHARMACIST
CONFERENCE
WOMEN'S
RESTROOM
MEN'S RESTROOM
F
P G
F
P G
/F2 01PG133 /F2 01PG133
CORRIDOR 1-3A-C7
CORRIDOR
1-3A-C5
CORRIDOR
1" ø
O
1" ø
M A
1/
2" ø
M V
1-MGZB-3-1-1
181716151413121110
F
G
H
J
K
1/
2" ø
M V
1" ø
M A
1" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG131
MED GAS PLAN - BLDG 01 3RD
FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 3RD FLOOR REGION 1
F2
MV
MA
O
M V
M
AO
M V
M A O
M V
M
AO
M V
M A O
MV
MA
O
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
/F2 01PG134
F
P G
F
P G
NOURISHMENT 3741
MEDS
HAC
ELECTRICAL
3745A
RESTROOM
SOILED UTILITIES
PATIENT ROOM 8
3735A
RESTROOM
3733B
RESTROOM
PATIENT ROOM 4
POS
PATIENT ROOM 5
3747A
RESTROOM
3751A
RESTROOM
PATIENT ROOM 7
3749A
RESTROOM
PATIENT ROOM 6
ANTE ROOM
STORAGE
3733A
PATIENT ROOM 10
F
P G
F
P G
/F2 01PG134/F2 01PG134
F
P G
F
P G
CORRIDOR
CORRIDOR
1-MGZB-3-2-1
3729A
PRINTERS
01-MGAP-3-1
1-MGZB-3-1-2
987654321
F
G
H
J
K
POS
01-MGAP-3-2
1 1/4"ø O
1 1/4"ø MA
2"ø MV
1/2"ø O
1/2"ø MA
3/4"ø MV
1 1/2"ø MV
3/4"ø MA
3/4"ø O
1/
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
1/2"ø O
1/2"ø MA
3/4"ø MV
1/2"ø O
1/2"ø MA
3/4"ø MV
1/
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
1/2"ø O
1/2"ø MA
3/4"ø MV
1 1/2"ø MV
3/4"ø MA
3/4"ø O
1 1/2"ø MV
3/4"ø MA
3/4"ø O
1/
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG132
MED GAS PLAN - BLDG 01 3RD
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 3RD FLOOR REGION 2
F2
O
MA
MV
O
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
/F2 01PG131
F
P G
3726A
RESTROOM
PATIENT ROOM 13
PATIENT ROOM 15
3724A
RESTROOM
3710A
LOCKERS
BREAK ROOM
NURSE MANAGER
OFFICE
DR SLEEP ROOM
3718A
RESTROOM
DR SLEEP ROOM
DR WORKROOM
3A-C6A
STORAGE
DR OFFICE
DR OFFICE
DR OFFICE
3760C
VISITOR KITCHEN
3760D
OXYGEN STORAGE
F
P G
F
P G
/F2 01PG131 /F2 01PG131
1-3A-C6
CORRIDOR
1-3A-C7
CORRIDOR
CORRIDOR
CORRIDOR
3760B
FAMILY ROOM
01-2
STAIR 2
01-1
STAIR 1
STORAGE
181716151413121110
D
E
C
B
A
1 1/2"ø MV
1"ø MA
1"ø O
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V 1 1/2"ø MV 1"ø MA
1"ø O
1"ø O
1"ø MA
1 1/2"ø MV
1/
2" ø
M V
1" ø
M A
1" ø
O
1/
2" ø
M V
1" ø
M A
1" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG133
MED GAS PLAN - BLDG 01 3RD
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 3RD FLOOR REGION 3
F2
O
MV
MA
O
O M A
M V
M V
M A O
O M A
M V
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
/F2 01PG132
F
P G
F
P G
3746A
RESTROOM
PATIENT ROOM 1
PATIENT ROOM 2
3744A
RESTROOM
POS
PATIENT ROOM 3
3742A
RESTROOM
FAMILY ROOM
COUNSELING 3738
TR
3736A
RESTROOM
PATIENT ROOM 9 3734
PATIENT ROOM 11
3734A
RESTROOM
3760B
FAMILY ROOM
3760A
RESTROOM
F
P G
F
P G
/F2 01PG132/F2 01PG132
F
P G
F
P G
F
P G
CORRIDOR
CORRIDOR
01-3
STAIR 3
S-1
ELEV.
P-1
ELEV.
P-2
ELEV.
1-MGZB-3-2-2
987654321
D
E
C
B
A
1 1/2"ø MV
1"ø MA
1"ø O
1 1/2"ø MV
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
3/ 4" ø M
V
1/ 2" ø M
A
1/ 2" ø O
1/
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
1/
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
3/ 4" ø O
3/ 4" ø M
A
1/
2" ø
M V
1 1/2"ø MV 3/4"ø MA
3/4"ø O
1/
4" ø
O
1/
4" ø
M A
2" ø
M V
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
1 1/2"ø MV 1"ø MA
1"ø O
3/4"ø MA
3/4"ø O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG134
MED GAS PLAN - BLDG 01 3RD
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 3RD FLOOR REGION 4
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
181716151413121110
D
E
C
B
A
TYP
1/
2" ø
M V
1" ø
M A
1" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 4/
3/
:1 6:
P
M
01PG143
MED GAS PLAN - BLDG 01 4TH
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/23 MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 4TH FLOOR REGION 3
F2
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
987654321
D
E
C
B
A
TYP
1/ 4" ø M
V
3/ 4" ø M
A
3/ 4" ø O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG144
MED GAS PLAN - BLDG 01 4TH
FLOOR REGION 4
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
1. SHEET INCLUDED FOR EXISTING PIPE ROUTING REFERENCE ONLY. NO NEW
WORK ANTICIPATED.
0 100% CONSTRUCTION DOCUMENTS 03/22/2023
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 4TH FLOOR REGION 4
F2
OM
A
M V
M
A OM
V
M
A OM
V
M
A OM
V
M
A OM
V
M
A OM
V
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
STORAGE
RESTROOM
HAC
TR
5100A
OFFICE
STORAGE
STORAGE
STORAGE
WORK ROOM
LOBBY
CORRIDOR
P-2
ELEV.
P-1
ELEV.
S-1
ELEV.
01-2
STAIR 2
1-MGAP-5-1
1-MGZB-5-1-1
1/
2" ø
M V
3/4"ø MV
1/2"ø MA
1/2"ø O
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
131211109876
D
E
F
G
C
B
1/
4" ø
M V
3/ 4" ø M
A
3/ 4" ø O
3/4"ø MV
1/2"ø MA
1/2"ø O
1 1/4"ø MV
3/4"ø MA
3/4"ø O
3/4"ø MV
1/2"ø MA
1/2"ø O
1" ø
M A
1" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG151
MED GAS PLAN - BLDG 01 5TH
FLOOR
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 01 5TH FLOOR
F2
DEN
DEN
RAD
RAD
DEN
DEN
DEN
DEN
DEN
DEN
RAD
M G Z B
PRM
PRM
PRM
PRM
PRM
PRM
PRM
PRM
M G Z B
PRM
3733A
PRM
PRM
PRM
PRM
3727A
PRM
ETD
ETD
ETD
M G Z B
ETD
ETD
ETD
M G Z B
M G Z B
M G Z B
1ST FLOOR
2ND FLOOR
3RD FLOOR
SUB-BASEMENT
4TH FLOOR
5TH FLOOR
TO B28
DENTAL AIR
COMPRESSOR
MV
MA
O
MV
MA
O
1 1/4"
1"
2"
1 1/4"
3/4"
3/4"
3/4" 3/4"
1 1/2"
1" 1"
1 1/2"
1 1/2" 1"
1"
1" 1"
1 1/2"
1"
3/4"
3/4"
1 1/2"
2"
1 1/4"
1 1/4" 2"
1 1/4"
1 1/4"
1 1/4"
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO PLAN SHEETS FOR OUTLET QUANTITIES AND SCOPE IN ROOMS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
01PG601
MED GAS PLAN - BLDG 01 RISER
DIAGRAM
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB MLH
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
NTS
MED GAS PLAN - BLDG 01 RISER DIAGRAM
F1
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
MECHANICAL ROOM
28-3
STAIR 3
WATER TREATMENT
STORAGE
STAIR
UTILITIES TUNNEL
1 1/2"ø O
1 1/2"ø O
1 1/2"ø MA
2 1/2"ø MV
/F4 PS101
28PK401
F2
1 1/2"ø O
1/
2" ø
O
1 1/2"ø O
1/
2" ø
M A
1/
2" ø
M V
1/
2" ø
O
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:2
0:
P M
28PG103
MED GAS PLAN - BLDG 28
BASEMENT REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 28 BASEMENT REGION 3
F1
D
AO M
V
O
DA
O M V
D
A OM
V
D
AO M
V
MV
MA
O
M
VO
J
10 11 12 1397 8
H
G
F
E
F.3
10.3 12.4
E.4
/F1 28PG113
F
P G
F
P G
28-5
STAIR 5
S-1
ELEV
P-1
ELEV
P-2
ELEV
ESCORT
RELEASE INFO
1204A
TVC
TRAVEL
1204A1
VIC
HAC
1204B
ELIGIBILITY
1204C
ELIGIBILITY
1204D
ELIGIBILITY
1204D1
BREAK ROOM
TR
STORAGE
ELECTRICAL
MEN'S RESTROOM
RESTROOM
LINEN CHUTE
BONE DENSITY
X-RAY#1
1327A
ELECTRICAL
WAITING
CONTROL ROOM
ULTRA SOUND1333
STORAGE
WORK STATIONS
HAC
1319A
STORAGE
CT SCAN
1334B
RECEPTION DESK
1342D
DAV
1342C
TVC
1342B
VBA
SECRETARY
ADMIN. OFFICE
1342A
HAS CHIEF
SUCTION
OPERATORY
OPERATORY
OPERATORY
OPERATORY
OPERATORY
ALL PURPOSE
DENTAL LAB
F
P G
F
P G
F
P G
F
P G
/F1 28PG113 /F1 28PG113
28-CG-1
CORRIDOR
28-CG-52
CORRIDOR
28-CG-54
CORRIDOR
28-CG-48
CORRIDOR
28-CG-43
CORRIDOR
28-CG-34
CORRIDOR
28-CG-51
CORRIDOR
28-MGZB-1-1-1
3/ 4" ø M
V
1/ 2" ø O
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
28-MGAP-1-1
28-MGZB-1-1-2
3/4"ø MV
1/2"ø O
1/ 2" ø O
3/ 4" ø M
V
28-MGAP-1-2
28-MGAP-1-3
3/4"ø LV
1/2"ø LA
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
28PG111
MED GAS PLAN - BLDG 28 1ST
FLOOR REGION 1
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 28 1ST FLOOR REGION 1
F1
O
MV
M A
M V O
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
O
MA
MV
OMV
M A
OMV
M A
O
MV
M A
O
MA
MV
O
MA
MV
MA
MV
O
MA
MV
O
M A
M
VO
J
6 752 3 41
H
G
F
E
F.3
3.21.2
E.4
TRIAGE/
ISOLATION/EXAM
/F1 28PG114
F
P G
28-5
STAIR 5
INFO DESK
SECURITY
RECEPTION
AGENT CASHIER
PHARMACY
WAITING
CONSULTATION
ELEV. MECHANICAL
HAC
S-2
ELEV.
CHECK-IN
ELEV. LOBBY
WAITING
1210A
INTERVIEW/PRESRIPTION
1209A
BREAK ROOM
CT SCAN ROOM
1255B
CT EQUIPMENT
XXX
1351A
ELECTRICAL
MRI
CONTROL ROOM
TRAUMA
1371A
ANTE.
1359A1
STORAGE
DECON/ANTE. ROOM
AMBULANCE VEST.
ALCOVE
1369A
RESTROOM
AOD
STORE
PUBLIC WAITING
NURSE STATION
WOMENS
ELECTRICAL
TR
PSYCH
PSYCH
EXAM
EXAM
EXAM
1230A
RESTROOM
WOMENS HEALTH
SOILED UTILITY
HAC
CLEAN SUPPLY
CLEAN LINEN
PATIENT
RESTROOM
PATIENT RESTROOM
OX FULL
OX EMPTY
SOILED LINEN
TRAUMA
TRAUMA
CORRIDOR
HEAD NURSE
BREAK ROOM
CONSULT ROOM
OFFICE
ON-CALL
WAITING
X-RAY
RESTROOM
RESTROOM
1255A
CT CONTROL ROOM
RESTROOM
LINEN CHUTE
/F1 28PG114/F1 28PG114
F
P G
F
P G
CORRIDOR
CORRIDOR
CORRIDOR
28-CG-1
CORRIDOR
28-MGAP-1-8
28-MGZB-1-5-1
28-MGZB-1-6-2
1/
4" ø
M A
1/
2" ø
O
3/4"ø O
3" ø
M V
28-MGAP-1-4
28-MGZB-1-7-1
28-MGAP-1-5
28-MGZB-1-5-2
28-MGZB-1-6-1
28-MGZB-1-8-1
28-MGZB-1-8-2
28-MGZB-1-4-1
28-MGZB-1-4-2
28-MGAP-1-6
1 1/2"ø MV
1/2"ø MA
1/2"ø O
1/
2" ø
M V
1/ 2" ø M
A
1/ 2" ø O
1/ 2" ø O
1" ø
M V
1/ 2" ø M
A
1/ 2" ø O
2"ø MV
2" ø M
V
1"ø O
3/4"ø O
1/2"ø MA
1"ø MV
1/2"ø MA
1"ø MV
1" ø
M V
28-MGAP-1-7
3/4"ø MV
1/2"ø MA
1/2"ø O
1/ 2" ø O
1/ 2" ø M
A
1" ø
M V
1/ 2" ø O
3/ 4" ø M
A
1" ø
M V
1/2"ø O
1/2"ø MA
1"ø MV
1/2"ø O
1/2"ø MA
1"ø MV
1/2"ø O
1/2"ø MA
1"ø MV
1/ 4" ø M
V
1/ 2" ø M
A
1/ 2" ø O
3/4"ø O
3/4"ø MA
2"ø MV
2" ø
M V
3/ 4" ø M
A
3/ 4" ø O
3/4"ø MA
3/4"ø O
3" ø
M V
1" ø
N O
1" ø
N
1/2"ø MA
1"ø MV
3/ 4" ø M A
3/ 4" ø O
3/4"ø O
3/4"ø MA
1"ø MV
1/2"ø O
1/2"ø MA
3/4"ø MV
1" ø
M A
3/ 4" ø O
1/ 2" ø M
A
1/
2" ø
M V
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 4/
3/
:2 7:
P
M
28PG112
MED GAS PLAN - BLDG 28 1ST
FLOOR REGION 2
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
03/22/23 MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08
3/16" = 1'-0"
MED GAS PLAN - BLDG 28 1ST FLOOR REGION 2
F1
LV
A
O
M V
M A
O
M V
M A
O
M V
M A
O
M V
X
LALV LALV LA
X
LA
O LV
M V
M
AO
M V
M A O
O
M V
M
AO
10 11 12 1397 8
E
D
C
B
A
10.3 12.4
/F1 28PG111
F
P G
MECH RM
13371
ANTEROOM
133711
BUFFER RM
133712
BUFFER RM
ROOM
GAS STORAGE
1204D4 Room
1337E
HAC
1337F
RESTROOM
IV/CHEMO
1337H
CHEMO
PHARMACY
NUCLEAR MEDICINE
LAB
OFFICE
MECHANICAL
WAITING
GAMMA CAMERA
X-RAY #2
GAMMA CAMERA
ENTRY
SWITCHGEAR
X-RAY #4
ELECTRICAL
1313A
RESTROOM
CT SCAN
RESTROOM
VIEWING
FILM PROCESSING
OFFICE
CHIEF TECH.
BREAK ROOM
1316A
RESTROOM
RESTROOM
ULTRA SOUND1333
STORAGE1335
RESTROOM
HAC
1309A
RESTROOM
XXX
DRESSING
1318A
VIEWING
/F1 28PG111 /F1 28PG111
F
P G
F
P G
28-CG-31
CORRIDOR
28-3
STAIR 3
CORRIDOR
28-CG-34
CORRIDOR
28-CG-35
CORRIDOR
28-CG-37
CORRIDOR
28-CG-43
CORRIDOR
28-MGZB-1-2-1
28-MGZB-1-3-2
1/ 2" ø L
A
3/ 4" ø L
V
1/2"ø O
28-MGZB-1-2-2
CORRIDOR
28-MGZB-1-3-1
28-IDU-N (REF MECH)
1/2"ø O
1/2"ø MA
1"ø MV
3/ 4" ø M
V
1/ 2" ø M
A
1/ 2" ø O
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
3/ 4" ø M
V
1/ 2" ø M
A
1/ 2" ø O
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
1/ 2" ø O
1/ 2" ø M
A
3/ 4" ø M
V
1/
2" ø
O
1/
4" ø
M A
3" ø
M V
1" ø
N
1" ø
N O
3/4"ø MV
1/2"ø MA
1/2"ø O
3"ø MV
1 1/2"ø MA
1 1/2"ø O 4"ø MAI
6"ø MVE
1/
2" ø
O
1/
2" ø
M A
3" ø
M V
1" ø
N
1" ø
N O
28-MGM-N2
28-MGM-N2O
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. MED GAS
G. FOR MEDICAL GAS OUTLETS SHOWN FOR REPLACEMENT, REMOVE EXISTING
AND PROTECT PIPE OPENINGS, REVISE EXISTING TRIM AT WALL,
HEADBOARD, OR BOOM AS REQUIRED WHERE APPLICABLE (REF
ASSOCIATED EXISTING PHOTOS). INSTALL NEW OUTLET PER NEW WORK
PLANS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
Tru e N or th
W A
LK
E
R B
LV
D
W A
LK
E
R B
LV
D
WALKER BLVD
WALKER BLVD
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
B _R
_m bi bl e2 H
X D
7.
rv t 3/
/2
:1
7:
P M
28PG113
MED GAS PLAN - BLDG 28 1ST
FLOOR REGION 3
UPGRADE MED GAS BLDG 01, 28, &
6010 W AMARILLO BLVD, AMARILLO, TX 79106
504-22-108
MB JD
100% CONSTRUCTION
DOCUMENTS
VEG 22.08 03/22/23
3/16" = 1'-0"
MED GAS PLAN - BLDG 28 1ST FLOOR REGION 3
F1
V
M A O
M V
M
AO
MA
MV
O
M A
M
VO
MA
MV
O
M V
M
AO
6 752 3 41
E
D
C
B
A
3.21.2
/F1 28PG112
F
P G
1210A
INTERVIEW/PRESRIPTION
ELECTRICAL
SOCIAL WORKER
TR
1282A
PATIENT ADVOCATE
OFFICE
1228A
OFFICE
LIPID
OFFICE
LIPID
OFFICE
SEC/WAITING
1228C
SUPERVISOR
HEAD NURSE
BREAK ROOM
CONSULT ROOM
OFFICE
ON-CALL
WAITING
PATIENT ADVOCATE
PATIENT REP.1229
PATIENT REP.
AW2
1231A
STORAGE
WAITING
CLERK
EKG
PF
HAC
SOILED
CLEAN
BLOOD GAS
RESTROOM
RESTROOM
STRESS LAB
EQUIP. STORAGE
OFFICE
HOME 02 1289
NEURO EEG
ECHO CARDIO
MECHANICAL
VENDING
CORRIDOR
1228B
PHARMACY CHIEF
1228D
LIBRARY/CLINICAL
TECH.
EXAM 4
EXAM 3
EXAM 2
EXAM 1
NURSE
STATION/NOURISH
PREP ROOM
1288A
RESTROOM
1292A
STORAGE
/F1 28PG112 /F1 28PG112
F
P G
F
P G
/F1 29PG111 /F1 29PG111/F1 29PG111
CORRIDOR
28-CG-31
CORRIDOR
CHEMO
PHARMACY
CORRIDOR
CORRIDOR
CORRIDOR
28-2
STAIR 2
28-CG-19
CORRIDOR
28-MGAP-10
28-MGZB-1-9-1
1/
2" ø
O
1/
4" ø
M A
3" ø
M V
3/ 4" ø O
3/ 4" ø M
A
1"ø MV
1"ø MV
1/2"ø MA
1/2"ø O
28-MGAP-1-9
28-MGZB-10-1
3/4"ø O
3/4"ø MA
3/4"ø MV
3/4"ø O
3/4"ø MA
3/4"ø MV
1" ø
O
1" ø
O
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .