P9001_Specifications.pdf
PDF 13 MB Posted
- Attached to
- FY24 AYHN239001 (P-9001), PDI TRANSIENT AIRCRAFT PARKING APRON, BASA AIR BASE, PHILIPPINES
- Solicitation number
- N6274224R1304
About this file
This document provides details on a federal contract opportunity for construction services. The Navy Naval Facilities Engineering Command is soliciting proposals for the FY24 AYHN239001 (P-9001) contract to build a PDI Transient Aircraft Parking Apron at the Basa Air Base in the Philippines. Proposals are due by November 15, 2024 according to solicitation number N6274224R1304. The opportunity type is listed as a solicitation. A 13MB PDF file titled P9001_Specifications contains additional requirements for the aircraft parking apron construction project at the specified overseas Navy base location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24R1304 Note 7.pdf | ||
| 24R1304_AMD07.pdf | ||
| 24R1304_AMD06.pdf | ||
| 24R1304 Note 6.pdf | ||
| 24R1304_AMD05.pdf | ||
| 24R1304 Note 5.pdf | ||
| 24R1304_AMD04.pdf | ||
| 24R1304 Note 4.pdf | ||
| 24R1304_AMD03.pdf | ||
| 24R1304_AMD02.pdf | ||
| 24R1304 Note 3.pdf | ||
| AMD1 Drawings Part1.pdf | ||
| 24R1304_AMD01.pdf | ||
| AMD1 Drawings Part6.pdf | ||
| AMD1 Drawings Part2.pdf | ||
| AMD1 Drawings Part3.pdf | ||
| AMD1 Drawings Part5.pdf | ||
| AMD1 Drawings Part4.pdf | ||
| 24R1304 Note 2.pdf | ||
| 24R1304 Note 1.pdf | ||
| P9001_dwg_Part 2.pdf | ||
| P9001_dwg_Part 3.pdf | ||
| P9001_dwg_Part 6.pdf | ||
| P9001_dwg_Part 1.pdf | ||
| P9001_dwg_Part 4.pdf | ||
| P9001_dwg_Part 5.pdf | ||
| 24R1304_RFP.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC PACIFIC
WORK ORDER NO:
1720128
SPECIFICATIONS
For
FY24 AYHN239001 (P-9001),
PDI Transient Aircraft Parking Apron
At the
Basa Air Base, Philippines
(Final)
PREPARED BY:
Architectural: Chad Chamberlin, AIA Mechanical: Ashraf Gohar, P.E.
Civil: Carly Divine, P.E.
Electrical: Nathan Veen, P.E.
Structural: Daniel Dreyer, P.E.
Fire Protection: Robert Bigtas, P.E.
Submitted By: _______________________________ Date: 12/15/2023 Carly Divine
APPROVED BY:
For Commander, NAVFAC Pacific: ________________________________________________
Evan A. Mizue, P.E.
Date: _______________________ jovencio.cadiz Text Box 12/22/2023
FY24 AYHN239001 (P-9001), PDI Transient Aircraft Parking Apron Work Order No.
Basa Air Base, Philippines 1720128
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS Munitions Response Explosives Safety Submission (MRESS) Basa Air Base Construction Support
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23 FACILITY DATA WORKBOOK (FDW)
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 – CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 05 – METALS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 50 15 08/18 CIVIL WORKS FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 24 00 05/11, CHG 4: 08/18 EXTERIOR FINISH SYSTEMS
07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM INSULATION
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 – FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 – PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES FOR
HVAC
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
DIVISION 26 – ELECTRICAL
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE
INTERIOR OF STEEL WATER TANKS
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND
VISUAL NAVIGATION AIDS
DIVISION 27 – COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 – EARTHWORK
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 11/22 COLD MILLING ASPHALT PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 05/22 SEPARATION LAYER
32 11 23 05/22 AGGREGATE AND/OR GRADED-CRUSHED
AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 14.13 11/22 CONCRETE PAVING FOR AIRFIELDS AND OTHER
HEAVY DUTY PAVEMENTS
32 15 00 05/17 AGGREGATE SURFACING
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 16 15 11/20 WATER STORAGE STEEL TANKS
33 40 00 11/21 STORMWATER UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
FY24 AYHN239001 ( P- 9001) , PDI Tr ansi ent Ai r cr af t Par ki ng Apr on Wor k Or der No:
Basa Ai r Base, Phi l i ppi nes 1720128
SECTI ON TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
1. 2 CONTRACT DRAWI NGS
1. 3 SUPPLEMENTARY DRAWI NGS
1. 3. 1 Bor i ng Logs
- - End of Sect i on Tabl e of Cont ent s - -ms2236 DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
SHEET NO. NAVFAC DRAWI NG NO TI TLE
GENERAL
GI 001 17307590 COVER SHEET
GI 002 17307591 I NDEX OF SHEETS
GI 003 17307592 LEGENDS, ABBREVI ATI ONS, & NOTES
GI 101 17307593 SI TE ACCESS PLAN
GI 102 17307594 CONSTRUCTI ON CONTROL LI NE PLAN
GENERAL FI RE PROTECTI ON
G- 001 17307595 BUI LDI NG CODE AND LI FE SAFETY CODE SUMMARY
ms2236 DOCUMENT 00 01 15 Page 2
G- 101 17307596 CODE COMPLI ANCE SI TE PLAN
G- 102 17307597 FI RE PUMP BUI LDI NG - LI FE SAFETY PLAN
GENERAL CONTRACT REQUI REMENTS
GC001 17307598 CONSTRUCTI ON PHASI NG NOTES
GC101 17307599 CONSTRUCTI ON PHASI NG PLAN - SHEET 1
GC102 17307600 CONSTRUCTI ON PHASI NG PLAN - SHEET 2
GC103 17307601 CONSTRUCTI ON PHASI NG PLAN - SHEET 3
GC110 17307602 EROSI ON CONTROL PLAN AND NOTES
GC501 17307603 TAXI WAY CLOSI NG DETAI LS
GC510 17307604 EROSI ON CONTROL DETAI LS
GEOTECHNI CAL
BB101 17307605 BORI NG LOCATI ON PLAN - SHEET 1
ms2236 DOCUMENT 00 01 15 Page 3
BB102 17307606 BORI NG LOCATI ON PLAN - SHEET 2
BB601 17307607 BORI NG LOGS - SHEET 1
BB602 17307608 BORI NG LOGS - SHEET 2
BB603 17307609 BORI NG LOGS - SHEET 3
BB604 17307610 BORI NG LOGS - SHEET 4
BB605 17307611 BORI NG LOGS - SHEET 5
BB606 17307612 BORI NG LOGS - SHEET 6
BB607 17307613 BORI NG LOGS - SHEET 7
BB608 17307614 BORI NG LOGS - SHEET 8
BB609 17307615 BORI NG LOGS - SHEET 9
BB610 17307616 BORI NG LOGS - SHEET 10
BB611 17307617 BORI NG LOGS - SHEET 11
BB612 17307618 BORI NG LOGS - SHEET 12
BB613 17307619 BORI NG LOGS - SHEET 13
ms2236 DOCUMENT 00 01 15 Page 4
BB614 17307620 BORI NG LOGS - SHEET 14
BB615 17307621 BORI NG LOGS - SHEET 15
BB616 17307622 BORI NG LOGS - SHEET 16
CI VI L DEMOLI TI ON
CD100 17307623 OVERALL DEMOLI TI ON KEY PLAN
CD101 17307624 DEMOLI TI ON PLAN - SHEET 1
CI VI L SI TE
CS100 17307625 OVERALL SI TE KEY PLAN
CS101 17307626 SI TE PLAN - SHEET 1
CS102 17307627 SI TE PLAN - SHEET 2
CS103 17307628 SI TE PLAN - SHEET 3
CS104 17307629 SI TE PLAN - SHEET 4
ms2236 DOCUMENT 00 01 15 Page 5
CS105 17307630 SI TE PLAN - SHEET 5
CS106 17307631 SI TE PLAN - SHEET 6
CS107 17307632 SI TE PLAN - SHEET 7
CS108 17307633 SI TE PLAN - SHEET 8
CS109 17307634 SI TE PLAN - SHEET 9
CS110 17307635 SI TE PLAN - SHEET 10
CS111 17307636 SI TE PLAN - SHEET 11
CS201 17307637 PROFI LE - ENTRANCE 1, 2, 3
CS202 17307638 PROFI LE - ACCESS ROAD 1, 2, 3
CS301 17307639 TYPI CAL SECTI ONS
CS302 17307640 SHOULDER GRADI NG TYPI CAL SECTI ON
CS401 17307641 ENLARGED SI TE PLAN - SHEET 1
CS402 17307642 ENLARGED SI TE PLAN - SHEET 2
CS501 17307643 CI VI L DETAI LS - SHEET 1
ms2236 DOCUMENT 00 01 15 Page 6
CS502 17307644 CI VI L DETAI LS - SHEET 2
CI VI L GRADI NG
CG100 17307645 OVERALL GRADI NG & DRAI NAGE KEY PLAN
CG101 17307646 GRADI NG & DRAI NAGE PLAN - SHEET 1
CG102 17307647 GRADI NG & DRAI NAGE PLAN - SHEET 2
CG103 17307648 GRADI NG & DRAI NAGE PLAN - SHEET 3
CG104 17307649 GRADI NG & DRAI NAGE PLAN - SHEET 4
CG105 17307650 GRADI NG & DRAI NAGE PLAN - SHEET 5
CG106 17307651 GRADI NG & DRAI NAGE PLAN - SHEET 6
CG107 17307652 GRADI NG & DRAI NAGE PLAN - SHEET 7
CG108 17307653 GRADI NG & DRAI NAGE PLAN - SHEET 8
CG109 17307654 GRADI NG & DRAI NAGE PLAN - SHEET 9
CG110 17307655 GRADI NG & DRAI NAGE PLAN - SHEET 10
ms2236 DOCUMENT 00 01 15 Page 7
CG111 17307656 GRADI NG & DRAI NAGE PLAN - SHEET 11
CG201 17307657 DRAI NAGE PROFI LES - SHEET 1
CG202 17307658 DRAI NAGE PROFI LES - SHEET 2
CG401 17307659 ENLARGED GRADI NG & DRAI NAGE PLAN - SHEET 1
CG402 17307660 ENLARGED GRADI NG & DRAI NAGE PLAN - SHEET 2
CG501 17307661 GRADI NG & DRAI NAGE DETAI LS - SHEET 1
CG502 17307662 GRADI NG & DRAI NAGE DETAI LS - SHEET 2
CG503 17307663 GRADI NG & DRAI NAGE DETAI LS - SHEET 3
CG601 17307664 DRAI NAGE STRUCTURE & PI PE TABLES
CG700 17307665 OVERALL GRADI NG CROSS SECTI ON KEY PLAN
CG701 17307666 GRADI NG CROSS SECTI ONS - SHEET 1
CG702 17307667 GRADI NG CROSS SECTI ONS - SHEET 2
CG703 17307668 GRADI NG CROSS SECTI ONS - SHEET 3
CG704 17307669 GRADI NG CROSS SECTI ONS - SHEET 4
ms2236 DOCUMENT 00 01 15 Page 8
CG705 17307670 GRADI NG CROSS SECTI ONS - SHEET 5
CG706 17307671 GRADI NG CROSS SECTI ONS - SHEET 6
CG707 17307672 GRADI NG CROSS SECTI ONS - SHEET 7
CG708 17307673 GRADI NG CROSS SECTI ONS - SHEET 8
CG709 17307674 GRADI NG CROSS SECTI ONS - SHEET 9
CG710 17307675 GRADI NG CROSS SECTI ONS - SHEET 10
CG711 17307676 GRADI NG CROSS SECTI ONS - SHEET 11
CG712 17307677 GRADI NG CROSS SECTI ONS - SHEET 12
CG713 17307678 GRADI NG CROSS SECTI ONS - SHEET 13
CG714 17307679 GRADI NG CROSS SECTI ONS - SHEET 14
CG715 17307680 GRADI NG CROSS SECTI ONS - SHEET 15
CG716 17307681 GRADI NG CROSS SECTI ONS - SHEET 16
CG717 17307682 GRADI NG CROSS SECTI ONS - SHEET 17
CG718 17307683 GRADI NG CROSS SECTI ONS - SHEET 18
ms2236 DOCUMENT 00 01 15 Page 9
CG719 17307684 GRADI NG CROSS SECTI ONS - SHEET 19
CG720 17307685 GRADI NG CROSS SECTI ONS - SHEET 20
CG721 17307686 GRADI NG CROSS SECTI ONS - SHEET 21
CG722 17307687 GRADI NG CROSS SECTI ONS - SHEET 22
CG723 17307688 GRADI NG CROSS SECTI ONS - SHEET 23
CG724 17307689 GRADI NG CROSS SECTI ONS - SHEET 24
CG725 17307690 GRADI NG CROSS SECTI ONS - SHEET 25
CG726 17307691 GRADI NG CROSS SECTI ONS - SHEET 26
CG727 17307692 GRADI NG CROSS SECTI ONS - SHEET 27
CG728 17307693 GRADI NG CROSS SECTI ONS - SHEET 28
CG729 17307694 GRADI NG CROSS SECTI ONS - SHEET 29
CG730 17307695 GRADI NG CROSS SECTI ONS - SHEET 30
CI VI L PAVEMENT JOI NTI NG
ms2236 DOCUMENT 00 01 15 Page 10
CP100 17307696 OVERALL PCC PAVEMENT JOI NT LAYOUT KEY PLAN
CP101 17307697 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 1
CP102 17307698 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 2
CP103 17307699 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 3
CP104 17307700 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 4
CP105 17307701 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 5
CP106 17307702 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 6
CP107 17307703 PCC PAVEMENT JOI NT LAYOUT PLAN - SHEET 7
CP501 17307704 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 1
CP502 17307705 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 2
CP503 17307706 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 3
CP504 17307707 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 4
CP505 17307708 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 5
CP506 17307709 CI VI L PAVEMENT JOI NTI NG DETAI LS - SHEET 6
ms2236 DOCUMENT 00 01 15 Page 11
CP601 17307710 TI E DOWN LOCATI ON POI NT TABLES
CI VI L PAVEMENT ELEVATI ONS
CI 100 17307711 OVERALL AI RFI ELD PAVEMENT ELEVATI ON KEY PLAN
CI 101 17307712 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 1
CI 102 17307713 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 2
CI 103 17307714 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 3
CI 104 17307715 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 4
CI 105 17307716 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 5
CI 106 17307717 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 6
CI 107 17307718 AI RFI ELD PAVEMENT ELEVATI ON PLAN - SHEET 7
CI 401 17307719 ENLARGED AI RFI ELD PAVEMENT ELEVATI ON PLAN
CI VI L UTI LI TY - WATER
ms2236 DOCUMENT 00 01 15 Page 12
CU100 17307720 OVERALL UTI LI TY KEY PLAN
CU101 17307721 UTI LI TY PLAN - SHEET 1
CU102 17307722 UTI LI TY PLAN - SHEET 2
CU103 17307723 UTI LI TY PLAN - SHEET 3
CU104 17307724 UTI LI TY PLAN - SHEET 4
CU105 17307725 UTI LI TY PLAN - SHEET 5
CU201 17307726 UTI LI TY PROFI LE WATER MAI N - SHEET 1
CU202 17307727 UTI LI TY PROFI LE WATER MAI N - SHEET 2
CU203 17307728 UTI LI TY PROFI LE WATER MAI N - SHEET 3
CU501 17307729 UTI LI TY DETAI LS - SHEET 1
CU502 17307730 UTI LI TY DETAI LS - SHEET 2
SI TE STRUCTURAL
SS501 17307731 MANHOLE AND HANDHOLE STRUCTURAL DETAI LS
ms2236 DOCUMENT 00 01 15 Page 13
SI TE ELECTRI CAL - DEMOLI TI ON
ED100 17307732 OVERALL DEMOLI TI ON KEY PLAN AI RFI ELD LI GHTI NG
ED101 17307733 ENLARGED DEMOLI TI ON PLAN AI RFI ELD LI GHTI NG
SI TE ELECTRI CAL - AI RFI ELD LI GHTI NG
EA001 17307734 AI RFI ELD LI GHTI NG LEGEND, ABBREVI ATI ONS & NOTES
EA100 17307735 OVERALL AI RFI ELD LI GHTI NG KEY PLAN
EA101 17307736 AI RFI ELD LI GHTI NG PLAN - SHEET 1
EA102 17307737 AI RFI ELD LI GHTI NG PLAN - SHEET 2
EA103 17307738 AI RFI ELD LI GHTI NG PLAN - SHEET 3
EA104 17307739 AI RFI ELD LI GHTI NG PLAN - SHEET 4
EA105 17307740 AI RFI ELD LI GHTI NG PLAN - SHEET 5
EA106 17307741 AI RFI ELD LI GHTI NG PLAN - SHEET 6
ms2236 DOCUMENT 00 01 15 Page 14
EA107 17307742 AI RFI ELD LI GHTI NG PLAN - SHEET 7
EA401 17307743 ENLARGED AI RFI ELD LI GHTI NG PLAN - SHEET 1
EA501 17307744 AI RFI ELD LI GHTI NG DETAI LS - SHEET 1
EA502 17307745 AI RFI ELD LI GHTI NG DETAI LS - SHEET 2
EA503 17307746 AI RFI ELD LI GHTI NG DETAI LS - SHEET 3
EA504 17307747 AI RFI ELD LI GHTI NG DETAI LS - SHEET 4
EA505 17307748 AI RFI ELD LI GHTI NG DETAI LS - SHEET 5
EA506 17307749 AI RFI ELD LI GHTI NG DETAI LS - SHEET 6
EA507 17307750 AI RFI ELD LI GHTI NG DETAI LS - SHEET 7
EA601 17307751 AI RFI ELD LI GHTI NG SCHEDULES - SHEET 1
EA602 17307752 AI RFI ELD LI GHTI NG SCHEDULES - SHEET 2
EA603 17307753 ONE- LI NE DI AGRAM
EA701 17307754 POWER HOUSE - ELECTRI CAL PLAN
ms2236 DOCUMENT 00 01 15 Page 15
SI TE ELECTRI CAL - SI TE LI GHTI NG
EL100 17307755 OVERALL SI TE LI GHTI NG PLAN
EL109 17307756 ENLARGED SI TE LI GHTI NG PLAN - SHEET 1
EL110 17307757 ENLARGED SI TE LI GHTI NG PLAN - SHEET 2
EL501 17307758 ELECTRI CAL SI TE LI GHTI NG DETAI LS
SI TE ELECTRI CAL
ES100 17307759 OVERALL SI TE ELECTRI CAL PLAN
ES108 17307760 ENLARGED SI TE ELECTRI CAL PLAN - SHEET 1
ES109 17307761 ENLARGED SI TE ELECTRI CAL PLAN - SHEET 2
ES110 17307762 ENLARGED SI TE ELECTRI CAL PLAN - SHEET 3
ES501 17307763 SI TE ELECTRI CAL DETAI LS
SI TE ELECTRI CAL - CATHODI C PROTECTI ON
ms2236 DOCUMENT 00 01 15 Page 16
EC100 17307763 OVERALL CATHODI C PROTECTI ON SI TE PLAN
EC103 17307764 ENLARGED CATHODI C PROTECTI ON PLAN - SHEET 1
EC104 17307765 ENLARGED CATHODI C PROTECTI ON PLAN - SHEET 2
EC105 17307766 ENLARGED CATHODI C PROTECTI ON PLAN - SHEET 3
EC501 17307767 CATHODI C PROTECTI ON DETAI LS - SHEET 1
EC502 17307768 CATHODI C PROTECTI ON DETAI LS - SHEET 2
SI TE TELECOMMUNI CATI ONS
TS100 17307769 OVERALL TELECOMM SI TE PLAN
TS401 17307770 ENLARGED TELECOMM SI TE PLAN
TS501 17307771 TELECOMM SI TE DETAI LS
FI RE PUMP BUI LDI NG
STRUCTURAL
ms2236 DOCUMENT 00 01 15 Page 17
S- 001 17307775 STRUCTURAL NOTES
S- 002 17307776 TYPI CAL REI NFORCI NG DETAI LS
S- 101 17307777 FI RE PUMP BUI LDI NG - STRUCTURAL PLANS
S- 102 17307778 TANK FOUNDATI ON
S- 201 17307779 FI RE PUMP BUI LDI NG - ELEVATI ON
S- 501 17307780 TYPI CAL BUI LDI NG DETAI LS
S- 502 17307781 FOUNDATI ON AND ROOF DETAI LS
ARCHI TECTURAL
A- 100 17307785 FI RE PUMP BUI LDI NG - PLANS
A- 200 17307786 FI RE PUMP BUI LDI NG - ELEVATI ONS
A- 300 17307787 FI RE PUMP BUI LDI NG - SECTI ON
A- 310 17307788 FI RE PUMP BUI LDI NG - WALL SECTI ON
A- 501 17307789 FI RE PUMP BUI LDI NG - DETAI LS
ms2236 DOCUMENT 00 01 15 Page 18
FI RE PROTECTI ON
F- 001 17307792 FI RE PROTECTI ON NOTES, SYMBOLS AND ABBREVI ATI ONS
FA101 17307793 FLOOR PLAN - FI RE ALARM, WATER TANK - FI RE ALARM
FA601 17307794 FI RE ALARM SYSTEM SEQUENCE OF OPERATI ONS AND
RI SER DI AGRAM
FX101 17307795 FLOOR PLAN - FI RE SPRI NKLER HAZARD PLAN AND
SPRI NKLER PLAN
FX401 17307796 ENLARGED FLOOR PLAN - PI PI NG LAYOUT
FX402 17307797 WATER TANK PI PI NG PLAN
FX403 17307798 WATER TANK I SOMETRI C PI PI NG
FX501 17307799 FI RE PROTECTI ON DETAI LS - SHEET 1
FX502 17307800 FI RE PROTECTI ON DETAI LS - SHEET 2
FX503 17307801 FI RE PROTECTI ON DETAI LS - SHEET 3
MECHANI CAL & PLUMBI NG
M- 100 17307804 FI RE PUMP BUI LDI NG - MECHANI CAL / PLUMBI NG PLANS
ms2236 DOCUMENT 00 01 15 Page 19
M- 501 17307805 FI RE PUMP BUI LDI NG - MECHANI CAL / PLUMBI NG DETAI LS
M- 601 17307806 FI RE PUMP BUI LDI NG - MECHANI CAL / PLUMBI NG
SCHEDULES
ELECTRI CAL
E- 100 17307810 FI RE PUMP BUI LDI NG - LI GHTNI NG PROTECTI ON AND
GROUNDI NG PLAN
E- 101 17307811 FI RE PUMP BUI LDI NG - LI GHTI NG AND POWER PLAN
E- 102 17307812 FI RE PUMP BUI LDI NG - ONE- LI NE AND PANEL SCHEDULE
TELECOMMUNI CATI ONS
T- 100 17307816 FI RE PUMP BUI LDI NG - TELECOMM PLAN
T- 501 17307817 TELECOMM DETAI LS - SHEET 1
T- 601 17307818 TELECOMM DI STRI BUTI ON RI SER DI AGRAM
1. 3 SUPPLEMENTARY DRAWI NGS
These suppl ement ar y dr awi ngs may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.
1. 3. 1 Bor i ng Logs
The Gover nment does not guar ant ee t hat bor i ngs i ndi cat e act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made.
Subsur f ace dat a, not speci f i ed or i ndi cat ed, have been obt ai ned by t he ms2236 DOCUMENT 00 01 15 Page 20
Gover nment at t hi s st at i on. The dat a ar e avai l abl e f or exami nat i on by pr ospect i ve bi dder s i n t he of f i ce of t he Cont r act i ng Of f i cer .
- - End of Document - -ms2236 DOCUMENT 00 01 15 Page 21
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 2 Locat i on
1. 3 EXI STI NG WORK
1. 4 ON- SI TE PERMI TS
1. 4. 1 Ut i l i t y Out age Request s and Ut i l i t y Connect i on Request s
1. 4. 2 Bor r ow
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on
1. 6 SALVAGE MATERI AL AND EQUI PMENT
PART 2 PRODUCTS
PART 3 EXECUTI ON
ms2236 SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ut i l i t y Out age Request s
Ut i l i t y Connect i on Request s
Excavat i on Per mi t s
Wel di ng Per mi t s
Bur ni ng Per mi t s
Sal vage Pl an; G
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes const r uct i on of an ai r cr af t par ki ng apr on wi t h ent r ance t axi ways connect i on t o Taxi way " E" , suppor t i ng f aci l i t i es of st or mwat er management , apr on edge l i ght i ng, vehi cul ar r oadways, and i nci dent al r el at ed wor k.
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he Cesar Basa Ai r Base, Phi l i ppi nes, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
ms2236 SECTI ON 01 11 00 Page 2
1. 4 ON- SI TE PERMI TS
1. 4. 1 Ut i l i t y Out age Request s and Ut i l i t y Connect i on Request s
Schedul e wor k t o mi ni mi ze out ages. For ut i l i t y out ages and connect i ons r equi r ed dur i ng t he execut i on of wor k t hat af f ect exi st i ng syst ems, schedul e out si de t he r egul ar wor ki ng hour s or on weekends, as appr oved by t he Cont r act i ng Of f i cer . Schedul e ut i l i t y out ages and connect i ons t o mi ni mi ze di sr upt i ons t ot he Gover nment . No addi t i onal payment wi l l be pr ovi ded f or ut i l i t y out ages and connect i ons r equi r ed t o be per f or med out si de t he r egul ar wor k hour s.
Submi t r equest s f or ut i l i t y out ages and connect i ons i n wr i t i ng t o t he Cont r act i ng Of f i cer f or appr oval at l east 14 cal endar days i n advance of t he t i me r equi r ed. I n each r equest , st at e t he syst em i nvol ved, ar ea i nvol ved, appr oxi mat e dur at i on of out age, and t he nat ur e of wor k i nvol ved.
1. 4. 2 Bor r ow
ACTI VI TY SUBMI SSI ON DATE SUBMI SSI ON FORM
Bur ni ng Per mi t s 14 cal endar days pr i or t o wor k
Cont r act or t o obt ai n f r om Chi ef , CESO , 5t h FW, Basa Ai r Base
Excavat i on Per mi t s 14 cal endar days pr i or t o wor k
Cont r act or t o obt ai n f r om Chi ef , CESO , 5t h FW, Basa Ai r Base
Wel di ng Per mi t s 14 cal endar days pr i or t o wor k
Cont r act or t o obt ai n f r om Chi ef , CESO , 5t h FW, Basa Ai r Base
Post per mi t s at a conspi cuous l ocat i on i n t he const r uct i on ar ea.
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 14 cal endar days pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any ms2236 SECTI ON 01 11 00 Page 3 t ype of under gr ound obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed.
Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 6 SALVAGE MATERI AL AND EQUI PMENT
I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he st or age ar ea l ocat ed wi t hi n 5 k i l omet er s of t he const r uct i on s i t e.
Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Pr ovi de a syst em f or pr oper t y cont r ol i n t he sal vage pl an. St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -ms2236 SECTI ON 01 11 00 Page 4
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22, CHG 1: 02/ 23
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
1. 3. 1. 2 No Smoki ng Pol i cy
1. 3. 1. 3 I nst al l at i on Access
1. 3. 1. 4 Per sonnel Ent r y Appr oval
1. 3. 2 Wor ki ng Hour s
1. 3. 3 Wor k Out si de Regul ar Hour s
1. 3. 4 Excl usi onar y Per i od
1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons
1. 4 SECURI TY REQUI REMENTS
1. 4. 1 Per sonnel Li st
1. 5 MATERI ALS, FACI LI TI ES, AND SERVI CES
1. 5. 1 E- mai l and I nt er net
PART 2 PRODUCTS
PART 3 EXECUTI ON
ms2236 SECTI ON 01 14 00 Page 1
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22, CHG 1: 02/ 23
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel
Per sonnel Li st
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
a. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k. Speci f i c i t ems of wor k t o whi ch t hi s r equi r ement appl i es i ncl ude:
b. Const r uct i on submi t t al s Sect i on 32 13 14. 13 CONCRETE PAVI NG FOR AI RFI ELDS AND OTHER HEAVY DUTY PAVEMENTS SD- 05 Pr oduct Dat a, Pr opor t i oni ng St udi es and Sect i on 32 12 15. 13 ASPHALT PAVI NG FOR AI RFI ELDS SD- 03 Pr oduct Dat a, Mi x Desi gn must be appr oved pr i or t o r equest i ng c l osur e of t he t axi way.
c. The Taxi way wi l l r emai n i n oper at i on dur i ng t he ent i r e const r uct i on per i od except f or t he phased cl osur e shown on t he pr oj ect dr awi ngs.
The Cont r act or must conduct hi s oper at i ons so as t o cause t he l east possi bl e i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y.
d. Per mi ssi on t o i nt er r upt any Act i v i t y r oads, r ai l r oads, or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.
e. The Smal l Ar ms Pr act i ce Range west of t he pr oj ect s i t e has r egul ar wor ki ng hour s of 1500 t o 1800.
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
ms2236 SECTI ON 01 14 00 Page 2
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 1. 3 I nst al l at i on Access
Cont r act or must pr ovi de t he f ol l owi ng t o Chi ef , CESO , 5t h FW, Basa Ai r Base ( t hr ough t he cont r act i ng of f i cer ) :
a. Company pr of i l e
b. Phi l i ppi ne Cont r act or s Accr edi t at i on Boar d ( PCAB) l i cense
c. Mayor ' s per mi t
d. Busi ness per mi t
e. Bar angay cl ear ance f . Pol i ca Cl ear ance
g. Nat i onal Bur eau of I nvest i gat i on ( NBI ) c l ear ance
1. 3. 1. 4 Per sonnel Ent r y Appr oval
Fai l ur e t o obt ai n ent r y appr oval wi l l not af f ect t he cont r act pr i ce or t i me of compl et i on.
1. 3. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od, bet ween 7 a. m.
and 3: 30 p. m. , , excl udi ng hol i days l i s t ed i n 01 32 17. 00 20 COST- LOADED
NETWORK ANALYSI S SCHEDULES ( NAS) .
1. 3. 3 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.
ms2236 SECTI ON 01 14 00 Page 3
1. 3. 4 Excl usi onar y Per i od
No wor k may be per f or med dur i ng t he Phi l i ppi ne Ai r For ce Anni ver sar i es ( Jul y 3) & Bal i kat an exer ci ses ( up t o 20 cont i nuous cal endar days i n Mar ch & Apr i l each year ) , i ncl usi ve, wi t hout pr i or wr i t t en appr oval of t he Cont r act i ng Of f i cer . Thi s per i od has not been consi der ed i n comput i ng t he t i me al l owed f or t he per f or mance of t hi s cont r act .
1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.
c. I nt er r upt i on t o ai r f i el d l i ght i ng, wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, and compr essed ai r ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.
d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.
1. 4 SECURI TY REQUI REMENTS
1. 4. 1 Per sonnel Li st
Submi t f or appr oval , at l east 15 days pr i or t o t he desi r ed dat e of ent r y, an or i gi nal al phabet i cal l i s t of per sonnel who r equi r e ent r y i nt o Gover nment pr oper t y t o per f or m wor k on t he pr oj ect . Fur ni sh f or each per son:
a. Name
b. Dat e and pl ace of bi r t h
c. Ci t i zenshi p
d. Home addr ess
e. Cur r ent pass expi r at i on dat e f . Passpor t number , pl ace of i ssue, and expi r at i on dat e
1. 5 MATERI ALS, FACI LI TI ES, AND SERVI CES
1. 5. 1 E- mai l and I nt er net
The cont r act or must ar r ange and pr ovi de t hei r own i nt er net access.
ms2236 SECTI ON 01 14 00 Page 4
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used ms2236 SECTI ON 01 14 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 EARNED VALUE REPORT
1. 3. 1 Dat a Requi r ed
1. 3. 2 Payment Schedul e I nst r uct i ons
1. 4 CONTRACT MODI FI CATI ONS
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
1. 5. 2 Submi ssi on of I nvoi ces
1. 6 PAYMENTS TO THE CONTRACTOR
1. 6. 1 Obl i gat i on of Gover nment Payment s
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
PART 2 PRODUCTS
PART 3 EXECUTI ON
ms2236 SECTI ON 01 20 00 Page 1
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ear ned Val ue Repor t ; G
1. 3 EARNED VALUE REPORT
1. 3. 1 Dat a Requi r ed
Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Wi t hi n 15 cal endar days of Cont r act Awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Ear ned Val ue Repor t ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces. Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.
1. 3. 2 Payment Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .
Addi t i onal l y, t he Ear ned Val ue Repor t must be separ at ed as f ol l ows:
a. Pr i mar y Faci l i t i es Cost Br eakdown:
Def i ned as wor k on ai r cr af t pavement and ai r cr af t paved shoul der s.
ms2236 SECTI ON 01 20 00 Page 2
b. Suppor t i ng Faci l i t i es Cost Br eakdown:
Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he ai r cr af t paved shoul der s.
1. 4 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he
EP 1110- 1- 8.
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS.
c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.
d. Mont hl y Wor k- hour r epor t .
e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .
f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
g. Updat ed submi t t al r egi st er .
h. Sol i d Wast e Di sposal Repor t .
i . Cer t i f i ed payr ol l s.
j . Updat ed t est i ng l ogs.
k. Ot her suppor t i ng document s as r equest ed.
1. 5. 2 Submi ssi on of I nvoi ces
Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he ms2236 SECTI ON 01 20 00 Page 3 anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.
1. 6 PAYMENTS TO THE CONTRACTOR
Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .
1. 6. 1 Obl i gat i on of Gover nment Payment s
The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR
32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:
a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;
b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;
c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and
d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n accor dance wi t h FAR 52. 236. 21.
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:
a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.
b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.
c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Ear ned Val ue Repor t r equi r ement of t hi s Cont r act .
Request s f or pr ogr ess payment consi der at i on f or such i t ems must be ms2236 SECTI ON 01 20 00 Page 4 suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .
d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.
e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.
f . Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .
g. Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used ms2236 SECTI ON 01 20 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 VI EW LOCATI ON MAP
1. 4 PROGRESS AND COMPLETI ON PI CTURES
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
1. 6 SUPERVI SI ON
1. 6. 1 Super i nt endent Qual i f i cat i ons
1. 6. 2 Mi ni mum Communi cat i on Requi r ement s
1. 6. 3 Dut i es
1. 6. 4 Non- Compl i ance Act i ons
1. 7 PRECONSTRUCTI ON MEETI NG
1. 7. 1 At t endees
1. 8 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
1. 8. 1 Red Zone Checkl i st
1. 8. 2 Meet i ngs
1. 9 EXPORT LI CENSES FOR OVERSEAS PROJECTS
1. 10 WAI VER FOR WORKER' S COMPENSATI ON
1. 11 PARTNERI NG
1. 11. 1 Faci l i t at ed ( For mal ) Par t ner i ng
1. 12 MOBI LI ZATI ON
1. 13 AI RFI ELD PAVI NG WORKSHOP
PART 2 PRODUCTS
PART 3 EXECUTI ON
ms2236 SECTI ON 01 30 00 Page 1
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y - - Saf et y and Heal t h Requi r ement s Manual
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
15 CFR 772 Def i ni t i on of Ter ms
15 CFR 773 Speci al Li censi ng Pr ocedur es
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map
Pr ogr ess and Compl et i on Pi ct ur es
1. 3 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r st di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
1. 4 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en di f f er ent v i ewpoi nt s sel ect ed by t he Cont r act or unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es.
Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he vi ew l ocat i on sket ch. Al so pr ovi de t he vi ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e.
ms2236 SECTI ON 01 30 00 Page 2
I ncl ude a dat e desi gnat or i n f i l e names. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by l ocal , pr ovi nci al and nat i onal l aw.
1. 6 SUPERVI SI ON
1. 6. 1 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
1. 6. 2 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 6. 3 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 6. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .