About this file

This is a set of construction drawings from the California Department of Fish and Wildlife for HVAC and electrical replacement work at Crystal Lake Fish Hatchery in Shasta County. The project involves replacing HVAC systems and electrical panels at seven residences (R1-40, R1-41, R1-42, R1-43, R1-44, R1-62, and R1-77) at 40158 Baum Lake Road in Cassel, CA. The scope includes removing existing window AC units, furnaces, and ventilation systems and installing new split system HVAC units (2-3 ton capacity, minimum 15 SEER2) with gas furnaces (96% AFUE), painted case coils, new ducting, registers, return air grilles, and filters. The electrical work includes replacing service panels, upgrading circuits, installing AC disconnect switches, and replacing various receptacles and light fixtures.

The drawings include detailed floor plans, electrical panel schedules, and specifications that must conform to 2022 California building codes and standards. Each residence requires specific modifications, including concrete pads for condensers, HERS testing requirements, and various electrical upgrades like GFCI protection and grounding improvements. The buildings are Type V-B construction, mostly single-story residences between 1,520-2,000 square feet, built between 1950-1990, and located in a high fire hazard severity zone. The project design was completed by Scott Murata and approved by Katherine Miyai with engineering stamps dated 12/03/24.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESIDENCE R1-40

RESIDENCE R1-41

RESIDENCE R1-62

RESIDENCE R1-42

RESIDENCE R1-43

RESIDENCE R1-44

RESIDENCE R1-77

OFFICE

JOBWALK MEET

UP LOCATION

BAUM LAKE RD

BAUM LAKE RD

PROJECT DESCRIPTION:

THE PROJECT CONSISTS OF THE REPLACEMENT OF HVAC SYSTEMS, ELECTRICAL PANELS, AND

OTHER MISCELLANEOUS IMPROVEMENTS.

THE PROJECT SHALL CONFORM TO THE APPLICABLE STATE AND FEDERAL CODES AS SHOWN

BELOW:

1. 2022 CALIFORNIA CODE OF REGULATIONS (CCR)

2. 2022 CALIFORNIA ADMINISTRATIVE CODE (CAR), (CCR, TITLE 24, PART 1)

3. 2022 CALIFORNIA BUILDING CODE (CBC), VOLUMES 1, AND 2, (CCR, TITLE 24, PART 2) (BASED

ON 2021 INTERNATIONAL BUILDING CODE)

4. 2022 CALIFORNIA RESIDENTIAL CODE (CRC), (CCR, TITLE 24, PART 2.5), (BASED ON 2021

INTERNATIONAL RESIDENTIAL CODE)

5. 2022 CALIFORNIA ELECTRICAL CODE (CEC), (CCR, TITLE 24, PART 3) (2020 NATIONAL

ELECTRIC CODE (NEC))

6. 2022 CALIFORNIA MECHANICAL CODE (CMC), (CCR, TITLE 24, PART 4) (BASED ON 2021

UNIFORM MECHANICAL CODE)

7. 2022 CALIFORNIA PLUMBING CODE (CPC), (CCR, TITLE 24, PART 5) (BASED ON 2021 UNIFORM

PLUMBING CODE)

8. 2022 CALIFORNIA ENERGY CODE, (CCR, TITLE 24, PART 6)

9. 2022 CALIFORNIA HISTORICAL BUILDING CODE, (CCR, TITLE 24, PART 8)

10. 2022 CALIFORNIA FIRE CODE (CFC), (CCR, TITLE 24, PART 9) (BASED ON 2021 INTERNATIONAL

FIRE CODE)

11. 2022 CALIFORNIA EXISTING BUILDING CODE, (CCR, TITLE 24, PART 10) (BASED ON THE 2021

INTERNATIONAL EXISTING BUILDING CODE)

12. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE, (CCR, TITLE 24, PART 11).

13. 2022 CALIFORNIA REFERENCED STANDARDS CODE, (CCR, TITLE 24, PART 12);

NFPA 13 - AUTOMATIC SPRINKLER SYSTEMS W/ CA AMENDMENTS 2022 EDITION

NFPA 14 - STANDPIPE SYSTEMS W/ CA AMENDMENTS 2019 EDITION

NFPA17A - WET CHEMICAL SYSTEMS 2021 EDITION

NFPA 20 - STATIONARY PUMPS 2022 EDITION

NFPA 24 - PRIVATE FIRE MAINS W/ CA AMENDMENTS 2022 EDITION

NFPA 72 - NATIONAL FIRE ALARM CODE W/ CA AMENDMENTS 2022 EDITION

NFPA 2001 - CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2022 EDITION

W/ CA AMENDMENTS

REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35 OR

2022 CFC CHAPTER 80.

14. REFERENCE CODE SECTIONS FOR APPLICABLE STANDARDS;

2022 CBC, CHAPTER 35

2022 CFC, CHAPTER 80

15. TITLE 8 CALIFORNIA CODE OF REGULATIONS (CCR), CAL/OSHA REGULATIONS-SAFETY

ORDERS ISSUED BY DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA

16. TITLE 19 C.C.R., PUBLIC SAFETY, SFM REGULATIONS, LIST OF FEDERAL CODES & STANDARDS

(IF APPLICABLE)

17. AMERICAN WITH DISABILITIES ACT (ADA), TITLE II OR TITLE III

18. 2022 CALIFORNIA ACCESS COMPLIANCE ADVISORY REFERENCE MANUAL (AS PREPARED BY

THE DIVISION OF THE STATE ARCHITECT OFFICE, PUBLISHED ON JANUARY 1, 2021

EFFECTIVE JULY 1, 2021)

19. DOT STANDARD SPECIFICATIONS AND/OR PLANS; STATE OF CALIFORNIA, DOT, 2022

20. UNDERWRITERS LABORATORIES, INC. (UL STANDARDS)

GENERAL NOTES:

1. CONTRACTOR SHALL READ AND BE FAMILIAR WITH ALL FACETS OF THE PLANS AND

SPECIFICATIONS.

2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

BIDDING/COMMENCEMENT OF WORK.

3. THESE PLANS ARE FOR GENERAL CONSTRUCTION PURPOSES ONLY. THEY ARE NOT FULLY

SPECIFIED.

4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SELECT, VERIFY, RESOLVE, AND

INSTALL ALL MATERIALS AND EQUIPMENT WITH COMPLIANCE TO CODES AND /OR

ORDINANCES.

5. CONSTRUCTION SHALL BE OF THE HIGHEST QUALITY OF WORKMANSHIP. ALL CONNECTIONS

SHALL BE MADE SECURE ACCORDING TO ACCEPTED CONSTRUCTION PRACTICES OR AS

SPECIFIED HEREIN OR PER CURRENT BUILDING CODES.

6. CONTRACTOR IS RESPONSIBLE FOR ANY CONSTRUCTION WHICH IS IN DEVIATION FROM

THESE PLANS.

Sheet 01 of 04

Drawing Number:

C al ifo rn ia D ep ar tm en t o f

APPROVED:

DESIGNED & DRAWN:

F a ci li ti es

E ng in ee ri ng

T he

N a tu ra l

R es ou rc es A g en cy

S ta te o f C a li fo rn ia

Scott Murata

REVISIONS:

DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED

BY

CHIEF ENGINEER DATE

C65221 09/30/2025

Fi sh a nd

W ild lif e

P2499009

H13-2024-001

KATHERINE MIYAI

C24-09

12/03/24

C R Y S T A L L

A K E F

IS

H H

A T C H E R Y

S H A S T A C

O U N T Y

N O R T H E R N R

E G

IO

N

H V

A C

E

LE

C

TR

IC

A L

R

EP

LA

C

EM

EN

T

SOH R1-62 INFORMATION:

OCCUPANCY GROUP.................................................... R - 3

1. TYPE OF CONSTRUCTION............................................TYPE V - B

2. NUMBER OF STORIES

3. ACTUAL BUILDING HEIGHT (FT)...................................15'

4. BUILDING AREA (SF)......................................................1340±

5. AREA OF PROJECT (SF)................................................1340±

6. SEPARATED OR NON-SEPARATED.............................SEPARATED

7. ALLOWABLE AREA (SF)................................................UL

8. AREA INCREASE............................................................NO

9. HEIGHT INCREASE........................................................NO

10. FIRE SPRINKLERS.........................................................NO

11. FIRE ALARM....................................................................NO

12. OTHER FIRE PROTECTION SYSTEMS.........................NONE

13. SMOKE CONTROL SYSTEM..........................................NO

14. OCCUPANT LOAD

15. YEAR BUILDING WAS CONSTRUCTED

16. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

17. SEISMIC JOINTS.............................................................NO

18. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-77 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................2000±

6. AREA OF PROJECT (SF)................................................2000±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-44 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................2435±

6. AREA OF PROJECT (SF)................................................2435±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-42 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................1520±

6. AREA OF PROJECT (SF)................................................1520±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-41 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................1340±

6. AREA OF PROJECT (SF)................................................1340±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-40 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................1340±

6. AREA OF PROJECT (SF)................................................1340±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SOH R1-43 INFORMATION:

1. OCCUPANCY GROUP.................................................... R - 3

2. TYPE OF CONSTRUCTION............................................TYPE V - B

3. NUMBER OF STORIES

4. ACTUAL BUILDING HEIGHT (FT)...................................15'

5. BUILDING AREA (SF)......................................................1520±

6. AREA OF PROJECT (SF)................................................1520±

7. SEPARATED OR NON-SEPARATED.............................SEPARATED

8. ALLOWABLE AREA (SF)................................................UL

9. AREA INCREASE............................................................NO

10. HEIGHT INCREASE........................................................NO

11. FIRE SPRINKLERS.........................................................NO

12. FIRE ALARM....................................................................NO

13. OTHER FIRE PROTECTION SYSTEMS.........................NONE

14. SMOKE CONTROL SYSTEM..........................................NO

15. OCCUPANT LOAD

16. YEAR BUILDING WAS CONSTRUCTED

17. IN A HIGH FIRE HAZARD SEVERITY ZONE.................YES

18. SEISMIC JOINTS.............................................................NO

19. EMERGENCY RESPONDER RADIO COVERAGE.........YES

SITE PLAN

SCALE: 1" = 100'

LOCATION MAP

SCALE: NTS

CRYSTAL LAKE FISH HATCHERY

40158 BAUM LAKE RD,

CASSEL, CA 96016

BURNEY

CASSEL

N

N

SHEET INDEX:

1. TITLE SHEET & SITE PLAN

2. R1-44 & R1-62 FLOOR PLANS; HVAC NOTES;

ELECTRICAL PROCEDURES; RECEPTACLE WORK

3. R1-40, R1-41, R1-42, R1-43, & R1-77 FLOOR PLANS

4. ELECTRICAL PANEL SCHEDULES

Exp. 12/31/24 No. E-17986

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"=100'

LIVING RM

BR 1

BR 2

DINING RM

UTILITY

RM

MASTER BR

KITCHEN

BATH

GARAGE

BATH

REMOVE EXISTING CONDENSER/

INSTALL NEW CONDENSER

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

APPROX. LOCATION

ATTIC ACCESS

(E) ELECTRICAL PANEL

'R1-44 SERVICE'

REPLACE

RETURN

AIR VENT

NEW INSULATED

FLEX DUCTING; TYP.

52'-9"

27'-0"

INSTALL EMERGENCY

DISCONNECT

LOCATION SIGN;

SEE THIS SHEET

2#8, 1#10(G) TO PANEL 'R1-44

SERVICE', SEE TYPICAL

ELECTRICAL PROCEDURE 'IV'40A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

22'-91 2"

29'-3"

8'-81 2"

36'-9" 21'-0"

R1-44 EMERGENCY DISCONNECT

LOCATED ACROSS STREET ON

HOUSE R1-41 EXTERIOR NORTH

WALL

R1-44

R1-42

R1-43

R1-41

R1 -4

R1 -6

R1-44 EMERGENCY

DISCONNECT

LOCATION

2'-6"

1'-10"

LIVING RM BD 1

BD 2

KITCHEN BATHDINING RM

UTILITY

RM

MASTER RM

APPROX. LOCATION

ATTIC ACCESS

PROPOSED. LOCATION

NEW CONDENSER

NEW CONCRETE PAD

36" X 36" X 3" MIN.

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

SUBPANEL R1-62:

REPLACE (E) FLUSH MOUNTED ELECTRICAL SUB-PANEL,

SEE TYPICAL ELECTRICAL PROCEDURE 'III'.

PROPOSED. LOCATION

NEW RETURN AIR GRILLE

NEW INSULATED

FLEX DUCTING; TYP.

23'-81 2"

50'-3"

REPLACE ELECTRICAL PANEL 'R1-62

SERVICE'. SEE TYPICAL ELECTRICAL

PROCEDURE 'I' AND PANEL SCHEDULE.

OVERHEAD LINE

TO UTILITY POLE

(APPROX. 60 FEET)

2#10, 1#10(G), SEE TYPICAL ELECTRICAL

PROCEDURE 'IV'

25A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

11'-2"

Sheet 02 of 04

Drawing Number:

C al ifo rn ia D ep ar tm en t o f

APPROVED:

DESIGNED & DRAWN:

F a ci li ti es

E ng in ee ri ng

T he

N a tu ra l

R es ou rc es A g en cy

S ta te o f C a li fo rn ia

Scott Murata

REVISIONS:

DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED

BY

CHIEF ENGINEER DATE

C65221 09/30/2025

Fi sh a nd

W ild lif e

P2499009

H13-2024-001

KATHERINE MIYAI

C24-09

12/03/24

C R Y S T A L L

A K E F

IS

H H

A T C H E R Y

S H A S T A C

O U N T Y

N O R T H E R N R

E G

IO

N

H V

A C

E

LE

C

TR

IC

A L

R

EP

LA

C

EM

EN

T

FLOOR PLAN FOR R1-44

SCALE: 18" = 1'-0"

R1-44 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 3.5 TON AC UNIT; 15 SEER2 MIN; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER

SIZES IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

DISCONNECT SIGN DETAILS

SCALE: 1" = 1'-0"

SIGN NOTES:

1. SIGN PANEL OF 0.8" MIN. ALUMINUM SHEET ENAMEL PAINTED AFTER SMOOTHING ALL

EDGES OR 18 GAUGE STEEL SHEET PORCELAIN COATED

2. BACKGROUND SHALL BE WHITE; LETTERS, NUMBERS, GRAPHICS SHALL BE BLACK

3. INSTALL TO STUCCO USING MASONRY SCREWS AND ANCHORS SPECIFICALLY

DESIGNED FOR STUCCO; 3 8" GALVANIZED OR STAINLESS STEEL

GENERAL NOTES FOR HVAC REPLACEMENT:

1. ALL MEASUREMENTS ARE APPROXIMATE AND MUST BE

FIELD VERIFIED BY THE CONTRACTOR.

2. DEMO EXISTING HVAC UNITS AT SEVEN (7) RESIDENCES

AND DISPOSE OF PER ALL LOCAL, STATE, FEDERAL AND

EPA STANDARDS.

3. INSTALL NEW HVAC UNITS AT SEVEN (7) RESIDENCES.

4. DEMO EXISTING VENTILATION AND INSTALL ALL NEW

RETURN AND SUPPLY AIR DUCTING AND REGISTERS

AND AIR GRILLES.

5. THE CONTRACTOR MUST CALCULATE PROPER DUCTING

LENGTHS AND SIZING.

6. CONTRACTOR IS RESPONSIBLE FOR HERS TESTING

FOR ALL SEVEN (7) UNITS

7. SEE EXHIBIT T FOR SPECIFICATIONS.

FLOOR PLAN FOR R1-62

SCALE: 18" = 1'-0"

R1-62 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 2 TON AC UNIT; MIN. 15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER

SIZES IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

7. REPLACE SERVICE AND SUB-PANEL

8. RECEPTACLE WORK, SEE THIS SHEET FOR DETAILS

Exp. 12/31/24 No. E-17986

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text TYPICAL ELECTRICAL PROCEDURES I REPLACE EXTERIOR ELECTRICAL SERVICE PANEL: 1. COORDINATE WITH UTILITY (PG&E) TO HAVE THE EXISTING COORDINATE WITH UTILITY (PG&E) TO HAVE THE EXISTING ELECTRICAL SERVICE LINE DEENERGIZED, METER REMOVED AND SAFELY LOCKED OUT. IF THE SERVICE FEEDER IS SMALLER THAN SHOWN ON PLANS, INFORM PROJECT MANAGER. 2. AFTER SERVICE LINE IS DEENERGIZED, REMOVE EXISTING METERING AFTER SERVICE LINE IS DEENERGIZED, REMOVE EXISTING METERING ELECTRICAL SERVICE PANEL FROM EXTERIOR WALL. DISCONNECT, PULL BACK AND PROTECT EXISTING SERVICE LINE DROP. DISCONNECT AND REMOVE LOAD CONDUCTORS. PROTECT EXISTING GROUNDING ELECTRODE CONDUCTOR FOR RECONNECTION. 3. ON EXISTING WALL, REPLACE ELECTRICAL COMBINATION METERING ON EXISTING WALL, REPLACE ELECTRICAL COMBINATION METERING AND DISTRIBUTION PANEL WITH NEW NEMA 3R, SERVICE RATED 240 VOLT RATED, 100 AMP, SINGLE PHASE, THREE WIRE, 22KAIC, ALL-IN-ONE COMBINATION METERING PANEL WITH 100A MAIN CIRCUIT BREAKER. SURFACE MOUNT PANEL IN EXISTING WALL SPACE. METER JAW CONFIGURATION IS ASSUMED TO BE 4-JAW, CONFIRM PRIOR TO INSTALLATION. MAKE ANY AND ALL EXTERIOR WALL REPAIR OR MODIFICATION TO ACCOMMODATE NEW PANEL. 4. ALL WORK SHALL MEET THE PG&E REQUIREMENTS AS GIVEN IN ALL WORK SHALL MEET THE PG&E REQUIREMENTS AS GIVEN IN PG&E GREENBOOK ELECTRIC & GAS SERVICE REQUIREMENTS 2022-2023. REFER TO PG&E ENGINEERING DOCUMENTS 061032 AND 065374. 5. MAKE ALL ELECTRICAL AND GROUND RECONNECTIONS AND CONDUIT MAKE ALL ELECTRICAL AND GROUND RECONNECTIONS AND CONDUIT MODIFICATIONS NECESSARY TO HAVE SERVICE RETURNED TO WORKING ORDER. 6. COORDINATE WITH PG&E TO HAVE THE SERVICE LINE REENERGIZED. COORDINATE WITH PG&E TO HAVE THE SERVICE LINE REENERGIZED. II REPURPOSE INTERIOR SUB-PANEL AS JUNCTION BOX 1. EXISTING SUB-PANEL TO BE CONVERTED TO JUNCTION BOX. EXISTING SUB-PANEL TO BE CONVERTED TO JUNCTION BOX. RELOCATE BRANCH CIRCUITS FROM SUB-PANEL TO NEW MAIN PANEL. 2. EXTEND CIRCUITS AS NECESSARY IN EXISTING SUB-PANEL CABINET. EXTEND CIRCUITS AS NECESSARY IN EXISTING SUB-PANEL CABINET. INSTALL LUGS FOR CIRCUIT TERMINATIONS IN THE BOX. 3. SEE PANEL SCHEDULES FOR CIRCUIT BREAKER COUNTS AND SIZES. SEE PANEL SCHEDULES FOR CIRCUIT BREAKER COUNTS AND SIZES. 4. SIZE ANY NEW WIRE APPROPRIATELY FOR EXISTING CIRCUITS SIZE. SIZE ANY NEW WIRE APPROPRIATELY FOR EXISTING CIRCUITS SIZE. 5. CONVERT SUB-PANEL TO JUNCTION BOX. ADD SECURE FRONT TO CONVERT SUB-PANEL TO JUNCTION BOX. ADD SECURE FRONT TO BOX. III REPLACE INTERIOR SUB-PANEL WITH NEW SUB-PANEL 1. REPLACE INTERIOR, FLUSH MOUNTED, LOAD CENTER. NEW PANEL REPLACE INTERIOR, FLUSH MOUNTED, LOAD CENTER. NEW PANEL SHALL BE: 120/240 VAC, 100 AMP, SINGLE PHASE, THREE-WIRE, MAIN LUG ONLY, WITH 12 FULL SIZE SPACES. 2. PROVIDE NEW CIRCUIT BREAKERS WITH AMPERAGE RATINGS TO PROVIDE NEW CIRCUIT BREAKERS WITH AMPERAGE RATINGS TO PANEL SCHEDULE. FLUSH MOUNT NEW PANEL IN EXISTING WALL SPACE. PERFORM ANY DRYWALL WORK NECESSARY TO OPEN THE PROPER SPACE AND TRIM OUT THE PANEL FACE FLUSH MOUNTED ON THE INTERIOR WALL. IV POWER TO NEW AC UNIT 1. ROUTE POWER CONDUCTORS CONCEALED IN CEILING SPACE WITH ROUTE POWER CONDUCTORS CONCEALED IN CEILING SPACE WITH NM SHEATHED CABLE (ROMEX) OR THHN/THWN-2 SINGLE CONDUCTOR IN EMT CONDUIT WHERE EXPOSED. 2. USE TIME DELAY FUSE OR HACR TYPE CIRCUIT BREAKER.USE TIME DELAY FUSE OR HACR TYPE CIRCUIT BREAKER.

AutoCAD SHX Text BUILDING SPECIFIC ELECTRICAL RECEPTACLE WORK R1-40: 1. REPLACE 11 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 11 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 2. LAUNDRY ROOM 20A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 20A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 3. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE RECEPTACLE IS 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. 4. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. R1-41: 1. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. TWO KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. TWO RECEPTACLES ARE 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. LABEL ANY RECEPTACLES PROTECTED BY A GFCI RECEPTACLE AS BEING GFCI PROTECTED. 2. REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 3. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 4. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. R1-42: 1. REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. SOME EXISTING GROUNDING RECEPTACLES DO NOT HAVE GROUND WIRE. DETERMINE WHERE THIS IS THE CASE AND WHERE NECESSARY, PULL NEW GROUND WIRE AND CONNECT TO RECEPTACLE OR REPLACE WITH GFCI. 2. REPLACE TWO 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE TWO 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. 3. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 4. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE RECEPTACLE IS 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. LABEL ANY RECEPTACLES PROTECTED BY A GFCI RECEPTACLE AS BEING GFCI PROTECTED. R1-62: 1. REPLACE 14 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 14 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 2. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. 3. KITCHEN SURFACES DO NOT HAVE GFCI. REPLACE EXISTING 15A KITCHEN SURFACES DO NOT HAVE GFCI. REPLACE EXISTING 15A RECEPTACLES ON KITCHEN SURFACES WITH GFCI RECEPTACLES SO THAT ALL SURFACE RECEPTACLES ARE GFI PROTECTED. MAXIMUM OF THREE. 4. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED.

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

N

LIVING RM

BR 1

BR 2

KITCHEN

DINING RM

UTILITY

RM

MASTER BR

BATH

APPROX. LOCATION

ATTIC ACCESS

PROPOSED. LOCATION

NEW CONDENSER

NEW CONCRETE PAD

36" X 36" X 3" MIN. REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

REPURPOSE EXISTING SUB PANEL INTO JUNCTION BOX. RELOCATE FIVE

(5) CIRCUITS TO SERVICE PANEL. SEE TYPICAL ELECTRICAL PROCEDURE

'II' AND PANEL SCHEDULE.

PROPOSED. LOCATION

NEW RETURN AIR GRILLE

NEW INSULATED

FLEX DUCTING; TYP.

24'-1"

49'-8"

REPLACE ELECTRICAL SERVICE PANEL.

SEE TYPICAL ELECTRICAL PROCEDURE

'I' AND PANEL SCHEDULE.

ELECTRICAL PANEL 'R1-40 SERVICE'

OVERHEAD LINE

TO UTILITY POLE

(APPROX. 65 FEET)

2#10, 1#10(G) TO PANEL 'R1-40 SERVICE',

SEE TYPICAL ELECTRICAL PROCEDURE 'IV'

25A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

11'-4"

7'-11"

REPLACE CEILING MOUNTED

LED BULB LIGHT FIXTURES

IN (1) KITCHEN AND (1) HALLWAY

LIVING RMBR 1

BR 2

DINING RM

UTILITY

RM

MASTER BR

KITCHEN

BATH

BATH

APPROX. LOCATION

ATTIC ACCESS

PROPOSED. LOCATION

NEW CONDENSER

NEW CONCRETE PAD

36" X 36" X 3" MIN.

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

ELECTRICAL PANEL 'R1-42 SUB':

REPLACE (E) FLUSH MOUNTED

ELECTRICAL SUB-PANEL; SEE

TYPICAL ELECTRICAL

PROCEDURE 'III'.

PROPOSED. LOCATION

NEW RETURN AIR GRILLE NEW INSULATED

FLEX DUCTING; TYP.

24'-0"

56'-3"

REPLACE ELECTRICAL SERVICE

PANEL. SEE TYPICAL ELECTRICAL

PROCEDURE 'I' AND PANEL SCHEDULE.

ELECTRICAL PANEL 'R1-42 SERVICE'

OVERHEAD LINE

TO UTILITY POLE

(APPROX. 100 FEET)

2#8, 1#10(G) TO PANEL 'R1-42 SERVICE', SEE

TYPICAL ELECTRICAL PROCEDURE 'IV'

40A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

18'-41 2"

6'-6"

29'-0"

LIVING RM

BR 1

BR 2

KITCHENDINING RM

UTILITY

RM

MASTER BR

BATH

APPROX. LOCATION

ATTIC ACCESS PROPOSED. LOCATION

NEW CONDENSER

NEW CONCRETE PAD

36" X 36" X 3" MIN.

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

REPURPOSE EXISTING SUB PANEL INTO JUNCTION

BOX. RELOCATE SEVEN (7) CIRCUITS TO SERVICE

PANEL. SEE TYPICAL ELECTRICAL PROCEDURE 'II'

AND PANEL SCHEDULE.

PROPOSED. LOCATION

NEW RETURN AIR GRILLE

NEW INSULATED

FLEX DUCTING; TYP.

49'-8"

24'-1"

REPLACE ELECTRICAL

SERVICE PANEL. SEE

TYPICAL ELECTRICAL

PROCEDURE 'I' AND PANEL

SCHEDULE.

ELECTRICAL PANEL

'R1-41 SERVICE'

OVERHEAD LINE

TO UTILITY POLE

(APPROX. 65 FEET)

2#10, 1#10(G) TO PANEL 'R1-41 SERVICE',

SEE TYPICAL ELECTRICAL PROCEDURE 'IV'

25A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

11'-4"

7'-11"

REPLACE CEILING MOUNTED

LED BULB LIGHT FIXTURES

IN (1) KITCHEN AND (1) HALLWAY

LIVING RM

BR 1

DINING RM

UTILITY

RM

KITCHEN

BATH

BATH

BR 2

MASTER BR

APPROX. LOCATION

ATTIC ACCESS

PROPOSED. LOCATION

NEW CONDENSER

NEW CONCRETE PAD

36" X 36" X 3" MIN.

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

SUBPANEL R1-43:

REPLACE (E) FLUSH MOUNTED

ELECTRICAL SUB-PANEL,

SEE TYPICAL ELECTRICAL

PROCEDURE 'III'.

PROPOSED. LOCATION

NEW RETURN AIR GRILLE

NEW INSULATED

FLEX DUCTING; TYP.

24'-0"

56'-3"

REPLACE ELECTRICAL

SERVICE PANEL. SEE

TYPICAL ELECTRICAL

PROCEDURE 'I' AND PANEL

SCHEDULE.

ELECTRICAL PANEL

'R1-43 SERVICE'

OVERHEAD LINE

TO UTILITY POLE

(APPROX. 100 FEET)

2#8, 1#10(G) TO PANEL 'R1-43 SERVICE', SEE

TYPICAL ELECTRICAL PROCEDURE 'IV'

40A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

6'-91 2"

18'-41 2"

5'-11"

29'-0"

9'-3"

LIVING RM

BD 1

BD 2

KITCHEN BATH

DINING RM

UTILITY

RM

MASTER RM

BATH

APPROX. LOCATION

ATTIC ACCESS

NEW CONCRETE PAD

36" X 36" X 3" MIN.

REMOVE EXISTING CONDENSER/

INSTALL NEW CONDENSER

REMOVE EXISTING FURNACE/

INSTALL NEW FURNACE

WH

25'-8"

61'-6"

PROPOSED. LOCATION

NEW RETURN AIR GRILLE

PANEL 'R1-77 SERVICE'2#8, 1#10(G), SEE TYPICAL ELECTRICAL

PROCEDURE 'IV'

40A DISCONNECT, FUSE IF

REQ'D BY AC MANUFACTURER

Sheet 03 of 04

Drawing Number:

C al ifo rn ia D ep ar tm en t o f

APPROVED:

DESIGNED & DRAWN:

F a ci li ti es

E ng in ee ri ng

T he

N a tu ra l

R es ou rc es A g en cy

S ta te o f C a li fo rn ia

Scott Murata

REVISIONS:

DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED

BY

CHIEF ENGINEER DATE

C65221 09/30/2025

Fi sh a nd

W ild lif e

P2499009

H13-2024-001

KATHERINE MIYAI

C24-09

12/03/24

C R Y S T A L L

A K E F

IS

H H

A T C H E R Y

S H A S T A C

O U N T Y

N O R T H E R N R

E G

IO

N

H V

A C

E

LE

C

TR

IC

A L

R

EP

LA

C

EM

EN

T

FLOOR PLAN FOR R1-40

SCALE: 18" = 1'-0"

FLOOR PLAN FOR R1-41

SCALE: 18" = 1'-0"

FLOOR PLAN FOR R1-43

SCALE: 18" = 1'-0"

FLOOR PLAN FOR R1-42

SCALE: 18" = 1'-0"

R1-40 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 2 TON AC UNIT; MIN.15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. NEW CONCRETE CONDENSER PAD

2.3. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.4. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW FLEX DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER

SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL

REQUIREMENTS

4. SEAL OFF ANY EXISTING UNUSED VENTS.

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

7. REPLACE SERVICE PANEL AND REPURPOSE SUB-PANEL

8. REPLACE FLUSH MOUNTED CEILING LIGHT FIXTURES IN HALLWAY AND KITCHEN

9. RECEPTACLE WORK, SEE SHEET 2 FOR DETAILS

R1-41 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 2 TON AC UNIT; MIN. 15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER

SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL

REQUIREMENTS

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

7. REPLACE SERVICE AND REPURPOSE SUB-PANEL

8. REPLACE FLUSH MOUNTED CEILING LIGHT FIXTURES IN HALLWAY AND KITCHEN

9. RECEPTACLE WORK, SEE SHEET 2 FOR DETAILS

R1-42 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 3 TON AC UNIT; MIN. 15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND

REGISTER SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND

FEDERAL REQUIREMENTS

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

7. REPLACE SERVICE PANEL AND SUB-PANEL

8. RECEPTACLE WORK, SEE SHEET 2 FOR DETAILS

R1-43 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 3 TON AC UNIT; MIN. 15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND

REGISTER SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND

FEDERAL REQUIREMENTS.

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

7. REPLACE SERVICE PANEL AND SUB-PANEL

FLOOR PLAN FOR R1-77

SCALE: 18" = 1'-0"

R1-77 ITEMS OF WORK:

1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION

2. INSTALL NEW SPILT SYSTEM HVAC :

2.1. 3 TON AC UNIT; MIN. 15 SEER2; GOODMAN GSXC7 OR APPROVED EQUAL

2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 OR APPROVED EQUAL

2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL

3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.

3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER

SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.

4. SEAL OFF ANY EXISTING UNUSED VENTS

5. INSTALL NEW AC DISCONNECT SWITCH

6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS

Exp. 12/31/24 No. E-17986

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

Sheet 04 of 04

Drawing Number:

C al ifo rn ia D ep ar tm en t o f

APPROVED:

DESIGNED & DRAWN:

F a ci li ti es

E ng in ee ri ng

T he

N a tu ra l

R es ou rc es A g en cy

S ta te o f C a li fo rn ia

Scott Murata

REVISIONS:

DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED

BY

CHIEF ENGINEER DATE

C65221 09/30/2025

Fi sh a nd

W ild lif e

P2499009

H13-2024-001

KATHERINE MIYAI

C24-09

12/03/24

C R Y S T A L L

A K E F

IS

H H

A T C H E R Y

S H A S T A C

O U N T Y

N O R T H E R N R

E G

IO

N

H V

A C

E

LE

C

TR

IC

A L

R

EP

LA

C

EM

EN

T

ELECTRICAL PANEL SCHEDULES

Exp. 12/31/24 No. E-17986

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text GENERAL NOTES: 1. ALL PANELS SHOWN ABOVE ARE TO BE REPLACED ALL PANELS SHOWN ABOVE ARE TO BE REPLACED WITH NEW PANELS EXCEPT R1-44. NEW PANELS TO HAVE SPECIFICATIONS AS GIVEN ABOVE. 2. PANEL LOADS GIVEN WERE TAKEN FROM EXISTING PANEL LOADS GIVEN WERE TAKEN FROM EXISTING PANEL CARDS FOUND ON SITE. CONTRACTOR SHALL VERIFY EACH CIRCUIT AS TO WHAT LOADS ARE ACTUALLY SERVED OR WHETHER IT IS AN ABANDONED CIRCUIT. PROVIDE UPDATED TYPED PANEL CARDS BASED ON ACTUAL CONDITIONS.

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text R

Sheets and Views
P24999009_HVAC & ELECTRICAL REPLACEMENT bsilva edit 3-Sheet 1
SHEET 2.pdf
Sheets and Views
P24999009_HVAC & ELECTRICAL REPLACEMENT bsilva edit 3-Sheet 2
SHEET 3.pdf
Sheets and Views
P24999009_HVAC & ELECTRICAL REPLACEMENT bsilva edit 3-Sheet 3
SHEET 4.pdf
Sheets and Views
P24999009_HVAC & ELECTRICAL REPLACEMENT bsilva edit 3-Scheds

File details come from the government source that posted it. Updated .