CDFW_LFEB_Addendum_Letter_2_P24990009.pdf
PDF 1 MB Posted
- Solicitation number
- 0000033727
- Issued by
- Shasta County, Shasta CDP, Shasta Lake City, Mount Shasta City, California
About this file
This is Addendum #2 issued by the California Department of Fish and Wildlife for Project P2499009, HVAC & Electrical Replacement at Crystal Lake Hatchery in Shasta County. The bid opening date has been postponed to January 30, 2025 at 2:00 PM. The project requires either an A - "General Engineering Contractor" or B - "General Building Contractor" license, with a C22 - "Asbestos Abatement Contractor" license requirement that can be subcontracted if needed. A Lead-Related Certificate from the Department of Public Health is also required and can be subcontracted. The scope includes installing new Split System or Packaged HVAC units and ducting in seven residences (R1-40, R1-41, R1-42, R1-43, R1-44, R1-62 and R1-77), with requirements updated to specify 15.2 SEER2 ratings and 96% AFUE for furnaces.
The technical specifications have been revised to require R-8 level flexible ductwork instead of R-6, with specific requirements for installation of concrete pads for condenser units, rooftop unit mounting, and attic furnace freeze protection. An Environmental Report from Terracon has been added listing asbestos and lead sampling results, though it is noted as being for information only and not a biddable document. Drawing sheets 2 and 3 dated 12/03/2024 have been replaced with Revision 1 sheets dated 1/17/2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director Land and Facilities Engineering Branch 1010 Riverside Parkway West Sacramento, CA 95605 Engineering@wildlife.ca.gov
Conserving California’s Wildlife Since 1870
January 17, 2025
PLAN HOLDERS
P2499009, Addendum #2 HVAC & Electrical Replacement, Crystal Lake Hatchery Shasta County, California
The Bid Opening date has been postponed to Thursday, January 30, 2025, at 2:00 PM and changes have been made to P2499009_Specifiations. Update the following sections:
A. Description of Services
5. License Required:
A – “General Engineering Contractor” or B – “General Building Contractor” with the following requirement:
C22 – “Asbestos Abatement Contractor” License:
If the Bidding Contractor does not possess the required license, then the Bidding Contractor shall subcontract with a contractor having the said license.
Lead Abatement:
Lead-Related Certificate (LRC) from the Department of Public Health, Childhood Poisoning Prevention Branch. If the Bidding Contractor does not possess the required certificate, then the Bidding Contractor shall subcontract with a contractor with said Certification.
The subcontractor may not sublet the work to another contractor. The subcontractor must be listed on the list of Proposed Subcontractors, Attachment 4, page 6, and Attachment 13 GSPD-05-106, page 20, regardless of the amount of work.
C. Bid Requirements and Information
1. Key Action Dates
Event Date
IFB available to prospective bidders
Pre-bid Walkthrough (Mandatory)
Bid Opening
Bid Due Date
Notice of Intent to Award
Proposed Award Date [See C) 9) f), Page 7]
Proposed Start of Construction Date
December 16, 2024
January 9, 2025 @ 1:00 PM
January 23, 2025 @ 2:00 PM January 30, 2025 @ 2:00 PM
January 23, 2025 @ 2:00 PM January 30, 2025 @ 2:00 PM
January 30, 2025 February 6, 2025
April 2025
May 2025
The following changes have been made to Exhibit T – Technical Specifications:
Update Section 23 00 00 – HVAC as follows:
PART 1 – GENERAL
1.01 SCOPE OF WORK
A. The Contractor shall provide all labor, tools, equipment, materials, permits, and taxes necessary to remove existing heating and air conditioning systems and install new Split System or Packaged HVAC units and new ducting in seven (7) Residences R1-40, R1-41, R1-42, R1-43, R1-44, R1-62 and R1-77. The Contractor shall determine the best HVAC system to put in each house and must provide CDFW with a passing HERS test. The residences will be occupied during construction and the Contractor shall perform the work in such a manner as to cause the least disturbance to the occupants.
PART 2 - EXECUTION
2.01 HVAC
L. Install new concrete pads for new condenser units per all code requirements, if installing a split HVAC unit.
M. If installing a packaged rooftop HVAC unit, install necessary support structures or curbs on the roof to securely mount the new unit. The Contractor must ensure the roof deck is properly sealed and prepared to prevent leaks around the unit.
Install flashing and apply sealant around the unit base and all penetrations through the roof to prevent water infiltration.
N. If installing Furnace in attic Contractor must provide proper freeze protection on exhaust condensate trap. The Contractor must meet height requirements for attic assembly. The Contractor is responsible to relocate any rafter ties and install a catwalk to service the equipment in accordance with all code requirements.
2.02 FLEXIBLE DUCTS
H. Remove and dispose of the existing ductwork. Contractor new supply and return flexible ductwork with R-6 R-8 level. in each attic. Ducting shall be sized per Sheet Metal and Air Conditioning Contractor’s National Association (SMACNA).
I. The Contractor shall determine locations of supply and return ductwork and registers to meet all code requirements. Contractor may use crawl space or attic locations. The Contractor is responsible for a passing HERS test. The Contractor must properly seal all new registers in accordance with all local, State and Federal requirements. When creating new openings for installing new registers the Contractor try and be the least destructive to existing surrounds. SOH R1-77 and SOH R1-44 have existing floor registers; the Contractor may choose to use existing locations for the locations of the new registers.
J. Seal off any existing unused ventilating systems and any openings left open where old equipment was located. Remove registers/old unused equipment and seal with drywall in accordance with stated codes, ordinances and statutes. All Drywall installed at the interior of the house shall be half (½)” or five eighths (5/8)” per local code requirements. Drywall screws and nails shall be per code.
Provide all tape, compound, corner beads and all other materials and equipment needed to install Drywall in accordance with the manufacturer’s instructions.
Paint and texture the patch to match existing surrounding paint color with a minimum of 2 coats of paint.
PART 3 - PRODUCTS
2.01 MATERIAL REQUIREMENTS
A. Seven (7) Spilt System Air Conditioner Units (Three (3) – 2 Ton units, Three
(3) – 3 Ton units and One (1) – 3.5 Ton units); 17.2 15.2 SEER2; Goodman #GSXC7 #R-32 GLXS4B or approved equal. Or Seven (7) Packaged Gas/Electric Units (Three (3) – 2 Ton units, Three (3) – 3 Ton units and One
(1) – 3.5 Ton units); 15.2 SEER2/ 81% AFUE Goodman #GPGM5 or approved equal.
B. Seven (7) Furnace units; Multi-Position; Two-stage, multi-speed CM Gas furnaces; eighty (80)% AFUE min. 96% AFUE; Goodman # GR9T96 #GM9C96 or approved equal; if applicable. The Contract shall determine if setting the unit in a horizontal position in the attic space or a vertical position.
C. Seven (7) Indoor Coils; Goodman or approved equal.
An Environmental Report from Terracon listing Asbestos and Lead sampling results has been added. The report is not a biddable document and is for information only. Contractors reviewing this limited sampling report must draw their own conclusions regarding further investigation or remediation deemed necessary for the work items identified and the type of licenses/certifications required to perform the work. Add Attachment A1 – Environmental Report to the end of Exhibit T in the Specifications.
Drawing – Sheet 2 and Sheet 3 have been revised. Replace the following sheets in its entirety:
· Drawing H13-2024-001 Dated 12/03/2024 Sheet 2 of 4 and Sheet 3 of 4, shall be replaced with Drawing H13-2024-001 Dated 1/17/2025 Revision 1 Sheet 2 of 4 and Revision 1 Sheet 3 of 4.
Please acknowledge the receipt of this addendum in the space provided on the Bid Form.
Sincerely, Katherine Miyai, Project Engineer Wildlife and Fisheries Division Land and Facilities Engineering Branch
Enclosure:
Digitally signed by Miyai, Katherine@Wildlife DN: DC=Gov, DC=Ca, DC=Dfg, DC=AD, OU=DFG Divisions, OU=ECD, OU=Users, CN="Miyai, Katherine@Wildlife" Reason: I am the author of this document Location:
Date: 2025.01.17 14:05:31-08'00' Foxit PDF Editor Version: 13.1.4
Miyai, Katherine @Wildlife
Attachment A1 Environmental Report
Terracon Consultants, Inc. 1466 66t h Street Emeryvil le, Cali fornia 94608 P [510] 557 7144 terracon.com
October 21, 2021
Mr. Rob Benson California Department of Fish and Wildlife Engineering Branch 1010 Riverside Parkway West Sacramento, California
Telephone: (916) 323-1488 E-mail: rob.benson@wildlife.ca.gov
RE: Hazardous Materials Survey Report Crystal Lake Fish Hatchery Cassel, California
Dear Mr. Benson:
Terracon Consultants, Inc. (Terracon) conducted a hazardous materials survey that included the collection and identification of suspect asbestos and lead-containing materials in identified site structures at the Crystal Lake Fish Hatchery located in Cassel, California. The site investigation also included a visual inspection for signs of water intrusion, microbial growth and other potential safety hazards. This survey was performed by Remington Caldwell and Steve Rogers with Terracon from August 30, 2021 to September 1, 2021. Mr. Caldwell is certified by the California Division of Occupational Safety and Health (Cal-OSHA) as a Certified Asbestos Consultant (CAC) and Mr.
Rogers is a Certified Site Surveillance Technician (CSST). Mr. Caldwell is additionally certified by the California Department of Public Health (CDPH) as Lead Inspector/Assessors and Mr. Rogers is a Lead Sampling Technician.
Due to the non-destructive nature of this survey, any sampling that would have resulted in visible damage to any building materials within a given structure was not conducted. Identified suspect asbestos and/or lead containing materials that could not be sampled were noted and are listed as “assumed” in this report. The collection of samples on roofs and in attics and crawl spaces was excluded from the scope of work, although where visible, suspect materials were noted and were assumed. See Table I for a list of all materials confirmed and assumed to contain asbestos within the structures included in the survey.
Evidence of water damage and/or staining was observed in the Davis Building, Garage 5, Hatchery Building, House (R1-62), Meat Room, Residence 1 (R1-40), Residence 3 (R1-42), and Residence 4 (R1-43). Safety or trip hazards were observed at Building 5, the Davis Building, Domestic Water House, Garage 1 and 2 (Garage1/2), Garage 3 and 4 (Garage ¾), Garage 5, Garage 7 (Adjacent to R1-70), Hatchery Building, House (R1-62), Meat Room, Public Bathrooms, R1-70, Raceway 2, Residence 1 (R1-40), Residence 2 (R1-41), Residence 3 (R1-42), Residence 4 (R1-43), Residence 5 (R1-44), Sewer Pump House, Crystal Lake Site, Spawning Shed, Tool Shed, Truck Garage, and mailto:rob.benson@wildlife.ca.gov
Asbestos, Lead and Health and Safety Survey Report Crystal Lake Fish Hatchery ■ Cassel, California October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 2 the Truck/Office/Breakroom building. Photos of the observed safety and trip hazards and the Health and Safety Risk Table are appended herein.
Within the surveyed structures, four-hundred fifty-two (452) bulk samples were collected from one-hundred eighty-three (183) homogeneous suspect asbestos containing materials (ACMs). Forty-four (44) homogeneous materials were not sampled and are assumed to contain asbestos until additional testing is performed. Bulk samples were submitted under chain of custody to EMLab P&K (EMLab) in Irvine, California for analysis by polarized light microscopy with dispersion staining techniques per EPA methodology (40 CFR 763, Subpart F). The percentage of asbestos, where applicable, was determined by microscopical visual estimation.
Asbestos was found in twenty-eight (28) of the identified homogeneous materials. A summary of those results and a list of the assumed asbestos-containing materials are provided below in Table I. Laboratory analytical reports can be found attached to this letter.
Table I Confirmed and Assumed Asbestos-Containing Materials
Material Material
Location(s) Result
NESHAP
Classification
Condition
Davis Building
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Domestic Water House
Window Caulk North West South
Gray Caulk:
<1% CH Cat. II Intact
Roof Vapor Barrier Under Metal Roof Panels Assumed** Cat. I Intact
Garage 1 and 2
Shingle and Felt Roof System Assumed** Cat. I Intact
Garage 5
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Garage 6
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Garage 7 (Adjacent to R1-70)
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Vapor Barrier Under Wood Siding Assumed* Cat. II Intact
Hatchery Building
Vapor Barrier North ½ - Exterior
Elevations Assumed* Cat. II Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 3
Material Material
Location(s) Result
NESHAP
Classification
Condition
Metal Roof Vapor Barrier North ½ New South ½ Old Assumed** Cat. I Intact
Wall Vapor Barrier South ½ Under Metal Panels Assumed* Cat. II Intact
Residence (R1-62)
Drywall with Joint Compound
Southeast Bedroom Closet
- North Southwest
Bedroom Closet
– North
West Bedroom - West
White Joint Compound:
2% CH
Cream Tape:
ND
White Drywall:
ND
RACM Intact
Drywall Texture
Southeast Bedroom Closet
- North Southwest
Bedroom Closet
– North
West Bedroom
– West
Southeast Bedroom South
Wall Dining Room North Wall
White Texture:
2% CH RACM Intact
White Vinyl Sheet Flooring with Brown Vinyl Sheet
Flooring with Black Vapor Barrier
Laundry Room – 2 Layers
Off-White Sheet Flooring w/ Fibrous Backing: ND Beige Sheet Flooring with
Fibrous Backing and Black Mastic:
20% CH
Brown Wood
ND
RACM Intact
12” Grey Vinyl Floor Tile with Black Mastic Under Carpet Living Room
Grey Floor Tile: 5% CH Black Mastic:
ND
Cat. I Intact
4” White Ceramic Tile Hall Restroom Assumed* Cat. II Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 4
Material Material
Location(s) Result
NESHAP
Classification
Condition
(3X layered) White Vinyl Sheet Flooring / Tan Vinyl
Sheet Flooring/ 12” Grey Tile with Black Mastic
Kitchen
White Sheet Flooring w/
Fibrous Backing: ND
Yellow Mastic:
ND
Beige Sheet Flooring w/
Fibrous Backing: 20%
CH
Grey Floor
Tile: 5% CH Brown Wood:
ND
RACM Intact
2X layered Tan Vinyl Sheet Flooring/ 12” Grey with Black
Mastic
Hallway Southeast Bedroom
Southwest Bedroom
Tan Sheet Flooring w/
Fibrous Backing: 20%
CH
Grey Floor
Tile: 5% CH Black Mastic:
ND
RACM Intact
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Stucco Vapor Barrier Stucco System Assumed* Cat. II Intact
Sink Undercoating Kitchen Sink White Sink Undercoat:
2% CH
Cat. II Intact
Kiosk 1
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Meat Room
Window Caulk – Off-White
Restroom – North
Shop – North Shop – South
White Caulk:
<1% CH Cat. II Intact
8” Transite Flue Shop – Font Heater Assumed* Cat. II Intact
Grey Sealant Pipe Penetration Assumed* Cat. II Intact
Roof Shingle and Felt North Area West End Assumed** Cat. I Intact
Wall Insulation Between
Freezer Walls and Ceiling
Assumed* Cat. II Intact
Public Bathrooms
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 5
Material Material
Location(s) Result
NESHAP
Classification
Condition
Residence (R1-40)
Drywall with Joint Compound
Northeast Bedroom Closet
East Wall Northwest
Bedroom Closet East Wall
West Bedroom Closet West
Wall
White Drywall:
ND
White Joint Compound:
2% CH
Cream Tape:
ND
RACM Intact
Drywall Texture
Northeast Bedroom Closet
East Wall Northwest
Bedroom Closet East Wall
West Bedroom Closet West
Wall Hallway Opening
Doorway West Kitchen West
Wall
White Texture:
2% CH
Cream Tape:
ND
White Joint Compound:
2% CH
RACM Intact
4” White Ceramic Tile Hall Bathroom – Tub Surround Assumed* Cat. II Intact
4” Black Ceramic Tile Hall Bathroom – Tub Surround Assumed* Cat. II Intact
Roofing Shingle and Vapor Barrier Roof System Assumed** Cat. I Intact
Stucco Vapor Barrier Exterior Assumed* Cat. II Intact
Residence (R1-41)
Drywall with Joint Compound South Bedroom Closet
White Drywall:
ND
Off-White Joint
Compounds
2% CH
Cream Tape:
ND
RACM Intact
Drywall Texture
Southeast Southwest Northwest
Entry Closet Northeast
Dining Room Window
Off-White Texture: 2%
CH
White Texture:
ND
White Drywall:
ND
RACM Intact
4” White Ceramic Tile Tub Surround Hall Restroom Assumed* Cat. II Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 6
Material Material
Location(s) Result
NESHAP
Classification
Condition
12” Tan Ceramic Tile with Grout and Mortar
Hall Bathroom Floor Assumed* Cat. II Intact
12” Greyish Vinyl Floor Tile with Black Mastic Pantry
Grey Floor Tile: <1% CH Black Mastic:
3% CH
Cat. I Intact
HVAC Duct Tape Seams
Laundry Water Closet on HAVC
Duct Under Fiberglass
Gray Duct Insulation:
35% CH
Cat. II Intact
Stucco Vapor Barrier All Exteriors Assumed* Cat. II Intact
Roof Shingle and Vapor Barrier Roof System Assumed** Cat. I Intact
Residence (R1-42)
Drywall with Joint Compound and Texture
East Bedroom Closet
East Hallway Closet
Laundry Room North Wall
Off-White Texture: 2%
CH
Cream Tape:
ND
Off-White
Joint Compound:
2% CH
White Drywall:
ND
RACM Intact
Texture Coat on Drywall
East Bedroom Closet
East Bedroom Behind Door
Living Room at Vent by Kitchen
Entry Living Room West Side
Hallway North Side
White Texture:
<1% CH
White Drywall:
ND
RACM Intact
Shingled Roofing with Vapor Barrier
Throughout Roof Assumed** Cat. I Intact
Transite 4” Pipe Laundry Room Above Ceiling Assumed* Cat. II Intact
Transite 5” Pipe Laundry Room Above Ceiling Assumed* Cat. II Intact
Vapor Barrier Behind Stucco Assumed* Cat. II Intact
Shower Insert Mastic 2 Bathroom Showers Assumed* Cat. II Intact
Penetration Mastic Throughout Roof Vents Assumed** Cat. I Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 7
Material Material
Location(s) Result
NESHAP
Classification
Condition
Residence (R1-43)
Drywall / Joint Compound
Southwest Bedroom Closet
East Wall Southeast
Bedroom Closet East Wall
West Bedroom Closet North
Wall
White Joint Compound:
<1% CH
Cream Tape:
ND
White Drywall:
ND
Off-White
Joint Compound:
2% CH
RACM Intact
Drywall Texture
Southwest Bedroom Closet
Southeast Bedroom
West Bedroom Closet
Hallway
White Texture:
<1% CH
White Drywall:
ND
Off-White Texture: 2%
CH
Off-white Joint
Compound:
2% CH
RACM Intact
Tub/Shower Surround
Center Restroom Shower
Surround
Assumed* Cat. II Intact
HVAC Tape Yellow Laundry Room Over Metal Duct
Grey Insulation:
35% CH
Cat. II Intact
Vapor Barrier Exterior Walls Assumed* Cat. II Intact
Residence (R1-44)
Drywall with Joint Compound Rough
Bedroom Northeast
Closet South Wall
Bedroom Northwest
Closet South Wall
Bedroom West Bedroom Closet
West Wall
White Drywall:
ND
White Joint Compound:
<1% CH
Cream Tape:
ND
White Joint Compound:
<1% CH
RACM Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 8
Material Material
Location(s) Result
NESHAP
Classification
Condition
Drywall Texture
Bedroom Northeast
Closet South Wall
Bedroom Northwest
Closet South Wall
West Entryway Wall Hallway
Closet Mechanical Closet West
Wall
White Compound:
<1% CH
Cream Tape:
ND
White Texture:
<1% CH
RACM Intact
12” Brown Slate Ceramic Tile and Brown Grout
Back Bathroom Floor Northeast
Bathroom Assumed* Cat. II Intact
4” White Ceramic Tile and Grout and Glue
Middle Restroom Tub
Surround Assumed* Cat. II Intact
4” Purple Ceramic Tile with Grout and Mortar
Back Northeast Restroom Shower
Surround
Assumed* Cat. II Intact
Vapor Barrier Under Exterior Stucco Assumed* Cat. II Intact
Roof Shingle with Vapor Barrier Roof System Assumed** Cat. I Intact
Grey Patch Roof Penetration Assumed** Cat. I Intact
R1-70
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
Vapor Barrier (For Wood Siding)
Exterior Siding System Assumed* Cat. II Intact
Spawning Shed
Window Caulk - Clear East Window West Window
Silver Caulk:
<1% CH Cat. II Intact
Roof Patch on Penetrations Roof Pipe Penetrations Assumed** Cat. I Intact
Tool Shed
Roof Shingle and Felt Roof System Assumed** Cat. I Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 9
Material Material
Location(s) Result
NESHAP
Classification
Condition
Truck / Office / Break Room
Drywall / Joint Compound Smooth
Break Room (Only Ceiling and Walls) Truck Shop
Ceiling
White Drywall:
ND
White Joint Compound:
2% CH
Cream Tape:
ND
RACM Intact
Window Caulk
East Perimeter Wall North
East Perimeter Wall South
Off-White Caulk: <1%
CH
Cat. II Intact
Grey Mastic on Pipe Penetration Pipe Penetration Assumed** Cat. II Intact
Note: The name of structure as reflected on the lab results and chain-of-custody forms is used in this table. The given names of the structures provided following the field survey are listed parenthetically. Refer to the aerial photo appended herein to reference location of buildings.
*Homogeneous materials were assumed to be asbestos containing and were not sampled due to the destructive nature of sampling required for the material.
**Homogeneous materials outside the scope of work that were observed and were assumed to be asbestos-containing.
If additional suspect materials that have not been listed in this report are discovered, they should be assumed asbestos-containing until testing can confirm or refute potential asbestos content.
Eighty-eight (88) samples of suspect lead containing paint and other building materials were collected from the site buildings within the current scope of work. Bulk samples were submitted under chain of custody to EMLab in Irvine, California who analyzed the samples via flame atomic absorption spectroscopy (FLAA) in accordance to EPA Method 7000B. EMLab is accredited by the American Industrial Hygiene Association’s (AIHA’s) Environmental Lead Laboratory Accreditation Program for the analysis of lead in air, paint chips, dust wipes, and/or soil.
Lead was detected in eighty-eight (88) of the sampled materials and assumed in six (6). The lead sample results are summarized in Table II below. Materials are bolded where lead was assumed or detected in concentrations above the laboratory method detection limit.
Table II Lead Sample Results
Description Location Result (ppm)
Condition
Building 11 (Aerator for Raceway 1) Grey Paint on Metal Water Pipe
18” Aerator Pipe and Metal Box
120 Fair
Yellow Paint on Metal Stair
West Area – Stair to Pump
<38 Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 10
Description Location Result (ppm)
Condition
Building 5
Green Paint on Wood Trim West Elevation Window Trim (All Trim)
<39 Intact
Beige Paint on Wood Door West Elevation Door 830 Intact
Beige Paint Siding West Elevation <40 Intact
Davis Building
Blue Paint on Wood Eve North Half of Building <40 Poor
White Paint on Wood Wall Panel
North Half of Building <40 Poor
Domestic Water House
White Paint on Wood Wall East Interior 15,000 Intact
Window Glazing on Metal West Window (3X) 210 Poor
Silver Paint on Metal Tank Water Tank 1,300 Intact
Silver Paint on Metal Access Door
Exterior East 6,200 Poor
Yellow Paint on Metal Exterior Wall
East Elevation (All Walls)
7,600 Poor
Feed Bins
Blue Paint on Metal Column Feed Bin System on Column and Throughout
<37 Intact
Garage 1 and 2
Tan Paint on Stucco Exterior Walls – South (All Walls)
1,700 Intact
Green Paint on The Wood Trim
Window and Door Trim <40 Intact
Garage 3 and 4
Tan Paint on Stucco Wall South Elevation 270 Intact
Grey Paint on Wood Trim East Wood Trim 1,300 Poor
Garage 5 Blue Paint on Wood Siding Field
South Elevation (All Sides)
<39 Fair
White Paint on Wood Door South Elevation – Door and Trim
<41 Fair
Garage 6
Blue Paint on Stucco North Wall
South Unit North Wall and East, West and South
87 Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 11
Description Location Result (ppm)
Condition
Blue Paint on Wood Exterior Wall
North Unit East Wall and North and West
<36 Intact
White Paint on Wood North Trim
North Unit North Exterior Wall
<38 Fair
Garage 7 (Adjacent to R1-70)
Blue Paint on Wood Trim South Elevation Wood Trim and Door
<39 Fair
Grey Paint on Wood Exterior Wall
East Elevation Wood Siding
<39 Fair
Hatchery Building
White Paint on Wood Wall North Section Wood Walls and Ceiling
<38 Intact
Red Paint on Metal Column South Section South Column
1,600 Intact
White Paint on Wood Trim North Elevation (1/2 Structure)
<37 Fair
Grey Paint on Wood Siding North Elevation (1/2 Structure)
<38 Poor
Beige Paint on Metal Exterior Walls
South Elevation Walls 15,000 Intact
House (R1-62) Tan Paint on Stucco Exterior Wall
West Exterior <35 Intact
Brown Paint on Wood Garage Trim
R1 54 Doorway 24,000 Intact
Tan Paint on Wood Awning R1 55 Awning Southeast
Assumed Intact
Blue Paint on Stucco Exterior Wall
East Elevation 49 Intact
Kiosk 1
Beige Paint on Wood Eave Kiosk Eave <40 Intact
Meat Room
White Paint on Wood Eave South Loading Dock Eave
30,000 Poor
Beige Paint on Wood Ceiling Walk-In Freezer (Ice Room)
<40 Poor
Grey Paint on Metal Freezer Door
South Elevation East Side
4,500 Intact
Window Glazing on Metal Bathroom North Window
800 Poor
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 12
Description Location Result (ppm)
Condition
White Paint on Wood Wall Interior Bathroom South Wall
1,500 Intact
Yellow Paint on Metal Protective Door Cover
South Elevation Loading Dock
31,000 Fair
White Paint on Metal North Door
North Elevation - Ice Equipment Room Exit Doors
60,000 Poor
Silver Paint on Fiber Board Wall Panel Insulation
Northwest Room – Ceiling
460 Intact
Public Restrooms Green Paint on Metal Exterior Walls
North Elevation <39 Intact
Off-White Paint on Metal Interior Walls
Restroom Walls <40 Intact
R1-70
White Paint on Drywall Wall Entry Closet – North Wall
41 Intact
Green Paint on Wood Trim South Entryway – Wood Trim
<38 Intact
Grey Paint om Wood Siding Exterior South Elevation Wood Siding
<40 Intact
Raceway 1 Yellow Paint on Metal Water Supply Pipe
East of Raceway 1 Fence
110 Fair
Yellow Paint on Metal Pole Central Pole Holding Bird Screen
350 Fair
White Paint on Concrete Sign Concrete Sign <40 Fair
Residence 1 (R1-40)
White Paint on Drywall Wall Northeast Bedroom Closet East
710 Intact
Green Paint on Wood Window Frame
East Kitchen Exterior <39 Intact
Beige Paint on Stucco Exterior Wall
East Elevation (All Walls)
1,700 Intact
Beige Paint on Metal Interior HVAC Duct
Laundry Room HVAC Duct Under Fiberglass
9,500 Poor
Brown Paint on Wood Eave West Porch Eave 40,000 Fair
Residence 2 (R1-41)
White Paint on Drywall Wall Entry Closet North Wall 630 Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 13
Description Location Result (ppm)
Condition
4” White Ceramic Tiles Hallway Bathroom Wainscot
Assumed Intact
12” Tan Wood Floor Hallway Bathroom Assumed Intact
Tan Paint on Stucco Exterior Wall
South Elevation 1,800 Intact
Green Paint on Wood Handrail West Elevation Handrail <40 Intact
Beige Paint on Metal HVAC Duct
Laundry Room HVAC Duct
12,000 Poor
Brown Paint on Wood Eave West Elevation Eave 42,000 Fair
Residence 3 (R1-42)
White Paint on Drywall Wall North Bedroom Closet South Wall
<38 Intact
Green Paint on Wood Stair Rail
Southwest Stair Rail Wood and Trim
<37 Fair
Tan Paint on Stucco Exterior Wall
South Elevation <38 Intact
Beige Paint Metal HVAC Duct
Laundry Room 15,000 Poor
Residence 4 (R1-43)
White Paint on Drywall Wall East Bedroom Closet Wall South
<37 Intact
Tan Paint on Stucco Exterior Wall
North Elevation 990 Intact
Grey Paint on Wood Trim West Elevation Trim 41,000 Poor
Beige Paint on Metal HVAC Duct
Laundry Room HVAC Duct
14,000 Poor
Residence 5 (R1-44)
White Paint on Drywall Closet Wall
Northeast Bedroom Closet South Wall
<38 Intact
White Tub Surround on Drywall
Hallway Bathroom Assumed Intact
4” Purple Ceramic Tile Tub Surround on Drywall
Back Bathroom (Northeast Bathroom)
Assumed Intact
1”x6” Black Ceramic Tile Shower Surround on Drywall
Back Bathroom (Northeast Bathroom)
Assumed Intact
Grey Paint on Eave East Elevation 1,000 Intact
Pink Paint on Stucco Exterior East Wall
East Elevation at Entry Way
<36 Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 14
Description Location Result (ppm)
Condition
Grey Paint on Stucco East Wall
East Elevation Wall <36 Intact
Caulk at Wood/Stucco Joint on Window Frames
South Window Frame <40 Intact
Sewer Pump House
White Paint on Wood Interior Walls
Inside Ceiling <38 Fair
White Paint on Concrete Masonry Unit Wall
Exterior Concrete Masonry Unit
2,300 Intact
Site
Yellow Paint on Metal Bollard
Bollard Adjacent to Propane Tank (Large) Adjacent to Truck/Garage
330 Intact
Yellow Paint on Metal Bollard Fuel Tank Bollard (10X) <37 Intact
White Paint on Metal Fuel Tank
Fuel Tank <39 Intact
Spawning Shed
White Paint on Wood Interior Wall East
Interior Wall East (All Walls and Ceilings)
77 Intact
White Paint on Metal Door Entry Door Exterior 210 Poor
Grey Caulk Window Glazing on Metal
West Windows <40 Poor
Tool Shed
White Paint on Siding Exterior South Elevation (All)
<39 Intact
Green Paint on Wood Exterior Trim
Exterior Trim East Elevation (All)
<38 Intact
Truck Garage
Red Paint on Metal Building Column
Building Column North Perimeter
170 Intact
Truck / Office / Breakroom
White Paint on Drywall Ceiling Shop Wall South <36 Intact
Window Caulk Window Glazing on Metal
East Windows 1,200 Intact
Silver Paint on Metal Column Truck Bay West Side 480 Intact
October 21, 2021 ■ Terracon Project No. R120P020
Responsive ■ Resourceful ■ Reliable 15
Description Location Result (ppm)
Condition
Tan Paint on Wood Wall Truck Bay North Wall of Shop
<40 Intact
Grey Sealant on Metal West Elevation South End on Window/Metal Siding
<37 Fair
Note: Bolded materials above were analyzed to contain lead in concentrations above the method detection limit “< “Indicates lead was not detected in concentrations above the laboratory method detection limit at the stated parts per million (ppm)
This survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during this limited survey. This letter report has been prepared on behalf of, and exclusively for use and reliance by, the Client. This report is not a biddable document.
Contractors or consultants reviewing this limited sampling report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information, which may have been used in the preparation of this report. No warranty, express or implied is made.
Terracon appreciates the opportunity to provide our environmental consulting services to the California Department of Fish and Wildlife. If you have any questions regarding this report, please contact the undersigned at 949-383-1977.
Sincerely, Terracon Consultants, Inc.
Prepared By: Reviewed By:
Annabelle Call, CAC Karin Schroeter, CIH, CAC Staff Industrial Hygienist Department Manager III
Attachments: Laboratory reports and chain of custody forms, Aerial View of Property, Health and Safety Risk Table and Photos and Inspector certifications
LIVING RM
BR 1
BR 2
DINING RM
UTILITY
RM
MASTER BR
KITCHEN
BATH
GARAGE
BATH
REMOVE EXISTING CONDENSER
REMOVE EXISTING FURNACE
WH
APPROX. LOCATION
ATTIC ACCESS
(E) ELECTRICAL PANEL
'R1-44 SERVICE'
52'-9"
27'-0"
INSTALL EMERGENCY
DISCONNECT
LOCATION SIGN;
SEE THIS SHEET
2#8, 1#10(G) TO PANEL 'R1-44
SERVICE', SEE TYPICAL
ELECTRICAL PROCEDURE 'IV'40A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
22'-91 2"
29'-3"
8'-81 2"
36'-9" 21'-0"
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
CONTRACTOR SHALL
DETERMINE BEST
LOCATION NEW RETURN
AIR GRILLE
R1-44 EMERGENCY DISCONNECT
LOCATED ACROSS STREET ON
HOUSE R1-41 EXTERIOR NORTH
WALL
R1-44
R1-42
R1-43
R1-41
R1-40
R1-6
R1-44 EMERGENCY
DISCONNECT
LOCATION
2'-6"
1'-10"
LIVING RM BD 1
BD 2
KITCHEN BATHDINING RM
UTILITY
RM
MASTER RM
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING FURNACE
WH
SUBPANEL R1-62:
REPLACE (E) FLUSH MOUNTED ELECTRICAL SUB-PANEL,
SEE TYPICAL ELECTRICAL PROCEDURE 'III'.
NEW INSULATED
FLEX DUCTING; TYP.
23'-81 2"
50'-3"
REPLACE ELECTRICAL PANEL 'R1-62
SERVICE'. SEE TYPICAL ELECTRICAL
PROCEDURE 'I' AND PANEL SCHEDULE.
OVERHEAD LINE
TO UTILITY POLE
(APPROX. 60 FEET)
2#10, 1#10(G), SEE TYPICAL ELECTRICAL
PROCEDURE 'IV'
25A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
11'-2"
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
CONTRACTOR SHALL DETERMINE
BEST LOCATION
NEW RETURN AIR GRILLE
Sheet 02 of 04
Drawing Number:
C al ifo rn ia D ep ar tm en t o f
APPROVED:
DESIGNED & DRAWN:
F a ci li ti es
E ng in ee ri ng
T he
N a tu ra l
R es ou rc es A g en cy
S ta te o f C a li fo rn ia
Scott Murata
REVISIONS:
DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED
BY
CHIEF ENGINEER DATE
C65221 09/30/2025
Fi sh a nd
W ild lif e
P2499009
H13-2024-001
KATHERINE MIYAI
C24-09
12/03/24
C R Y S T A L L
A K E F
IS
H H
A T C H E R Y
S H A S T A C
O U N T Y
N O R T H E R N R
E G
IO
N
H V
A C
E
LE
C
TR
IC
A L
R
EP
LA
C
EM
EN
T
FLOOR PLAN FOR R1-44
SCALE: 18" = 1'-0"
R1-44 ITEMS OF WORK:
1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION
2. INSTALL NEW SPILT SYSTEM HVAC OR ROOFTOP PACKAGED GAS/ELECTRIC HVAC
UNIT:
2.1. 3.5 TON AC UNIT; 15 15.2 SEER2 MIN; GOODMAN GSXC7 R-32 GLXS4B OR
APPROVED EQUAL
2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 GM9C96 OR APPROVED EQUAL
2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL
OR
2.4. 3.5 TON PACKAGED GAS/ELECTRIC; MIN. 15.2 SEER2; MIN. 81% AFUE OR
APPROVED EQUAL
3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.
3.1. CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER
SIZES IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
4. SEAL OFF ANY EXISTING UNUSED VENTS
5. INSTALL NEW AC DISCONNECT SWITCH
6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS
DISCONNECT SIGN DETAILS
SCALE: 1" = 1'-0"
SIGN NOTES:
1. SIGN PANEL OF 0.8" MIN. ALUMINUM SHEET ENAMEL PAINTED AFTER SMOOTHING ALL
EDGES OR 18 GAUGE STEEL SHEET PORCELAIN COATED
2. BACKGROUND SHALL BE WHITE; LETTERS, NUMBERS, GRAPHICS SHALL BE BLACK
3. INSTALL TO STUCCO USING MASONRY SCREWS AND ANCHORS SPECIFICALLY
DESIGNED FOR STUCCO; 3 8" GALVANIZED OR STAINLESS STEEL
GENERAL NOTES FOR HVAC REPLACEMENT:
1. ALL MEASUREMENTS ARE APPROXIMATE AND MUST BE
FIELD VERIFIED BY THE CONTRACTOR.
2. DEMO EXISTING HVAC UNITS AT SEVEN (7) RESIDENCES
AND DISPOSE OF PER ALL LOCAL, STATE, FEDERAL AND
EPA STANDARDS.
3. INSTALL NEW HVAC UNITS AT SEVEN (7) RESIDENCES.
4. DEMO EXISTING VENTILATION AND INSTALL ALL NEW
RETURN AND SUPPLY AIR DUCTING AND REGISTERS
AND AIR GRILLES.
5. THE CONTRACTOR MUST CALCULATE PROPER DUCTING
LENGTHS AND SIZING.
6. CONTRACTOR IS RESPONSIBLE FOR HERS TESTING
FOR ALL SEVEN (7) UNITS
7. SEE EXHIBIT T FOR SPECIFICATIONS.
FLOOR PLAN FOR R1-62
SCALE: 18" = 1'-0"
Exp. 12/31/24 No. E-17986
R1-62 ITEMS OF WORK:
1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION
2. INSTALL NEW SPILT SYSTEM HVAC OR ROOFTOP PACKAGED GAS/ELECTRIC HVAC
UNIT:
2.1. 2 TON AC UNIT; 15 15.2 SEER2 MIN; GOODMAN GSXC7 R-32 GLXS4B OR APPROVED
EQUAL
2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 GM9C96 OR APPROVED EQUAL
2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL
OR
2.4. 2 TON PACKAGED GAS/ELECTRIC; MIN. 15.2 SEER2; MIN. 81% AFUE OR
APPROVED EQUAL
3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.
3.1. CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER
SIZES IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
4. SEAL OFF ANY EXISTING UNUSED VENTS
5. INSTALL NEW AC DISCONNECT SWITCH
6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS
7. REPLACE SERVICE AND SUB-PANEL
8. RECEPTACLE WORK, SEE THIS SHEET FOR DETAILS
REVISED SHEET1 1/17/25 SM
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text TYPICAL ELECTRICAL PROCEDURES I REPLACE EXTERIOR ELECTRICAL SERVICE PANEL: 1. COORDINATE WITH UTILITY (PG&E) TO HAVE THE EXISTING COORDINATE WITH UTILITY (PG&E) TO HAVE THE EXISTING ELECTRICAL SERVICE LINE DEENERGIZED, METER REMOVED AND SAFELY LOCKED OUT. IF THE SERVICE FEEDER IS SMALLER THAN SHOWN ON PLANS, INFORM PROJECT MANAGER. 2. AFTER SERVICE LINE IS DEENERGIZED, REMOVE EXISTING METERING AFTER SERVICE LINE IS DEENERGIZED, REMOVE EXISTING METERING ELECTRICAL SERVICE PANEL FROM EXTERIOR WALL. DISCONNECT, PULL BACK AND PROTECT EXISTING SERVICE LINE DROP. DISCONNECT AND REMOVE LOAD CONDUCTORS. PROTECT EXISTING GROUNDING ELECTRODE CONDUCTOR FOR RECONNECTION. 3. ON EXISTING WALL, REPLACE ELECTRICAL COMBINATION METERING ON EXISTING WALL, REPLACE ELECTRICAL COMBINATION METERING AND DISTRIBUTION PANEL WITH NEW NEMA 3R, SERVICE RATED 240 VOLT RATED, 100 AMP, SINGLE PHASE, THREE WIRE, 22KAIC, ALL-IN-ONE COMBINATION METERING PANEL WITH 100A MAIN CIRCUIT BREAKER. SURFACE MOUNT PANEL IN EXISTING WALL SPACE. METER JAW CONFIGURATION IS ASSUMED TO BE 4-JAW, CONFIRM PRIOR TO INSTALLATION. MAKE ANY AND ALL EXTERIOR WALL REPAIR OR MODIFICATION TO ACCOMMODATE NEW PANEL. 4. ALL WORK SHALL MEET THE PG&E REQUIREMENTS AS GIVEN IN ALL WORK SHALL MEET THE PG&E REQUIREMENTS AS GIVEN IN PG&E GREENBOOK ELECTRIC & GAS SERVICE REQUIREMENTS 2022-2023. REFER TO PG&E ENGINEERING DOCUMENTS 061032 AND 065374. 5. MAKE ALL ELECTRICAL AND GROUND RECONNECTIONS AND CONDUIT MAKE ALL ELECTRICAL AND GROUND RECONNECTIONS AND CONDUIT MODIFICATIONS NECESSARY TO HAVE SERVICE RETURNED TO WORKING ORDER. 6. COORDINATE WITH PG&E TO HAVE THE SERVICE LINE REENERGIZED. COORDINATE WITH PG&E TO HAVE THE SERVICE LINE REENERGIZED. II REPURPOSE INTERIOR SUB-PANEL AS JUNCTION BOX 1. EXISTING SUB-PANEL TO BE CONVERTED TO JUNCTION BOX. EXISTING SUB-PANEL TO BE CONVERTED TO JUNCTION BOX. RELOCATE BRANCH CIRCUITS FROM SUB-PANEL TO NEW MAIN PANEL. 2. EXTEND CIRCUITS AS NECESSARY IN EXISTING SUB-PANEL CABINET. EXTEND CIRCUITS AS NECESSARY IN EXISTING SUB-PANEL CABINET. INSTALL LUGS FOR CIRCUIT TERMINATIONS IN THE BOX. 3. SEE PANEL SCHEDULES FOR CIRCUIT BREAKER COUNTS AND SIZES. SEE PANEL SCHEDULES FOR CIRCUIT BREAKER COUNTS AND SIZES. 4. SIZE ANY NEW WIRE APPROPRIATELY FOR EXISTING CIRCUITS SIZE. SIZE ANY NEW WIRE APPROPRIATELY FOR EXISTING CIRCUITS SIZE. 5. CONVERT SUB-PANEL TO JUNCTION BOX. ADD SECURE FRONT TO CONVERT SUB-PANEL TO JUNCTION BOX. ADD SECURE FRONT TO BOX. III REPLACE INTERIOR SUB-PANEL WITH NEW SUB-PANEL 1. REPLACE INTERIOR, FLUSH MOUNTED, LOAD CENTER. NEW PANEL REPLACE INTERIOR, FLUSH MOUNTED, LOAD CENTER. NEW PANEL SHALL BE: 120/240 VAC, 100 AMP, SINGLE PHASE, THREE-WIRE, MAIN LUG ONLY, WITH 12 FULL SIZE SPACES. 2. PROVIDE NEW CIRCUIT BREAKERS WITH AMPERAGE RATINGS TO PROVIDE NEW CIRCUIT BREAKERS WITH AMPERAGE RATINGS TO PANEL SCHEDULE. FLUSH MOUNT NEW PANEL IN EXISTING WALL SPACE. PERFORM ANY DRYWALL WORK NECESSARY TO OPEN THE PROPER SPACE AND TRIM OUT THE PANEL FACE FLUSH MOUNTED ON THE INTERIOR WALL. IV POWER TO NEW AC UNIT 1. ROUTE POWER CONDUCTORS CONCEALED IN CEILING SPACE WITH ROUTE POWER CONDUCTORS CONCEALED IN CEILING SPACE WITH NM SHEATHED CABLE (ROMEX) OR THHN/THWN-2 SINGLE CONDUCTOR IN EMT CONDUIT WHERE EXPOSED. 2. USE TIME DELAY FUSE OR HACR TYPE CIRCUIT BREAKER.USE TIME DELAY FUSE OR HACR TYPE CIRCUIT BREAKER.
AutoCAD SHX Text BUILDING SPECIFIC ELECTRICAL RECEPTACLE WORK R1-40: 1. REPLACE 11 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 11 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 2. LAUNDRY ROOM 20A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 20A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 3. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE RECEPTACLE IS 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. 4. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. R1-41: 1. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. TWO KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. TWO RECEPTACLES ARE 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. LABEL ANY RECEPTACLES PROTECTED BY A GFCI RECEPTACLE AS BEING GFCI PROTECTED. 2. REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 3. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 4. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. R1-42: 1. REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 7 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. SOME EXISTING GROUNDING RECEPTACLES DO NOT HAVE GROUND WIRE. DETERMINE WHERE THIS IS THE CASE AND WHERE NECESSARY, PULL NEW GROUND WIRE AND CONNECT TO RECEPTACLE OR REPLACE WITH GFCI. 2. REPLACE TWO 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE TWO 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. 3. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED. 4. KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE KITCHEN HAS 4 15A RECEPTACLES ABOVE SURFACES. ONE RECEPTACLE IS 15A GFCI. CONFIRM THAT ALL SURFACES ARE GROUND FAULT PROTECTED. LABEL ANY RECEPTACLES PROTECTED BY A GFCI RECEPTACLE AS BEING GFCI PROTECTED. R1-62: 1. REPLACE 14 20A NON-GROUNDING RECEPTACLES WITH TAMPER REPLACE 14 20A NON-GROUNDING RECEPTACLES WITH TAMPER RESISTANT GROUNDING TYPE 20A RECEPTACLES. 2. REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI REPLACE ONE 15A BATHROOM RECEPTACLE WITH 15A GFCI RECEPTACLE. 3. KITCHEN SURFACES DO NOT HAVE GFCI. REPLACE EXISTING 15A KITCHEN SURFACES DO NOT HAVE GFCI. REPLACE EXISTING 15A RECEPTACLES ON KITCHEN SURFACES WITH GFCI RECEPTACLES SO THAT ALL SURFACE RECEPTACLES ARE GFI PROTECTED. MAXIMUM OF THREE. 4. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. LAUNDRY ROOM 15A RECEPTACLES DO NOT HAVE GFCI. REPLACE ONE RECEPTACLE WITH GFCI SO THAT ALL RECEPTACLES IN THE ROOM ARE GFCI PROTECTED.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text N
LIVING RM
BR 1
BR 2
KITCHEN
DINING RM
UTILITY
RM
MASTER BR
BATH
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING FURNACE
WH
REPURPOSE EXISTING SUB PANEL INTO JUNCTION BOX. RELOCATE FIVE
(5) CIRCUITS TO SERVICE PANEL. SEE TYPICAL ELECTRICAL PROCEDURE
'II' AND PANEL SCHEDULE.
CONTRACTOR SHALL DETERMINE
BEST LOCATION
NEW RETURN AIR GRILLE
NEW INSULATED
FLEX DUCTING; TYP.
24'-1"
49'-8"
REPLACE ELECTRICAL SERVICE PANEL.
SEE TYPICAL ELECTRICAL PROCEDURE
'I' AND PANEL SCHEDULE.
ELECTRICAL PANEL 'R1-40 SERVICE'
OVERHEAD LINE
TO UTILITY POLE
(APPROX. 65 FEET)
2#10, 1#10(G) TO PANEL 'R1-40 SERVICE',
SEE TYPICAL ELECTRICAL PROCEDURE 'IV'
25A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
11'-4"
7'-11"
REPLACE CEILING MOUNTED
LED BULB LIGHT FIXTURES
IN (1) KITCHEN AND (1) HALLWAY
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
LIVING RMBR 1
BR 2
DINING RM
UTILITY
RM
MASTER BR
KITCHEN
BATH
BATH
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING FURNACE
WH
ELECTRICAL PANEL 'R1-42 SUB':
REPLACE (E) FLUSH MOUNTED
ELECTRICAL SUB-PANEL; SEE
TYPICAL ELECTRICAL
PROCEDURE 'III'.
NEW INSULATED
FLEX DUCTING; TYP.
24'-0"
56'-3"
REPLACE ELECTRICAL SERVICE
PANEL. SEE TYPICAL ELECTRICAL
PROCEDURE 'I' AND PANEL SCHEDULE.
ELECTRICAL PANEL 'R1-42 SERVICE'
OVERHEAD LINE
TO UTILITY POLE
(APPROX. 100 FEET)
2#8, 1#10(G) TO PANEL 'R1-42 SERVICE', SEE
TYPICAL ELECTRICAL PROCEDURE 'IV'
40A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
18'-41 2"
6'-6"
29'-0"
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
CONTRACTOR SHALL
DETERMINE BEST
LOCATION NEW RETURN
AIR GRILLE
LIVING RM
BR 1
BR 2
KITCHENDINING RM
UTILITY
RM
MASTER BR
BATH
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING FURNACE
WH
REPURPOSE EXISTING SUB PANEL INTO JUNCTION
BOX. RELOCATE SEVEN (7) CIRCUITS TO SERVICE
PANEL. SEE TYPICAL ELECTRICAL PROCEDURE 'II'
AND PANEL SCHEDULE.
NEW INSULATED
FLEX DUCTING; TYP.
49'-8"
24'-1"
REPLACE ELECTRICAL
SERVICE PANEL. SEE
TYPICAL ELECTRICAL
PROCEDURE 'I' AND PANEL
SCHEDULE.
ELECTRICAL PANEL
'R1-41 SERVICE'
OVERHEAD LINE
TO UTILITY POLE
(APPROX. 65 FEET)
2#10, 1#10(G) TO PANEL 'R1-41 SERVICE',
SEE TYPICAL ELECTRICAL PROCEDURE 'IV'
25A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
11'-4"
7'-11"
REPLACE CEILING MOUNTED
LED BULB LIGHT FIXTURES
IN (1) KITCHEN AND (1) HALLWAY
CONTRACTOR SHALL DETERMINE
BEST LOCATION
NEW RETURN AIR GRILLE
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
LIVING RM
BR 1
DINING RM
UTILITY
RM
KITCHEN
BATH
BATH
BR 2
MASTER BR
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING FURNACE
WH
SUBPANEL R1-43:
REPLACE (E) FLUSH MOUNTED
ELECTRICAL SUB-PANEL,
SEE TYPICAL ELECTRICAL
PROCEDURE 'III'.
NEW INSULATED
FLEX DUCTING; TYP.
24'-0"
56'-3"
REPLACE ELECTRICAL
SERVICE PANEL. SEE
TYPICAL ELECTRICAL
PROCEDURE 'I' AND PANEL
SCHEDULE.
ELECTRICAL PANEL
'R1-43 SERVICE'
OVERHEAD LINE
TO UTILITY POLE
(APPROX. 100 FEET)
2#8, 1#10(G) TO PANEL 'R1-43 SERVICE', SEE
TYPICAL ELECTRICAL PROCEDURE 'IV'
40A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
6'-91 2"
18'-41 2"
5'-11"
29'-0"
9'-3"
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
CONTRACTOR SHALL
DETERMINE BEST
LOCATION NEW RETURN
AIR GRILLE
LIVING RM
BD 1
BD 2
KITCHEN BATH
DINING RM
UTILITY
RM
MASTER RM
BATH
APPROX. LOCATION
ATTIC ACCESS
REMOVE EXISTING CONDENSER
REMOVE EXISTING FURNACE
WH
25'-8"
61'-6"
PANEL 'R1-77 SERVICE'2#8, 1#10(G), SEE TYPICAL ELECTRICAL
PROCEDURE 'IV'
40A DISCONNECT, FUSE IF
REQ'D BY AC MANUFACTURER
INSTALL NEW HVAC SYSTEM;
CONTRACTOR SHALL DETERMINE
LOCATION FOR SPLIT SYSTEM OR
ROOFTOP PACKAGE HVAC UNIT
CONTRACTOR SHALL DETERMINE
BEST LOCATION
NEW RETURN AIR GRILLE
Sheet 03 of 04
Drawing Number:
C al ifo rn ia D ep ar tm en t o f
APPROVED:
DESIGNED & DRAWN:
F a ci li ti es
E ng in ee ri ng
T he
N a tu ra l
R es ou rc es A g en cy
S ta te o f C a li fo rn ia
Scott Murata
REVISIONS:
DATENO. DESCRIPTION/SHEET NUMBERSAPPROVED
BY
CHIEF ENGINEER DATE
C65221 09/30/2025
Fi sh a nd
W ild lif e
P2499009
H13-2024-001
KATHERINE MIYAI
C24-09
12/03/24
C R Y S T A L L
A K E F
IS
H H
A T C H E R Y
S H A S T A C
O U N T Y
N O R T H E R N R
E G
IO
N
H V
A C
E
LE
C
TR
IC
A L
R
EP
LA
C
EM
EN
T
FLOOR PLAN FOR R1-40
SCALE: 18" = 1'-0"
FLOOR PLAN FOR R1-41
SCALE: 18" = 1'-0"
FLOOR PLAN FOR R1-43
SCALE: 18" = 1'-0"
FLOOR PLAN FOR R1-42
SCALE: 18" = 1'-0"
R1-40 ITEMS OF WORK:
1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION
2. INSTALL NEW SPILT SYSTEM HVAC OR ROOFTOP PACKAGED GAS/ELECTRIC HVAC UNIT:
2.1. 2 TON AC UNIT; MIN.15 15.2 SEER2; GOODMAN GSXC7 R-32 GLXS4B OR APPROVED
EQUAL
2.2. NEW CONCRETE CONDENSER PAD
2.3. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 GM9C96 OR APPROVED EQUAL
2.4. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL
OR
2.5. 2 TON PACKAGED GAS/ELECTRIC; MIN. 15.2 SEER2; MIN. 81% AFUE OR APPROVED
EQUAL
3. INSTALL ALL NEW FLEX DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.
3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER
SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REQUIREMENTS
4. SEAL OFF ANY EXISTING UNUSED VENTS.
5. INSTALL NEW AC DISCONNECT SWITCH
6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS
7. REPLACE SERVICE PANEL AND REPURPOSE SUB-PANEL
8. REPLACE FLUSH MOUNTED CEILING LIGHT FIXTURES IN HALLWAY AND KITCHEN
9. RECEPTACLE WORK, SEE SHEET 2 FOR DETAILS
R1-41 ITEMS OF WORK:
1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION
2. INSTALL NEW SPILT SYSTEM HVAC OR ROOFTOP PACKAGED GAS/ELECTRIC HVAC UNIT:
2.1. 2 TON AC UNIT; MIN. 15 15.2 SEER2; GOODMAN GSXC7 R-32 GLXS4BOR APPROVED
EQUAL
2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 GM9C96 OR APPROVED EQUAL
2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL
OR
2.4. 2 TON PACKAGED GAS/ELECTRIC; MIN. 15.2 SEER2; MIN. 81% AFUE OR APPROVED
EQUAL
3. INSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.
3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND REGISTER
SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REQUIREMENTS
4. SEAL OFF ANY EXISTING UNUSED VENTS
5. INSTALL NEW AC DISCONNECT SWITCH
6. UPGRADE AC & FURNACE CIRCUIT PER MANUFACTURER'S RECOMMENDATIONS
7. REPLACE SERVICE AND REPURPOSE SUB-PANEL
8. REPLACE FLUSH MOUNTED CEILING LIGHT FIXTURES IN HALLWAY AND KITCHEN
9. RECEPTACLE WORK, SEE SHEET 2 FOR DETAILS
R1-42 ITEMS OF WORK:
1. REMOVE EXISTING WINDOW AC UNIT, FURNACE, & VENTILATION
2. INSTALL NEW SPILT SYSTEM HVAC OR ROOFTOP PACKAGED GAS/ELECTRIC HVAC
UNIT:
2.1. 3 TON AC UNIT; MIN. 15 15.2 SEER2; GOODMAN GSXC7 R-32 GLXS4B OR
APPROVED EQUAL
2.2. GAS FURNACE; 96% AFUE; GOODMAN GR9T96 GM9C96 OR APPROVED EQUAL
2.3. PAINTED CASE COIL; GOODMAN OR APPROVED EQUAL
OR
2.4. 3 TON PACKAGED GAS/ELECTRIC; MIN. 15.2 SEER2; MIN. 81% AFUE OR
APPROVED EQUAL
3. NSTALL ALL NEW DUCTING, REGISTERS, RETURN AIR GRILLE & FILTER, ETC.
3.1. THE CONTRACTOR SHALL CALCULATE THE REQUIRED DUCT, GRILLE, AND
REGISTER SIZES/LENGTHS IN ACCORDANCE WITH ALL LOCAL, STATE, AND
FEDERAL REQUIREMENTS
4. SEAL OFF ANY EXISTING UNUSED VENTS
5. INSTALL NEW AC DISCONNECT SWITCH
6. UPGRADE AC & FURNACE…