P17PS00436
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
MORA 15278705/24/2017000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/27/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Legacy Doc #: NPS
MORA 152787 Rehabilitate Paradise Inn Annex and Connection Snowbridge
Mount Rainier National Park, Washington
The purpose of this amendment is to modify the project specifications and answer questions received. See attached page.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sharon Miner
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation P17PS00436 Amendment Three
In order to modify the project specifications and answer questions received, the above numbered solicitation is hereby amended as follows:
1. The following change is made to the project specifications in SECTION 01 50 00-2.2A
TEMPORARY FACILITIES AND CONTROLS/TEMPORARY FACILITIES:
D. Construction Management Representative Field Office: The field office shall be a separate structure or separate 300 sqft room,with interior partition with lockable door to divide office, from the Contractor's office.
1. Prefabricated, job built, or a mobile unit; excellent condition, structurally sound, non-flammable exterior construction, weather tight, minimum 300 square feet.
2. Operable windows and security screens, adjustable ventilation.
3. Restroom (minimum of lavatory and toilet, with exhaust fan if room is windowless).
4. Air conditioner and heater.
5. Paneling or freshly painted walls, acoustical tile or painted ceilings, and resilient flooring.
6. Exterior doors with dead bolts keyed from outside.
2. The following questions regarding the solicitation have been received and answers provided.
Q31. Is the entire window (sash and framing) will be removed for restoration, or just the sash?
A31. Where windows are called, on the drawings, to be removed and repaired/restored, it shall be the entire window, not just the sashes.
Q32. My questions refers to the fire alarm section 28 31 00-6 Part 2 Products. Which states: 2.1 Manufactures, A . Edward Systems Technology (EST) No substitutions.
Are you accepting like and equal equipment on this as other panels will do as much or more.
A32. The new fire alarm devices in the Annex are to be fed from the existing head end equipment in the main Inn; therefore, the devices would need to be EST to match existing.
3. All other terms and conditions, including the solicitation due date, remain unchanged.
| B09_Amendment Three P17PS00436_20170524 |
| Draft Amendment 3 text |
File details come from the government source that posted it. Updated .