P16PS02015_AMENDMENT_5.pdf

PDF 167 KB Posted

Attached to
Rehabilitation of the interior and exterior of Vanderbilt Mansion
Solicitation number
P16PS02015
Issued by

About this file

P16PS02015 Amendment 5 NOTE THIS AMENDMENT CONTAINS UPDATED PROPOSAL SUBMISSION INSTRUCTIONS.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P16PS02015

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

VAMA 16126408/10/2016000005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/10/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

A) Incorporate the attached questions and answers.

B) Update Section L of the solicitation to clarify submission procedures.

All other terms and conditions remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Aaron Adams

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

QUESTIONS AND ANSWERS

SOLICITATION P16PS02015, AMENDMENT 0005

1. What are the submission instructions for proposals?

Section L has been updated to better clarify the proposal submission instructions.

The due date remains September 12, 2016.

Solicitation Document No.

P16PS02015

Document Title

VAMA 161264 – Rehabilitation of the interior and exterior of Vanderbilt Mansion

For more information and to RSVP, offerors shall contact Paula Johnson at Paula_Johnson@nps.gov

(End of provision)

L.11 PROPOSAL SUBMISSION REQUIREMENTS

Offerors shall submit proposals in a hard copy that includes an electronic version of the proposal in the form of a CD or flashdrive. Emailed submissions will not be accepted. There are two mailing addresses for the receiving office, depending on the methodology used for sending the proposals. Please send hard copy proposals to one of the following addresses:

Hand carried or Commercial Carriers:

U. S. Department of the Interior National Park Service, Denver Service Center Attention: Paula Johnson, Contract Specialist 12759 West Alameda Parkway Lakewood, CO 80228

U.S. Postal Service:

U. S. Department of the Interior National Park Service, Denver Service Center Attention: Paula Johnson, Contract Specialist P.O. Box 25287 Denver, CO 80225-0287

In order to be considered a timely submission, proposals must be received by the Government, in accordance with the parameters in FAR 15.208, by September 12, 2016 at 1400 ET.

Submit, at a minimum, an offer that conforms to the solicitation documents. By submission of its offer in accordance with the instructions provided here, the offeror unconditionally consents to the terms and conditions in this solicitation document and the attachments hereto.

Submit an offer that fully addresses the evaluation factors contained in Section M of this solicitation and complies with the submission requirements contained in this section.

The offer shall consist of two separately bound volumes, organized and submitted as described below.

VOLUME I -- TECHNICAL PROPOSAL

Shall be submitted in (5) five hard copies and (1) one electronic copy sent via email organized as follows:

TAB A - FACTOR 1 – EXPERIENCE, QUALIFICATIONS AND CAPABILITY

TAB B -FACTOR 2 – PROJECT TECHNICAL APPROACH AND SCHEDULE

TAB C -FACTOR 3 – QUALITY CONTROL

TAB D - FACTOR 4 – KEY PERSONNEL / KEY SUBCONTRACTORS

TAB D - FACTOR 5 – PAST PERFORMANCE (NO MORE THAN 3 PROJECTS MAY BE SUBMITTED)

VOLUME II – BUSINESS AND PRICE PROPOSAL

Shall be submitted in an original hard copy and (1) electronic copy on a CD or Thumb Drive: organized as follows:

TAB A – SF1442 - PRICE SCHEDULE - AMENDMENTS

Solicitation Document No.

P16PS02015

Document Title

VAMA 161264 – Rehabilitation of the interior and exterior of Vanderbilt Mansion

TAB B – SF 24 BID BOND AND PROOF OF FINANCIAL CAPABILITY

TAB C – SECTION K REPRESENTATIONS AND CERTIFICATIONS AND COMPANY INFORMATION

TAB D – HAZARDOUS MATERIAL AND PROPOSED EQUALS

TAB E – GENERAL REFERENCES

VOLUME I TECHNICAL PROPOSAL SUBMISSION REQUIREMENT

(TAB A) FACTOR 1 – EXPERIENCE, QUALIFICATIONS & CAPABILITY SUBMISSION REQUIREMENT

Provide information that shows the experience, qualifications and capabilities of the prime contractor as it relates to this project.

This submission is limited to 10 pages.

(TAB B) FACTOR 2 – PROJECT TECHNICAL APPROACH & SCHEDULE SUBMISSION REQUIREMENT

Provide a narrative of the approach the project. Describe the sequencing of the required activities. Describe approach to accessing the site, prepping the site, constructing on the site and cleaning up the site. Describe the required materials and equipment for the project. Describe any known challenges and proposed solutions specific to this project.

Provide a schedule that clearly identifies required activities, major milestones and critical path. The proposed schedule shall be within the period of performance identified in this solicitation. The proposed schedule shall demonstrate an activity sequencing that allows for the following specific requirement and does not affect the schedule.

This submission is limited to 10 pages.

(TAB C) FACTOR 3 – QUALITY CONTROL SUBMISSION REQUIREMENT

Provide a narrative of the (1) quality control process that will be used on the project and the (2) plan to ensure effective management of the project and all subcontractors.

Describe how the prime contractor plans to manage and maintain the contract’s schedule, cost and scope. Describe how safety requirements will be incorporated into the construction activities. Describe how the quality control requirements will be performed to ensure the Government receives a quality project. Describe how the subcontractors will be selected, their qualifications and how the prime will managed and coordinate them.

This submission is limited to 10 pages.

(TAB D) FACTOR 4 – KEY PERSONNEL / KEY SUBCONTRACTORS SUBMISSION REQUIREMENT

Provide resumes for the key personnel (Project Manager, On-site Superintendent, Site Safety Officer, Site Quality Control Manager and Environmental Manager.) and capability statements of key subcontractors, if applicable.

NOTE: Proposed key personnel and subcontractors must be used on the project, if your firm is awarded the contract.

The Quality Control may have other responsibilities. Any deviation must be approved by the Contracting Officer.

(TAB E) FACTOR 5 – PAST PERFORMANCE SUBMISSION REQUIREMENT

Provide descriptions of up to three (3) projects substantially complete or completed by the prime contractor with in the last (5) five years which are similar to this project in size, scope and dollar value. Projects considered substantially complete are projects that have been completed enough to determine performance on all phases of the project

1 VAMA P16PS02015 SOLICITATION AM 5.pdf
SECTION B – SUPPLIES OR SERVICES AND PRICE/ COSTS
B.1 CONTRACT PRICE SCHEDULE AND INSTRUCTIONS
SECTION C – DESCRIPTION/ SPECIFICATIONS / STATEMENT OF WORK
C.1 STATEMENT OF WORK/PROJECT SPECIFICATIONS
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUGUST 1996)
SECTION F – DELIVERIES OR PERFORMANCE
F.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
F.3 52.211-13 TIME EXTENSIONS (SEPT 2000)
F.4 52.242-14 SUSPENSION OF WORK (APR 1984)
F.5 52.242-15 STOP WORK ORDER (AUG 1989)
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
G.2 1452.204-70 RELEASE OF CLAIMS (JUL 1996)
G.3 DOI AAAP-0050 NOTICE TO CONTRACTORS -- CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)
G.4 DOI AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS—INVOICE PROCESSING PLATFORM (IPP) (APRIL 2013)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 1452.203-70 RESTRICTIONS ON ENDORSEMENTS – DEPARTMENT OF INTERIOR (JUL 1996)
H.2 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF INTERIOR (APR 1984)
H.3 1452.228-70 LIABILITY INSURANCE (JUL 1996)
H.4 1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT—DEPARTMENT OF THE INTERIOR (JUL 1996)
H.5 KEY PERSONNEL
H.6 WAGE RATES
SECTION I – CONTRACT CLAUSES
I.1 52.202-01 DEFINITIONS (NOV 2013)
I.2 52.203-03 GRATUITIES (APR 1984)
I.3 52.203-05 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.5 52.203-07 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-08 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
I.9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)
I.10 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
I.11 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEE OF WHISTLEBLOWER RIGHTS (APR 2014)
I.14 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015)
I.15 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER MAINTENANCE (DEC 2012)
I.16 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)
I.17 52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
I.18 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
I.19 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)
I.20 52.210-1 MARKET RESEARCH (APR 2011)
I.21 52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)
I.23 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA--MODIFICATIONS (AUG 2011)
I.25 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
I.26 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POST RETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)
I.27 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
I.29 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT 2014)
I.30 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
I.31 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
I.32 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
I.33 52.222-03 CONVICT LABOR (JUNE 2003)
I.34 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPENSATION (MAY 2014)
I.35 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)
I.36 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
I.37 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)
I.38 52.222-9 APPRENTICES AND TRAINEES (JULY 2005)
I.40 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
I.41 52.222-12 CONTRACT TERMINATION—DEBARMENT (MAY 2014)
I.43 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I.44 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
I.45 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.46 52.222-26 EQUAL OPPORTUNITY (APR 2015)
I.48 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
I.49 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
I.50 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.51 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
I.52 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
I.53 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.54 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
I.55 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
I.56 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE 1 (JULY 1995)
I.58 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.59 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) ALTERNATE I (MAY 2008)
I.60 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)
I.61 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)
I.62 52.223.-18 ENCOURAGING CONTRACTOR POLICIES TO BAND TEXT MESSAGING WHILE DRIVING (AUG 2011)
I.63 52.223-21 FOAMS (JUN 2016)
I.64 52.225-9 BUY AMERICAN -- CONSTRUCTION MATERIALS (MAY 2014)
I.65 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)
I.66 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.67 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRIGEMENT (DEC 2007)
I.68 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
I.69 52.228-1 BID GUARANTEE (SEPT 1996)
I.70 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
I.71 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
I.72 52.228-11 PLEDGES OF ASSETS (JAN 2012)
I.73 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
I.74 52.228-14 IRREVOCABLE LETTER OF CREDIT (MAY 2014)
I.75 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (OCT 2010)
I.76 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.78 52.232-17 INTEREST (MAY 2014)
I.79 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.80 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)
I.81 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
I.82 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
I.83 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
I.84 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)
I.85 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.86 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.87 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
I.88 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
I.90 52.236-4 PHYSICAL DATA (APR 1984)
I.91 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
I.92 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
I.93 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
I.94 52.236-8 OTHER CONTRACTS (APR 1984)
I.95 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
I.96 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
I.97 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
I.98 52.236-12 CLEANING UP (APR 1984)
I.99 52.236-13 ACCIDENT PREVENTION (NOV 1991) ALTERNATE I (NOV 1991)
I.100 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
I.101 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
I.102 52.236-17 LAYOUT OF WORK (APR 1984)
I.105 52.242-13 BANKRUPTCY (JULY 1995)
I.106 52.243-4 CHANGES (JUNE 2007)
I.107 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
I.108 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
I.109 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2016)
I.110 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
I.111 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2015)
I.112 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012) ALTERNATE 1 (SEPT 1996)
I.113 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
I.114 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
SECTION J – LIST OF ATTACHMENTS
J.1 LIST OF ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENT OF OFFERORS
K.1 LOCAL PROVISION 52.203-98 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS – REPRESENTATION (FEB 2015)
K.2 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEPT 2007)
K.3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)
K.4 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
K.5 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
K.6 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
K.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT – CONSTRUCTION MATERIALS (MAY 2014)
K.8 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRAN—REPRESENTATION AND CERTIFICATION (OCT 2015)
K.9 52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L.1 DIAR 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION—DEPARTMENT OF THE INTERIOR (APR 1984)
L.2 DIAR 1452.233-2 SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR (JUL 1996) (DEVIATION)
L.3 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER (JUL 2013)
L.4 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
L.5 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN 2004)
L.6 52.216-1 TYPE OF CONTRACT (APR 1984)
L.7 52.222-5 DAVIS-BACON ACT—SECONDARY SITE OF THE WORK (MAY 2014)
L.8 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
L.9 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
L.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
L.11 PROPOSAL SUBMISSION REQUIREMENTS

SECTION M – EVALUATION FACTORS FOR AWARD

File details come from the government source that posted it. Updated .