VANDERBILT MANSION NATIONAL
HISTORIC SITE
HYDE PARK, NEW YORK
REHAB VANDERBILT MANSION FOUNDATION AND
SUPPORT WALLS
PMIS NO. 161264
APPENDIX
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
August 1, 2016
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
VAMA - 121264 TOC-1
TABLE OF CONTENTS
APPENDIX
Statement of Structural Tests and Special Inspections ................................................................................... A.
Profit Calculator ............................................................................................................................................. B.
Contract Price Schedule- Blank ...................................................................................................................... C.
Contract Price Schedule- Complete ................................................................................................................ D.
Submittal List ……. ........................................................................................................................................ E.
Closeout and Operation and Maintenance Requirements .............................................................................. F.
Constructability Checklist ............................................................................................................................... G.
NPS Project Sustainability Checklist .............................................................................................................. H.
Class A Construction Cost Estimate ................................................................................................................ I.
Responses to Schematic Design Comments .................................................................................................... J.
Mortar Analysis Report ................................................................................................................................... K.
Exterior Cleaning Test Report ........................................................................................................................ L.
Asbestos Test Report. ..................................................................................................................................... M.
Radon Test Results Report .............................................................................................................................. N.
Petrographic Analysis Report ......................................................................................................................... O.
Statement of Structural Tests and Special Inspections Denver Service Center National Park Service
Park: Vanderbilt Mansion National Historic Park
PMIS: 161264
Project Name: Rehabilitate the Exterior of Historic Vanderbilt Mansion
Structural Engineering Firm: 1200 Architectural Engineers
This Statement of Structural Tests and Special Inspections (STSI) is being submitted as required by Chapter 17 of the 2009 International Building Code (IBC-09). It includes the following:
1. Seismic requirements
2. Wind requirements
3. Qualification requirements for Inspectors and Testing Technicians
4. Listing of Required Structural Tests and Special Inspections
The Construction Contractor’s Quality Control Supervisor will provide copies of all special inspection reports and associated documentation to the Contracting Officer. The Construction Contractor will be required to correct all deficiencies discovered in the Special Inspection and Structural Testing program.
Prepared by:
John A. Matteo
(Type or print name)
Signature
6/21/2016
Date PE or SE Stamp
PARK/PMIS Statement of Structural Tests and Special Inspections Page 1 of 12
PARK/PMIS Statement of Structural Tests and Special Inspections Page 2 of 8
Seismic and Wind Requirements
Seismic Requirements, IBC-09 Section 1705.3
Description of seismic-force-resisting system and designated seismic systems subject to special inspections per Section 1707:
Vanderbilt Mansion is an existing unreinforced masonry building. Per ASCE 7, its lateral system is classified as ordinary plain masonry shear walls. Per the 2009 IBC, the scope of work is classified as Repair and no seismic evaluation or retrofit is required. No seismic special inspections are required by code.
Wind Requirements, IBC-09 Section 1705.4
Description of wind-force-resisting system and designated wind systems subject to special inspections per Section 1706:
Vanderbilt Mansion is an existing unreinforced masonry building with ordinary plain masonry shear walls as its lateral system. Per the 2009 IBC, the scope of work is classified as Repair and no retrofit for wind loads is required. No wind special inspections are required by code.
PARK/PMIS Statement of Structural Tests and Special Inspections Page 3 of 8
Instructions:
1. Place an “X” in the column titled “Required?” for all Special Inspections and Tests required for this project.
2. In the column marked “Required Qualifications” provide the qualifications for the special inspector, using the list beginning on page 4, for all required Structural Tests and Special Inspections.
3. For those items listed as “Continuous,” continuous special inspection shall be as defined in Section 1702, IBC-09.
4. For those items listed as “Periodic” provide the minimum number of tests, i.e. 20% of all field welds, or the amount of work to be inspected (e.g. 10% of all wall surfaces).
5. Attach completed STSI to the end of the Specification Section 01 40 00, Quality Requirements.
PARK/PMIS Statement of Structural Tests and Special Inspections Page 4 of 8
Qualification Requirements for Inspectors and Testing Technicians
PE/SE Structural Engineer – licensed PE or SE specializing in the design of buildings and structures PE/GE Geotechnical Engineer – licensed PE specializing in soil mechanics and foundations EIT Engineer-In-Training – graduate engineer who has passed the Fundamentals of engineering examination
American Concrete Institute (ACI) Certification ACI-CCSI Concrete Construction Special Inspector ACI-LTT Concrete Laboratory Testing Technician Level 1 or 2 ACI-STT Concrete Strength Testing Technician ACI-FTT Concrete Field Testing Technician – Grade I
American Society of Non-Destructive Testing (ASNT) Certification Non-Destructive Testing Technician – Level II or III
American Welding Society (AWS) Certification AWS-CWI Certified Welding Inspector
Exterior Design Institute (EDI) Certification EDI-EIFS Certified EIFS inspector
International Code Council (ICC) Certification ICC-PCSI Prestressed Concrete Special Inspector ICC-RCSI Reinforced Concrete Special Inspector ICC-SSI Soils Special Inspector ICC-SFSI Spray-applied Fireproofing Special Inspector ICC-SMSI Structural Masonry Special Inspector ICC-SSBSI Structural Steel and Bolting Special Inspector ICC-SWSI Structural Welding Special Inspector
National Institute for Certification in Engineering Technologies (NICET) Certification NICET-CT Concrete Technician – Levels I, II, III and IV NICET-GET Geotechnical Engineering Technician - Levels I, II, III and IV NICET-ST Soils Technician - Levels I, II, III and IV
PARK/PMIS Statement of Structural Tests and Special Inspections Page 5 of 8
Other
PARK/PMIS Statement of Structural Tests and Special Inspections Page 6 of 8
Listing of Required Structural Tests and Special Inspections
R eq u ir ed
Structural Test or Special Inspection Required Qualifications
C on ti n u ou s
P er io d ic
F re q u en cy of
P er io
T es t or
In sp ec ti on
Steel Construction (ref: IBC-09 Table 1704.3)
1. Material verification of high-strength bolts, nuts and washers:
X
a. Identification markings to conform to ASTM standards specified in the approved construction documents.
PE/SE X
25% of Work
b. Manufacturer’s certificate of compliance required. X
2. Inspection of high strength bolting:
X a. Snug-tight joints. PE/SE X 25% of Joints
b. Pretensioned and slip-critical joints using turn-of-nut with matchmarking, twist-off bolt, or direct tension indicator methods of installation.
c. Pretensioned and slip-critical joints using turn-of-nut without matchmarking, twist-off bolt or calibrated wrench methods of installation.
3. Material verification of structural steel and cold-formed steel deck:
X a. For structural steel, identification markings to conform to AISC 360.
PE/SE
10% of Pieces
b. For other steel, identification markings to conform to ASTM standards specified in the construction documents
c. Manufacturer’s certified test reports. X
4. Material verification of weld filler metals:
X a. Identification markings to conform to AWS specification in the construction documents.
AWS-CW1
25% of Welds
b. Manufacturer’s certificate of compliance required. X
5. Inspection of welding:
X a. Structural steel and cold-formed steel deck: 25% of Welds X 1) Complete and partial joint penetration groove welds
2) Multi-pass fillet welds. X X 3) Single-pass fillet welds > 5/16” X
4) Plug and slot welds X X 5) Single-pass fillet welds ≤ 5/16” X
6) Floor and roof deck welds. X
b. Reinforcing steel:
1) Verification of weldability of reinforcing steel other than ASTM A706.
2) Reinforcing steel resisting flexural and axial X
PARK/PMIS Statement of Structural Tests and Special Inspections Page 7 of 8 u ir ed
Structural Test or Special Inspection Required Qualifications
C on ti n u ou s
P er io q u er io ec forces in intermediate and special moment frames, and boundary elements of special structural walls of concrete and shear reinforcement.
3) Shear reinforcement. X
4) Other reinforcing steel. X
6. Inspection of steel frame joint details for compliance:
a. Details such as bracing and stiffening. X
b. Member locations. X
c. Application of joint details at each connection. X
7. Cold-formed steel trusses spanning 60 feet or greater:
a. Verify temporary installation restrain/bracing and permanent individual truss member restraint/bracing installed in accordance with approved truss submittal.
Level 1 Masonry Construction (ref: IBC-09 Table 1704.5.1) X 1. Verify compliance with required inspection provisions of the construction documents and approved submittals.
2. At the start of masonry construction, verify:
X a. Proportions of site-prepared mortar. PE/SE X X b. Construction of mortar joints. PE/SE X X c. Location of reinforcement, connectors, prestressing tendons and anchorages.
d. Prestressing technique. X
e. Grade and size of prestressing tendons and anchorages.
3. During masonry construction, verify:
a. Size and location of structural members. X X b. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames, or other construction.
X c. Specified size, grade and type of reinforcement, anchor bolts, prestressing tendons and anchorages.
d. Welding of reinforcing bars. X X e. Preparation, construction and protection of masonry during cold weather (temperature below 40°F) or hot weather (temperature above 90°F).
f. Application and measurement of prestressing force. X
4. Prior to grouting, verify:
a. Grout space is clean. X
b. Placement of reinforcing and connectors, and prestressing tendons and anchorages.
c. Proportions of site-prepared grout and prestressing X
PARK/PMIS Statement of Structural Tests and Special Inspections Page 8 of 8 u ir ed
Structural Test or Special Inspection Required Qualifications
C on ti n u ou s
P er io q u er io ec grout for bonded tendons.
d. Construction of mortar joints. X
5. Verify grout placement. X
a. Grouting of prestressing bonded tendons X X 6. Observe preparation of grout specimens, mortar specimens and/or prisms.
Wind Resistance (ref: IBC-09 Section 1706)
1. See page 2 of this form for requirements.
Seismic Resistance (ref: IBC-09 Section 1707)
1. See page 2 of this form for requirements.
Maximum Project Rate Allowed Specific
10% Rate
Contract Cost Risk
Self Performed work (Contractor to perform all work) 2.00% 2.00%
Contract Type (Firmed Fixed Price, FFP) 1.00% 1.00%
Contractor Effort (Complexity of Work)
General Management 1.00% 1.00%
Direct Labor skill requirement 1.00% 1.00%
Safety Requirements 1.00% 1.00%
Equipment Requirements 1.00% 1.00%
Material Requirements 1.00% 1.00%
Federal Socioeconomic Program
Disadvantage Business 2.00% 0.00%
Maximum Allowable Profit 8.00%
PROFIT CALCULATOR FOR SELF PERFORMED WORK
Profit Factors
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
Complete the Exterior Rehabilitation of the Vanderbilt Mansion
1 Lump Sum $0.00 $0.00
$0.00
OPTION A- Complete Existing Wood Window Sash and Door Restoration
1 Lump Sum $0.00 $0.00
OPTION B- Provide new Storm Windows- All Openings
1 Lump Sum $0.00 $0.00
OPTION C- Restore and Reinstall Existing Wood Shutters
1 Lump Sum $0.00 $0.00
OPTION D- Restoration of Wine Cellar Interior
1 Lump Sum $0.00 $0.00
6 Additional Stone Repointing 1 Linear Foot - -
7 Additional Stone Dutchman Repair 1 Cubic Foot - -
$0.00
$0.00
PROJECT TITLE: Rehab Vanderbilt Mansion Foundation and Support Walls
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: VAMA- 161264
DEVELOPED AREA: Mansion Exterior
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 5) ------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 5) -----------
All measurement and payment information is included in the project specifications, Section 012700.
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
PARK - PMIS
CPS - 1
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
Complete the Exterior Rehabilitation of the Vanderbilt Mansion
1 Lump Sum $4,324,833.00 $4,324,833.00
$4,324,833.00
OPTION A- Complete Existing Wood Window Sash and Door Restoration
1 Lump Sum $841,845.00 $841,845.00
OPTION B- Provide new Storm Windows- All Openings
1 Lump Sum $251,395.00 $251,395.00
OPTION C- Restore and Reinstall Existing Wood Shutters
1 Lump Sum $255,046.00 $255,046.00
OPTION D- Restoration of Wine Cellar Interior
1 Lump Sum $163,108.00 $163,108.00
6 Additional Stone Repointing 1 Linear Foot - -
7 Additional Stone Dutchman Repair 1 Cubic Foot - -
$1,511,394.00
$5,836,227.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 5) ------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 5) -----------
All measurement and payment information is included in the project specifications, Section 012700.
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
PROJECT TITLE: Rehab Vanderbilt Mansion Foundation and Support Walls
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: VAMA- 161264
DEVELOPED AREA: Mansion Exterior
PARK - PMIS
CPS - 1
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
013000 1.3 Temporary Facilities and Controls Letter Designating Project Superintendent X Construction Schedule X Comprehensive Breakdown of Schedule of Values X Accident Prevention Plan X List of Subcontractors for Project X Statements Certifying Subcontractor Compliance with X Evidence of Liability Insurance Coverage and X Waste Management Plan X Quality Control Plan X Temporary Storm Water Pollution Prevention Plan X Indoor Air Quality Management Plan X Contractors Commissioning Plan X Historic Preservation Treatment Plan X Accessibility Inspection Report X
013233 1.2 Construction Images X 013591 Historic Preservation Treatment Procedures
1.3 Historic Preservation Treatment Plan X
Alternative Methods and Materials X
13513.22 1.3 Daily Archeological Construction Work Schedule X 014000 1.3 Quality Requirements
Quality control plan X Qualification data X Contractor's quality control daily reports X Test reports X Accessibility Inspection Report Off-site inspection reports X Permits, licences, certificates X
015000 1.4 Temporary Facilities and Controls Product Data X Shop Drawings X Delegated-Design Submittal X
015719.11 1.4 Indoor Air Quality (IAQ) Management Plan X X X IAQ management plan X Product data X Inspection and test reports X
015723 1.3 Under-An-Acre Pollution Prevention Plan (UPPP)
UPPP X
Inspection Schedule X Erosion Control Products X
016700 1.3 Record Submittals X X 017329 1.2 Cutting and Patching Plan X 017340 1.2 Execution
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Land Surveyor or Professional Engineer Certificate X Landfill Receipt X Quanitity Survey X
017419 1.4 Construction Waste Management and Disposal
Landfill and incinerator disposal records X
Qualification data X
Statement of refigerant recovery X
Progress payment requirements X
017700 1.3 Closeout submittals X
017823 1.2 Manual X
017900 1.3 Instruction program X
1.3 Demonstration and training video X
020550 1.2 Methods of protection X X
024119 1.6 Selective Removals
Proposed Protection Measures X
Schedule of Selective Removal Activities X
Inventory X
PreRemoval Photographs or Video X
Qualification Data X
Warranties X
040120 1.5 Brick Masonry Restoration
Product Data X
Shop Drawings X
Mortar Samples X
Mortar Mixes X
Masonry Unit Samples X
Sand Samples X
Accessory Samples X
Qualification Data X
Preconstruction Test Reports X
Quality-Control Program X
Restoration Program X
Cleaning Program X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Mortar Analysis X
040140 1.5 Stone Masonry Restoration
Product Data X
Shop Drawings X
Mortar Samples X
Mortar Mixes X
Stone Samples X
Sand Samples X
Accessory Samples X
Qualification Data X
Preconstruction Test Reports X
Quality-Control Program X
Restoration Program X
Cleaning Program X
Mortar Analysis X
050175 1.3 Historic Treatment of Cast and Wrought Iron
Product Data X
Shop Drawings X
Iron Samples X
Fitting and Bracket Samples X
Connection Samples X
Finish Samples X
Sealant Materials X
Accessory Samples X
Qualification Data X
Restoration Program X
Cleaning Program X
051200 Structural Steel Framing
1.5 Product Data X
Shop Drawings X
1.6 Qualification data X
Paint compatibility certificates X
Product Test Reports X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Survey Certificates X
Reports X
055113 Metal Ramp and Railings
1.4 Product Data X
Shop Drawings X
Samples for Verification X
Cleaning Solution Cut Sheets X
055113 1.5 Welding Certificates X
Paint Compatibility Certificates X
055313 Bar Gratings
1.4 Product Data X
Shop Drawings X
055313 1.5 Mill Certificates X
Welding Certificates X
Paint Compatibility Certificates X
057300 Decorative Metal Railings
1.6 Product Data X
Shop Drawings X
Samples involving color, texture and design X
057300 1.7 Qualification Data X
Mill Certificates X
Welding Certificates X
Product Test Reports X
Preconstruction Test Reports X
Evaluation Reports X
061053 Miscellaneous Rough Carpentry
1.4 Product Data X
1.5 Evaluation Reports X
062013 Exterior Finish Carpentry
1.3 Product Data X
Samples involving color, profiles and texture X
Qualification Data X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
1.4 Compliance Certificates X
Warranties X
062023 Interior Finish Carpentry
1.3 Product Data X
Samples X
Shop Drawings X
1.4 Sample Warranty X
071326 Foundation Waterproofing
1.4 Product Data X
Shop Drawings X
Samples X
1.5 Qualification Data X
Field Quality-Control Reports X
Warranties X
079200 Joint Sealants
1.4 Product Data X
Samples showing exposed colors X
Joint Sealant Schedule X
1.5 Qualification Data X
Product Test Reports X
Field-Adhesion-Test Reports X
Warranties X
080150 Wood Window and Door Restoration
1.4 Restoration Proposal X
Shop Drawings X
Replacement Member Samples X
Hardware Samples X
Weather Stripping Samples X
Replacement Glass Samples X
Sealant Samples X
Photographic Documentation X
1.5 Qualification Data X
Maintenance Data X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Field Quality-Control Reports X
085169 Metal Storm Windows
1.4 Product Data X
Shop Drawings X
Finish Samples X
Glazing Samples X
1.5 Qualification Data X
Product Test Reports X
Field Quality-Control Reports X
Warranties X
087000 Hardware
1.3 Product Data X
Samples for New Hardware X
Hardware Schedule X
Conditions Survey for Restored Hardware X
1.4 Qualification Data X
Maintenance Data X
Warranties X
090320 Historic Treatment of Plaster
1.5 Product Data X
Shop Drawings X
Samples X
1.6 Qualification Data X
Plasterwork Historic Treatment Program X
092100 1.5 Exterior Stucco
Product Data X
Shop Drawings X
Sand Samples X
Accessory Samples X
Sample Panel X
Mix Samples X
Qualification Data X
Quality-Control Program X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
096400 Wood Flooring Restoration
1.3 Product Data X
Shop Drawings X
Samples X
1.4 Maintenance Materials X
099113 1.4 Painting
Product Data X
Topcoat Product Samples X
Product List X
144216 1.4 Vertical Wheelchair Lift
Product Data X
Shop Drawings X
Templates X
Samples X
Manufacturer's Certificates X
Qualification Data X
Product Certificates X
Warranties X
260519 Low-Voltage Electrical Power Conductors, Cables and Conduits
1.4 Product Data X
1.5 Qualification Data X
Field Quality-Control Reports X
262726 1.4 Wiring Devices
Product Data X
Shop Drawings X
Samples X
Field Quality-Control Reports X
Operation and Maintenance Data X
265000 1.3 Custom Fabricated Light Fixtures
Product Data X
Shop Drawings X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Patterns, Models, or Plaster Castings X
Samples involving color, texture and design X
Qualification Data X
Operation and Maintenance Data X
Warranties X
310000 1.4 Earthwork
Soil Material Testing Results X
Third-Party Soil Testing Service Qualifications X
List of Soil Sources X
311319 1.4 Temporary Tree and Plant Protection
Existing Condition Documentation X
312513 1.3 Erosion and Sedementation Control
Permit Documentation X
Erosion and Sediment Control Plan X
Material Samples X
321214 1.4 Asphalt Paving
Test Reports X
CQC Accessibility Inspection Report X
Granular Subbase X
Certificates X
329200 1.3 Turf and Grasses
Product Data X
Manufacturer's Certificates X
334100 1.3 Storm Drainage Piping
Product Data X
Project Record Documents X
334600 1.4 Foundation Drainage System
Product Data X
Project Record Documents X
334900 1.5 Storm Drainage Structures
Shop Drawings X
Samples X
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S P
R O
G R
A M
O R
P L
A N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 161264, Rehab Vanderbilt Mansion Foundation and Support Walls
SUBMITTAL REQUIREMENTS (indicate with an "X")
Topic Specification
Section Requirement
Submittal Date
Completed Received by Park
017700 Final Project Record Drawings
017900 Demonstration and Training Videotape
050175 Molds used for cast and wrought iron castings.
096400
099113
099300
017419
024119 Inventory of items that have been removed or salvaged.
024119 Landfill Records
144216
144216 Continuing maintenance proposal for lifts.
071326
079200
085169 Windows and glazing units, manufacturer's 10 years
087000 Hardware, manufacturer's 3 years.
265000
144216 O&M Data for vertical wheelchair lifts.
Foundation waterproofing, manufacturer's 5 years;
installer 2 years.
Joint sealants, manufacturer's 5 years; installer 2 years.
O&M Data Warranties Guarantees
Extra Stock
Custom fabricated light fixtures, fabricator's one year warranty.
CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS
Project Record Drawings
System Demonstration and Training
Tools Spare Parts Equipment
Inspection/acceptance certificates and operating permits for lifts.
Project waste management plan worksheet for waste disposal and diversion.
Reports
1 percent of amount installed for each type, color and finish of wood flooring
5 percent, but not less than 1 gallon of each material and color applied.
5 percent, but not less than 1 gallon of each material and color applied.
PARK: PMIS:
VAMA 161264
ITEM #
STATE OR LOCAL CONTACTS
New York State Historic Preservation Office (SHPO) and New York State Department of Environmental Conservation (DEC)
LIST INDIVIDUAL PERMIT REQUIREMENTS
REQUIREMENTS INCLUDED IN DESIGN PACKAGE
CONSTRUCTABILITY CHECKLIST
( For Instructions, see Instructions Tab below)
Storm water Pollution Prevention Plan (under one acre) (SWPPP)
Storm water Pollution Prevention Plan (under one acre) (SWPPP)
JOHN G. WAITE ASSOCIATES,
ARCHITECTS
DATE:
1-Aug-16
PROJECT TITLE: COMPLETED BY:
Rehab Vanderbilt Mansion Foundation and
Support Walls
LIST REQUIRED PERMITS (Water, Sewer, Road)
New York State Historic Preservation Office (SHPO) and New York State Department of Environmental Conservation (DEC)
SWPPP only
Schematic Design approved by SHPO.
Draft Construction Documents should also be submitted to SHPO for review.
CD RESOLUTION
PERMITTING AND COMPLIANCE
PROJECT ISSUES DD COMMENTS
SWPPP only
Schematic Design approved by SHPO.
Draft Construction Documents should also be submitted to SHPO for review.
ALL COMPLIANCE COMPLETE
SHPO, NEPA, EA, etc.
1 of 7 FORM CC 041409
ITEM # CD RESOLUTIONPROJECT ISSUES DD COMMENTS
Electric and Water only.
Minimal impact to visitor access to site.
Visitor Center and site to remain open during construction. Mansion and immediate area surrounding will be closed during construction
AVAILABILITY OF TEMPORARY UTILITIES FOR
STAGING (electric, phone, etc.)
LOGISTICS- TRAFFIC CONTROL/ IMPACTS TO
PARK AND VISITOR OPERATIONS
Requirements indicated on site plan.
Electric and Water only.
Main access road limited by bridge weight limit and turning radius.
Minimal impact to visitor access to site.
Visitor Center and site to remain open during construction. Mansion and immediate area surrounding will be closed during construction
STAGING AREAS IDENTIFIED ON SITE PLAN
(Coordinated with Park)
STAGING AND MOBILIZATION
Draft Statement of Structural Tests and Special Inspections is included in the Appendix.
Requirements indicated on site plan.
Statement of Structural Tests and Special Inspections is included in the Appendix.
Requirements indicated on site plan.
8 Requirements indicated on site plan.
ADEQUATE SPACE FOR STAGING (Prime, Subs, Material Storage)
DAB submission provided. DAB submission provided.
SITE ACCESS ISSUES/ LOAD LIMITS
BRIDGE/TUNNEL HEIGHT RESTRICTIONS
Main access road limited by bridge weight limit and turning radius.
ALL APPROVALS COMPLETE (Director's, DAB, Congressional Funding issues, estimate within available funds?)
SPECIAL INSPECTIONS
2 of 7 FORM CC 041409
Indiana limestone only available as sole source.
Requirements indicated on site plan.
Indiana limestone only available as sole source.
Stone samples, selection, and procurement. Storm window fabrication.
Cast iron replacement parts fabrication.
Reproduction light fixtures. Wheelchair lift.
Stone samples, selection, and procurement. Storm window fabrication.
Cast iron replacement parts fabrication.
Reproduction light fixtures. Wheelchair lift.
PRELIMINARY SITE INVESTIGATION COMPLETE
EXISTING CONDITIONS VERIFIED AND INCLUDED
Requirements indicated on site plan.
MATERIAL SUBMITTALS ON THE CRITICAL PATH
Stone samples, selection, and procurement. Storm window fabrication.
Cast iron replacement parts fabrication.
Reproduction light fixtures.
Survey completed and included with documents.
LONG LEAD ITEMS/ MATERIAL AND
EQUIPMENTAVAILABILITY/SPECIAL DELIVERY
REQUIREMENTS
IDENTIFY SOLE SOURCE OR GOVERNMENT
FURNISHED MATERIALS OR EQUIPMENT
Yes.
Requirements indicated on site plan.
Stone samples, selection, and procurement. Storm window fabrication.
Cast iron replacement parts fabrication.
Reproduction light fixtures.
CONSTRUCTION LIMITS ADEQUATELY SHOWN
AND DEFINED (needed for both access and construction)
SUBMITTALS
Survey completed and included with documents.
Yes.
SITE LAYOUT / RESOURCE PROTECTION
TYPE OF RESOURCE PROTECTION REQUIRED /
SPECIFIED AND ADEQUATELY SHOWN
ACCURATE SURVEY DATA ON PLANS (BMs, TBMs, TOPO)
Requirements indicated on site plan.
3 of 7 FORM CC 041409
Requirements will be outlined in the specifications.
N/A
N/A
Survey completed and included with documents.
N/A
NOISE / DUST / SAFETY CONCERNS
ANY CONSTRAINTS ON MEANS AND METHODS
(blasting vs mechanical, etc.)
DEMOLITION
N/A
N/A
N/A
Requirements will be outlined in the specifications.
IDENTIFY TEMPORARY SYSTEMS REQUIRED
(Coordinate for Park / Public needs)
SALVAGEABLE ITEMS / PARK/ RECYCLE
Work area should be fenced off to exclude the public.
Work area should be fenced off to exclude the public.
ANY SPECIAL SIGNAGE REQUIREMENTS
MAJOR SAFETY CONCERNS
ALL EXISTING UTILITIES LOCATED ACCURATELY
SHOWN
Survey completed and included with documents.
4 of 7 FORM CC 041409
Preliminary hazardous material testing of widows indicates none present.
Preliminary hazardous material testing of widows indicates none present.
Monitoring of excavations by NPS archeologist is recommended.
N/A
Normal working hours.
Normal weather restrictions for masonry and painting work will be outlined in the specifications.
N/A
Schedule for window work dependent upon park staff to prepare and protect interior spaces at window locations.
N/A
Monitoring of excavations by NPS archeologist is recommended.
HAZARDOUS MATERIAL CONSIDERATIONS DEMO
METHODS AND DISPOSAL STATE AND LOCAL
REQUIREMENTS
ARCHEOLOGICAL POTENTIAL MONITORING
REQUIREMENTS (Arch / Native American, shown on plans/division 01 spec language)
WELL DEFINED SCOPE OF WORK FOR LOCAL
UTILITY COMPANIES AND THE CONSTRUCTION
CONTRACTOR
WEATHER CONSIDERATIONS, CONSTRUCTION
SEASON, OPTIMUM TIME TO ADVERTISE,
RECOMMENDED CONTRACT LENGTH
N/A
Normal working hours.
REMOTE SITES/ AVAILABILITY: MATERIAL,
EQUIPMENT, LABOR
CONSTRUCTION
Normal weather restrictions for masonry and painting work will be outlined in the specifications.
Schedule for window work dependent upon park staff to prepare and protect interior spaces at window locations.
SITE ACCESS RESTRICTIONS CONSTRUCTION
OPERATIONS
PARK / CONCESSION IMPOSED RESTRICTIONS
INCLUDED IN PKG. IMPACTS ON SCHEDULE &
COST
5 of 7 FORM CC 041409
Recommend training maintenance and curatorial staff on regular exterior masonry cleaning, procedures for operating doors and windows, cleaning drainage structures.
Requirements will be outlined in the specifications.
PMIS 152373 is in progress.
Value engineering is not recommended for this project. Recommend completing interior scope in future project.
Requirements are outlined in the specifications.
None.
Schedule for window work affecting interior spaces to be coordinated with park staff.
Requirements are outlined in the specifications. The restoration work requires highly specialized craftsmen. A/E strongly recommends a two stage procurement process to ensure selection of a qualified contractor.
None.
PMIS 152373 is in progress.
Value engineering is not recommended for this project.
Recommend training maintenance and curatorial staff on regular exterior masonry cleaning, procedures for operating doors and windows, cleaning drainage structures.
SPECIALIZED - MATERIALS/INSTALLATION
METHODS CERTIFICATIONS/TRAINING
REQUIREMENTS
34 GENERAL DISRUPTION: UTILITY CONNECTIONS,
DOWN TIMES
TRAINING REQUIREMENTS, CERTIFICATIONS
SPECIFIED
Schedule for window work affecting interior spaces to be coordinated with park staff.
Requirements will be outlined in the specifications. The restoration work requires highly specialized craftsmen. A/E strongly recommends a two stage procurement process to ensure selection of a qualified contractor.
PROJECT CLOSEOUT
ADJACENT CONCURRENT CONTRACTS
COORDINATION / OVERLAPS ON CONCURRENT
OR FUTURE CONTRACTS
VALUE ENGINEERING POTENTIAL
O&M REQUIREMENTS COVERED
SPECIFIC PHASING REQUIREMENTS35
6 of 7 FORM CC 041409
Recommend training maintenance and curatorial staff on regular exterior masonry cleaning, procedures for operating doors and windows, cleaning drainage structures.
Clean masonry of entire building with medium pressure hot water every five years to remove light biological growth. Drainage structures to be clean out annually. All windows and doors require ongoing monitoring and annual cleaning and touch up painting.
Recommend training maintenance and curatorial staff on regular exterior masonry cleaning, procedures for operating doors and windows, cleaning drainage structures.
Clean masonry of entire building with medium pressure hot water every five years to remove light biological growth.
Drainage structures to be clean out annually. All windows and doors require ongoing monitoring and annual cleaning and touch up painting.
POST CONSTRUCTION REQUIREMENTS
LONG TERM MAINTENANCE NEEDS
7 of 7 FORM CC 041409
Fund Source: Gross Project Construction Cost:
Predesign Begin Date:
FY of Const. Funding
Park:
State: Region:
Type of Building
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
SS Prereq 1 Construction Activity Pollution Prevention
NA N/A NA N/A NA N/A
SS Credit 1 Site Selection NA 0 NA 0 NA 0
SS Credit 2 Development Density & Community Connectivity
N 0 N 0 N 0
SS Credit 3 Brownfield Redevelopment N 0 N 0 N 0
SS Credit 4.1 Alternative Transportation, Public Transportation Access
N 0 N 0 N 0
SS Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms
N 0 N 0 N 0
SS Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
N 0 N 0 N 0
SS Credit 4.4 Alternative Transportation, Parking Capacity
N 0 N 0 N 0
SS Credit 5.1 Site Development, Protect or Restore Habitat
N 0 N 0 N 0
SS Credit 5.2 Site Development, Maximize Open Space
N 0 N 0 N 0
SS Credit 6.1 Stormwater Design, Quantity Control (See EISA Section 438)
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
SS Credit 6.2 Stormwater Design, Quality Control (See EISA Section 438)
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Project Type Building Renovation
Description:
Park/PMIS: VAMA / 161264 2018
Not Certified/Missing Prereq.
Exterior Restoration 2015
Please Input CRV in block to the right for the building(s) in this project
Indicate CRV Above
Missed Prereq. Missed Prereq.
Gross Non Building (i.e. Site) Cost:
Indicate CRV Above Indicate CRV Above
If Renovation, Exist. Bldg. CRV
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development
John G. Waite Associates, Architects VAMA
Missed Prereq.
Not Certified/Missing Prereq.
Gross Building Construction Cost:
Missed Prereq. Missed Prereq. Missed Prereq.
LEED Certification Level Not Certified/Missing Prereq. Not Certified/Missing Prereq. Not Certified/Missing Prereq.
Construction
Indicate CRV Above% Federal Regulations Achieved
Sustainable Sites (SS) Maximum LEED NC 2009 Credits: 26
Construction Documents
Indicate CRV Above
Architect/Engineer Firm:
NortheastDate: August 2, 2016 NY Historic
NPS Project Sustainability Checklist Building and Non-Building Projects
(For New Construction or Renovation) LEED 2009 Edition
Project Title: Rehabilitate Vanderbilt Mansion Foundation and Support Walls Line Item
Not Certified/Missing Prereq.
Total LEED-NC Credits
45,000Building Size (Square Feet)
Indicate CRV Above
Form E 62 (8/2/13) 1
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EISA 2007,
Section 438 Protect Hydrology Y N/A
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y N/A
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
Y N/A
A SMALL AMOUNT OF
RAINWATER WILL BE
COLLECTED BY NEW
FOUNDATION DRAINS AND
DIVERTED TO EXISTING
DRYWELLS AROUND SITE.
SS Credit 7.1 Heat Island Effect, Non-Roof N 0 N 0 N 0
SS Credit 7.2 Heat Island Effect, Roof N 0 N 0 N 0
SS Credit 8 Light Pollution Reduction N 0 N 0 N 0
2006 NPS Mgmt Policies (Para.
4.9) Soundscape Preservation NA N/A
THE NEW WHEELCHAIR
LIFT WILL PRODUCE
OCCAISIONAL NOISE WHEN
IN OPERATION, BUT WILL
BE OF SHORT DURATION.
NA N/A
THE NEW WHEELCHAIR
LIFT WILL PRODUCE
OCCAISIONAL NOISE WHEN
IN OPERATION, BUT WILL
BE OF SHORT DURATION.
NA N/A
THE NEW WHEELCHAIR
LIFT WILL PRODUCE
OCCAISIONAL NOISE WHEN
IN OPERATION, BUT WILL
BE OF SHORT DURATION.
2006 NPS Mgmt Policies (Para.
4.10) Dark Sky Preservation NA N/A
ALL LIGHTS ARE BENEATH
ROOFS AND DO NOT
CONTRIBUTE TO LIGHT
POLLUTION.
NA N/A
ALL LIGHTS ARE BENEATH
ROOFS AND DO NOT
CONTRIBUTE TO LIGHT
POLLUTION.
NA N/A
ALL LIGHTS ARE BENEATH
ROOFS AND DO NOT
CONTRIBUTE TO LIGHT
POLLUTION.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
WE Prereq 1 Water Use Reduction, 20% Reduction (see Guiding Principle III ‐ Protect and Conserve Water)
NA N/A
NO NEW PLUMBING
FIXTURES ARE PROPOSED
IN THIS SCOPE OF WORK
NA N/A
NO NEW PLUMBING
FIXTURES ARE PROPOSED
IN THIS SCOPE OF WORK
NA N/A
NO NEW PLUMBING
FIXTURES ARE PROPOSED
IN THIS SCOPE OF WORK.
WE Credit 1
Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III ‐ Protect and Conserve Water)
NA 0
LANDSCAPING
IS NOT MAINTAINED
WITH POTABLE
RESOURCES.
NA 0
LANDSCAPING
IS NOT MAINTAINED
WITH POTABLE
RESOURCES.
NA 0
EXISTING LANDSCAPING
IS NOT MAINTAINED WITH
POTABLE RESOURCES.
WE Credit 1 (cont'd)
Water Efficient Landscaping, No Potable Use or No Irrigation
Y 2
LANDSCAPING
DOES NOT REQUIRE
IRRIGATION
Y 2
LANDSCAPING
DOES NOT REQUIRE
IRRIGATION
Y 2
EXISTING LANDSCAPING
DOES NOT
REQUIRE IRRIGATION
WE Credit 2 Innovative Wastewater Technologies
N 0 N 0 N 0
NPS Policy Water Metering NA N/A
CHANGES TO EXISTING
WATER SERVICE ARE NOT
IN THE SCOPE OF THIS
PROJECT.
NA N/A
CHANGES TO EXISTING
WATER SERVICE ARE NOT
IN THE SCOPE OF THIS
PROJECT.
NA N/A
CHANGES TO EXISTING
WATER SERVICE ARE
NOTE IN THE SCOPE OF
THIS PROJECT.
EPACT 2005,
Section 109
Water Used for Energy Conservation
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
WE Credit 3 Water Use Reduction (30%, 35%, 40%)
N 0 N 0 N 0
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Schematic Design Design Development
LEED-NC Subtotal
Energy & Atmosphere (EA) Maximum LEED NC 2009 Credits: 35
PMIS Submission Predesign Construction Documents Construction
LEED-NC Subtotal
Water Efficiency (WE) Maximum LEED NC 2009 Credits: 10
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Documents Construction
Form E 62 (8/2/13) 2 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
EA Prereq 1
Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I ‐ Employ Integrated Design Principles)
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Prereq 2 Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Prereq 3
Fundamental Refrigerant Management (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE CSOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE CSOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 1
Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II ‐ Optimize Energy Performance)
NA 0
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EISA 2007,
Section 433
Reduce Fossil Fuel Derived Energy
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EO 13963
Procure Environmentally sustainable electronic products (Predominantly relates to purchases of desktop/laptop computer and peripherals)
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING SYSTEMS ARE
NOT IN THE SCOPE OF
THIS PROJECT.
CFR Title 10, Part 436.4
Procure Energy Star or FEMP designated products
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING SYSTEMS ARE
NOT IN THE SCOPE OF
THIS PROJECT.
EPACT 2005,
Section 104
Premium Efficiency Electric Motors
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EISA 2007,
Section 523
On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 2 On-Site Renewable Energy*** 1%-13% Renewable Energy