About this file

Amendment No. 6 - Specification Changes

View the file

Other files for this federal contract opportunity

Other files attached to Replace Floating Bridge and Access Trails with Elevated Bridge and Walkway, newest first.
File Type Posted
Q A_Amendment_5.pdf PDF
Q-A-Spec_Chgs-Drwgs_chgs-Amend4.pdf PDF
Amendment_3SubKPlanForm.pdf PDF
KATM_148250_Pre-Bid_Attendance_List_2016_0901.pdf PDF
KATM_148250_Pre-bid_Site_Visit_Notes_2016_0906.pdf PDF
SubContracting_Form_1_-_Amendment_2.htm HTM file
Amendment_No._1_P16PS00287.pdf PDF
KATM_Brooks_Camp_100__Final_Drawings-22x34_Signed_160616.pdf PDF
Proposal_Submission_Pkg.pdf PDF
KATM_148250-Combined_Specifications_2016_0628.pdf PDF
Solicitation-P16PS00287.pdf PDF
DB_wage_rates.txt TXT text file
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 6

Item 1

Specification Section 01 11 00 1.3.B.2.a

Delete:

“All barge/boat landings shall occur at the Spit or the Barge Landing area southeast of the mouth of the Brooks River.”

Add:

“All barge/boat landings shall occur and are limited to: the Barge Landing area southeast of the mouth of the Brooks River after August 1, 2017, the Brooks Camp Beach after September 19, 2017, and before May 1, 2018; and the Spit during the month of September, 2017 AND the month of September 2018.”

Item 2

Specification Section 01 11 00 1.4.B.1.

Delete Item 1.a

Replace with:

“Spit: September 1 through September 30, 2017 and September 1 through September 30, 2018.”

Item 3

Specification Section 01 11 00 1.4.D.

Delete paragraph in its entirety

File details come from the government source that posted it. Updated .