P15PS01955_Price_Schedule.pdf
PDF 11 KB Posted
- Attached to
- Repair of Failed Wall - McDowell Road Fort Mason
- Solicitation number
- P15PS01955
About this file
Contract Price Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P15PS01955_Amend_No._000003_SOC.pdf | ||
| P15PS01955.pdf | ||
| P15PS01955.pdf | ||
| P15PS01955_Amend_No._000002_SOC.pdf | ||
| P15PS01955.pdf | ||
| 2014-05-06_Soil_Test_Report_FM_McDowell_Rd.pdf | ||
| P15PS01955_Amend_No._000001_SOC.pdf | ||
| McDowell_08-10-15_Site_Visit_Sign_In.pdf | ||
| Appendix_Geo_Tech_Report.pdf | ||
| P15PS01955_SF_1442.pdf | ||
| Key_Personnel_Qualifications.docx | DOCX document | |
| PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| Subcontractor_Reference.docx | DOCX document | |
| Repair_Failed_Wall_McDowell_Road_Final_Drawings.pdf | ||
| Relevant_Prior_Experience.docx | DOCX document | |
| Repair_Failed_Wall_McDowell_Road_Final_Specifications_Rev002.pdf | ||
| P15PS01955_Clauses_ _Provisions.pdf | ||
| General_References.docx | DOCX document | |
| DB_WD_CA150029_07-17-2015__CA29.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE SCHEDULE
Date: 7-21-15
Solicitation: P15PS01955 Project: Repair of Failed Wall on McDowell Road at Fort Mason Park: GOGA
PMIS: 173063
Line Item Description Quantity Unit Cost/Unit Total
Base CLINS 10 Mobilization and Demobilization 1 LS 20 Drilled, Cast-in-Place Concrete Piers 284 LF 30 Foundations Including Pile Caps and Grade Beams 27 CY 40 Concrete Suspended Roadway Slab 52 CY 50 Concrete Barrier Wall 60 LF 60 Asphalt Concrete Roadway Pavement 333 SY 70 Demolition and Removal of Barrier Wall 60 LF 80 Electrical and Lighting 1 LS subtotal
Options 90 Drilled, Cast-in-Place Concrete Piers 1 LS subtotal
Notice: Refer to FAR clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Submit pricing for base price and all options. Failure to do so may render the proposal unacceptable. On lump sum items, provide total price only; on unit price items, provide the unit price and the extended amount. If no item exists for a portion of the work, include the costs in a related item. In case of error in extension prices, unit governs. In case of errors in summations, the total of the corrected amounts govern. Limit amounts to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the Notice to Proceed. Pricing will be evaluated based on best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgement of the Contracting Officer to offer the best advantage (value) in goods and services for the dollar. Award will be made to one offerer in accordance with the Evaluation Factors for Award, Section M.
Total Cost of Construction