August 20, 2015

P15PS01955 – Amendment 000001 Summary of Changes

A. To clarify, the hour and date specified for receipt of offers remains 1400 (2:00 PM) Pacific Daylight Time on August 31, 2015 as stated in Section L of the solicitation, and in the original Standard Form 1442 posted to FedConnect. The Standard Form 1442 posted to FedBizOpps indicates the incorrect time, omitted the date, and should not be used. The Standard Form 1442 posted to FedConnect is the correct version, and should be used for submission of proposals.

B. Pertinent information from the site visit is in question and answer format, and is contained in the Q&A below. The sign in sheet is attached.

C. The two appendices referenced in the Specification’s Table of Contents are attached.

D. The following are questions/inquiries from interested offerors, and the official Government responses to those questions/inquiries:

Q1. I saw a mechanical coupler identified several times on drawing sheet S4 (13 of 15) but nowhere could I find a detail or any mention of it in the specifications.

A1. The couplers are covered in Spec Section 03200 Concrete Reinforcement and Reinforcement Support Part 2, 2.04 Mechanical Connectors.

Q2. Drawing D2 (3 of 15) shows 6 pictures of road and wall demolition. Please confirm that all these items are included in the project scope. During the site visit meeting, others indicated that the demo shown in the lower left picture was not to be included.

A2. Work shown on Sheet D2 - detail labelled "(E) Existing Barrier Wall Debris at Bottom of Steep Slope and in San Francisco Bay" is not in this contract.

Q3. The specifications table of contents shows 2 appendices; Geotechnical and Geological Service Repair of Concrete Wall Along McDowell Road and Summary of Soil Sampling and Analytical Testing. I could not find either one.

A3. See “C” above.

Q4. The original solicitation included a SF1442 and then on 6 August an additional SF1442 was posted. Which one are we supposed to use? Also, the second 1442 dropped off the due date for the solicitation in block 13.

A4. See “A” above.

Q5. Request that the current bid due date (31 August) be extended a minimum of 1 week to receive and process responses to the above.

A5. See “A” above.

End of Amendment