DIV_1.pdf
PDF 2 MB Posted
- Solicitation number
- P15PS01032
About this file
P15PS01032 Specifications Division 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GeneralReferences.doc | DOC document | |
| P15PS01032_amendment_3.pdf | ||
| THRB_420_D11_VI_p3.pdf | ||
| ProposedEquals.doc | DOC document | |
| Past_Performance_Questionnaire.doc | DOC document | |
| HazmatForm.doc | DOC document | |
| THRB_420_D11_VI_p1.pdf | ||
| THRB_420_D11_VI_p2.pdf | ||
| Experience_Form.doc | DOC document | |
| THRB_420_D11_VII_ id80356 .pdf | ||
| THRB_PreProposal_Site_Visit_mtg_mns.pdf | ||
| P15PS01032_amendment_No._2.pdf | ||
| Preproposal_mtg_attend_7-23-15.pdf | ||
| Amendment_No_2_questions.pdf | ||
| P15PS01032_Amendment_1_DB_Wages.pdf | ||
| Div_2_-_49.pdf | ||
| THRB_154129_Construction_Drawings.pdf | ||
| P15PS01032_SF_1442.pdf | ||
| P15PS01032_Clauses_.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THEODORE ROOSEVELT BIRTHPLACE
NATIONAL HISTORIC SITE
NEW YORK, NY
CONTRACT # P10PC60521
LIFE SAFETY AND SYSTEM UPGRADES
for
THEODORE ROOSEVELT BIRTHPLACE
PMIS NO. THRB 154129
PROJECT SPECIFICATIONS
FINAL
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
June 30, 2015
THRB - 154129 TOC-1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 03 50 Asbestos Containing Materials and Lead Based Paint 01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management & Coordination 01 32 16 Construction Schedule 01 32 33 Photo Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures --- Submittal List 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements --- CQC Accessibility Inspection Report 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 57 19.11 Indoor Air Quality 01 57 19.12 Noise Acoustics Management 01 57 23 Temporary Storm Water Pollution Prevention 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 79 00 Demonstration and Training 01 81 13 Sustainable Design Requirements for Non-LEED Projects 01 91 14 Total Building Commissioning --- Closeout and Operation & Maintenance Requirements
DIVISION 02 – EXISTING CONDITIONS
02 20 26 Minor Demolition for Historic Fabric
DIVISION 03 – CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 04 – MASONRY
04 01 20 Patching of Brick Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
THRB - 154129 TOC-2
05 40 00 Cold-Formed Metal Framing 05 73 00 Decorative Metal Railings 05 73 10 Glass Partitions
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 20 53 Exterior Wood Repair and Restoration 06 40 23 Interior Architectural Woodwork
DIVISION 07
07 84 13 Penetration Firestopping 07 92 00 Joint Sealants
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 14 33 Stile and Rail Wood Doors 08 41 23 Fire Rated Glass and Framing Systems 08 71 00 Door Hardware
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 09 23 00 Patching of Gypsum Plaster 09 29 00 Gypsum Board 09 30 00 Tiling 09 64 00 Wood Flooring 09 65 13 Resilient base and Accessories 09 66 00 Terrazzo Repair 09 68 16 Sheet Carpeting 09 91 23 Interior & Exterior Painting
DIVISIONS 10 – SPECIALTIES
10 14 00 Signage 10 21 13 Toilet Compartments 10 28 00 Toilet Accessories
DIVISIONS 11 (Not Used)
DIVISION 12 – FURNISHINGS
12 36 61 Solid Surface Countertops
DIVISION 13 (Not Used)
DIVISIONS 14 – CONVEYING EQUIPMENT
14 42 00 Wheelchair Lifts
THRB - 154129 TOC-3
DIVISIONS 15 – 20 (Not Used)
DIVISION 21 – FIRE SUPPRESSION
21 11 00 Facility Fire-Suppression water-Service Piping 21 13 00 Wet-Pipe Sprinkler System 21 31 13 Electric-Drive, Centrifugal Fire Pumps 21 34 00 Pressure-Maintenance Pumps 21 39 00 Controllers for Fire-Pump Drivers
DIVISION 22 – PLUMBING
22 05 00 Common Work Requirements for Plumbing and Fire Protection 22 05 29 Hangers and Supports for Piping and Equipment 22 05 53 Identification for Plumbing, Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 40 00 Plumbing Fixtures
DIVISIONS 23 – 25 (Not Used)
DIVISION 26 – ELECTRICAL
26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical System 26 05 29 Hangers and Supports for Electrical System 26 05 33 Raceways and Boxes for Electrical Systems 26 05 53 Electrical Identification 26 05 19 Lighting Control Devices 26 05 73 Overcurrent Protective Device Coordination Study 26 09 43.23 Relay-Based Lighting Controls 26 24 13 Switch Boards 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 33 23.11 Central Battery Equipment For Emergency Lighting 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits 26 51 00 Interior Lighting
DIVISION 27 (Not Used)
DIVISION 28 – ELECTRONIC SAFETY & SECURITY
28 31 11 Addressable Fire-Alarm System
THRB - 154129 TOC-4
DIVISIONS 29-31 (Not Used)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 14 00 Unit Paving
APPENDICES
Hazmat Survey Volume I: Asbestos-Containing Materials, Radon & Universal Wastes Hazmat Survey Volume II: Lead-Based-Paint Survey
THRB – 154129 01 03 50 - 1
ASBESTOS CONTAINING MATERIALS & LEAD-BASED PAINT
SECTION 01 03 50 - ASBESTOS CONTAINING MATERIALS & LEAD BASED PAINT
PART 1 - GENERAL
1.1 SUMMARY
A. This Section provides information on known environmental hazards identified as being present, in the Theodore Roosevelt Birthplace Historic Site.
1. A copy of the two-volume Hazmat Survey – Environmental Planning & Management, Inc. – March 2007, which identifies the type, location and quantity of each environmental hazard is appended to the project specifications for the Contractor’s use.
B. Environmental hazards identified include asbestos containing materials and lead-containing paints.
C. If the Contractor identifies additional potential environmental hazards not addressed in the Report of Hazardous Materials Survey, notify the Contracting Officer immediately, so appropriate actions can be identified and completed prior to disturbing the materials.
1.2 ASBESTOS CONTAINING MATERIALS
A. The work related to asbestos containing materials includes, but is not necessarily limited to the following:
1. Preparation of an asbestos abatement design/plan for the removal of asbestos containing materials affected by the work, from the Theodore Roosevelt Birthplace Historic Site, by an AHERA certified project designer.
a. The following sections should be provided at a minimum:
1) Summary of Work.
2) Regulatory Compliance.
3) Documentation and Notification.
4) Materials and Equipment.
5) Asbestos Removal Procedures.
6) Work Area Cleanup and Clearance.
7) Completion of Abatement Work.
8) Asbestos Disposal.
9) Air Monitoring (Routine and Clearance Air Monitoring).
10) Personnel Protective Equipment and Personal Hygiene.
2. Provide for and incur cost of all permits and certifications for the asbestos abatement of all areas impacted by the work. Asbestos containing materials (ACM’s) have been identified in the following areas: intact pipe insulation (PI), intact mudded joint packing (MJP), PI and MJP debris on pipes, radiator insulation material, duct insulation material, gasket material associated with steam pipes/heat exchanger, floor tiles, linoleum flooring, flashing material, mastic material, caulk material, ebony board material and braided wire insulation (may be present in walls, floors and ceilings). Refer to HazMat Survey, listed above, for specific locations of the above materials within the building.
3. Removing asbestos containing materials from the Theodore Roosevelt Birthplace prior to renovation.
THRB – 154129 01 03 50 - 2
4. Loading, transporting and proper disposal of materials removed from the building to approved disposal sites.
5. Obtain a third party to conduct clearance air sampling and certify to the Contracting Officer that the Asbestos Containing Materials have been removed from areas impacted by the work, and that final clearance air sampling has been completed successfully.
B. Regulatory Compliance:
1. The Contractor shall assume full responsibility for compliance with all applicable Federal, State, and local regulations pertaining to work practices, hauling, disposal, and protection of the site.
a. The Contractor is responsible for providing medical examinations and maintaining records of personnel as required by the applicable Federal, State, and local regulations.
b. The Contractor shall hold the Contracting Officer harmless for failure to comply with any applicable work, hauling, disposal, safety, health, or other regulations on the part of himself, his employees, or his subcontractors.
2. The Contractor and its agents shall comply with all current federal, state, and local regulations and guidelines relating to demolition, removal, transportation, and disposal of asbestos containing materials; employee health and safety; and environmental protection.
a. These include, but are not limited to the following:
1) Occupational Safety and Health Administration (OSHA) Standards: Title 29 Code of Federal Regulations (CFR) Sections 1926.1101, 1910.134 and 1910.1200.
2) U.S. Environmental Protection Agency (EPA) Standards: Title 40 CFR, Part 61, Subpart M; Title 40 CFR, Part 763, Subpart E; Title 40 CFR Part 763, Subpart G.
3) New York State Environmental Laboratory Accreditation Program
(ELAP).
4) New York State Department of Labor (NYSDOL).
5) All other applicable Federal, State, and local laws, regulations and guidelines.
3. The regulations described in paragraph 2 must be strictly followed and are made part of these Technical Specifications by reference.
a. Compliance with these Technical Specifications does not relieve the Contractor from any obligations to comply with the regulations themselves.
b. If any conflicts arise between these Technical Specifications and the regulations, the more stringent requirements apply.
4. The Contractor shall employ on this project only trained and qualified employees proficient in asbestos abatement work and certified to perform such work by EPA and the New York City Department of Environmental Protection.
a. Copies of certificates for each worker and supervisor to be on the work site shall be delivered to the Contracting Officer prior to beginning any work.
1.3 LEAD-BASED PAINT
A. Renovation involving painted surfaces.
1. Testing indicates that the majority of the coatings at the Theodore Roosevelt Birthplace Historic Site contain lead.
THRB – 154129 01 03 50 - 3
B. Lead containing wastes should be sampled, tested, classified (hazardous or non-hazardous) and handled, transported, and disposed of accordingly.
1.4 CLOSEOUT SUBMITTALS
A. Manifests: Submit the following at the closeout of the Project:
1. Originals of all waste disposal manifests, seals, and disposal logs.
PART 2 - PRODUCTS
2.1 PRODUCTS:
A. Provide all containment materials needed to contain debris.
B. Supply the instrumentation needed for the monitoring of worker and area exposures, and environmental and waste sampling, including all equipment needed for control practices.
C. Provide all personal protective equipment (PPE) needed for the project.
D. Provide DOT-approved containers of the appropriate size and type for the hazardous waste generated during the project.
1. Provide all containers for non-hazardous construction waste.
2. Provide appropriate containers for storage of scrap steel recyclable materials.
3. Maintain all containers in good condition.
PART 3 - EXECUTION
3.1 GENERAL
A. Conduct the work in strict compliance with Federal, New York, and local regulations governing worker protection.
3.2 COMPLIANCE PROGRAM
A. Develop a written Compliance Program to establish and implement practices and procedures for protecting the health of those employees exposed to lead and other toxic metals contained in paint.
1. This program is in addition to other OSHA hazard communication and general safety and health requirements of the project.
2. Revise and update the program if changes in conditions result in new or increased worker exposures or modifications in the control practices.
B. Establish methods for complying with this section and any OSHA standards published for the toxic metals present in the paint (e.g., 29 CFR 1926.62 for lead).
C. Identify the methods of compliance that will be used to reduce worker exposures to toxic metals.
1. Rely on respiratory protection only after feasible engineering and work practice controls have been implemented to reduce airborne exposures.
D. Confirm that regular inspections of the work area will be made by a competent person.
THRB – 154129 01 03 50 - 4
1. Identify the project competent person by name in the compliance program and indicate the frequency of inspections that will be undertaken, not to be less than daily.
E. The compliance program will include at a minimum the following sections:
1. Exposure monitoring.
2. Action levels.
3. Permissible exposure limits.
4. Respiratory protection.
5. Protective clothing and equipment.
6. Housekeeping.
7. Personal hygiene.
8. Medical surveillance and medical removal protection.
9. Employee information and training.
10. Signs and regulated areas.
11. Record keeping.
3.3 ESTABLISHMENT OF REGULATED AREAS
A. Establish zones (regulated areas) around areas or activities that might generate airborne emissions of lead, or other toxic metals (e.g., paint removal and renovation activities, waste and recyclable material storage areas, etc.).
1. Use whatever means necessary to prohibit entrance into the regulated areas by unprotected or untrained personnel.
B. Conduct air sampling according to NIOSH 7082, or equivalent to establish regulated area(s).
1. Conduct sampling upon commencement of each phase of renovation activities.
2. Collect the samples throughout the entire work shift.
3.4 CONTROL OF DUST AND FUGITIVE EMISSIONS
A. Control fugitive dust so that at no time does it pass beyond the work area.
1. Emissions extending beyond a regulated area are cause for immediate project shutdown until the cause of the emissions is corrected.
2. Take all actions necessary to prevent fugitive dust from becoming airborne.
B. The Contracting Officer may undertake air monitoring during renovation activities to confirm that dust and fugitive emissions do not extend beyond the renovation area.
3.5 WORK PRACTICES
A. General:
1. Implement work practices that control worker exposures to lead, other toxic metals, and other hazardous materials and prevents the dispersion of fugitive emissions.
2. Use containment materials as needed to control dust emissions and to facilitate the collection of the debris for proper disposal.
B. Torch Cutting, Burning, and Welding:
THRB – 154129 01 03 50 - 5
1. Prior to torch cutting, burning, or welding on a surface coated with paint containing lead or other toxic metals, remove the paint for a distance of at least 4 IN from both sides of and in either direction from the area of heat application as required by 29 CFR 1926.354, or provide local ventilation.
a. If local ventilation is used and the air is discharged into the work environment, utilize HEPA filtration on the exhaust air.
C. Mechanical and Manual Renovation:
1. Apply water or dust control agents to the ceilings, walls and other painted surfaces, as necessary, prior to commencing renovation.
2. Containerize all construction/renovation waste at the end of each shift of operation, or more frequently if required to control fugitive emissions.
3.6 WASTE CLASSIFICATION, HANDLING, AND DISPOSAL
A. General:
1. The National Park Service is the generator of the hazardous waste for permitting purposes, and will provide the EPA identification number, but the Contractor is responsible for the sampling, testing, handling, storage, transportation and disposal of all wastes (hazardous and non-hazardous), and handling of recyclable materials until their placement for reclamation.
a. The National Park Service will provide signatures on hazardous waste manifests.
2. Conduct the work in strict accordance with Federal (40 CFR 261-268), Pennsylvania, and local regulations governing the handling, transportation and disposal of waste.
3. All materials that are not recycled should be treated as waste.
a. Prepare an MSDS to accompany all shipments of recyclable materials identifying the toxic metals that are present.
B. Waste Sampling, Testing and Classification:
1. Collect representative samples of each type of debris generated by renovation activities.
a. Collect samples in accordance with SW-846, “Test Methods for Evaluating
Solid Waste – Physical/Chemical Methods.”
b. Describe the sampling methods in a written program.
c. A minimum of four samples of each type of waste stream must be collected and analyzed.
2. Have the testing conducted in accordance with 40 CFR 61, Appendix II, Method
1311 Toxicity Characteristic Leaching Procedure (TCLP), to determine if it is hazardous.
a. Analyze the samples for all eight (8) metals and other hazardous substances.
b. Have all testing performed by a qualified laboratory acceptable to the
Contracting Officer.
3. Debris is classified as hazardous waste if, after testing by TCLP, the leachate contains any of the 8 metals or other hazardous substance in concentrations at or above limits established in 40 CFR 261.
C. Waste Storage, Transportation, and Disposal:
1. Comply with 40 CFR 262 regulations for the on-site handling and storage of all hazardous waste generated by the project.
THRB – 154129 01 03 50 - 6
2. Store non-hazardous waste separately from hazardous waste.
3. Train all personnel in the proper handling of the hazardous waste at the work area in accordance with 40 CFR 265.16.
4. Store waste on-site no longer than 90 days.
5. Arrange for the transportation of all hazardous waste by a licensed transporter in accordance with 40 CFR 263 and 49 CFR 171-179.
a. Provide the name, address, and qualifications of the licensed transporter to the
Contracting Officer.
6. Arrange for disposal of all hazardous waste in accordance with 40 CFR 264 and 40
CFR 268.
a. Verify that only licensed treatment, storage and disposal (TSD) facilities are used.
b. Provide the name, address and qualifications of the TSD facility to the
Contracting Officer.
7. Comply with all the manifesting, certification, and reporting requirements of 40
CFR 262 and 40 CFR 268, including certificates of final disposal for each shipment.
8. At no time can any waste generated from the demolition of painted surfaces be disposed of as clean fill.
9. Transport and dispose of all non-hazardous wastes in accordance with New York Regulations.
D. Wastewater:
1. Containerize, filter (5 microns or less), test and dispose of water generated at the site including but not limited to water used for hygiene purposes and cleanup activities.
2. Following filtration, test the water for total lead, arsenic, and cadmium.
3. Arrange for and complete the discharge of the waste water to the WWTP.
a. Additional treatment may be required to meet discharge standards.
E. Labeling:
1. Until the TCLP results are received, label the containers as debris containing lead (or other toxic metals as appropriate).
a. Apply hazardous waste labels after the test results are received, if required.
2. Label each container or roll-off of hazardous waste in accordance with U.S.
Department of Transportation Regulations.
3. All labeling, marking, and placarding are the responsibility of the Contractor.
END OF SECTION 01 03 50
THRB - 154129 01 11 00 - 1
031414 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Government Furnished Materials.
3. Contractor use of site.
4. Public use of site.
5. Occupancy requirements for buildings.
6. Conduct of Operations.
7. Work Restrictions.
8. Special Construction Requirements.
9. Additional Reports.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Theodore Roosevelt Birthplace National Historic Site, 28 E. 20th Street, New York, NY.
B. The Work consist of, but is not limited to the following:
1. Hazardous Material Abatement: Prior to start of construction, asbestos containing materials must be removed from limited areas to be impacted by the work. Refer to article 1.10, this Section, for information regarding types and location of hazardous materials within the building. During construction, provide containment and proper disposal of lead-based paint debris in disturbed areas, in addition to personal protective equipment and monitoring of workers.
2. Fire Protection Work includes installing a new fire protection service, fire system boosting pump, and sprinkler protection throughout all levels of the building. The service will be picked-up from a point in the street and extended into the building, requiring trenching. A standpipe for fire department use will be furnished and installed. Patching of flat and ornamental plaster and architectural woodwork is required.
3. Electrical Work includes preparing the existing service for future upgrading, and installing a new electrical distribution system and emergency egress lighting and signage throughout the building. All active branch circuit wiring and devices will be replaced.
Furnish and install all material and equipment for power to the new wheel chair lifts.
Existing light fixtures will be rewired and reinstalled. A new fire alarm system will be furnished and installed.
4. Plumbing Work includes furnishing and installing a new backflow preventer on the domestic water service, new fixtures for ground and 3rd floor restroom renovations, THRB - 154129 01 11 00 - 2 additional interior drains for the new fire suppression system, and an additional exterior drain in the lift pit.
5. Egress Improvements include addition of fire-separation elements, including new doors with closers and hold-open devices, and interior fire-rated glass and framing assemblies.
Some existing doors are to be removed. Paired exit doors are to receive new dual acting operators and magnetic security locks. The fire escape is to be modified to provide new or improved access landings at the 1st, 2nd, and 3rd floors. Two rear window opening are to be modified to provide exit doors, and the architectural woodwork to be reconfigured accordingly.
6. Accessibility Improvements include modifications to planter walls at the westward street entrance to provide a paved path to a new vertical exterior platform lift. Ornamental iron railings are to be reconfigured accordingly, and new handrails provided. The ground level museum floor is to be raised level with the adjacent ground floor, by provision of an over-built floor assembly integrated around the existing exhibit cabinetry. Restrooms at the ground and 3rd floors are to be fully renovated to comply with current accessibility standards. An inclined wheelchair lift is to be provided at the stair connecting 3rd and 4th floors, and a portable wheelchair lift for 4th floor stage access. A portable threshold ramp is to be provided for use at the second floor.
7. The project scope also includes painting, concrete work, gypsum board assemblies, metal doors, and brick work.
C. Project will be constructed under a single prime contract.
1.3 GOVERNMENT-FURNISHED MATERIALS
A. Government will furnish products indicated.
1. Government will arrange and pay for delivery of Government-furnished items according to Contractor's Construction Schedule.
2. After delivery, Government will inspect delivered items for damage. Contractor shall be present for and assist in Government's inspection.
3. If Government-furnished items are damaged, defective, or missing, Government will arrange for replacement.
4. Contractor is responsible for receiving, unloading, and handling Government-furnished items at Project site.
5. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.
7. Contractor shall install and otherwise incorporate Government-furnished items into the Work.
B. Government-Furnished Products:
1. The Park will furnish free standing waste containers for each toilet room to be remodeled.
THRB - 154129 01 11 00 - 3
2. Toilet room liquid-soap dispensers shall be supplied by Park Service Maintenance contractor and installed by Contractor.
1.4 CONTRACTOR USE OF SITE
A. General: Contractor shall have full use of the site for construction operations during the construction period. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
B. Open Flames: No open flames are permitted within the building during construction.
C. Storage of Materials: Confine storage of materials to areas within the building preapproved by the Contracting Officer. The west side of the basement is preapproved for material storage by Contractor.
D. Entrances: The east-side staff door is preferred for Contractor’s general entrance. The connecting service corridor provides ready access to the basement for Contractor staging. Where this hall is too narrow, the visitors’ ground floor entrance may be used. Keep entrances serving premises clear and available to Government, Government's employees, and City emergency personnel at all times.
Do not use these areas for storage of materials.
1. Schedule deliveries to minimize use of entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Construction Camp: Establishment of a camp within the premises will not be permitted.
F. Hauling Restrictions: Comply with all City and State load restrictions in the hauling of materials.
A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
1.5 PUBLIC USE OF SITE
A. The building will be closed to the public during construction.
1.6 OCCUPANCY REQUIRMENTS FOR BUILIDINGS
A. Existing Buildings
1. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government’s operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
THRB - 154129 01 11 00 - 4
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
1.7 CONDUCT OF OPERATIONS
A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Refer to www.nps.gov/thrb/parkmgmt/lawsandpolicies.htm.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 24 hours in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.8 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated.
1. Weekend Hours: As established during the Preconstruction Conference.
2. Early Morning Hours: As established during the Preconstruction Conference.
3. Hours for core drilling and other noisy activity: As established during the
Preconstruction Conference.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Hours for Utility Shutdowns: As established during the Preconstruction Conference.
D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
THRB - 154129 01 11 00 - 5
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.
1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.
1.10 ADDITIONAL REPORTS
A. Reports entitled Hazmat Survey Volume I: Asbestos-Containing Materials, Radon and Universal Wastes, and Hazmat Survey Volume II: Lead-based-Paint Survey have been prepared by Environmental Planning & Management, Inc.
B. Copies of the reports are available to all plan holders with this package.
C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
THRB - 154129 01 26 01 - 1
031414 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager, Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
THRB - 154129 01 26 01 - 2
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:
1) Social Security
2) Medicare
3) Workers Compensation– Policy and company calculation to be made available.
4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.
5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.
THRB - 154129 01 26 01 - 3
6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm%23ct
THRB - 154129 01 26 01 - 4
Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.
Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS.
All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.
Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region) http://www.nps.gov/dscw/publicforms.htm%23ct
THRB - 154129 01 26 01 - 5
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit……………… 7.50%
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
THRB - 154129 01 26 01 - 6
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 012601
THRB - 154129 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No.1 – Foundations.
1. This item consists of all trenching and patching of slabs for electric to fire pump;
concrete encasement of feeder to fire pump; cutting, coring, patching of bathroom slabs;
and new concrete pad at fire pump.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item No.2 – Superstructure.
1. This item consists of cutting, coring, and patching of interior concrete floors for MEP penetrations not covered in contract Line Item No. 1; light gage steel framing and plywood sheathing for raised museum floor; and glass partition at Ground floor hearth opening..
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item No.3 – Exterior Enclosure.
1. This item consists of modifying masonry openings, and new exit doors and hardware for modified openings.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
D. Contract Line Item No.4 – Interior Construction.
1. This item consists of modifying interior masonry openings; fire rated gypsum board partitions; cutting, patching & sealing of walls as required for pipe penetrations; cores, sleeves and sealant at masonry walls for sprinkler mains; cutting & patching of finishes
THRB - 154129 01 27 00 - 2
for new wiring, lights & electrical equipment; temporary protection of floors and stairs;
and protection of furniture, fixtures and equipment.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
E. Contract Line Item No.5 – Stairs.
1. This item consists of all steel framing and floor grating at fire escape; modifying porch wood lattice; painted steel pipe rail at new fire escape landing & treads; and at existing stair.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
F. Contract Line Item No.6 – Interior Finishes.
1. This item consists of modifying/reinstalling wood molding, paneling & plaster at modified openings and for sprinkler pipe installation; ceramic tile walls; cutting & patching of plaster walls, ceilings & moldings; new veneer plaster ceilings; painting and finishing of disturbed walls; new ceramic tile floors; new wood and sheet carpet floors;
portable threshold ramps.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
G. Contract Line Item No.7 – Conveying Systems.
1. This item consists of exterior chair lift; inclined interior wheel chair lift; portable chair lift at stage.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
H. Contract Line Item No.8 – Plumbing Systems.
1. This item consists of bathroom fixtures; drinking fountain; floor drains; sewerage ejector with pit; and domestic water distribution, including pipe insulation and connecting to existing.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
I. Contract Line Item No.9 – HVAC.
1. This item consists of modifying distribution as required at bathrooms and for new electrical & plumbing work.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
J. Contract Line Item No.10 – Fire Protection.
1. This item consists of all sprinkler system work including backflow preventer, meter & valves; fire pump & jockey pump with controllers; Siamese connection; hose valves; dry pipe valve; piping, heads & testing.
2. Measurement for payment will be by lump sum.
THRB - 154129 01 27 00 - 3
3. Payment will be made at the contract lump sum price.
K. Contract Line Item No.11 – Electrical.
1. This item consists of all electrical service and distribution work.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
L. Contract Line Item No.12 – Selective Building Demolition.
1. This item consists of all building demolition work & hazardous materials abatement.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
M. Contract Line Item No.13 – Site Preparation.
1. This item consists of demolishing stone planter wall and adjacent concrete slab and paving; excavation for foundations; compacted fill; and grading and prep work for new slabs.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
N. Contract Line Item No.14 – Site Improvements.
1. This item consists of all exterior site improvements including concrete footings, walls & slabs; pavers; repair mortar; bronze handrail; cleaning & pointing; sealant; signage; and modifying entry door opening.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
O. Contract Line Item No.15 – Site Mechanical Utilities.
1. This item consists of installing a new service water supply pipe, including excavation, backfilling & shoring and paving restoration; and piping and an area drain for the exterior lift.
2. Measurement for payment will be by lump sum.
3. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
THRB - 154129 01 31 00 - 1
031414 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination.
3. Submittals
4. Requests for Information (RFIs).
5. NPS/DSC SharePoint Project Website.
6. Project meetings.
7. Environmental Coordination.
8. Permits
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.
4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with
Owner’s Commissioning Authority.
1.2 DEFINITIONS
A. Authority Having Jurisdiction (AHJ): An AHJ is an agency that has been granted legal authority over a location, action or resource. This authority includes the ability to issue a permit or other legal permission document.
B. Construction Permits: Are those permits obtained by the contractor based on means and methods used to execute the work. Construction Permits are issued to the Contractor and not to the National Park Service (NPS).
C. Government Furnished Permits: Are those permits that are obtained by NPS during the design process and provided to the Contractor for compliance with the provisions through construction.
These permits may address impacts to natural resources, construction stormwater, etc.
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate
THRB - 154129 01 31 00 - 2
construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best…