Site_Visit_Questions.pdf
PDF 122 KB Posted
- Solicitation number
- P15PS00830
About this file
Site Visit Q A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_004.pdf | ||
| Amendment__004_RFI_Questions.pdf | ||
| Sol_P15PS00830_Amd_000004.pdf | ||
| Sol_P15PS00830_Amd_000003.pdf | ||
| Amendment_0003_RFP.pdf | ||
| Amendment__003_RFI_Questions.pdf | ||
| Bid_Schedule_REVISED_6.19.2015.pdf | ||
| SAP_Template.pdf | ||
| P15PS00830_Amend_02.pdf | ||
| Sol_P15PS00830_Amd_000002.pdf | ||
| Site_Visit_Questions__2.pdf | ||
| SF_30_Amendment_0001_-_P15PS00830.pdf | ||
| SV_Sign_In_Sheet_Utility_Map.pdf | ||
| Sol_P15PS00830_Amd_000001.pdf | ||
| SOW_FINAL.pdf | ||
| Past_Performance_Questinnaire.docx | DOCX document | |
| A1_Bid_Schedule__Impacted_Soil_Remediation__-_Copy_(4).pdf | ||
| A5_Bid_Bond_SF_24.pdf | ||
| Lower_Keweah_Solicitation_FINAL_5-20-15_(1).pdf | ||
| Key_Personnel_Qualifications.docx | DOCX document | |
| General_References.docx | DOCX document | |
| Submittal_Instructions.pdf | ||
| A3_EECA_Report_FINAL.pdf | ||
| Sol_P15PS00830.pdf | ||
| A9_Wages_DB.pdf | ||
| Subcontractor_Reference.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
Santa Monica Mountains National Recreation Area
401 West Hillcrest Drive
Thousand Oaks, California 91360
June 3, 2015
Memorandum
To: Contractor(s)
From: Project Manager, PWR/Sequoia and Kings Canyon National Parks
Subject: Lower Keweah Soil Remediation
Solicitation Number P15PS00830
Site Visit Question & Answer
Q1- Can branches of the trees be removed for access?
A1- See SOW para 3.7.1 and 5.3.
Q2- What is the area to be returned to after construction?
A2 See SOW para 3.7.1
Q3- Can we ask/submit our questions (in RFI format) and by when?
A3- Yes. We would like to receive all questions by 6/12/2015.
Q4- Can you clarify EECA Report 4.3.10 of SOW, regarding the weight to volume ratio for the waste material to be removed, as it does not calculate correctly
A4- Attachment D of the Final Engineering Evaluation/Cost Analysis Report assumed a standard ratio of 1.5 tons per cubic yard. There is a total of 3,139 tons estimated for the
2,180 cubic yards of waste material volume.
Q5- Will existing trees need to be removed and what is to be done with them?
A5- See SOW para 3.7.1 and 5.3.
Q6- Is there a place to fill water trucks? Where can contractors get water to hall in?
A6- The NPS will not provide water.
Q7- Can we get a copy of Utility Map?
A7- Yes, attached in this amendment.
Q8- Can you please clarify the Competitive Range, as a cost estimate is contained on page 58 of
EECA?
A8- Estimates stated in the report are not the Government's estimate. These are estimates developed by the consultant for various options. The Government's estimate is between $500K and $1M as stated in the solicitation.