Contract Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_004.pdf | ||
| Amendment__004_RFI_Questions.pdf | ||
| Sol_P15PS00830_Amd_000004.pdf | ||
| Sol_P15PS00830_Amd_000003.pdf | ||
| Amendment_0003_RFP.pdf | ||
| Amendment__003_RFI_Questions.pdf | ||
| Bid_Schedule_REVISED_6.19.2015.pdf | ||
| SAP_Template.pdf | ||
| P15PS00830_Amend_02.pdf | ||
| Sol_P15PS00830_Amd_000002.pdf | ||
| Site_Visit_Questions__2.pdf | ||
| SF_30_Amendment_0001_-_P15PS00830.pdf | ||
| SV_Sign_In_Sheet_Utility_Map.pdf | ||
| Sol_P15PS00830_Amd_000001.pdf | ||
| Site_Visit_Questions.pdf | ||
| SOW_FINAL.pdf | ||
| Past_Performance_Questinnaire.docx | DOCX document | |
| A5_Bid_Bond_SF_24.pdf | ||
| Lower_Keweah_Solicitation_FINAL_5-20-15_(1).pdf | ||
| Key_Personnel_Qualifications.docx | DOCX document | |
| General_References.docx | DOCX document | |
| Submittal_Instructions.pdf | ||
| A3_EECA_Report_FINAL.pdf | ||
| Sol_P15PS00830.pdf | ||
| A9_Wages_DB.pdf | ||
| Subcontractor_Reference.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE SCHEDULE
SOLICITATION NO. P15PS00830
PROJECT AREA: SEQUOIA AND KINGS CANYON NATIONAL PARK
PROJECT TITLE: IMPACTED SOIL REMEDIATION
NOTICE: Offers’ are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Additive line items. Failure to do so may render this proposal unacceptable. On lump-sum (LS) line items, provide the total price only. For all unit-price (UP) line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars.
CONTRACT
LINE ITEM
NUMBER
(CLIN)
CONTRACT LINE ITEM TITLE
QTY
UNIT
PRICE
UNIT OF
MEASURE
TOTAL
PRICE
Prepare Schedule and Conduct Conference Call
1 $ Lump
Prepare Plans – Project Plans/Action Plan, Site Specific Health and Safety Plan, and Sampling and Analysis Plan HASP, Sampling and Analysis Plan
1 $ Lump
3.1 Removal Actions – Clear and Stockpile, Confirmation Sample Collection and Analysis, Load Trucks
1 $ Lump
3.2.1 Transportation – Non-Hazardous Waste Transport to Landfill
1 $ Trip
3.2.2 Transportation – Hazardous Regulated Waste Transport to RCRA Landfill
1 $ Trip
3.2.3
Disposal – Disposal Fees for Non- Hazardous Waste
1 $ Ton
3.2.4 Disposal – Disposal Fees for Hazardous Regulated Waste
1 $ Ton
4 Composite Sampling 1 $ Lump $
5 Site Survey 1 N/A
6 Meetings/Conference Calls 1 $ Lump $ 7 Prepare Reports 1 $ Lump $
TOTAL PROPOSED PRICE