Bid_Schedule_REVISED_6.19.2015.pdf

PDF 262 KB Posted

Attached to
Impacted Soil Remediation at Sequoia and Kings Canyon National Park
Solicitation number
P15PS00830
Issued by

About this file

Revised Bid Schedule

View the file

Other files

File Type Posted
Amendment_004.pdf PDF
Amendment__004_RFI_Questions.pdf PDF
Sol_P15PS00830_Amd_000004.pdf PDF
Sol_P15PS00830_Amd_000003.pdf PDF
Amendment_0003_RFP.pdf PDF
Amendment__003_RFI_Questions.pdf PDF
SAP_Template.pdf PDF
P15PS00830_Amend_02.pdf PDF
Sol_P15PS00830_Amd_000002.pdf PDF
Site_Visit_Questions__2.pdf PDF
SF_30_Amendment_0001_-_P15PS00830.pdf PDF
SV_Sign_In_Sheet_Utility_Map.pdf PDF
Sol_P15PS00830_Amd_000001.pdf PDF
Site_Visit_Questions.pdf PDF
SOW_FINAL.pdf PDF
Past_Performance_Questinnaire.docx DOCX document
A1_Bid_Schedule__Impacted_Soil_Remediation__-_Copy_(4).pdf PDF
A5_Bid_Bond_SF_24.pdf PDF
Lower_Keweah_Solicitation_FINAL_5-20-15_(1).pdf PDF
Key_Personnel_Qualifications.docx DOCX document
General_References.docx DOCX document
Submittal_Instructions.pdf PDF
A3_EECA_Report_FINAL.pdf PDF
Sol_P15PS00830.pdf PDF
A9_Wages_DB.pdf PDF
Subcontractor_Reference.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT BID SCHEDULE

Solicitation No. P15PS00830

SOLICITATION NO.

PROJECT AREA: SEQUOIA AND KINGS CANYON NATIONAL PARK

PROJECT TITLE: IMPACTED SOIL REMEDIATION

NOTICE: Refer to FAR clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Submit pricing for base price and all options.

Failure to do so may render the proposal unacceptable. On lump sum items, provide total price only; on unit price items, provide the unit price and the extended amount.If no item exists for a portion of the work, include the costs in a related item. In case of error in extension prices, unit governs. In case of errors in summations, the total of the corrected amounts govern. Limit amounts to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the Notice to Proceed.

Options may be exercised in any combination, order, or grouping deemed in the judgement of the Contracting Officer to offer the best advantage (value) in goods and services for the dollar.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM

TITLE

QTY UNIT

PRICE

UNIT OF

MEASURE

TOTAL PRICE

Base

Project Mob and Demob 1 Lump Sum N/A

Base

Tasks 1 and 2--Prepare Plans –

Project Plans/Action Plan, Site

Specific Health and Safety Plan, and Sampling and Analysis Plan

HASP, Sampling and Analysis

Plan IAW SOW paragraphs 4.1 &

4.2

1 Lump Sum N/A

Base

Task 3--Removal Actions – Clear and Stockpile, Confirmation

Sample Collection and Analysis, Load Trucks IAW SOW paragraphs 4.3.3, 4.3.4 and 4.3.5.

1 Lump Sum N/A

Base

Task 3 -- Stockpiling and

Sampling IAW paragraphs 4.3.1 to 4.3.5

1 Lump Sum N/A

Base

Task 3 – Transport Hazardous

Regulated Waste Transport to

RCRA Landfill IAW SOW paragraphs 4.3.5 to 4.3.7, maximum 3,300 tons

3,300 Tons

Option

OPTION ITEM: Task 3 --

Transport Hazardous Regulated

Waste Transport to RCRA

Landfill IAW SOW paragraphs

4.3.5 to 4.3.7. This option is for transportation of hazardous waste in excess the quantity in CLIN

0005. Option may be exercised to a maximum 3,300 tons.

1 Tons

N/A

0007 Task 3 -- Disposal Fees for 3,300 Tons $_____________ $_____________

Base Hazardous Regulated Waste transported IAW SOW paragraph

4.3.5 to 4.3.7

Option

Option Item -- Disposal Fees for

Hazardous Regulated Waste transported IAW SOW paragraph

4.3.5 to 4.3.7. This option provides for disposal fees when option item 0006 is awarded and will typically be awarded in the same quanity.

1 Tons

N/A

Base

Task 4 -- Composite Sampling

IAW SOW paragraph 4.4 1 Lump Sum N/A

Base

Task 6 -- Meetings/Conference

Calls IAW SOW paragraph 4.6 1 Lump Sum N/A

Base

Task 7 -- Prepare Reports IAW paragraph 4.7 1 Lump Sum N/A

Base

Task 8 -- Final Inspection &

Closeout IAW SOW paragraph

4.8.1 and 4.8.2.

1 Lump Sum N/A

TOTAL PROPOSED PRICE

(Contract Line Item Numbers 0001 through 0012) $_____________