Amendment__004_RFI_Questions.pdf

PDF 140 KB Posted

Attached to
Impacted Soil Remediation at Sequoia and Kings Canyon National Park
Solicitation number
P15PS00830
Issued by

About this file

RFI Questions Amendment 004

View the file

Other files

File Type Posted
Amendment_004.pdf PDF
Sol_P15PS00830_Amd_000004.pdf PDF
Sol_P15PS00830_Amd_000003.pdf PDF
Amendment_0003_RFP.pdf PDF
Amendment__003_RFI_Questions.pdf PDF
Bid_Schedule_REVISED_6.19.2015.pdf PDF
SAP_Template.pdf PDF
P15PS00830_Amend_02.pdf PDF
Sol_P15PS00830_Amd_000002.pdf PDF
Site_Visit_Questions__2.pdf PDF
SF_30_Amendment_0001_-_P15PS00830.pdf PDF
SV_Sign_In_Sheet_Utility_Map.pdf PDF
Sol_P15PS00830_Amd_000001.pdf PDF
Site_Visit_Questions.pdf PDF
SOW_FINAL.pdf PDF
Past_Performance_Questinnaire.docx DOCX document
A1_Bid_Schedule__Impacted_Soil_Remediation__-_Copy_(4).pdf PDF
A5_Bid_Bond_SF_24.pdf PDF
Lower_Keweah_Solicitation_FINAL_5-20-15_(1).pdf PDF
Key_Personnel_Qualifications.docx DOCX document
General_References.docx DOCX document
Submittal_Instructions.pdf PDF
A3_EECA_Report_FINAL.pdf PDF
Sol_P15PS00830.pdf PDF
A9_Wages_DB.pdf PDF
Subcontractor_Reference.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

Santa Monica Mountains National Recreation Area

401 West Hillcrest Drive

Thousand Oaks, California 91360

IN REPLY REFER TO:

S7215 (PWR)

June 24, 2015

Memorandum

To: Contractor(s)

From: Operations/Environmental Programs Branch Chief, PWR-San

San Francisco

Subject: Lowe Kaweah Soil Remediation- Solicitation Number P15PS00830;

RFI Response for Question Received, Through 6/24/2015

1. Will construction water be available?

A1. No, see SOW paragraph 6.13.3.

2. Are As-Built available for existing utilities within site?

A2. No.

3. Who is responsible for trimming of existing trees in conflict with site access? If contractor please establish guidelines.

A3. Contractor, see SOW paragraph 3.7.1

4. There appears to be a error within the estimate of earthwork quantities, please review and confirm.

A4. See revised bid schedule.

5. There appears to be an error within the estimate of engineer's estimate of project value, please review and confirm.

A5. Operations/Environmental Programs Branch Chief does not understand the question.

6. Existing trees within excavation will require removal, please establish guidelines for expectable removal and disposal.

A6. See SOW paragraph 3.7.1

7. Will the overflow parking area adjacent to work site be designated for staging? If so, how much?

A7. Yes. See amendment #002, question #10. Allocation can be made based on need/availability.

8. Past Performance Factor: Does offeror have to submit a past performance questionnaire to their clients in order to get a rating or will the NPS acquire that rating themselves? If offeror has to acquire a completed past performance questionnaire from the client, is it acceptable to submit an already completed past performance questionnaire from a previous submittal?

A8. Answered in previous amendment

9. Since a utility map is provided, does the contractor need to conduct underground utility locating?

A9. See SOW paragraph 5.5

10. In response to A9 and A31, do we apply the 1.5 tons/CY to the 2,220 CY or to the 594 tons? Which number is the correct basis?

A10. Apply the 1.5 tons/CY.

11. In Key Personnel, an "Environmental Engineer" is called out. Since California does not offer a PE license for Environmental Engineering, what engineering disciplines are acceptable?

A11. A discipline with commensurate approved training & qualifications