P152 ATCT Price Schedule BLANK May 4 2021 revised.pdf
PDF 124 KB Posted
- Attached to
- P152 AIR TRAFFIC CONTROL TOWER DESIGN BID BUILD
- Solicitation number
- N4008021R7290
About this file
This price schedule outlines pricing requirements for the construction of a new air traffic control tower at Naval Air Station Patuxent Webster Outlying Field in St. Inigoes, Maryland. The Navy seeks a firm fixed price for the base bid to construct a new ATCT and demolish the existing tower in accordance with the drawings and specifications. Optional line items include pricing for an electronic security system and furnishings, fixtures, and equipment. For the FF&E option, offerors must propose a handling and administrative rate not to exceed 5% to cover associated costs for the coordination and installation of FF&E. The total estimated budget for FF&E is provided for informational purposes. The base bid period of performance is 578 calendar days from notice to proceed. The solicitation number is N4008021R7290 and offers are valid for 90 days.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
N40080-21-R-7290
May 4, 2021
P-152, DBB, Air Traffic Control Tower (ATCT)
Naval Air Station Patuxent, Webster Outlying Field, St. Inigoes, MD
ITEM DESCRIPTION PRICE
0001 BASE BID: Total Price for Item 0001 $__________ New Air Traffic Control Tower (WON 1615009)
Basis of Bid for items 0001 shall be in accordance with the drawings and specifications, including constructing new
ATCT and demolishing existing ATCT, with the exceptions of Item 0002 Option 1 and Item 0003 Option 2.
0002 OPTION 1: Electronic Security System, Total Price for Item 0002 $ _________
Basis of Bid for Item 0002 Option 1 shall be in accordance with the drawings and specifications for the Electronic
Security Systems equipment with the exception of Item
0001, and Item 0003 Option 2.
0003 OPTION 2: FF&E, Total Price for Item 0003 $ __________
Basis of the Bid for Item 0003 shall be the establishment of a
Handling & Administrative Rate (HAR) for any possible future work associated with FF&E/Collateral Equipment (See Note 9 below).
1) FF&E Collateral Equipment
(BUDGET ONLY) $14,794
2) Handling and Administrative Rate (HAR)
(NTE 5%) ______% x 14,794.00 = $___________
3) Total FF& E Amount (1) + (2) = (3) $___________
TOTAL PRICE FOR ITEMS 0001 through 0003 $____________
General Notes:
1. Offeror shall provide a price for all items on the Price Schedule.
2. A firm fixed price is required for each item and no provision will be made for economic adjustments.
3. The Design Bid Build Budget rate is $10,000,000 to $15,000,000 includes for the base bid and options.
4. The Offeror’s price is valid for 90 days from the receipt of proposals.
5. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.
6. Option items may be awarded at time of award or within 365 days of award.
7. Total Contract duration for Base Bid is 578 calendar days from Notice to Proceed (NTP).
Should the Government choose to exercise any or all options, the contract duration will remain the same.
8. If option items are exercised after award, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all items.
9. 0003 Option Item: The total estimated budget amount for FF&E has been identified, to provide offerors with the projected magnitude of effort for FF&E. The FF&E Budget Amount is only an estimated amount. The contractor shall determine the final budget amount for the FF&E, during the post-award phase of the FF&E.
a. Offerors shall propose a Handling and Administration Rate (HAR) for the FF&E not to exceed (NTE) 5%. The HAR fee should account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of
FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate. The dollar amount of the HAR will change based on the actual, final amount for the FF&E determined during the post-award design phase of the FF&E.
b. If awarded, line item (1) under 0003 option item will be funded separately after completion of the FF&E design review by the Government, acceptance of FF&E package by the Government, and receipt of appropriate funding by the Government. The design effort and the development of the FF&E packages are performed by the Contractor under the Base Bid. See Administrative Specifications 01 30 01.00 22, including (but not limited to) FF&E Basis of Design CD for requirements and details.
c. The Government is not obligated to award the FF&E Option. Should the Government choose to award the FF&E, the Option will be awarded as a negotiated Modification to the contract/task order six months prior to the Occupant Date. The contractor’s proposed
HAR will be applied to all vendor/supplier costs for the FF&E.
d. It is the contractor responsibility to purchase, deliver, and install the FF&E without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions will be granted.
Name and address of Firm Submitting Offer:
Print Name;__________________________________
Signature: ___________________________________
Email: ______________________________________
ACKNOWLEDGEMENT OF AMENDMENT(S): ___________________________
File details come from the government source that posted it. Updated .