AMENDMENT 0005 P152.pdf
PDF 755 KB Posted
- Attached to
- P152 AIR TRAFFIC CONTROL TOWER DESIGN BID BUILD
- Solicitation number
- N4008021R7290
About this file
This amendment modifies a solicitation for the construction of a new Air Traffic Control Tower at Webster Outlying Field for the Department of the Navy Naval Facilities Engineering Command. The amendment extends the proposal due date to June 29, 2021 and provides responses to 31 questions from potential offerors. Key details include:
-
The project involves construction of a new ATCT to replace the existing tower, which will remain operational until the new tower is complete. Associated roads, parking, and utilities will also be constructed.
-
The amendment extends the proposal due date to June 29, 2021 while keeping the time of receipt unchanged. Responses are provided to 31 questions from offerors seeking clarification on plans, specifications, and requirements. Areas addressed include structural drawings, specifications, permitting, paving, fireproofing, and aircraft operating schedules.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40080-21-R-7290-P152 DESIGN BID BUILD (DBB) AIR TRAFFIC CONTROL TOWER (ATCT) WEBSTER OUTLYING FIELD (WOLF), NAVAL
AIR STATION, PATUXENT RIVER, SAINT INIGOES, MD
As an amendment to the solicitation the follow ing is hereby incorporated:
Proposal due date is extended to 29 June 2021 time remains unchange.
Responses to Request for Information (RFI).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008021R7290
X 9B. DATED (SEE ITEM 11)
05-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2021
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST.
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008021R7290
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
10. I have been reviewing the plans for this project and have been unable to locate the L1 louver. Would you be able to advise on which drawing(s) I would find the L1 louver?
GOVERNMENT RESPONSE: LOUVER L1 IS LOCATED ON THE SECOND LEVEL, SOUTH SIDE.
SEE ADDENDUM 1, SHEETS A-102 AND A-202
11. In the Solicitation, Offer, and Award, page 5 of 63, the first sentence under General states “This solicitation is being issued as unrestricted for full and open competition. The NAICS code for this procurement is 48811 and the size standard is $35M.” This NAICS code is for Airport Operations and as this is a construction project, is this the correct NAICS code?
GOVERNMENT RESPONSE: YES THIS IS CORRECT
12. In the Solicitation, Offer, and Award, page 6 of 63, under Time for Completion, the colander day value for the completion of the project is blank. What is the duration?
GOVERNMENT RESPONSE: TIME FOR COMPLETION IS 578 CALENDAR DAYS.
13. In the Solicitation, Offer, and Award, page 33of 63, Section 52.204-8 (a)(1) once again references the NAICS code of 488111. This NAICS code is for Air Traffic Control and as this is a construction project, is this the correct NAICS code?
GOVERNMENT RESPONSE: YES THIS IS CORRECT.
14. What is the status of the Maryland Department of the Environment (MDE) review of these plans and the anticipated approval?
GOVERNMENT RESPONSE: MDE HAS BEEN APPROVED AND PERMIT NUMBER IS 21-SF0030
15. On Sheet CD101, there is an area that is boxed by a heavy black line. What does this signify?
GOVERNMENT RESPONSE: GRAPHICAL ERROR. SHOULD HAVE BEEN AN LOD LINETYPE TO
INDICATE WORK NOT NEEDED IN THIS AREA.
16. On Sheet CS101, what type of paving is the 20-foot-wide driveway to the tower?
GOVERNMENT RESPONSE: THIS AREA SHOULD BE HEAVY DUTY ASPHALT. NOTE THAT THE
DETAILS TITLES FOR LIGHT DUTY AND HEAVY DUTY WERE INADVERTANTLY SWITCHED. SEE
ADDENDUM #1 SHEETS CS101 AND CS501 TO CLARIFY THE PAVEMENT SECTION AND
CORRECT THE DETAIL TITLES.
17. On Sheet CS501, where is detail B1/CS501 used?
GOVERNMENT RESPONSE: THE MOW STRIP DETAIL SHOWN ON CS501 IS SHOWN AS A HATCH
IN THE LEGEND ON CS101 AND ALONG THE NW AND SE CORNERS OF THE BUILDING. THE 3'
TYPICAL APPLIES TO THE NW LOCATION.
18. On sheet CS502, detail B2/C502 references that the concrete for the Emergency Access Road is to be 650 flexural concrete. Where in the specifications is this material described?
GOVERNMENT RESPONSE: SEE ADDENDUM #1 SHEET CS502 FOR ADDITIONAL INFORMATION.
19. On Sheet CG102, there is a plan view of the storm drain system. Are there profiles of these storm drain runs available?
GOVERNMENT RESPONSE: STORM DRAINS LESS THAN 12" WERE NOT PROFILED.
20. Section 03 30 00, Paragraph 1.5.1.1, pg. 654 of 1084.
Specification 03 30 00-1.5.1.1 notes epoxy coated reinforcing steel. The structural drawings only indicate to post installed epoxy anchors, no other concrete reinforcing is noted to be epoxy coated. If epoxy coated reinforcing is needed, please clarify where it is to be used, for instance should it be used in the exterior concrete walls of the tower per drawing S-101?
GOVERNMENT RESPONSE: EPOXY COATED REINFORCING IS NOT REQUIRED IN THIS
PROJECT.
21. Section 05 12 00, Paragraph 2.6.2 Shop Primer.
Specification 05 12 00-2.6.2 Shop Primer notes SSPC Paint 20 or SSPC Paint 29, (Zinc Rich Primer) for steel. Per UFGS 05 12 00, generally, for interior use, standard steel with minimum coating system of a shop primer is adequate. For Exterior environments or areas open to the exterior, galvanized steel or zinc rich is used. Please verify Zinc Rich Primer is desired or can a standard rust inhibitive shop primer be used per AISC (except at areas where fireproofing is required)?
GOVERNMENT RESPONSE: STANDARD RUST INHIBITIVE SHOP PRIMER IS ACCEPTABLE FOR
ALL INTERIOR STEEL, EXCEPT FOR AREAS WHERE FIRE PROOFING IS REQUIRED OR
EXTERIOR APPLICATIONS.
22. Section 07 81 00, Paragraph 1.3.2, pg. A1/510, D1/A513, Specification 07 81 00 Spray Applied Fireproofing section 1.3.2 Rating Schedule references 2 hour rating on floor decking (not required due to concrete thickness), stair enclosure supports and floor supports.
The current plans nor the addendum show or reference sprayed fireproofing on the details for these areas. Details similar to A1/510 or D1/A513 perimeter beam would not have access to apply sprayed fireproofing material. Please confirm if the structural steel components including HSS and Ledger steel supporting the floors require spray applied fireproofing?
GOVERNMENT RESPONSE: STRUCTURAL PLANS INDICATE LOCATIONS OF FIREPROOFED
STEEL BEAMS (FP). NFPA 101 7.1.3.2.1(6) REQUIRES STRUCTURAL MEMBERS SUPPORTING
EXIT COMPONENTS THAT PENETRATE INTO A FIRE RESISTANCE-RATED ASSEMBLY (2-HOUR
RATED STAIR ENCLOSURE) TO BE FIRE RATED.
23. Section 00100 – Bidding Schedule/Instructions to Bidders, Factor 1 - Experience, pg. 9.
Factor 1 states to use Experience Project Data Sheet (Attachment A) and that the form can not be more than 2 single-sided pages. This section also states to address any sustainable features for the project and include applicable documentation on the projects that were validated and/or certified.
Please confirm this documentation is not included within the 2 single-sided pages limitation.
GOVERNMENT RESPONSE: CONFIRMED
24. At this time, no Pre-Proposal Inquires (PPIs) have been answered. Please consider a three-week time extension along with an extension for submission of Pre-Proposal Inquiries to allow for more engagement with the small business subcontracting community.
GOVERNMENT RESPONSE: SEE PAGE 1 BLOCK 14.
25. Section – Architectural Plans, Sheet A-310.
Note 23 on Sheet A-310 calls out for “LATEX PAINT, VAPOR SEMI-PERMEABLE VAPOR RETARDER.”
Please confirm whether the paint product will contain a semi-permeable vapor retarder or if the paint and vapor retarder are two separate systems. If separate systems, please provide a specification section and a manufacturer for the vapor retarder.
GOVERNMENT RESPONSE: LATEX PAINT WILL ACT AS THE VAPOR RETARDER.
PER GENERAL SHEET NOTE 2 ON A310: PAINT APPLIED TO GWB AT EXTERIOR WALLS MUST
BE A CLASS III VAPOR SEMI-PERMEABLE VAPOR RETARDER WITH WATER VAPOR
PERMEANCE RATING GREATER THAN OR EQUAL TO 5 AND LESS THAN 10.
26. A-512.
View detail A1 on A-512. Please advise how the continuous air barrier for the tower will be maintained between the traffic coating on the catwalk and the insulated soffit panels underneath the catwalk?
Currently detail A1/A-512 is showing these two areas connected by a post facia mount plate only.
GOVERNMENT RESPONSE: REFER TO AIR BARRIER DIAGRAMS, A1/A002 AND A3/A002, AND
SECTION DETAILS, A1/A512 AND A1/A510. INSULATED SOFFIT PANELS UNDERNEATH
CATWALK ARE NOT PART OF CONTINUOUS AIR BARRIER.
27. A-201
The elevations on A-201 Show downspouts ending just below the level 6 line. Please confirm that the downspouts from the top of the tower are to terminate under the level 6 line and open discharge on the sides of the tower.
GOVERNMENT RESPONSE: REFER SECTION DETAIL A1/A512. DOWNSPOUTS EXTEND 3”
BEYOND BOTTOM OF INSULATED METAL PANEL.
28. A-611
Drawing A-611, Exterior Materials Finish Schedule, notes the CIP-1 is to be a “color to match exist Patuxent River Naval Air Station (PAX) ATCT Concrete Shaft, Design Drawings Dated 20 JUNE 2005”.
Please provide these drawings and provide the exact color needed to be in the concrete mix.
GOVERNMENT RESPONSE: REFER TO DETAIL B1/A611, EXISTING PAX ATCT
PHOTOGRAPHS, FOR EXISTING PAX ATCT CONCRETE SHAFT COLOR. PROVIDE COLOR TO
MATCH.
29. Section 01 35 13 – Special Project Requirements, Paragraph 3.1.2 – Schedule of Work/Aircraft Operating Schedules.
Paragraph 3.1.2 notes that the Government will exert every effort to schedule aircraft operations so as to permit maximum amount of time for contractor’s activities.
Please confirm if the contractor must cease operations as a result of aircraft operations per this paragraph, this event will be considered a differing site condition and will be treated as a compensable time for any delays per the FAR.
GOVERNMENT RESPONSE: CONFIRMED
30. Section 01 45 00.00 20 – Quality Control, Paragraph 1.5.4 – Alternate QC Manager Duties and Qualifications.
As required, the prime contractor must designate an alternate QC Manager to serve in the event of the QC Manager’s absence. The alternate QC Manager must have the same qualification requirements as the QC Manager.
Does the alternate QC Manager have to also be on site full time during construction when the QC Manager is present?
GOVERNMENT RESPONSE: NO
31. Specification 07 81 00, Paragraph 1.3.2
Specification section 07 81 00 “Spray Applied Fireproofing” – fire rating schedule states that floor decks and floor supports are to be two-hour fire rated. The structural drawings do have floor support members designated with “FP” for applied fireproofing. Please confirm that only the marked (FP) structural members are to receive applied fireproofing. Additionally, none of the floor decks in the structural drawing nor architectural drawings show applied fireproofing to the floor decks. Please confirm if applied fireproofing is required at the floor decks per specification section 078100.
GOVERNMENT RESPONSE: CONFIRMED. ONLY THE MARKED (FP) STRUCTURAL MEMBERS
ARE TO RECEIVE FIREPROOFING. FLOOR DECKS WILL BE 2-HOUR RATED AND UL-LISTED
THAT DO NOT REQUIRE SPRAY-APPLIED FIREPROOFING, AS REQUIRED BY UFC 3-60-01 7-
4.2.3.
END OF AMENDMENT 0005