This document is a comprehensive set of construction contract drawings and specifications for a system repair project at the Fargo VA Health Care System to prevent Legionella contamination. The project (437-23-165) is located at 2101 Elm Street, Fargo, North Dakota 58102, and is managed by the Department of Veterans Affairs Office of Construction and Facilities Management.

The project scope encompasses mechanical, plumbing, and electrical work across multiple buildings and floors to address water quality and safety concerns. Key deliverables include installation of new water monitoring/sampling stations (MS-1) with associated controllers, sensors, and analytical equipment; replacement of pedal-operated faucets with thermostatic mixing valves and sensor-operated fixtures at numerous locations throughout the facility; modification of existing water quality control boards; and replacement of power receptacles with GFCI quadraplex units. The mechanical work involves detailed plumbing modifications shown on sheets M-0.10 through M-1.41, including mixing valve installations, sink replacements, and water monitoring station demolition and installation details. Electrical work specified on sheets E-0.00 through E-2.00 requires new power connections, GFCI protection, and conduit work to support the monitoring stations. The drawings indicate work across basement levels (Wings A through E), Building 10 boiler plant, and multiple floors (first through fourth) of the primary building. An Infection Control Risk Assessment (ICRA) is detailed on sheet G-1.00, with control measures specified by precaution levels including containment barriers, negative pressurization requirements, and dust control protocols. Room finish schedules on sheet A-5.00 specify paint, tile, and flooring repairs required after plumbing installations. The contract documents were dated 02/14/2025 and prepared by Four Front Design, Inc. of Rapid City, South Dakota.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER PAGE

G-0.00

SYSTEM REPAIR TO PREVENT LEGIONELLA

PROJECT NO. 437-23-165

FARGO VA HEALTH CARE SYSTEM

DEPARTMENT OF VETERANS AFFAIRS

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

VA U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION SHEET INDEX

SHEET # SHEET TITLE

G-0.00 COVER PAGE

A-5.00 ROOM FINISH SCHEDULE

M-0.00 MECHANICAL GENERAL NOTES AND ABBREVIATIONS

M-0.10 SCHEDULES, MIXING VALVE DETAIL, SENSOR FAUCET & SINK DETAIL

M-1.01 BASEMENT WEST FLOOR PLAN

M-1.02 BASEMENT EAST FLOOR PLAN

M-1.03 BASEMENT SOUTH FLOOR PLAN

M-1.04 BUILDING 10 BOILER PLANT LOWER LEVEL PLAN

M-1.11 FIRST FLOOR NORTHWEST FLOOR PLAN

M-1.12 FIRST FLOOR SOUTHWEST FLOOR PLAN

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

M-1.13 FIRST FLOOR EAST FLOOR PLAN

M-1.14 FIRST FLOOR SOUTHEAST FLOOR PLAN

M-1.15 FIRST FLOOR INFUSION CENTER FLOOR PLAN

M-1.21 SECOND FLOOR NORTH FLOOR PLAN

M-1.22 SECOND FLOOR WEST FLOOR PLAN

M-1.23 SECOND FLOOR SOUTHWEST FLOOR PLAN

M-1.24 SECOND FLOOR EAST FLOOR PLAN

M-1.31 THIRD FLOOR FLOOR PLANS

M-1.41 FOURTH FLOOR NORTH FLOOR PLAN

E-0.00 ELECTRICAL LEGEND AND ABBREVIATIONS

E-1.00 BUILDING 1 BASEMENT ELECTRICAL PLANS, WINGS A,C

E-1.10 BUILDING 1 BASEMENT ELECTRICAL PLANS, WINGS D,E

M-0.20 PEDAL SINK AND FAUCET REPLACEMENT DETAILS

M-0.30 WATER MONITORING STATION DEMOLITION DETAIL

M-0.40 NEW WATER MONITORING STATION DETAILS

E-2.00 BUILDING 10 LEVEL 1 ELECTRICAL PLANS

G-1.00 INFECTION CONTROL RISK ASSESSMENT (ICRA)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text

RAYMOND E. DAWES

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

INFECTION CONTROL RISK

ASSESSMENT (ICRA)

G-1.00

Number Name ICRA Level

ROOMS & INFECTION CONTROL RISK ASSESSMENT (ICRA) LEVELS

1A CORRIDOR II

1A-30C SECTION LEADERS II

1D-06 EXAM ROOM 1 II

1D-07 EXAM ROOM 2 II

1D-126 HEALTH PROMOTION DISEASE PREVENTION II

1D-13 EXAM ROOM 5 II

1D-133 PACT SOCIAL WORKERS II

1D-14 EXAM ROOM 6 II

1D-18 EXAM ROOM 8 II

1D-20 BREAK ROOM II

1D-23 SOILED UTILITY II

1D-25 EXAM ROOM 12 II

1D-26 EXAM ROOM 13 II

1D-28 EXAM ROOM 15 II

1D-29 EXAM ROOM 14 II

1D-30 EXAM ROOM 16 II

1D-31 EXAM ROOM 17 II

1D-32 EXAM ROOM 18 II

1D-33 EXAM ROOM 19 II

2B-03 SOILED UTILITY II

2C-43 PROCEDURE ROOM 3 III

2C-44 PROCEDURE ROOM 2 III

2C-46 PRE OP III

2C-58A TOILET II

2C-70 ASSOCIATE CHIEF / NURSING SERVICE FOR OPERATIONS II

2C-72 CLC PSYCHOLOGIST II

2C-76 SOILED UTILITY II

3C-24 PATIENT INTAKE II

3C-26 BREAK ROOM II

3C-79 REPAIR SHOP II

3C-88 SLEEP LAB CONTROL ROOM II

3C-89 SLEEP STUDY 1 II

4B-36 RANGE PROGRAM II

1D-115 RESTROOM II

1D-117 RESTROOM II

1D-127A STAFF RESTROOM II

1D-127B STAFF RESTROOM II

1D-24 PROCEDURE ROOM 11 III

REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS

Level of Precautions Control Measures

Level I 1. 1. Perform work activity in a manner that does not create dust or interrupt patient care.

2. 2. Immediately replace any ceiling tile, close access panels, etc., upon completion of

3. work.

4. 3. Any materials and equipment being brought into the facility must be free of

5. contaminants and loose material.

Level II All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves/effects potable water systems including stagnation due to reduced usage, piping shall be flushed twice a week or isolated from main system.

5. Seal doors to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth & cleanable containers (w/ a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned & free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

11. Ensure no unauthorized access, by means of lock or continuous, direct supervision for site entry, until project completion.

Level III All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands.

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All barrier construction activities must be completed in a manner that prevents dust release.

4. Barriers must be hard barriers unless temporary to install final barrier. Barrier walls shall be inspected and approved prior to the start of demolition or construction. (If VA staff cannot inspect prior to 4:30PM, then the check will be the next business day.)

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A. These controls must be maintained continuously 24/7 for the duration of the project. HEPA-filtered exhaust if discharged directly to the outdoors must be at a distance of 25 feet or greater from entrances, air intakes, and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.

7. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Level IV All control measures in Levels I, II and III and the following:

1. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

2. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

3. Workers must wear shoe covers or have a method to clean shoes in anteroom.

Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

NotesNumber Name Floor Finish Base Finish North East South West Walls

ROOM FINISH SCHEDULE

1A CORRIDOR - - - - P1 - SINK LOCATION IS BETWEEN DOORS TO ROOMS 1A-24 & 1A-23. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 24 SF MINIMUM.

1A-30C SECTION LEADERS - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 112 SF MINIMUM.

1D-06 EXAM ROOM 1 - - - P5 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 80 SF MINIMUM.

1D-07 EXAM ROOM 2 - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 88 SF MINIMUM.

1D-126 HEALTH PROMOTION DISEASE PREVENTION - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

1D-13 EXAM ROOM 5 - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 88 SF MINIMUM.

1D-133 PACT SOCIAL WORKERS - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 152 SF MINIMUM.

1D-14 EXAM ROOM 6 - RB - - - P1 REPLACE RB ON WEST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-18 EXAM ROOM 8 - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-20 BREAK ROOM - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-23 SOILED UTILITY - RB - - - P2 REPLACE RB ON WEST WALL WITH BEDPAN WASHER, 40 SF MINIMUM.

1D-25 EXAM ROOM 12 - RB - P1 - - REPLACE ENTIRE LENGTH OF RB ON EAST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM..

1D-26 EXAM ROOM 13 - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-28 EXAM ROOM 15 - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-29 EXAM ROOM 14 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-30 EXAM ROOM 16 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

1D-31 EXAM ROOM 17 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 48 SF MINIMUM.

1D-32 EXAM ROOM 18 - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 108 SF MINIMUM.

1D-33 EXAM ROOM 19 - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 24 SF MINIMUM.

2B-03 SOILED UTILITY - - - PT2/PT2 COVE/PT2 BULLNOSE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

2C-43 PROCEDURE ROOM 3 - - - - P2 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

2C-44 PROCEDURE ROOM 2 WSF - - - - - REPLACE ENTIRE FLOOR IN ROOM, CORNER TO CORNER AND UP TOEKICK COVE. USE MANUFACTURER'S RECOMMENDED WELD ROD AND ACCESSORIES.

2C-46 PRE OP - - - - - PT1/PT1 COVE/PT1 BULLNOSE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

2C-58A TOILET - - - - - PT1/PT1 COVE/PT1 BULLNOSE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

2C-70 ASSOCIATE CHIEF / NURSING SERVICE FOR OPERATIONS - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

2C-72 CLC PSYCHOLOGIST - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.

2C-76 SOILED UTILITY - RB - - - P2 REPLACE ENTIRE LENGTH OF RB ON WEST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 64 SF MINIMUM.

3C-24 PATIENT INTAKE - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 56 SF MINIMUM.

3C-26 BREAK ROOM - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 64 SF MINIMUM.

3C-79 REPAIR SHOP - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

3C-88 SLEEP LAB CONTROL ROOM - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

3C-89 SLEEP STUDY 1 - - - - P4 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER 104 SF MINIMUM.

4B-36 RANGE PROGRAM - - P1 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 120 SF MINIMUM.

ROOM FINISH LEGEND

P1 P2 P3 P4 P5 P6

PT1

PT2

RB

SF

WSF

FIELD PAINT

FIELD PAINT

ACCENT PAINT

ACCENT PAINT

ACCENT PAINT

FIELD PAINT

PORCELAIN/CERAMIC TILE

PORCELAIN/CERAMIC TILE

RESILIENT BASE

SQUARE FEET

WELDED SHEET FLOORING

EXISTING

SHEET SPECIFIC NOTES:

1. ROOM FINISH SCHEDULE DENOTES WORK

AREAS AND CORRESPONDING FINISHES TO

PATCH.

2. SEE MECHANICAL SHEETS FOR SINK LOCATIONS.

3. PAINT COLORS NOTED FOR BASIS OF DESIGN.

CONTRACTOR TO VERIFY IN FIELD.

4. TILE COLORS NOTED FOR BASIS OF DESIGN.

CONTRACTOR TO VERIFY IN FIELD.

5. RESILIENT BASE COLOR NOTED FOR BASIS OF

DESIGN. CONTRACTOR TO VERIFY IN FIELD.

6. ENSURE SMOOTH AND EVEN SUBFLOOR

SURFACE TO ALLOW PROPER APPLICATION OF

WELDED SHEET FLOORING.

1D-115 RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

1D-117 RESTROOM - - - - - PT2/PT2 COVE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

1D-127A STAFF RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

1D-127B STAFF RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.

1D-24 PROCEDURE ROOM 11 - - P1 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.

5'-0"

VERIFY IN FIELD

8' -0

VE

R

IF

Y

IN

F

IE

LD

5'-0"

VERIFY IN FIELD

8' -0

VE

R

IF

Y

IN

F

IE

LD

6'-27 8"

VERIFY IN FIELD

8' -0

VE

R

IF

Y

IN

F

IE

LD

6'-27 8"

VERIFY IN FIELD

8' -0

VE

R

IF

Y

IN

F

IE

LD

6'-1"

VERIFY IN FIELD

3' -8

VE

R

IF

Y

IN

F

IE

LD

9'-9"

VERIFY IN FIELD

3' -8

VE

R

IF

Y

IN

F

IE

LD

3'-0"

VERIFY IN FIELD

3' -8

VE

R

IF

Y

IN

F

IE

LD

PLUMBING FIXTURE, SEE MECHANICAL SHEETS.

COVE TILE BASE, 4"X4". SEE ROOM FINISH SCHEDULE.

PT1 TILE, 4"X4". SEE ROOM FINISH SCHEDULE.

PT2 TILE, 4"X4". SEE ROOM FINISH SCHEDULE.

BULLNOSE TILE, 4"X4". SEE ROOM FINISH SCHEDULE.

EXISTING PAINT, TO REMAIN AS IS. SEE ROOM FINISH

SCHEDULE.

KEYED NOTES

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

ROOM FINISH SCHEDULE/FINISH PLANS

A-5.00

ENLARGED ROOM 2C-44 FLOOR REPLACEMENT PLAN

SCALE: 1/2" = 1'

A5.00

FLOOR FINISH LEGEND

WSF - WELDED SHEET

FLOORING

CONTRACTOR

TO PLAN FOR

MINIMUM 60"W x

24"D SECTION

OF WSF TO

ENSURE

PROPER

PATTERN

MATCH. CUT TO

SIZE IN FIELD.

HEAT WELD AT

EXISTING

SEAMS.

ESTIMATED

LOCATION OF WSF

AND SEAMS TO BE

REPLACED. SMOOTH

PATCH BELOW TO

ENSURE SMOOTH

AND SEAMLESS

SUBSTRATE PRIOR

TO PLACEMENT OF

SHEET FLOORING.

1D-115 EAST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

1D-117 WEST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

1D-127A EAST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

1D-127B EAST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

2B-03 EAST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

2C-46 WEST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

2C-58A WEST INTERIOR ELEVATION

SCALE: 1/4" = 1'

A5.00

S

ABBREVIATIONS:

AC ALTERNATING CURRENT

ADJ. ADJUSTABLE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BHP BRAKE HORSEPOWER

BMS BUILDING MANAGEMENT SYSTEM

CA COMPRESSED AIR

CFM CUBIC FEET PER MINUTE

C/L CENTERLINE

CO CLEANOUT

COEF COEFFICIENT

COMLINK COMMUNICATION LINK

COND CONDENSATION

CONFIG CONFIGURED

COR CONTRACTING OFFICER'S REPRESENTATIVE

CV CONTROL VALVE

CV FLOW COEFFICIENT

DAMP. DAMPER

DC DIRECT CURRENT

DEG DEGREES

DIFF. DIFFERENTIAL

(E) EXISTING

EA EXHAUST AIR

ECC ENERGY CONTROL CENTER

ELECT. ELECTRICAL

ELEV ELEVATION

ENT ENTERING

F FAHRENHEIT

FD FLOOR DRAIN

FS FLOOR SINK

FILT. FILTER

FPM FEET PER MINUTE

FT FEET

GAL GALLONS

G.C. GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

HP HORSEPOWER

HR HOUR

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

HX HEAT EXCHANGER

Hz HERTZ

IBC INTERNATIONAL BUILDING CODE

IECC INTERNAIONAL ENERGY CONSERVATION CODE

IFB INTEGRAL FACE AND BYPASS

IMC INTERNATIONAL MECHANICAL CODE

I/O INPUT/OUTPUT

IPC INTERNATIONAL PLUMBING CODE

L LENGTH

LA LABORATORY EQUIPMENT COMPRESSED AIR

LBS POUNDS

MA MEDICAL AIR

MAX MAXIMUM

MBH

THOUSAND BRITISH THERMAL UNITS PER HOUR

MC MECHANICAL CONTRACTOR

MECH MECHANICAL

MFG MANUFACTURER

MIN MINIMUM

MIN MINUTE

mm MILLIMETER

MV MEDICAL VACUUM

N.C. NORMALLY CLOSED

NC NOISE CRITERIA LEVEL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NG NATURAL GAS

N.O. NORMALLY OPEN

NPT NATIONAL PIPE THREAD

O2 OXYGEN

ORD OVERFLOW ROOF DRAIN

OSHA

Pa PASCAL

PD PRESSURE DROP

PRESS. PRESSURE

PSIG POUNDS PER SQUARE INCH - GAUGE

QUANT. QUANTITY

RA RETURN AIR

RC REHEAT STEAM COIL - AHU

RD ROOF DRAIN

RE RESIDENT ENGINEER

REQ'D REQUIRED

RPM REVOLUTIONS PER MINUTE

S SUPPLY

SF SQUARE FEET

SPEC SPECIFICATION

SS STAINLESS STEEL

T THERMOSTAT

TYP TYPICAL

V VOLTS

VAC MEDICAL VACUUM

W/ WITH

WB WET BULB

WG INCHES OF WATER

ZAP ZONE ALARM PANEL

ZVB ZONE VALVE BOX

B

T

A

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

CHECK VALVE

FLOW CONTROL VALVE

PRESSURE REDUCING VALVE

REDUCED PRESSURE ZONE VALVE

SOLENOID VALVE

PRESSURE RELIEF VALVE

PRESSURE GAUGE

THERMOMETER

CONCENTRIC REDUCER

PIPE UNION

TEST PLUG

VALVE GLOBE VALVE

BALANCING VALVE

TEMPERATURE SENSOR

GLOBE VALVE -MANUAL

GLOBE VALVE - ON/OFF

GLOBE VALVE - MODULATING

PLUMBING SYMBOLS

POINT OF CONNECTION

POINT OF DISCONNECTION

TO BE DEMOLISHED

2 PLUMBING PLAN NOTE

PIPE DOWN

PIPE UP

PIPE TEE DOWN

TEE

GENERAL MECHANICAL NOTES:

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF

THE INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE

(IMC), UNIFORM PLUMBING CODE (IPC), INTERNATIONAL FUEL GAS CODE (IFGC), NFPA

99, NFPA 101 LIFE SAFETY CODE, VA PLUMBING DESIGN MANUAL (REV 02/24), VHA

DIRECTIVE 1061 (AMENDED 03/24) AND ANY AUTHORITY HAVING JURISDICTION. THIS

IS A FEDERAL PROJECT, AS SUCH ALL CODE REQUIREMENTS ARE REQUIRED.

ALL EQUIPMENT, MATERIALS, AND ARTICLES INCORPORATED IN THE WORK SHALL BE

NEW AND OF COMPARABLE QUALITY AS SPECIFIED. ALL WORKMANSHIP SHALL BE

FIRST-CLASS AND SHALL BE PERFORMED BY MECHANICS SKILLED AND REGULARLY

EMPLOYED IN THEIR RESPECTIVE TRADES.

ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED TRADES PRIOR TO

STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES SHALL BE

PERFORMED BY THE INSTALLATION CONTRACTOR WITHOUT INCREASED COST TO

THE OWNER.

THESE DRAWINGS ARE GENERAL IN NATURE. ALTHOUGH EVERY ATTEMPT HAS BEEN

MADE TO INDICATE THE EXACT ROUTING AND LOCATION OF PROPOSED SYSTEMS,

NOT ALL OFFSETS, REQUIRED FITTINGS AND/OR CONDITIONS CAN BE SHOWN. THE

CONTRACTOR SHALL COORDINATE WORK AND MAKE REQUIRED CHANGES TO THE

ROUTING IN ORDER TO AVOID CONFLICTS WITHOUT ANY INCREASED COST TO THE

OWNER.

SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT

DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE

EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM

READY FOR NORMAL AND PROPER OPERATION, INCLUDING ALL WORK OR

MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS,

BUT NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE

CLEARANCES ARE MAINTAINED. CORRIDORS SHALL NOT BE COMPLETELY BLOCKED

BY DUST BARRIERS. AT LEAST HALF OF THE CORRIDORS SHALL BE OPEN. CLOSE

COORDINATION WILL BE REQUIRED WITH THE MECHANICAL PIPING, HVAC, FIRE

PROTECTION, ELECTRICAL CONTRACTOR AND VA COR.

TURN OVER REMOVED EQUIPMENT AND FAUCETS TO THE VA FOR SPARE PARTS OR

DISPOSE OF IF NOT WANTED BY FARGO VA STAFF.

THE CONTRACTOR WILL BE ADDING NEW WALL PENETRATIONS IN A VARIETY OF WALL TYPES

TO COMPLETE THIS PROJECT. ALL PENETRATIONS WILL BE SEALED MINIMALLY FOR SMOKE

AND FIRE SPREAD. FOR RATED WALLS, THE CONTRACTOR SHALL SUBMIT AND PROVIDE UL

LISTED PENETRATION FOR EACH APPROPRIATE RATED ASSEMBLY PENETRATION. ALL

PENETRATIONS SHALL BE SEALED AT THE END OF WORK SHIFT TO AVOID LEAVING AN

OPENING OVERNIGHT.

ZC VALVE OR DAMPER CONTROLLER

DCW. DOMESTIC COLD WATER

DHW. DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

STRAINER

HOSE BIBB

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

MECHANICAL GENERAL NOTES AND

ABBREVIATIONS

M-0.00

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

COUNTER

EXISTING COUNTER SINK/LAVATORY &

FAUCET, SHOWN FOR REFERENCE ONLY.

ACTUAL STYLE MAY VARY.

SUPPORT MV-1 ON A STUD, MV-1

AND DCW/DHW SUPPLIES TO BE

CLEANLY BUNDLED AND

SUPPORTED BELOW NEW SINK,

SUBJECT TO AE/COR INSPECTION.

NEW DCW SUPPLY TO

EXISTING FAUCET

NEW DHW SUPPLY TO

EXISTING SINK

COUNTER

EXISTING COUNTER SINK/LAVATORY &

FAUCET, SHOWN FOR REFERENCE ONLY.

ACTUAL STYLE MAY VARY

EXISTING HOT WATER

STOP (TO REMAIN)

EXISTING COLD WATER

STOP (TO REMAIN)

REMOVE EXISTING COLD WATER

SUPPLY TO EXISTING FAUCET

REMOVE EXISTING HOT WATER

SUPPLY TO EXISTING FAUCET

EXISTING/DEMO NEW

MV

NEW DCW/DHW

SUPPLIES TO MV-1

FINISHED

FLOOR

FINISHED

FLOOR

P

P

P

P

EXISTING HOT WATER

STOP (TO REMAIN)

EXISTING COLD WATER

STOP (TO REMAIN)

SPECIALTY TAG DESCRIPTION BASIS OF DESIGN MANUFACTURER & MODEL #

PIPING CONNECTIONS

TRAP S/W VENT C.W. H.W.

PLUMBING SPECIALTY SCHEDULE

NOTES:

1. PROVIDE NEW 3/8" BRAIDED SUPPLY HOSE FOR CONNECTION TO NEW AND EXISTING FAUCETS.

2. PROVIDE NEW WATER MONITORING STATION USING ANNOTATED COMPONENTS SHOWN IN DETAIL 3 M-0.1

3. WATER SAMPLING STATION IS TO COME WITH THE FOLLOWING COMPONENTS:

TOPAX CONTROLLER MODEL MC4 TOTAL CHLORINE ANALYZER

pH ELECTRODE

FREE CHLORINE/CHLORINE DIOXIDE MEASURING CELL

CONDUCTIVITY ELECTRODE

ULTRASONIC TRANSIT TIME FLOW METER (NCMB2-F/E)

DDA SMART PUMP (DDA 7.5-16)

4. TO BE PROVIDED WITH DHWR SAMPLING STATIONS. MOUNT TO MONITORING BOARD FOR DHWR SAMPLING STATIONS.

5. TIE INTO EXISTING DOMESTIC WATER INLET AND OUTLET PIPING.

6. NEW MS-1 TO BE INTEGRATED INTO THE EXISTING FARGO VA BAS VIA NEAREST EXISTING CONTROL PANEL VIA BACNET.

CONTROLS CONTRACTOR TO INSTALL NEW CONDUIT AND CONTROL WIRING. CONTROLS CONTRACTOR TO PROVIDE NEW

GRAPHICS PROGRAMMING FOR EACH MONITORING STATION INTO THE EXISTING BAS.

7. MANUFACTURER TO PROVIDE STARTUP AND COMMISSIONING OF MONITORING STATION IN LIEU OF 3RD PARTY COMMISSIONING.

PLUMBING SPECIALTY MAY BE CALLED OUT ON PLANS AS TAGGED, SPECIFICALLY CALLED FOR IN NOTES/DETAILS, OR NOT AT ALL. IF REFERENCE TO ANY OF THE ABOVE SPECIALTY IS NOT SPECIFICALLY CALLED OUT, THIS SCHEDULE ALSO PROVIDES BASIS OF

SPECIFICATION FOR SUPPLY BY THE CONTRACTOR.

2"UNDERSINK THERMOSTATIC MIXING VALVE WATTS, LFUSG-B M3 OR EQUALMV-1 1

2" 1

REMARKS

C.W.

PLUMBING FIXTURE SCHEDULE

FIXTURE TAG DESCRIPTION MANUFACTURER & MODEL # PIPING CONNECTIONS

H.W. REMARKS

NOTES:

1. PROVIDE NEW SUPPLY LINES FOR USE WITH NEW MV-1 AND EXISTING FAUCET.

2. P-102 TO INCLUDE NEW HOLD RITES AND ESCUTCHEONS.

3. INSTALL NEW SINK AT SAME LOCATION AND ELEVATION AS SINK BEING REPLACED.

4. PROVIDE ADA OFFSET TRAP AND INSULATION WHERE REQUIRED.

P-100

2"

COUNTER MOUNT LAVATORY EXISTING, TO REMAIN

2"EXISTING, TO REMAINFAUCET

P-101

WATER SUPPLY STOPS EXISTING, TO REMAIN

2" 1

2"

P-102

FAUCET

WALL MOUNT LAVATORY AMERICAN STANDARD 0355.012

WRIST BLADE FAUCET CHICAGO FAUCET 895-GN6AE36XK317AB

WALL MOUNT LAVATORY

WATER SUPPLIES BRASSCRAFT B1-A

EXISTING, TO REMAIN

EXISTING, TO REMAIN

WATER SUPPLY WITH STOP KIT 1

2" 1

2"

WATER MONITORING/SAMPLING STATIONMS-1 LUTZ-JESCO EASYPRO OR EQUAL

WATER SUPPLY STOPS EXISTING, TO REMAIN

BRASSCRAFT KTCR19X C 1/4 TURN KIT

2" 1

2"

2"1

2" 2,3,5,6,7

P-103

COUNTER MOUNT LAVATORY

WRIST BLADE FAUCET

WATER SUPPLIES

VENTS/W

1 14"

EXISTING, TO REMAIN

BRASSCRAFT B1-A

CHICAGO FAUCET 895-GN6AE36XK317AB 1

2" 1

2"

4"SAMPLE COOLER NEPTUNE, SC-316 OR EQUALSC-1 3

8" 4

4P-TRAP DRAIN ASSEMBLY DEARBORN BRASS 704-1

2, 3

WATER SUPPLIES BRASSCRAFT B1-A

WATER SUPPLY STOPS EXISTING, TO REMAIN

REMOVE EXISTING LAVATORY

SINK, SENSOR FAUCET, AND

TAILPIECE

DISCONNECT EXISTING COLD

WATER FROM EXISTING FAUCET,

TO REMAIN FOR RECONNECTION

TO NEW MIXING VALVE

DISCONNECT EXISTING HOT

WATER FROM EXISTING FAUCET,

TO REMAIN FOR RECONNECTION

TO NEW MIXING VALVE

EXISTING/DEMO

FINISHED

FLOOR

NEW

EXISTING DCW/DHW

STOPS

FINISHED

FLOOR

NEW DCW/DHW

SUPPLIES TO MV-1

NEW DCW/DHW SUPPLIES

TO NEW FAUCET

MV

P

NEW LAVATORY SINK

SUPPORT MV-1 ON A STUD, MV-1

AND DCW/DHW SUPPLIES TO BE

CLEANLY BUNDLED AND

SUPPORTED BELOW NEW SINK,

SUBJECT TO AE/COR INSPECTION.NEW P-TRAP/TAILPIECE, CONNECT TO

EXISTING SAN/VENT IN WALL

EXISTING DCW/DHW

STOPS

· CONTRACTOR TO COORDINATE AND SCHEDULE ANY

REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE

COR PRIOR TO WORK STARTING.

GENERAL PLUMBING NOTE

EXISTING SINK MIXING VALVE ADDITION DETAILS

SCALE: NTS

M0.10

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

M-0.10

SENSOR FAUCET & SINK REPLACEMENT DETAIL

SCALE: NTS

M0.10

SCHEDULES, MIXING VALVE DETAIL, SENSOR

FAUCET & SINK DETAIL

GENERAL SCHEDULES NOTE: ALL EQUIPMENT SHOWN IN THE SCHEDULES BELOW ARE BASIS OF DESIGN. OR EQUAL PRODUCT MAY BE SUBMITTED FOR REVIEW.

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

EXISTING/DEMO NEW

NEW DCW/DHW

STOPS AND SUPPLIES

REMOVE EXISTING

MIXED SUPPLY TO

EXISTING FAUCET

EXISTING DCW/DHW IN

WALL TO FOOT PEDAL

SUPPLY STOPS

REMOVE EXISTING

SINK/P-TRAP AND

PEDAL OPERATED

FAUCET

REMOVE EXISTING

DCW/DHW PEDAL

SUPPLY STOPS

REMOVE EXISTING WALL

APPROX 18" TALL BETWEEN

STUDS TO MODIFY EXISTING

DCW/DHW PIPING FOR NEW

DCW/DHW STOPS.

EXISTING DCW/DHW IN

WALL

PROVIDE NEW WALL

ESCUTCHEONS (x2)

REMOVE EXISTING

PEDAL OPERATOR

FINISHED

FLOOR

FINISHED

FLOOR

NEW DCW/DHW

SUPPLIES TO NEW MV-1

NEW DCW/DHW SUPPLIES

TO NEW FAUCET

PATCH AND REPAIR WALL TO

MATCH EXISTING, REFER TO ROOM

FINISH SCHEDULE ON SHEET A-5.00

NEW HOLDRITE, OR EQUAL,

SUPPORTS BETWEEN STUDS

NEW DCW/DHW SUPPLY PIPING IN

WALL TO RAISE AND WIDEN NEW

SUPPLY STOPS LOCATION

MV

P

NEW LAVATORY

SUPPORT MV-1 ON A STUD, MV-1 AND

DCW/DHW SUPPLIES TO BE CLEANLY

BUNDLED AND SUPPORTED BELOW NEW

SINK, SUBJECT TO AE/COR INSPECTION.

NEW P-TRAP/TAILPIECE, CONNECT TO

EXISTING SAN/VENT IN WALL

EXISTING/DEMO

EXISTING COUNTER

MOUNT SINK TO REMAIN

REMOVE EXISTING

PEDAL OPERATOR

EXISTING TMV TO

REMAIN FOR RE-USE

REMOVE EXISTING WATER SUPPLIES FROM

MIXING VALVE TO PEDAL OPERATOR

EXISTING DHW AND

DCW STOPS TO

REMAIN

NEW

CUT 2 NEW HOLES INTO EXISTING COUNTER

FOR NEW FAUCET INSTALLATION,

COORDINATE WITH MANUFACTURERS

INSTALLATION INSTRUCTIONS.

EXISTING TMV TO REMAIN. SUPPORT ON A STUD,

EXISTING MIXING VALVE AND NEW DCW/DHW SUPPLIES

TO BE CLEANLY BUNDLED AND SUPPORTED BELOW NEW

SINK, SUBJECT TO AE/COR INSPECTION.

EXISTING DHW AND

DCW STOPS TO

REMAIN

NEW DCW/DHW

SUPPLIES TO NEW

FAUCET

FINISHED

FLOOR

FINISHED

FLOOR

P

COUNTER COUNTER

EXISTING MIXED WATER TO

EXISTING FAUCET

REPLACE FLOORING IN TOE

KICK, REFER TO ROOM FINISH

SCHEDULE ON SHEET A-5.00

REMOVE EXISTING

PEDAL OPERATED

FAUCET

REMOVE EXISTING WATER SUPPLIES

TO EXISTING MIXING VALVE

NEW DCW/DHW

SUPPLIES TO EXISTING

MIXING VALVE

· CONTRACTOR TO COORDINATE AND SCHEDULE ANY

REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE

COR PRIOR TO WORK STARTING.

GENERAL PLUMBING NOTE

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

WALL MOUNT PEDAL OPERATED SINK AND FAUCET REPLACEMENT DETAIL

SCALE: NTS

M0.20

M-0.20

COUNTER MOUNT PEDAL OPERATED FAUCET REPLACEMENT DETAIL

SCALE: NTS

M0.20

PEDAL SINK AND FAUCET REPLACEMENT

DETAILS

AutoCAD SHX Text

FOURFRONT DESIGN, INC.

AutoCAD SHX Text

517 7TH STREET

AutoCAD SHX Text

RAPID CITY, SOUTH DAKOTA 57701

AutoCAD SHX Text

PH: (605) 342-9470

AutoCAD SHX Text

FAX: (605) 342-2377

AutoCAD SHX Text

WWW.FOURFRONTDESIGN.COM

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

EXISTING PRESSURE GAUGE

EXISTING FLOW CELL

EXISTING MONOCHLORAMINE SENSOR

EXISTING OUTLET TO

DRAIN

EXISTING BOOSTER PUMP

EXISTING 1/2" DOMESTIC

WATER INLET PIPING

EXISTING MONOCHLORAMINE

PROCESSOR

EXISTING CONTROLLER

EXISTING pH SENSOR

EXISTING CONDUCTIVITY

SENSOR

EXISTING FLOW GAUGE

EXISTING FLOW SENSOR

EXISTING DDA SMART PUMP

EXISTING INJECTION

POINT

EXISTING PIPING INLET FROM

CHLORAMINE CONTAINER

EXISTING 1/2" DOMESTIC WATER

OUTLET PIPING

EXISTING WATER QUALITY

MONITORING STATION MOUNTING

BOARD

SOV (TYP)

SOV (TYP)

· CONTRACTOR TO COORDINATE AND SCHEDULE ANY

REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE

COR PRIOR TO WORK STARTING.

GENERAL PLUMBING NOTE

EXISTING WATER MONITORING STATION DEMOLITION DETAIL

SCALE: NTS

M0.30

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

M-0.30

WATER MONITORING STATION DEMOLITION

DETAIL

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

NEW PRESSURE GAGUE

NEW FLOW CELL

NEW MONOCHLORAMINE SENSOR

NEW BOOSTER PUMP

NEW MONOCHLORAMINE PROCESSORNEW CONTROLLER

NEW pH SENSOR

NEW CONDUCTIVITY SENSOR

NEW FLOW GAUGE

NEW FLOW SENSOR

NEW DDA SMART PUMP

NEW INJECTION POINT

CONNECT TO EXISTING 1/2"

DCW PIPING FROM NEW

WATER MONITORING

STATION OUTLET SOV

NEW TUBING FROM CHLORAMINE

CONTAINER TO NEW WATER

MONITORING STATION PUMP NEW 3/4" DRAIN PIPING TO

EXISTING FLOOR DRAIN/SINK

NEW WATER QUALITY MONITORING

STATION MOUNTING BOARD

CONNECT EXISTING 1/2" DCW

PIPING TO NEW WATER

MONITORING STATION INLET

SOV

NEW STRAINER

NEW PRESSURE REDUCING

VALVE, 30 PSI MAX

SOV (TYP)

GENERAL NOTE: REDUCE/EXPAND PIPE SIZE AT MONITORING

STATION AS NEEDED TO MAKE CONNECTIONS. MAKE PIPING

CONNECTIONS ACCORDING TO MANUFACTURER INSTALLATION

INSTRUCTIONS. MOUNT NEW MS-1 MONITORING STATION BOARD TO

EXISTING STRUT SUPPORT STAND, MODIFY EXISTING STAND AS

REQUIRED.

MS

NEW PRESSURE GAGUE

NEW FLOW CELL

NEW MONOCHLORAMINE SENSOR

NEW BOOSTER PUMP

NEW MONOCHLORAMINE PROCESSORNEW CONTROLLER

NEW pH SENSOR

NEW CONDUCTIVITY SENSOR

NEW FLOW GAUGE

NEW FLOW SENSOR

NEW DDA SMART PUMP

NEW INJECTION POINT

NEW TUBING FROM CHLORAMINE

CONTAINER TO NEW WATER

MONITORING STATION PUMP NEW 3/4" DRAIN PIPING TO

EXISTING FLOOR DRAIN/SINK

NEW WATER QUALITY MONITORING

STATION MOUNTING BOARD

CONNECT EXISTING 1/2" DHWR

PIPING TO NEW WATER

MONITORING STATION INLET SOV

NEW 1/2" DCW PIPING TO

SAMPLE COOLER INLET

GENERAL NOTE: REDUCE/EXPAND PIPE SIZE AT MONITORING STATION AS

NEEDED TO MAKE CONNECTIONS. MAKE PIPING CONNECTIONS

ACCORDING TO MANUFACTURER INSTALLATION INSTRUCTIONS. MOUNT

NEW MS-1 MONITORING STATION BOARD TO EXISTING STRUT SUPPORT

STAND, MODIFY EXISTING STAND AS REQUIRED.

NEW SAMPLE COOLER

NEW STRAINER

NEW PRESSURE REDUCING

VALVE, 30 PSI MAX

NEW CHECK VALVE

CONNECT TO EXISTING 1/2" DHWR

PIPING FROM NEW WATER

MONITORING STATION OUTLET SOV

NEW SOV (TYP)

NEW 1/2" DRAIN PIPING FROM

SAMPLE COOLER OUTLET. PIPE

TO EXISTING FLOOR

DRAIN/SINK

MS

NEW STRAINER

SC

· CONTRACTOR TO COORDINATE AND SCHEDULE ANY

REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE

COR PRIOR TO WORK STARTING.

GENERAL PLUMBING NOTE

NEW DCW WATER MONITORING STATION DETAIL

SCALE: NTS

M0.40

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

E

C

A

Department of Veterans Affairsof

5/

/2

3:

:4

PM

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

NEW WATER MONITORING STATION DETAILS

M-0.40

NEW DHWR WATER MONITORING STATION DETAIL

SCALE: NTS

M0.40

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

WATER MONITORING

STATION LOCATION

DHWR(E)

MS

EXISTING BAS

CONTROL PANELS

MS

WATER MONITORING

STATION LOCATION

EXISTING 1/2" DCW TO/FROM

WATER MONITORING

STATION TO/FROM EXISTING

DCW PIPING.

DCW(E) DCW(E)

WH

(E)

WH

(E)

3" D

C W

(E

NEW 1/2" DCW TO MS-1

SAMPLE COOLER

1/ 2"

D C

W

EXISTING

CAPPED AND

VALVED 3/4" DCW

NEW 1/2" DCW TO MS-1

SAMPLE COOLER

EXISTING 1/2" DHW TO/FROM

WATER MONITORING STATION

TO/FROM EXISTING DHWR

PIPING.

INSTALL NEW MIXING VALVE TO EXISTING

LAVATORY/SINK. REFER TO DETAIL 1 ON SHEET M-0.10.

REPLACE EXISTING DCW WATER QUALITY MONITORING

STATION WITH NEW MS-1. REFER TO DETAIL 1 ON SHEET

M-0.40.

REPLACE EXISTING DHW WATER QUALITY MONITORING

STATION WITH NEW MS-1. REFER TO DETAIL 2 ON SHEET

M-0.40.

KEYED PLUMBING NOTES

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

BUILDING IS FULLY SPRINKLED

ARCHITECT-ENGINEERCONSULTANTS:

DateRevisions:

8A«(OR/«��-����

Q P G G

KI

J

VJ

KP

E J Q P G

HQ

Q V

Q P G S W C

TV

G T«

KP

E J Q P G

HQ

Q V

VJ

TG

G G

KI

J

VJ

U«

KP

E J Q P G

HQ

Q V

Q P G J C

NH

KP

E J Q P G

HQ

Q V

VJ

TG

G S W C

TV

G

TU

KP

E J Q P G

HQ

Q V

Q P G

KP

E J Q P G

HQ

Q V

Q P G C P F Q P G J C

NH

KP

E J G U«

Q P G

HQ

Q V

VJ

TG

G

KP

E J G U«

Q P G

HQ

Q V

E

C

A

Department of Veterans Affairsof

����«-«CONTRACT«&OCU/ENTS

02/14/2025 PMRD

437-23-165SYSTEM REPAIR TO

PREVENT LEGIONELLA

FARGO, ND

1, 9, 46

12/13/2023REVISION #1: BIDDING ADDENDUM #1

BASEMENT WEST FLOOR PLAN

SCALE: 1/8" = 1'

M1.01

BASEMENT WEST FLOOR PLAN

M-1.01

BASEMENT FLOOR KEY PLAN

SCALE: NTS

AutoCAD SHX Text BB-34 Mechanical

AutoCAD SHX Text

BB-34B

AutoCAD SHX Text BB-15 Storage

AutoCAD SHX Text

BB-16A

AutoCAD SHX Text BB-15B Men's

AutoCAD SHX Text

BB-15B1

AutoCAD SHX Text

BB-18B

AutoCAD SHX Text

BA-30 TR

AutoCAD SHX Text

BB-18A

AutoCAD SHX Text

BB-20A

AutoCAD SHX Text BB-17 Pre-Assembly Storage

AutoCAD SHX Text

BB-10 ENG/VAEA

AutoCAD SHX Text

BB-26

AutoCAD SHX Text BB-76 Staff Lounge

AutoCAD SHX Text

BB-22

AutoCAD SHX Text BB-27 Pharm Chief

AutoCAD SHX Text BB-80 In-patient Pharm

AutoCAD SHX Text BB-75 Pharmacy Receiving

AutoCAD SHX Text

BB-90 ANTE

AutoCAD SHX Text BB-78 HD Stor

AutoCAD SHX Text

BB-72A

AutoCAD SHX Text

BB-80C

AutoCAD SHX Text

LIBERTY ELEV (1,2,3)

AutoCAD SHX Text BB-20 Receiving Decontamination

AutoCAD SHX Text

BB-21

AutoCAD SHX Text BA-10 BLDG 9 Switchgear

AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen

AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen

AutoCAD SHX Text BA-01A BLDG 46 Switchgear

AutoCAD SHX Text BA-07 SPS Storage

AutoCAD SHX Text BA-05 Envo Mgmt

AutoCAD SHX Text

BA-03 EMS

AutoCAD SHX Text

STAIR #9

AutoCAD SHX Text BB-80A Crtl Sub Vault

AutoCAD SHX Text

BB-80B

AutoCAD SHX Text

BC-05C

AutoCAD SHX Text

BC-05B

AutoCAD SHX Text

BC-79

AutoCAD SHX Text

BC-05A

AutoCAD SHX Text BC-20 Customer Relationship Manager

AutoCAD SHX Text

BC-93 EMS

AutoCAD SHX Text BC-95 Women's Locker

AutoCAD SHX Text

BD-02 TR/TEL

AutoCAD SHX Text BD-10 M-Tlt

AutoCAD SHX Text

BD-12 FM-TLT

AutoCAD SHX Text BD-08 CTN-Stor

AutoCAD SHX Text

BD-06 TR

AutoCAD SHX Text

BD-04 BRKRM

AutoCAD SHX Text BA-01 Mechanical

AutoCAD SHX Text

BC-20A

AutoCAD SHX Text

BC-20B

AutoCAD SHX Text

BC-03 M&R

AutoCAD SHX Text

BB-12

AutoCAD SHX Text

BB-34A UPS

AutoCAD SHX Text

BB-16B

AutoCAD SHX Text BB-15A Women's

AutoCAD SHX Text

BB-44B

AutoCAD SHX Text

BB-44

AutoCAD SHX Text

BB-17A

AutoCAD SHX Text

BB-15-A1

AutoCAD SHX Text BB-30 SPS Asst Chief

AutoCAD SHX Text

BB-44A

AutoCAD SHX Text BB-09 BLDG #9 Tank room

AutoCAD SHX Text BB-24 Receiving

AutoCAD SHX Text BB-31 Pharm

AutoCAD SHX Text BB-28 Pharm

AutoCAD SHX Text BA-09 Soiled Linens

AutoCAD SHX Text BC-05 Anti-Coag Clinic

AutoCAD SHX Text

BC-01

AutoCAD SHX Text BA-42 Office

AutoCAD SHX Text BA-35 Men

AutoCAD SHX Text BA-39 Women

AutoCAD SHX Text BA-37 Jan

AutoCAD SHX Text BA-41 Mech

AutoCAD SHX Text BA-43 Brk Rm

AutoCAD SHX Text BA-45 Office

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

WOODEN

AutoCAD SHX Text

UP

AutoCAD SHX Text BB-96 Fitness Instruction

AutoCAD SHX Text BB-100 Mechanical

AutoCAD SHX Text BB-95 Fitness

AutoCAD SHX Text BB-95B Men's LKR

AutoCAD SHX Text BB-95A Women's LKR

AutoCAD SHX Text

BB-91

AutoCAD SHX Text BB-93 Storage

AutoCAD SHX Text BB-94 Electrical

AutoCAD SHX Text

BB-92 TR

AutoCAD SHX Text

BB-67A

AutoCAD SHX Text

BB-67B

AutoCAD SHX Text BB-84 Exam

AutoCAD SHX Text BB-85A Exam

AutoCAD SHX Text BB-67C OC-Hlth

AutoCAD SHX Text BB-66 Women

AutoCAD SHX Text BB-64 Men

AutoCAD SHX Text

BB-60A

AutoCAD SHX Text

BB-60 W-LKRM

AutoCAD SHX Text

BB-61 HLDG

AutoCAD SHX Text

BB-57

AutoCAD SHX Text BB-58 Mech

AutoCAD SHX Text BB-54 PD A-Chief

AutoCAD SHX Text

BB-52

AutoCAD SHX Text

BB-59A

AutoCAD SHX Text

BB-59 M-LKRM

AutoCAD SHX Text BB-97 Stor

AutoCAD SHX Text BB-50 Storage

AutoCAD SHX Text BB-53 Police Admin

AutoCAD SHX Text BB-55 PD Chief

AutoCAD SHX Text BB-35 Imaging UPS

AutoCAD SHX Text

BB-67

AutoCAD SHX Text BB-32 SPS Chief

AutoCAD SHX Text BB-34 Mechanical

AutoCAD SHX Text

BB-34B

AutoCAD SHX Text BB-15 Storage

AutoCAD SHX Text

BB-16A

AutoCAD SHX Text BB-15B Men's

AutoCAD SHX Text

BB-15B1

AutoCAD SHX Text

BB-18B

AutoCAD SHX Text

BA-30 TR

AutoCAD SHX Text

BB-18A

AutoCAD SHX Text

BB-20A

AutoCAD SHX Text BB-17 Pre-Assembly Storage

AutoCAD SHX Text

BB-10 ENG/VAEA

AutoCAD SHX Text

BB-26

AutoCAD SHX Text BB-76 Staff Lounge

AutoCAD SHX Text

BB-22

AutoCAD SHX Text BB-27 Pharm Chief

AutoCAD SHX Text BB-80 In-patient Pharm

AutoCAD SHX Text BB-75 Pharmacy Receiving

AutoCAD SHX Text

BB-90 ANTE

AutoCAD SHX Text

BB-90B

AutoCAD SHX Text

BB-90A

AutoCAD SHX Text BB-78 HD Stor

AutoCAD SHX Text

BB-72A

AutoCAD SHX Text

BB-80C

AutoCAD SHX Text

BB-68

AutoCAD SHX Text BB-33 Pharm

AutoCAD SHX Text

BB-69

AutoCAD SHX Text

LIBERTY ELEV (1,2,3)

AutoCAD SHX Text BB-20 Receiving Decontamination

AutoCAD SHX Text

BB-21

AutoCAD SHX Text BA-72 Mech

AutoCAD SHX Text BA-67 Mech

AutoCAD SHX Text BA-10 BLDG 9 Switchgear

AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen

AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen

AutoCAD SHX Text BA-01A BLDG 46 Switchgear

AutoCAD SHX Text BA-07 SPS Storage

AutoCAD SHX Text BA-05 Envo Mgmt

AutoCAD SHX Text

BA-03 EMS

AutoCAD SHX Text

STAIR #9

AutoCAD SHX Text BB-80A Crtl Sub Vault

AutoCAD SHX Text

BB-80B

AutoCAD SHX Text

BC-05C

AutoCAD SHX Text

BC-05B

AutoCAD SHX Text

BC-79

AutoCAD SHX Text

BC-05A

AutoCAD SHX Text BC-01 Wrk Rm

AutoCAD SHX Text

BC-02 TR

AutoCAD SHX Text

VICTORY ELEV (7,8)

AutoCAD SHX Text BB-85B OC-Hlth

AutoCAD SHX Text BB-70 Pharm EDU

AutoCAD SHX Text BB-85 OC-Hlth

AutoCAD SHX Text BC-10 Social Work

AutoCAD SHX Text BC-11 HMLS Outreach

AutoCAD SHX Text

BC-30

AutoCAD SHX Text

BC-32 PACT SW

AutoCAD SHX Text BC-12 Intrvw Rm

AutoCAD SHX Text BC-11A Intrvw-Rm

AutoCAD SHX Text BC-13 Super

AutoCAD SHX Text

BC-15A OEF/OIF

AutoCAD SHX Text

BC-45 TR

AutoCAD SHX Text

BC-43 TR

AutoCAD SHX Text BC-41 Mech

AutoCAD SHX Text BC-47 TR Off/Stor

AutoCAD SHX Text BC-15 OEF/OIF SW space

AutoCAD SHX Text BC-59 Mech

AutoCAD SHX Text

BC-63 TR

AutoCAD SHX Text BC-66 Men

AutoCAD SHX Text

BC-44 TR

AutoCAD SHX Text BC-50 Computer

AutoCAD SHX Text BC-60 EQ-Room

AutoCAD SHX Text BC-74B Storage

AutoCAD SHX Text

BC-52 CIO

AutoCAD SHX Text

BC-54 TR

AutoCAD SHX Text

BC-56 TR

AutoCAD SHX Text

BC-58 TR

AutoCAD SHX Text BC-74A Canteen Kitchen

AutoCAD SHX Text BC-74 Serving

AutoCAD SHX Text BC-67 Women

AutoCAD SHX Text

BC-34 PIV

AutoCAD SHX Text BC-89 Lounge

AutoCAD SHX Text BC-69 Vending

AutoCAD SHX Text BC-68 Stor

AutoCAD SHX Text

BC-64 TR

AutoCAD SHX Text

PATRIOT ELEV 10

AutoCAD SHX Text BC-75 Canteen Dining

AutoCAD SHX Text BC-91 EMS Brk-Rm

AutoCAD SHX Text

BC-90 CU

AutoCAD SHX Text BC-20 Customer Relationship Manager

AutoCAD SHX Text

BC-93 EMS

AutoCAD SHX Text

BC-90A CU

AutoCAD SHX Text BC-80 Retail Store

AutoCAD SHX Text BC-79 Mech

AutoCAD SHX Text BC-81 Ret-Storage

AutoCAD SHX Text BC-82 CTN-Chief

AutoCAD SHX Text

BC-83 ADMIN

AutoCAD SHX Text BC-94 Men's Locker

AutoCAD SHX Text BC-95 Women's Locker

AutoCAD SHX Text

BC-85A

AutoCAD SHX Text BC-85B FD-Stor

AutoCAD SHX Text BC-96 Men's Tlt

AutoCAD SHX Text

BD-02 TR/TEL

AutoCAD SHX Text BE-05 Mechanical

AutoCAD SHX Text

INDEPENDENCE ELEV (4,5)

AutoCAD SHX Text

BE-02

AutoCAD SHX Text BE-10 Mail-Rm Stor

AutoCAD SHX Text BE-09 Mech

AutoCAD SHX Text BE-29 Mech

AutoCAD SHX Text BE-30 N&FS Subsistence Storage

AutoCAD SHX Text BE-34 Pharm Storage

AutoCAD SHX Text

BE-40A

AutoCAD SHX Text

BE-42A

AutoCAD SHX Text BE-44A Compactor

AutoCAD SHX Text BE-44 Carts

AutoCAD SHX Text BE-42 Wmn-LKR

AutoCAD SHX Text BE-40 Men-LKR

AutoCAD SHX Text

BE-38C

AutoCAD SHX Text BE-35 Morgue

AutoCAD SHX Text BE-37 Mrg-Clr

AutoCAD SHX Text

BE-38 SP-CH MGMT

AutoCAD SHX Text

BE-45

AutoCAD SHX Text

BE-38A

AutoCAD SHX Text

BE-38B

AutoCAD SHX Text BE-31A Whse Storage

AutoCAD SHX Text BE-97 Stor

AutoCAD SHX Text BE-46 Mech

AutoCAD SHX Text

BE-50

AutoCAD SHX Text BE-25 Mech

AutoCAD SHX Text BE-27 Mech

AutoCAD SHX Text BE-24 Linen

AutoCAD SHX Text

BD-31 ENG

AutoCAD SHX Text

BD-33 EMS

AutoCAD SHX Text

BD-35 ENG

AutoCAD SHX Text

BD-37 ENG

AutoCAD SHX Text

BD-39 ENG

AutoCAD SHX Text BD-41 EM-Mng

AutoCAD SHX Text BD-43 Gems

AutoCAD SHX Text

BD-45 ENG

AutoCAD SHX Text

BD-47 ENG

AutoCAD SHX Text

BD-36 SFTY

AutoCAD SHX Text

BD-38 EEO

AutoCAD SHX Text

BD40 SFTY

AutoCAD SHX Text BD-42 ENg Conf

AutoCAD SHX Text BD-50 Engineering

AutoCAD SHX Text BD-50B ENG Chief

AutoCAD SHX Text BD-50A ENG A-Chief

AutoCAD SHX Text Shwr

AutoCAD SHX Text

BD-63 M-LKR

AutoCAD SHX Text BD-62 File-Rm

AutoCAD SHX Text BD-60E Biomed

AutoCAD SHX Text BD-60 Biomed D/O

AutoCAD SHX Text BD-60B W-Area

AutoCAD SHX Text BD-60C Charging Area

AutoCAD SHX Text BD-60D Biomed Drop-Off

AutoCAD SHX Text BD-65 Paint Shop

AutoCAD SHX Text BD-75A Electrical Shop

AutoCAD SHX Text BD-75B Carpentry

AutoCAD SHX Text BD-85A Plumbing Shop

AutoCAD SHX Text BD-85B Mechanic Shop

AutoCAD SHX Text BD-90 Equipment Area

AutoCAD SHX Text

BD-92

AutoCAD SHX Text

BD-91

AutoCAD SHX Text

BD-84 TR

AutoCAD SHX Text BD-83 Elec.

AutoCAD SHX Text BD-86 Mech

AutoCAD SHX Text BD-70 Mechanical

AutoCAD SHX Text BD-80 Storage

AutoCAD SHX Text BD-95 Breakroom

AutoCAD SHX Text BD-10 M-Tlt

AutoCAD SHX Text

BD-12 FM-TLT

AutoCAD SHX Text BD-08 CTN-Stor

AutoCAD SHX Text

BD-06 TR

AutoCAD SHX Text

BD-04 BRKRM

AutoCAD SHX Text BD-05 Mail

AutoCAD SHX Text BA-01 Mechanical

AutoCAD SHX Text

BC-20A

AutoCAD SHX Text

BC-20B

AutoCAD SHX Text

BC-03 M&R

AutoCAD SHX Text

BB-12

AutoCAD SHX Text

BB-34A UPS

AutoCAD SHX Text

BB-16B

AutoCAD SHX Text BB-15A Women's

AutoCAD SHX Text

BB-44B

AutoCAD SHX Text

BB-44

AutoCAD SHX Text

BC-46 TR

AutoCAD SHX Text

BF-11

AutoCAD SHX Text

BLDG #3 SP-CH MGMT

AutoCAD SHX Text BF-003 Inv-Mgmt

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text BE-28 Loading Dock

AutoCAD SHX Text

BD-81 TLT

AutoCAD SHX Text

STAIR #22

AutoCAD SHX Text

STAIR #13

AutoCAD SHX Text

BB-17A

AutoCAD SHX Text

BB-15-A1

AutoCAD SHX Text BB-62 Armory

AutoCAD SHX Text

STAIR #14

AutoCAD SHX Text

STAIR #4

AutoCAD SHX Text

BD-63A TLT

AutoCAD SHX Text BD-20 EMS Chief

AutoCAD SHX Text

BD-21 EMS

AutoCAD SHX Text BD-10A Mail

AutoCAD SHX Text BE-20 Linen

AutoCAD SHX Text BD-11 WD-Prop

AutoCAD SHX Text

BB-56

AutoCAD SHX Text BB-30 SPS Asst Chief

AutoCAD SHX Text

BB-44A

AutoCAD SHX Text

BD-23 EMS

AutoCAD SHX Text BD-22 Biomed

AutoCAD SHX Text BD-34 Production

AutoCAD SHX Text BD-60A Soiled

AutoCAD SHX Text

BD-61 LCK-SM

AutoCAD SHX Text BB-09 BLDG #9 Tank room

AutoCAD SHX Text BB-24 Receiving

AutoCAD SHX Text

BE-07

AutoCAD SHX Text

BF-002

AutoCAD SHX Text

BE-47 BIO-HZD

AutoCAD SHX Text BE-31 Whse-Storage

AutoCAD SHX Text

BE-36

AutoCAD SHX Text

BC-85

AutoCAD SHX Text

BE-03

AutoCAD SHX Text

BB-67D

AutoCAD SHX Text BC-70 Stor

AutoCAD SHX Text BE-99 BLDG#1 Switchgear

AutoCAD SHX Text BE-98 BLDG#1 Emergency Gen

AutoCAD SHX Text

BC-77

AutoCAD SHX Text BB-31 Pharm

AutoCAD SHX Text BB-28 Pharm

AutoCAD SHX Text

STAIR #15

AutoCAD SHX Text

BB-82

AutoCAD SHX Text

BB-90C

AutoCAD SHX Text

ELEV #12

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR #7

AutoCAD SHX Text

STAIR #20

AutoCAD SHX Text #7

AutoCAD SHX Text

DN

AutoCAD SHX Text #5

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text

STAIR #10

AutoCAD SHX Text

STAIRWELL #3

AutoCAD SHX Text BD-65A Spray/Drying

AutoCAD SHX Text

SUB

AutoCAD SHX Text BA-09 Soiled Linens

AutoCAD SHX Text Mech

AutoCAD SHX Text BC-05 Anti-Coag Clinic

AutoCAD SHX Text

ELEV #6

AutoCAD SHX Text #4

AutoCAD SHX Text #8

AutoCAD SHX Text

BC-01

AutoCAD SHX Text BA-42 Office

AutoCAD SHX Text BA-35 Men

AutoCAD SHX Text BA-39 Women

AutoCAD SHX Text BA-37 Jan

AutoCAD SHX Text BA-41 Mech

AutoCAD SHX Text BA-43 Brk Rm

AutoCAD SHX Text BA-45 Office

AutoCAD SHX Text BA-70 Office

AutoCAD SHX Text BA-69 Conf Rm

AutoCAD SHX Text…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .