P15 437-23-165 Drawings - Prevent Legionella 2.19.25 - 27 pages.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26326B0012
About this file
This document is a comprehensive set of construction contract drawings and specifications for a system repair project at the Fargo VA Health Care System to prevent Legionella contamination. The project (437-23-165) is located at 2101 Elm Street, Fargo, North Dakota 58102, and is managed by the Department of Veterans Affairs Office of Construction and Facilities Management.
The project scope encompasses mechanical, plumbing, and electrical work across multiple buildings and floors to address water quality and safety concerns. Key deliverables include installation of new water monitoring/sampling stations (MS-1) with associated controllers, sensors, and analytical equipment; replacement of pedal-operated faucets with thermostatic mixing valves and sensor-operated fixtures at numerous locations throughout the facility; modification of existing water quality control boards; and replacement of power receptacles with GFCI quadraplex units. The mechanical work involves detailed plumbing modifications shown on sheets M-0.10 through M-1.41, including mixing valve installations, sink replacements, and water monitoring station demolition and installation details. Electrical work specified on sheets E-0.00 through E-2.00 requires new power connections, GFCI protection, and conduit work to support the monitoring stations. The drawings indicate work across basement levels (Wings A through E), Building 10 boiler plant, and multiple floors (first through fourth) of the primary building. An Infection Control Risk Assessment (ICRA) is detailed on sheet G-1.00, with control measures specified by precaution levels including containment barriers, negative pressurization requirements, and dust control protocols. Room finish schedules on sheet A-5.00 specify paint, tile, and flooring repairs required after plumbing installations. The contract documents were dated 02/14/2025 and prepared by Four Front Design, Inc. of Rapid City, South Dakota.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER PAGE
G-0.00
SYSTEM REPAIR TO PREVENT LEGIONELLA
PROJECT NO. 437-23-165
FARGO VA HEALTH CARE SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
VA U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION SHEET INDEX
SHEET # SHEET TITLE
G-0.00 COVER PAGE
A-5.00 ROOM FINISH SCHEDULE
M-0.00 MECHANICAL GENERAL NOTES AND ABBREVIATIONS
M-0.10 SCHEDULES, MIXING VALVE DETAIL, SENSOR FAUCET & SINK DETAIL
M-1.01 BASEMENT WEST FLOOR PLAN
M-1.02 BASEMENT EAST FLOOR PLAN
M-1.03 BASEMENT SOUTH FLOOR PLAN
M-1.04 BUILDING 10 BOILER PLANT LOWER LEVEL PLAN
M-1.11 FIRST FLOOR NORTHWEST FLOOR PLAN
M-1.12 FIRST FLOOR SOUTHWEST FLOOR PLAN
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
M-1.13 FIRST FLOOR EAST FLOOR PLAN
M-1.14 FIRST FLOOR SOUTHEAST FLOOR PLAN
M-1.15 FIRST FLOOR INFUSION CENTER FLOOR PLAN
M-1.21 SECOND FLOOR NORTH FLOOR PLAN
M-1.22 SECOND FLOOR WEST FLOOR PLAN
M-1.23 SECOND FLOOR SOUTHWEST FLOOR PLAN
M-1.24 SECOND FLOOR EAST FLOOR PLAN
M-1.31 THIRD FLOOR FLOOR PLANS
M-1.41 FOURTH FLOOR NORTH FLOOR PLAN
E-0.00 ELECTRICAL LEGEND AND ABBREVIATIONS
E-1.00 BUILDING 1 BASEMENT ELECTRICAL PLANS, WINGS A,C
E-1.10 BUILDING 1 BASEMENT ELECTRICAL PLANS, WINGS D,E
M-0.20 PEDAL SINK AND FAUCET REPLACEMENT DETAILS
M-0.30 WATER MONITORING STATION DEMOLITION DETAIL
M-0.40 NEW WATER MONITORING STATION DETAILS
E-2.00 BUILDING 10 LEVEL 1 ELECTRICAL PLANS
G-1.00 INFECTION CONTROL RISK ASSESSMENT (ICRA)
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text
RAYMOND E. DAWES
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
INFECTION CONTROL RISK
ASSESSMENT (ICRA)
G-1.00
Number Name ICRA Level
ROOMS & INFECTION CONTROL RISK ASSESSMENT (ICRA) LEVELS
1A CORRIDOR II
1A-30C SECTION LEADERS II
1D-06 EXAM ROOM 1 II
1D-07 EXAM ROOM 2 II
1D-126 HEALTH PROMOTION DISEASE PREVENTION II
1D-13 EXAM ROOM 5 II
1D-133 PACT SOCIAL WORKERS II
1D-14 EXAM ROOM 6 II
1D-18 EXAM ROOM 8 II
1D-20 BREAK ROOM II
1D-23 SOILED UTILITY II
1D-25 EXAM ROOM 12 II
1D-26 EXAM ROOM 13 II
1D-28 EXAM ROOM 15 II
1D-29 EXAM ROOM 14 II
1D-30 EXAM ROOM 16 II
1D-31 EXAM ROOM 17 II
1D-32 EXAM ROOM 18 II
1D-33 EXAM ROOM 19 II
2B-03 SOILED UTILITY II
2C-43 PROCEDURE ROOM 3 III
2C-44 PROCEDURE ROOM 2 III
2C-46 PRE OP III
2C-58A TOILET II
2C-70 ASSOCIATE CHIEF / NURSING SERVICE FOR OPERATIONS II
2C-72 CLC PSYCHOLOGIST II
2C-76 SOILED UTILITY II
3C-24 PATIENT INTAKE II
3C-26 BREAK ROOM II
3C-79 REPAIR SHOP II
3C-88 SLEEP LAB CONTROL ROOM II
3C-89 SLEEP STUDY 1 II
4B-36 RANGE PROGRAM II
1D-115 RESTROOM II
1D-117 RESTROOM II
1D-127A STAFF RESTROOM II
1D-127B STAFF RESTROOM II
1D-24 PROCEDURE ROOM 11 III
REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
Level of Precautions Control Measures
Level I 1. 1. Perform work activity in a manner that does not create dust or interrupt patient care.
2. 2. Immediately replace any ceiling tile, close access panels, etc., upon completion of
3. work.
4. 3. Any materials and equipment being brought into the facility must be free of
5. contaminants and loose material.
Level II All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves/effects potable water systems including stagnation due to reduced usage, piping shall be flushed twice a week or isolated from main system.
5. Seal doors to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth & cleanable containers (w/ a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned & free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
11. Ensure no unauthorized access, by means of lock or continuous, direct supervision for site entry, until project completion.
Level III All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All barrier construction activities must be completed in a manner that prevents dust release.
4. Barriers must be hard barriers unless temporary to install final barrier. Barrier walls shall be inspected and approved prior to the start of demolition or construction. (If VA staff cannot inspect prior to 4:30PM, then the check will be the next business day.)
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A. These controls must be maintained continuously 24/7 for the duration of the project. HEPA-filtered exhaust if discharged directly to the outdoors must be at a distance of 25 feet or greater from entrances, air intakes, and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
7. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Level IV All control measures in Levels I, II and III and the following:
1. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
2. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
3. Workers must wear shoe covers or have a method to clean shoes in anteroom.
Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
NotesNumber Name Floor Finish Base Finish North East South West Walls
ROOM FINISH SCHEDULE
1A CORRIDOR - - - - P1 - SINK LOCATION IS BETWEEN DOORS TO ROOMS 1A-24 & 1A-23. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 24 SF MINIMUM.
1A-30C SECTION LEADERS - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 112 SF MINIMUM.
1D-06 EXAM ROOM 1 - - - P5 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 80 SF MINIMUM.
1D-07 EXAM ROOM 2 - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 88 SF MINIMUM.
1D-126 HEALTH PROMOTION DISEASE PREVENTION - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
1D-13 EXAM ROOM 5 - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 88 SF MINIMUM.
1D-133 PACT SOCIAL WORKERS - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 152 SF MINIMUM.
1D-14 EXAM ROOM 6 - RB - - - P1 REPLACE RB ON WEST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-18 EXAM ROOM 8 - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-20 BREAK ROOM - - P5 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-23 SOILED UTILITY - RB - - - P2 REPLACE RB ON WEST WALL WITH BEDPAN WASHER, 40 SF MINIMUM.
1D-25 EXAM ROOM 12 - RB - P1 - - REPLACE ENTIRE LENGTH OF RB ON EAST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM..
1D-26 EXAM ROOM 13 - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-28 EXAM ROOM 15 - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-29 EXAM ROOM 14 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-30 EXAM ROOM 16 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
1D-31 EXAM ROOM 17 - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 48 SF MINIMUM.
1D-32 EXAM ROOM 18 - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 108 SF MINIMUM.
1D-33 EXAM ROOM 19 - - - - P1 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 24 SF MINIMUM.
2B-03 SOILED UTILITY - - - PT2/PT2 COVE/PT2 BULLNOSE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
2C-43 PROCEDURE ROOM 3 - - - - P2 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
2C-44 PROCEDURE ROOM 2 WSF - - - - - REPLACE ENTIRE FLOOR IN ROOM, CORNER TO CORNER AND UP TOEKICK COVE. USE MANUFACTURER'S RECOMMENDED WELD ROD AND ACCESSORIES.
2C-46 PRE OP - - - - - PT1/PT1 COVE/PT1 BULLNOSE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
2C-58A TOILET - - - - - PT1/PT1 COVE/PT1 BULLNOSE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
2C-70 ASSOCIATE CHIEF / NURSING SERVICE FOR OPERATIONS - - - P1 - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
2C-72 CLC PSYCHOLOGIST - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 96 SF MINIMUM.
2C-76 SOILED UTILITY - RB - - - P2 REPLACE ENTIRE LENGTH OF RB ON WEST WALL. PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 64 SF MINIMUM.
3C-24 PATIENT INTAKE - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 56 SF MINIMUM.
3C-26 BREAK ROOM - - - - - P1 PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 64 SF MINIMUM.
3C-79 REPAIR SHOP - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
3C-88 SLEEP LAB CONTROL ROOM - - P2 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
3C-89 SLEEP STUDY 1 - - - - P4 - PAINT ENTIRE NOTED WALL, CORNER TO CORNER 104 SF MINIMUM.
4B-36 RANGE PROGRAM - - P1 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 120 SF MINIMUM.
ROOM FINISH LEGEND
P1 P2 P3 P4 P5 P6
PT1
PT2
RB
SF
WSF
FIELD PAINT
FIELD PAINT
ACCENT PAINT
ACCENT PAINT
ACCENT PAINT
FIELD PAINT
PORCELAIN/CERAMIC TILE
PORCELAIN/CERAMIC TILE
RESILIENT BASE
SQUARE FEET
WELDED SHEET FLOORING
EXISTING
SHEET SPECIFIC NOTES:
1. ROOM FINISH SCHEDULE DENOTES WORK
AREAS AND CORRESPONDING FINISHES TO
PATCH.
2. SEE MECHANICAL SHEETS FOR SINK LOCATIONS.
3. PAINT COLORS NOTED FOR BASIS OF DESIGN.
CONTRACTOR TO VERIFY IN FIELD.
4. TILE COLORS NOTED FOR BASIS OF DESIGN.
CONTRACTOR TO VERIFY IN FIELD.
5. RESILIENT BASE COLOR NOTED FOR BASIS OF
DESIGN. CONTRACTOR TO VERIFY IN FIELD.
6. ENSURE SMOOTH AND EVEN SUBFLOOR
SURFACE TO ALLOW PROPER APPLICATION OF
WELDED SHEET FLOORING.
1D-115 RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
1D-117 RESTROOM - - - - - PT2/PT2 COVE REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
1D-127A STAFF RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
1D-127B STAFF RESTROOM - - - PT2/PT2 COVE - - REMOVE EXISTING TILE, NEW TILE TO ALIGN WITH EXISTING TILE ON ADJACENT WALLS. NEW TILE TO BE PLACED AS SHOWN IN ELEVATIONS ON SHEET A5.00.
1D-24 PROCEDURE ROOM 11 - - P1 - - - PAINT ENTIRE NOTED WALL, CORNER TO CORNER, 104 SF MINIMUM.
5'-0"
VERIFY IN FIELD
8' -0
VE
R
IF
Y
IN
F
IE
LD
5'-0"
VERIFY IN FIELD
8' -0
VE
R
IF
Y
IN
F
IE
LD
6'-27 8"
VERIFY IN FIELD
8' -0
VE
R
IF
Y
IN
F
IE
LD
6'-27 8"
VERIFY IN FIELD
8' -0
VE
R
IF
Y
IN
F
IE
LD
6'-1"
VERIFY IN FIELD
3' -8
VE
R
IF
Y
IN
F
IE
LD
9'-9"
VERIFY IN FIELD
3' -8
VE
R
IF
Y
IN
F
IE
LD
3'-0"
VERIFY IN FIELD
3' -8
VE
R
IF
Y
IN
F
IE
LD
PLUMBING FIXTURE, SEE MECHANICAL SHEETS.
COVE TILE BASE, 4"X4". SEE ROOM FINISH SCHEDULE.
PT1 TILE, 4"X4". SEE ROOM FINISH SCHEDULE.
PT2 TILE, 4"X4". SEE ROOM FINISH SCHEDULE.
BULLNOSE TILE, 4"X4". SEE ROOM FINISH SCHEDULE.
EXISTING PAINT, TO REMAIN AS IS. SEE ROOM FINISH
SCHEDULE.
KEYED NOTES
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
ROOM FINISH SCHEDULE/FINISH PLANS
A-5.00
ENLARGED ROOM 2C-44 FLOOR REPLACEMENT PLAN
SCALE: 1/2" = 1'
A5.00
FLOOR FINISH LEGEND
WSF - WELDED SHEET
FLOORING
CONTRACTOR
TO PLAN FOR
MINIMUM 60"W x
24"D SECTION
OF WSF TO
ENSURE
PROPER
PATTERN
MATCH. CUT TO
SIZE IN FIELD.
HEAT WELD AT
EXISTING
SEAMS.
ESTIMATED
LOCATION OF WSF
AND SEAMS TO BE
REPLACED. SMOOTH
PATCH BELOW TO
ENSURE SMOOTH
AND SEAMLESS
SUBSTRATE PRIOR
TO PLACEMENT OF
SHEET FLOORING.
1D-115 EAST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
1D-117 WEST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
1D-127A EAST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
1D-127B EAST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
2B-03 EAST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
2C-46 WEST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
2C-58A WEST INTERIOR ELEVATION
SCALE: 1/4" = 1'
A5.00
S
ABBREVIATIONS:
AC ALTERNATING CURRENT
ADJ. ADJUSTABLE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
C/L CENTERLINE
CO CLEANOUT
COEF COEFFICIENT
COMLINK COMMUNICATION LINK
COND CONDENSATION
CONFIG CONFIGURED
COR CONTRACTING OFFICER'S REPRESENTATIVE
CV CONTROL VALVE
CV FLOW COEFFICIENT
DAMP. DAMPER
DC DIRECT CURRENT
DEG DEGREES
DIFF. DIFFERENTIAL
(E) EXISTING
EA EXHAUST AIR
ECC ENERGY CONTROL CENTER
ELECT. ELECTRICAL
ELEV ELEVATION
ENT ENTERING
F FAHRENHEIT
FD FLOOR DRAIN
FS FLOOR SINK
FILT. FILTER
FPM FEET PER MINUTE
FT FEET
GAL GALLONS
G.C. GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HP HORSEPOWER
HR HOUR
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HX HEAT EXCHANGER
Hz HERTZ
IBC INTERNATIONAL BUILDING CODE
IECC INTERNAIONAL ENERGY CONSERVATION CODE
IFB INTEGRAL FACE AND BYPASS
IMC INTERNATIONAL MECHANICAL CODE
I/O INPUT/OUTPUT
IPC INTERNATIONAL PLUMBING CODE
L LENGTH
LA LABORATORY EQUIPMENT COMPRESSED AIR
LBS POUNDS
MA MEDICAL AIR
MAX MAXIMUM
MBH
THOUSAND BRITISH THERMAL UNITS PER HOUR
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MFG MANUFACTURER
MIN MINIMUM
MIN MINUTE
mm MILLIMETER
MV MEDICAL VACUUM
N.C. NORMALLY CLOSED
NC NOISE CRITERIA LEVEL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
N.O. NORMALLY OPEN
NPT NATIONAL PIPE THREAD
O2 OXYGEN
ORD OVERFLOW ROOF DRAIN
OSHA
Pa PASCAL
PD PRESSURE DROP
PRESS. PRESSURE
PSIG POUNDS PER SQUARE INCH - GAUGE
QUANT. QUANTITY
RA RETURN AIR
RC REHEAT STEAM COIL - AHU
RD ROOF DRAIN
RE RESIDENT ENGINEER
REQ'D REQUIRED
RPM REVOLUTIONS PER MINUTE
S SUPPLY
SF SQUARE FEET
SPEC SPECIFICATION
SS STAINLESS STEEL
T THERMOSTAT
TYP TYPICAL
V VOLTS
VAC MEDICAL VACUUM
W/ WITH
WB WET BULB
WG INCHES OF WATER
ZAP ZONE ALARM PANEL
ZVB ZONE VALVE BOX
B
T
A
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
CHECK VALVE
FLOW CONTROL VALVE
PRESSURE REDUCING VALVE
REDUCED PRESSURE ZONE VALVE
SOLENOID VALVE
PRESSURE RELIEF VALVE
PRESSURE GAUGE
THERMOMETER
CONCENTRIC REDUCER
PIPE UNION
TEST PLUG
VALVE GLOBE VALVE
BALANCING VALVE
TEMPERATURE SENSOR
GLOBE VALVE -MANUAL
GLOBE VALVE - ON/OFF
GLOBE VALVE - MODULATING
PLUMBING SYMBOLS
POINT OF CONNECTION
POINT OF DISCONNECTION
TO BE DEMOLISHED
2 PLUMBING PLAN NOTE
PIPE DOWN
PIPE UP
PIPE TEE DOWN
TEE
GENERAL MECHANICAL NOTES:
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF
THE INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE
(IMC), UNIFORM PLUMBING CODE (IPC), INTERNATIONAL FUEL GAS CODE (IFGC), NFPA
99, NFPA 101 LIFE SAFETY CODE, VA PLUMBING DESIGN MANUAL (REV 02/24), VHA
DIRECTIVE 1061 (AMENDED 03/24) AND ANY AUTHORITY HAVING JURISDICTION. THIS
IS A FEDERAL PROJECT, AS SUCH ALL CODE REQUIREMENTS ARE REQUIRED.
ALL EQUIPMENT, MATERIALS, AND ARTICLES INCORPORATED IN THE WORK SHALL BE
NEW AND OF COMPARABLE QUALITY AS SPECIFIED. ALL WORKMANSHIP SHALL BE
FIRST-CLASS AND SHALL BE PERFORMED BY MECHANICS SKILLED AND REGULARLY
EMPLOYED IN THEIR RESPECTIVE TRADES.
ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED TRADES PRIOR TO
STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES SHALL BE
PERFORMED BY THE INSTALLATION CONTRACTOR WITHOUT INCREASED COST TO
THE OWNER.
THESE DRAWINGS ARE GENERAL IN NATURE. ALTHOUGH EVERY ATTEMPT HAS BEEN
MADE TO INDICATE THE EXACT ROUTING AND LOCATION OF PROPOSED SYSTEMS,
NOT ALL OFFSETS, REQUIRED FITTINGS AND/OR CONDITIONS CAN BE SHOWN. THE
CONTRACTOR SHALL COORDINATE WORK AND MAKE REQUIRED CHANGES TO THE
ROUTING IN ORDER TO AVOID CONFLICTS WITHOUT ANY INCREASED COST TO THE
OWNER.
SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT
DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE
EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM
READY FOR NORMAL AND PROPER OPERATION, INCLUDING ALL WORK OR
MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS,
BUT NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE
CLEARANCES ARE MAINTAINED. CORRIDORS SHALL NOT BE COMPLETELY BLOCKED
BY DUST BARRIERS. AT LEAST HALF OF THE CORRIDORS SHALL BE OPEN. CLOSE
COORDINATION WILL BE REQUIRED WITH THE MECHANICAL PIPING, HVAC, FIRE
PROTECTION, ELECTRICAL CONTRACTOR AND VA COR.
TURN OVER REMOVED EQUIPMENT AND FAUCETS TO THE VA FOR SPARE PARTS OR
DISPOSE OF IF NOT WANTED BY FARGO VA STAFF.
THE CONTRACTOR WILL BE ADDING NEW WALL PENETRATIONS IN A VARIETY OF WALL TYPES
TO COMPLETE THIS PROJECT. ALL PENETRATIONS WILL BE SEALED MINIMALLY FOR SMOKE
AND FIRE SPREAD. FOR RATED WALLS, THE CONTRACTOR SHALL SUBMIT AND PROVIDE UL
LISTED PENETRATION FOR EACH APPROPRIATE RATED ASSEMBLY PENETRATION. ALL
PENETRATIONS SHALL BE SEALED AT THE END OF WORK SHIFT TO AVOID LEAVING AN
OPENING OVERNIGHT.
ZC VALVE OR DAMPER CONTROLLER
DCW. DOMESTIC COLD WATER
DHW. DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
STRAINER
HOSE BIBB
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
MECHANICAL GENERAL NOTES AND
ABBREVIATIONS
M-0.00
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
COUNTER
EXISTING COUNTER SINK/LAVATORY &
FAUCET, SHOWN FOR REFERENCE ONLY.
ACTUAL STYLE MAY VARY.
SUPPORT MV-1 ON A STUD, MV-1
AND DCW/DHW SUPPLIES TO BE
CLEANLY BUNDLED AND
SUPPORTED BELOW NEW SINK,
SUBJECT TO AE/COR INSPECTION.
NEW DCW SUPPLY TO
EXISTING FAUCET
NEW DHW SUPPLY TO
EXISTING SINK
COUNTER
EXISTING COUNTER SINK/LAVATORY &
FAUCET, SHOWN FOR REFERENCE ONLY.
ACTUAL STYLE MAY VARY
EXISTING HOT WATER
STOP (TO REMAIN)
EXISTING COLD WATER
STOP (TO REMAIN)
REMOVE EXISTING COLD WATER
SUPPLY TO EXISTING FAUCET
REMOVE EXISTING HOT WATER
SUPPLY TO EXISTING FAUCET
EXISTING/DEMO NEW
MV
NEW DCW/DHW
SUPPLIES TO MV-1
FINISHED
FLOOR
FINISHED
FLOOR
P
P
P
P
EXISTING HOT WATER
STOP (TO REMAIN)
EXISTING COLD WATER
STOP (TO REMAIN)
SPECIALTY TAG DESCRIPTION BASIS OF DESIGN MANUFACTURER & MODEL #
PIPING CONNECTIONS
TRAP S/W VENT C.W. H.W.
PLUMBING SPECIALTY SCHEDULE
NOTES:
1. PROVIDE NEW 3/8" BRAIDED SUPPLY HOSE FOR CONNECTION TO NEW AND EXISTING FAUCETS.
2. PROVIDE NEW WATER MONITORING STATION USING ANNOTATED COMPONENTS SHOWN IN DETAIL 3 M-0.1
3. WATER SAMPLING STATION IS TO COME WITH THE FOLLOWING COMPONENTS:
TOPAX CONTROLLER MODEL MC4 TOTAL CHLORINE ANALYZER
pH ELECTRODE
FREE CHLORINE/CHLORINE DIOXIDE MEASURING CELL
CONDUCTIVITY ELECTRODE
ULTRASONIC TRANSIT TIME FLOW METER (NCMB2-F/E)
DDA SMART PUMP (DDA 7.5-16)
4. TO BE PROVIDED WITH DHWR SAMPLING STATIONS. MOUNT TO MONITORING BOARD FOR DHWR SAMPLING STATIONS.
5. TIE INTO EXISTING DOMESTIC WATER INLET AND OUTLET PIPING.
6. NEW MS-1 TO BE INTEGRATED INTO THE EXISTING FARGO VA BAS VIA NEAREST EXISTING CONTROL PANEL VIA BACNET.
CONTROLS CONTRACTOR TO INSTALL NEW CONDUIT AND CONTROL WIRING. CONTROLS CONTRACTOR TO PROVIDE NEW
GRAPHICS PROGRAMMING FOR EACH MONITORING STATION INTO THE EXISTING BAS.
7. MANUFACTURER TO PROVIDE STARTUP AND COMMISSIONING OF MONITORING STATION IN LIEU OF 3RD PARTY COMMISSIONING.
PLUMBING SPECIALTY MAY BE CALLED OUT ON PLANS AS TAGGED, SPECIFICALLY CALLED FOR IN NOTES/DETAILS, OR NOT AT ALL. IF REFERENCE TO ANY OF THE ABOVE SPECIALTY IS NOT SPECIFICALLY CALLED OUT, THIS SCHEDULE ALSO PROVIDES BASIS OF
SPECIFICATION FOR SUPPLY BY THE CONTRACTOR.
2"UNDERSINK THERMOSTATIC MIXING VALVE WATTS, LFUSG-B M3 OR EQUALMV-1 1
2" 1
REMARKS
C.W.
PLUMBING FIXTURE SCHEDULE
FIXTURE TAG DESCRIPTION MANUFACTURER & MODEL # PIPING CONNECTIONS
H.W. REMARKS
NOTES:
1. PROVIDE NEW SUPPLY LINES FOR USE WITH NEW MV-1 AND EXISTING FAUCET.
2. P-102 TO INCLUDE NEW HOLD RITES AND ESCUTCHEONS.
3. INSTALL NEW SINK AT SAME LOCATION AND ELEVATION AS SINK BEING REPLACED.
4. PROVIDE ADA OFFSET TRAP AND INSULATION WHERE REQUIRED.
P-100
2"
COUNTER MOUNT LAVATORY EXISTING, TO REMAIN
2"EXISTING, TO REMAINFAUCET
P-101
WATER SUPPLY STOPS EXISTING, TO REMAIN
2" 1
2"
P-102
FAUCET
WALL MOUNT LAVATORY AMERICAN STANDARD 0355.012
WRIST BLADE FAUCET CHICAGO FAUCET 895-GN6AE36XK317AB
WALL MOUNT LAVATORY
WATER SUPPLIES BRASSCRAFT B1-A
EXISTING, TO REMAIN
EXISTING, TO REMAIN
WATER SUPPLY WITH STOP KIT 1
2" 1
2"
WATER MONITORING/SAMPLING STATIONMS-1 LUTZ-JESCO EASYPRO OR EQUAL
WATER SUPPLY STOPS EXISTING, TO REMAIN
BRASSCRAFT KTCR19X C 1/4 TURN KIT
2" 1
2"
2"1
2" 2,3,5,6,7
P-103
COUNTER MOUNT LAVATORY
WRIST BLADE FAUCET
WATER SUPPLIES
VENTS/W
1 14"
EXISTING, TO REMAIN
BRASSCRAFT B1-A
CHICAGO FAUCET 895-GN6AE36XK317AB 1
2" 1
2"
4"SAMPLE COOLER NEPTUNE, SC-316 OR EQUALSC-1 3
8" 4
4P-TRAP DRAIN ASSEMBLY DEARBORN BRASS 704-1
2, 3
WATER SUPPLIES BRASSCRAFT B1-A
WATER SUPPLY STOPS EXISTING, TO REMAIN
REMOVE EXISTING LAVATORY
SINK, SENSOR FAUCET, AND
TAILPIECE
DISCONNECT EXISTING COLD
WATER FROM EXISTING FAUCET,
TO REMAIN FOR RECONNECTION
TO NEW MIXING VALVE
DISCONNECT EXISTING HOT
WATER FROM EXISTING FAUCET,
TO REMAIN FOR RECONNECTION
TO NEW MIXING VALVE
EXISTING/DEMO
FINISHED
FLOOR
NEW
EXISTING DCW/DHW
STOPS
FINISHED
FLOOR
NEW DCW/DHW
SUPPLIES TO MV-1
NEW DCW/DHW SUPPLIES
TO NEW FAUCET
MV
P
NEW LAVATORY SINK
SUPPORT MV-1 ON A STUD, MV-1
AND DCW/DHW SUPPLIES TO BE
CLEANLY BUNDLED AND
SUPPORTED BELOW NEW SINK,
SUBJECT TO AE/COR INSPECTION.NEW P-TRAP/TAILPIECE, CONNECT TO
EXISTING SAN/VENT IN WALL
EXISTING DCW/DHW
STOPS
· CONTRACTOR TO COORDINATE AND SCHEDULE ANY
REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE
COR PRIOR TO WORK STARTING.
GENERAL PLUMBING NOTE
EXISTING SINK MIXING VALVE ADDITION DETAILS
SCALE: NTS
M0.10
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
M-0.10
SENSOR FAUCET & SINK REPLACEMENT DETAIL
SCALE: NTS
M0.10
SCHEDULES, MIXING VALVE DETAIL, SENSOR
FAUCET & SINK DETAIL
GENERAL SCHEDULES NOTE: ALL EQUIPMENT SHOWN IN THE SCHEDULES BELOW ARE BASIS OF DESIGN. OR EQUAL PRODUCT MAY BE SUBMITTED FOR REVIEW.
AutoCAD SHX Text
FOURFRONT DESIGN, INC.
AutoCAD SHX Text
517 7TH STREET
AutoCAD SHX Text
RAPID CITY, SOUTH DAKOTA 57701
AutoCAD SHX Text
PH: (605) 342-9470
AutoCAD SHX Text
FAX: (605) 342-2377
AutoCAD SHX Text
WWW.FOURFRONTDESIGN.COM
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
EXISTING/DEMO NEW
NEW DCW/DHW
STOPS AND SUPPLIES
REMOVE EXISTING
MIXED SUPPLY TO
EXISTING FAUCET
EXISTING DCW/DHW IN
WALL TO FOOT PEDAL
SUPPLY STOPS
REMOVE EXISTING
SINK/P-TRAP AND
PEDAL OPERATED
FAUCET
REMOVE EXISTING
DCW/DHW PEDAL
SUPPLY STOPS
REMOVE EXISTING WALL
APPROX 18" TALL BETWEEN
STUDS TO MODIFY EXISTING
DCW/DHW PIPING FOR NEW
DCW/DHW STOPS.
EXISTING DCW/DHW IN
WALL
PROVIDE NEW WALL
ESCUTCHEONS (x2)
REMOVE EXISTING
PEDAL OPERATOR
FINISHED
FLOOR
FINISHED
FLOOR
NEW DCW/DHW
SUPPLIES TO NEW MV-1
NEW DCW/DHW SUPPLIES
TO NEW FAUCET
PATCH AND REPAIR WALL TO
MATCH EXISTING, REFER TO ROOM
FINISH SCHEDULE ON SHEET A-5.00
NEW HOLDRITE, OR EQUAL,
SUPPORTS BETWEEN STUDS
NEW DCW/DHW SUPPLY PIPING IN
WALL TO RAISE AND WIDEN NEW
SUPPLY STOPS LOCATION
MV
P
NEW LAVATORY
SUPPORT MV-1 ON A STUD, MV-1 AND
DCW/DHW SUPPLIES TO BE CLEANLY
BUNDLED AND SUPPORTED BELOW NEW
SINK, SUBJECT TO AE/COR INSPECTION.
NEW P-TRAP/TAILPIECE, CONNECT TO
EXISTING SAN/VENT IN WALL
EXISTING/DEMO
EXISTING COUNTER
MOUNT SINK TO REMAIN
REMOVE EXISTING
PEDAL OPERATOR
EXISTING TMV TO
REMAIN FOR RE-USE
REMOVE EXISTING WATER SUPPLIES FROM
MIXING VALVE TO PEDAL OPERATOR
EXISTING DHW AND
DCW STOPS TO
REMAIN
NEW
CUT 2 NEW HOLES INTO EXISTING COUNTER
FOR NEW FAUCET INSTALLATION,
COORDINATE WITH MANUFACTURERS
INSTALLATION INSTRUCTIONS.
EXISTING TMV TO REMAIN. SUPPORT ON A STUD,
EXISTING MIXING VALVE AND NEW DCW/DHW SUPPLIES
TO BE CLEANLY BUNDLED AND SUPPORTED BELOW NEW
SINK, SUBJECT TO AE/COR INSPECTION.
EXISTING DHW AND
DCW STOPS TO
REMAIN
NEW DCW/DHW
SUPPLIES TO NEW
FAUCET
FINISHED
FLOOR
FINISHED
FLOOR
P
COUNTER COUNTER
EXISTING MIXED WATER TO
EXISTING FAUCET
REPLACE FLOORING IN TOE
KICK, REFER TO ROOM FINISH
SCHEDULE ON SHEET A-5.00
REMOVE EXISTING
PEDAL OPERATED
FAUCET
REMOVE EXISTING WATER SUPPLIES
TO EXISTING MIXING VALVE
NEW DCW/DHW
SUPPLIES TO EXISTING
MIXING VALVE
· CONTRACTOR TO COORDINATE AND SCHEDULE ANY
REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE
COR PRIOR TO WORK STARTING.
GENERAL PLUMBING NOTE
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
WALL MOUNT PEDAL OPERATED SINK AND FAUCET REPLACEMENT DETAIL
SCALE: NTS
M0.20
M-0.20
COUNTER MOUNT PEDAL OPERATED FAUCET REPLACEMENT DETAIL
SCALE: NTS
M0.20
PEDAL SINK AND FAUCET REPLACEMENT
DETAILS
AutoCAD SHX Text
FOURFRONT DESIGN, INC.
AutoCAD SHX Text
517 7TH STREET
AutoCAD SHX Text
RAPID CITY, SOUTH DAKOTA 57701
AutoCAD SHX Text
PH: (605) 342-9470
AutoCAD SHX Text
FAX: (605) 342-2377
AutoCAD SHX Text
WWW.FOURFRONTDESIGN.COM
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
EXISTING PRESSURE GAUGE
EXISTING FLOW CELL
EXISTING MONOCHLORAMINE SENSOR
EXISTING OUTLET TO
DRAIN
EXISTING BOOSTER PUMP
EXISTING 1/2" DOMESTIC
WATER INLET PIPING
EXISTING MONOCHLORAMINE
PROCESSOR
EXISTING CONTROLLER
EXISTING pH SENSOR
EXISTING CONDUCTIVITY
SENSOR
EXISTING FLOW GAUGE
EXISTING FLOW SENSOR
EXISTING DDA SMART PUMP
EXISTING INJECTION
POINT
EXISTING PIPING INLET FROM
CHLORAMINE CONTAINER
EXISTING 1/2" DOMESTIC WATER
OUTLET PIPING
EXISTING WATER QUALITY
MONITORING STATION MOUNTING
BOARD
SOV (TYP)
SOV (TYP)
· CONTRACTOR TO COORDINATE AND SCHEDULE ANY
REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE
COR PRIOR TO WORK STARTING.
GENERAL PLUMBING NOTE
EXISTING WATER MONITORING STATION DEMOLITION DETAIL
SCALE: NTS
M0.30
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
M-0.30
WATER MONITORING STATION DEMOLITION
DETAIL
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
NEW PRESSURE GAGUE
NEW FLOW CELL
NEW MONOCHLORAMINE SENSOR
NEW BOOSTER PUMP
NEW MONOCHLORAMINE PROCESSORNEW CONTROLLER
NEW pH SENSOR
NEW CONDUCTIVITY SENSOR
NEW FLOW GAUGE
NEW FLOW SENSOR
NEW DDA SMART PUMP
NEW INJECTION POINT
CONNECT TO EXISTING 1/2"
DCW PIPING FROM NEW
WATER MONITORING
STATION OUTLET SOV
NEW TUBING FROM CHLORAMINE
CONTAINER TO NEW WATER
MONITORING STATION PUMP NEW 3/4" DRAIN PIPING TO
EXISTING FLOOR DRAIN/SINK
NEW WATER QUALITY MONITORING
STATION MOUNTING BOARD
CONNECT EXISTING 1/2" DCW
PIPING TO NEW WATER
MONITORING STATION INLET
SOV
NEW STRAINER
NEW PRESSURE REDUCING
VALVE, 30 PSI MAX
SOV (TYP)
GENERAL NOTE: REDUCE/EXPAND PIPE SIZE AT MONITORING
STATION AS NEEDED TO MAKE CONNECTIONS. MAKE PIPING
CONNECTIONS ACCORDING TO MANUFACTURER INSTALLATION
INSTRUCTIONS. MOUNT NEW MS-1 MONITORING STATION BOARD TO
EXISTING STRUT SUPPORT STAND, MODIFY EXISTING STAND AS
REQUIRED.
MS
NEW PRESSURE GAGUE
NEW FLOW CELL
NEW MONOCHLORAMINE SENSOR
NEW BOOSTER PUMP
NEW MONOCHLORAMINE PROCESSORNEW CONTROLLER
NEW pH SENSOR
NEW CONDUCTIVITY SENSOR
NEW FLOW GAUGE
NEW FLOW SENSOR
NEW DDA SMART PUMP
NEW INJECTION POINT
NEW TUBING FROM CHLORAMINE
CONTAINER TO NEW WATER
MONITORING STATION PUMP NEW 3/4" DRAIN PIPING TO
EXISTING FLOOR DRAIN/SINK
NEW WATER QUALITY MONITORING
STATION MOUNTING BOARD
CONNECT EXISTING 1/2" DHWR
PIPING TO NEW WATER
MONITORING STATION INLET SOV
NEW 1/2" DCW PIPING TO
SAMPLE COOLER INLET
GENERAL NOTE: REDUCE/EXPAND PIPE SIZE AT MONITORING STATION AS
NEEDED TO MAKE CONNECTIONS. MAKE PIPING CONNECTIONS
ACCORDING TO MANUFACTURER INSTALLATION INSTRUCTIONS. MOUNT
NEW MS-1 MONITORING STATION BOARD TO EXISTING STRUT SUPPORT
STAND, MODIFY EXISTING STAND AS REQUIRED.
NEW SAMPLE COOLER
NEW STRAINER
NEW PRESSURE REDUCING
VALVE, 30 PSI MAX
NEW CHECK VALVE
CONNECT TO EXISTING 1/2" DHWR
PIPING FROM NEW WATER
MONITORING STATION OUTLET SOV
NEW SOV (TYP)
NEW 1/2" DRAIN PIPING FROM
SAMPLE COOLER OUTLET. PIPE
TO EXISTING FLOOR
DRAIN/SINK
MS
NEW STRAINER
SC
· CONTRACTOR TO COORDINATE AND SCHEDULE ANY
REQUIRED DOMESTIC WATER SHUTDOWNS WITH THE
COR PRIOR TO WORK STARTING.
GENERAL PLUMBING NOTE
NEW DCW WATER MONITORING STATION DETAIL
SCALE: NTS
M0.40
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
E
C
A
Department of Veterans Affairsof
5/
/2
3:
:4
PM
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
NEW WATER MONITORING STATION DETAILS
M-0.40
NEW DHWR WATER MONITORING STATION DETAIL
SCALE: NTS
M0.40
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text No. 19926PE
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
WATER MONITORING
STATION LOCATION
DHWR(E)
MS
EXISTING BAS
CONTROL PANELS
MS
WATER MONITORING
STATION LOCATION
EXISTING 1/2" DCW TO/FROM
WATER MONITORING
STATION TO/FROM EXISTING
DCW PIPING.
DCW(E) DCW(E)
WH
(E)
WH
(E)
3" D
C W
(E
NEW 1/2" DCW TO MS-1
SAMPLE COOLER
1/ 2"
D C
W
EXISTING
CAPPED AND
VALVED 3/4" DCW
NEW 1/2" DCW TO MS-1
SAMPLE COOLER
EXISTING 1/2" DHW TO/FROM
WATER MONITORING STATION
TO/FROM EXISTING DHWR
PIPING.
INSTALL NEW MIXING VALVE TO EXISTING
LAVATORY/SINK. REFER TO DETAIL 1 ON SHEET M-0.10.
REPLACE EXISTING DCW WATER QUALITY MONITORING
STATION WITH NEW MS-1. REFER TO DETAIL 1 ON SHEET
M-0.40.
REPLACE EXISTING DHW WATER QUALITY MONITORING
STATION WITH NEW MS-1. REFER TO DETAIL 2 ON SHEET
M-0.40.
KEYED PLUMBING NOTES
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
BUILDING IS FULLY SPRINKLED
ARCHITECT-ENGINEERCONSULTANTS:
DateRevisions:
8A«(OR/«��-����
Q P G G
KI
J
VJ
KP
E J Q P G
HQ
Q V
Q P G S W C
TV
G T«
KP
E J Q P G
HQ
Q V
VJ
TG
G G
KI
J
VJ
U«
KP
E J Q P G
HQ
Q V
Q P G J C
NH
KP
E J Q P G
HQ
Q V
VJ
TG
G S W C
TV
G
TU
KP
E J Q P G
HQ
Q V
Q P G
KP
E J Q P G
HQ
Q V
Q P G C P F Q P G J C
NH
KP
E J G U«
Q P G
HQ
Q V
VJ
TG
G
KP
E J G U«
Q P G
HQ
Q V
E
C
A
Department of Veterans Affairsof
����«-«CONTRACT«&OCU/ENTS
02/14/2025 PMRD
437-23-165SYSTEM REPAIR TO
PREVENT LEGIONELLA
FARGO, ND
1, 9, 46
12/13/2023REVISION #1: BIDDING ADDENDUM #1
BASEMENT WEST FLOOR PLAN
SCALE: 1/8" = 1'
M1.01
BASEMENT WEST FLOOR PLAN
M-1.01
BASEMENT FLOOR KEY PLAN
SCALE: NTS
AutoCAD SHX Text BB-34 Mechanical
AutoCAD SHX Text
BB-34B
AutoCAD SHX Text BB-15 Storage
AutoCAD SHX Text
BB-16A
AutoCAD SHX Text BB-15B Men's
AutoCAD SHX Text
BB-15B1
AutoCAD SHX Text
BB-18B
AutoCAD SHX Text
BA-30 TR
AutoCAD SHX Text
BB-18A
AutoCAD SHX Text
BB-20A
AutoCAD SHX Text BB-17 Pre-Assembly Storage
AutoCAD SHX Text
BB-10 ENG/VAEA
AutoCAD SHX Text
BB-26
AutoCAD SHX Text BB-76 Staff Lounge
AutoCAD SHX Text
BB-22
AutoCAD SHX Text BB-27 Pharm Chief
AutoCAD SHX Text BB-80 In-patient Pharm
AutoCAD SHX Text BB-75 Pharmacy Receiving
AutoCAD SHX Text
BB-90 ANTE
AutoCAD SHX Text BB-78 HD Stor
AutoCAD SHX Text
BB-72A
AutoCAD SHX Text
BB-80C
AutoCAD SHX Text
LIBERTY ELEV (1,2,3)
AutoCAD SHX Text BB-20 Receiving Decontamination
AutoCAD SHX Text
BB-21
AutoCAD SHX Text BA-10 BLDG 9 Switchgear
AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen
AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen
AutoCAD SHX Text BA-01A BLDG 46 Switchgear
AutoCAD SHX Text BA-07 SPS Storage
AutoCAD SHX Text BA-05 Envo Mgmt
AutoCAD SHX Text
BA-03 EMS
AutoCAD SHX Text
STAIR #9
AutoCAD SHX Text BB-80A Crtl Sub Vault
AutoCAD SHX Text
BB-80B
AutoCAD SHX Text
BC-05C
AutoCAD SHX Text
BC-05B
AutoCAD SHX Text
BC-79
AutoCAD SHX Text
BC-05A
AutoCAD SHX Text BC-20 Customer Relationship Manager
AutoCAD SHX Text
BC-93 EMS
AutoCAD SHX Text BC-95 Women's Locker
AutoCAD SHX Text
BD-02 TR/TEL
AutoCAD SHX Text BD-10 M-Tlt
AutoCAD SHX Text
BD-12 FM-TLT
AutoCAD SHX Text BD-08 CTN-Stor
AutoCAD SHX Text
BD-06 TR
AutoCAD SHX Text
BD-04 BRKRM
AutoCAD SHX Text BA-01 Mechanical
AutoCAD SHX Text
BC-20A
AutoCAD SHX Text
BC-20B
AutoCAD SHX Text
BC-03 M&R
AutoCAD SHX Text
BB-12
AutoCAD SHX Text
BB-34A UPS
AutoCAD SHX Text
BB-16B
AutoCAD SHX Text BB-15A Women's
AutoCAD SHX Text
BB-44B
AutoCAD SHX Text
BB-44
AutoCAD SHX Text
BB-17A
AutoCAD SHX Text
BB-15-A1
AutoCAD SHX Text BB-30 SPS Asst Chief
AutoCAD SHX Text
BB-44A
AutoCAD SHX Text BB-09 BLDG #9 Tank room
AutoCAD SHX Text BB-24 Receiving
AutoCAD SHX Text BB-31 Pharm
AutoCAD SHX Text BB-28 Pharm
AutoCAD SHX Text BA-09 Soiled Linens
AutoCAD SHX Text BC-05 Anti-Coag Clinic
AutoCAD SHX Text
BC-01
AutoCAD SHX Text BA-42 Office
AutoCAD SHX Text BA-35 Men
AutoCAD SHX Text BA-39 Women
AutoCAD SHX Text BA-37 Jan
AutoCAD SHX Text BA-41 Mech
AutoCAD SHX Text BA-43 Brk Rm
AutoCAD SHX Text BA-45 Office
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
WOODEN
AutoCAD SHX Text
UP
AutoCAD SHX Text BB-96 Fitness Instruction
AutoCAD SHX Text BB-100 Mechanical
AutoCAD SHX Text BB-95 Fitness
AutoCAD SHX Text BB-95B Men's LKR
AutoCAD SHX Text BB-95A Women's LKR
AutoCAD SHX Text
BB-91
AutoCAD SHX Text BB-93 Storage
AutoCAD SHX Text BB-94 Electrical
AutoCAD SHX Text
BB-92 TR
AutoCAD SHX Text
BB-67A
AutoCAD SHX Text
BB-67B
AutoCAD SHX Text BB-84 Exam
AutoCAD SHX Text BB-85A Exam
AutoCAD SHX Text BB-67C OC-Hlth
AutoCAD SHX Text BB-66 Women
AutoCAD SHX Text BB-64 Men
AutoCAD SHX Text
BB-60A
AutoCAD SHX Text
BB-60 W-LKRM
AutoCAD SHX Text
BB-61 HLDG
AutoCAD SHX Text
BB-57
AutoCAD SHX Text BB-58 Mech
AutoCAD SHX Text BB-54 PD A-Chief
AutoCAD SHX Text
BB-52
AutoCAD SHX Text
BB-59A
AutoCAD SHX Text
BB-59 M-LKRM
AutoCAD SHX Text BB-97 Stor
AutoCAD SHX Text BB-50 Storage
AutoCAD SHX Text BB-53 Police Admin
AutoCAD SHX Text BB-55 PD Chief
AutoCAD SHX Text BB-35 Imaging UPS
AutoCAD SHX Text
BB-67
AutoCAD SHX Text BB-32 SPS Chief
AutoCAD SHX Text BB-34 Mechanical
AutoCAD SHX Text
BB-34B
AutoCAD SHX Text BB-15 Storage
AutoCAD SHX Text
BB-16A
AutoCAD SHX Text BB-15B Men's
AutoCAD SHX Text
BB-15B1
AutoCAD SHX Text
BB-18B
AutoCAD SHX Text
BA-30 TR
AutoCAD SHX Text
BB-18A
AutoCAD SHX Text
BB-20A
AutoCAD SHX Text BB-17 Pre-Assembly Storage
AutoCAD SHX Text
BB-10 ENG/VAEA
AutoCAD SHX Text
BB-26
AutoCAD SHX Text BB-76 Staff Lounge
AutoCAD SHX Text
BB-22
AutoCAD SHX Text BB-27 Pharm Chief
AutoCAD SHX Text BB-80 In-patient Pharm
AutoCAD SHX Text BB-75 Pharmacy Receiving
AutoCAD SHX Text
BB-90 ANTE
AutoCAD SHX Text
BB-90B
AutoCAD SHX Text
BB-90A
AutoCAD SHX Text BB-78 HD Stor
AutoCAD SHX Text
BB-72A
AutoCAD SHX Text
BB-80C
AutoCAD SHX Text
BB-68
AutoCAD SHX Text BB-33 Pharm
AutoCAD SHX Text
BB-69
AutoCAD SHX Text
LIBERTY ELEV (1,2,3)
AutoCAD SHX Text BB-20 Receiving Decontamination
AutoCAD SHX Text
BB-21
AutoCAD SHX Text BA-72 Mech
AutoCAD SHX Text BA-67 Mech
AutoCAD SHX Text BA-10 BLDG 9 Switchgear
AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen
AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen
AutoCAD SHX Text BA-01A BLDG 46 Switchgear
AutoCAD SHX Text BA-07 SPS Storage
AutoCAD SHX Text BA-05 Envo Mgmt
AutoCAD SHX Text
BA-03 EMS
AutoCAD SHX Text
STAIR #9
AutoCAD SHX Text BB-80A Crtl Sub Vault
AutoCAD SHX Text
BB-80B
AutoCAD SHX Text
BC-05C
AutoCAD SHX Text
BC-05B
AutoCAD SHX Text
BC-79
AutoCAD SHX Text
BC-05A
AutoCAD SHX Text BC-01 Wrk Rm
AutoCAD SHX Text
BC-02 TR
AutoCAD SHX Text
VICTORY ELEV (7,8)
AutoCAD SHX Text BB-85B OC-Hlth
AutoCAD SHX Text BB-70 Pharm EDU
AutoCAD SHX Text BB-85 OC-Hlth
AutoCAD SHX Text BC-10 Social Work
AutoCAD SHX Text BC-11 HMLS Outreach
AutoCAD SHX Text
BC-30
AutoCAD SHX Text
BC-32 PACT SW
AutoCAD SHX Text BC-12 Intrvw Rm
AutoCAD SHX Text BC-11A Intrvw-Rm
AutoCAD SHX Text BC-13 Super
AutoCAD SHX Text
BC-15A OEF/OIF
AutoCAD SHX Text
BC-45 TR
AutoCAD SHX Text
BC-43 TR
AutoCAD SHX Text BC-41 Mech
AutoCAD SHX Text BC-47 TR Off/Stor
AutoCAD SHX Text BC-15 OEF/OIF SW space
AutoCAD SHX Text BC-59 Mech
AutoCAD SHX Text
BC-63 TR
AutoCAD SHX Text BC-66 Men
AutoCAD SHX Text
BC-44 TR
AutoCAD SHX Text BC-50 Computer
AutoCAD SHX Text BC-60 EQ-Room
AutoCAD SHX Text BC-74B Storage
AutoCAD SHX Text
BC-52 CIO
AutoCAD SHX Text
BC-54 TR
AutoCAD SHX Text
BC-56 TR
AutoCAD SHX Text
BC-58 TR
AutoCAD SHX Text BC-74A Canteen Kitchen
AutoCAD SHX Text BC-74 Serving
AutoCAD SHX Text BC-67 Women
AutoCAD SHX Text
BC-34 PIV
AutoCAD SHX Text BC-89 Lounge
AutoCAD SHX Text BC-69 Vending
AutoCAD SHX Text BC-68 Stor
AutoCAD SHX Text
BC-64 TR
AutoCAD SHX Text
PATRIOT ELEV 10
AutoCAD SHX Text BC-75 Canteen Dining
AutoCAD SHX Text BC-91 EMS Brk-Rm
AutoCAD SHX Text
BC-90 CU
AutoCAD SHX Text BC-20 Customer Relationship Manager
AutoCAD SHX Text
BC-93 EMS
AutoCAD SHX Text
BC-90A CU
AutoCAD SHX Text BC-80 Retail Store
AutoCAD SHX Text BC-79 Mech
AutoCAD SHX Text BC-81 Ret-Storage
AutoCAD SHX Text BC-82 CTN-Chief
AutoCAD SHX Text
BC-83 ADMIN
AutoCAD SHX Text BC-94 Men's Locker
AutoCAD SHX Text BC-95 Women's Locker
AutoCAD SHX Text
BC-85A
AutoCAD SHX Text BC-85B FD-Stor
AutoCAD SHX Text BC-96 Men's Tlt
AutoCAD SHX Text
BD-02 TR/TEL
AutoCAD SHX Text BE-05 Mechanical
AutoCAD SHX Text
INDEPENDENCE ELEV (4,5)
AutoCAD SHX Text
BE-02
AutoCAD SHX Text BE-10 Mail-Rm Stor
AutoCAD SHX Text BE-09 Mech
AutoCAD SHX Text BE-29 Mech
AutoCAD SHX Text BE-30 N&FS Subsistence Storage
AutoCAD SHX Text BE-34 Pharm Storage
AutoCAD SHX Text
BE-40A
AutoCAD SHX Text
BE-42A
AutoCAD SHX Text BE-44A Compactor
AutoCAD SHX Text BE-44 Carts
AutoCAD SHX Text BE-42 Wmn-LKR
AutoCAD SHX Text BE-40 Men-LKR
AutoCAD SHX Text
BE-38C
AutoCAD SHX Text BE-35 Morgue
AutoCAD SHX Text BE-37 Mrg-Clr
AutoCAD SHX Text
BE-38 SP-CH MGMT
AutoCAD SHX Text
BE-45
AutoCAD SHX Text
BE-38A
AutoCAD SHX Text
BE-38B
AutoCAD SHX Text BE-31A Whse Storage
AutoCAD SHX Text BE-97 Stor
AutoCAD SHX Text BE-46 Mech
AutoCAD SHX Text
BE-50
AutoCAD SHX Text BE-25 Mech
AutoCAD SHX Text BE-27 Mech
AutoCAD SHX Text BE-24 Linen
AutoCAD SHX Text
BD-31 ENG
AutoCAD SHX Text
BD-33 EMS
AutoCAD SHX Text
BD-35 ENG
AutoCAD SHX Text
BD-37 ENG
AutoCAD SHX Text
BD-39 ENG
AutoCAD SHX Text BD-41 EM-Mng
AutoCAD SHX Text BD-43 Gems
AutoCAD SHX Text
BD-45 ENG
AutoCAD SHX Text
BD-47 ENG
AutoCAD SHX Text
BD-36 SFTY
AutoCAD SHX Text
BD-38 EEO
AutoCAD SHX Text
BD40 SFTY
AutoCAD SHX Text BD-42 ENg Conf
AutoCAD SHX Text BD-50 Engineering
AutoCAD SHX Text BD-50B ENG Chief
AutoCAD SHX Text BD-50A ENG A-Chief
AutoCAD SHX Text Shwr
AutoCAD SHX Text
BD-63 M-LKR
AutoCAD SHX Text BD-62 File-Rm
AutoCAD SHX Text BD-60E Biomed
AutoCAD SHX Text BD-60 Biomed D/O
AutoCAD SHX Text BD-60B W-Area
AutoCAD SHX Text BD-60C Charging Area
AutoCAD SHX Text BD-60D Biomed Drop-Off
AutoCAD SHX Text BD-65 Paint Shop
AutoCAD SHX Text BD-75A Electrical Shop
AutoCAD SHX Text BD-75B Carpentry
AutoCAD SHX Text BD-85A Plumbing Shop
AutoCAD SHX Text BD-85B Mechanic Shop
AutoCAD SHX Text BD-90 Equipment Area
AutoCAD SHX Text
BD-92
AutoCAD SHX Text
BD-91
AutoCAD SHX Text
BD-84 TR
AutoCAD SHX Text BD-83 Elec.
AutoCAD SHX Text BD-86 Mech
AutoCAD SHX Text BD-70 Mechanical
AutoCAD SHX Text BD-80 Storage
AutoCAD SHX Text BD-95 Breakroom
AutoCAD SHX Text BD-10 M-Tlt
AutoCAD SHX Text
BD-12 FM-TLT
AutoCAD SHX Text BD-08 CTN-Stor
AutoCAD SHX Text
BD-06 TR
AutoCAD SHX Text
BD-04 BRKRM
AutoCAD SHX Text BD-05 Mail
AutoCAD SHX Text BA-01 Mechanical
AutoCAD SHX Text
BC-20A
AutoCAD SHX Text
BC-20B
AutoCAD SHX Text
BC-03 M&R
AutoCAD SHX Text
BB-12
AutoCAD SHX Text
BB-34A UPS
AutoCAD SHX Text
BB-16B
AutoCAD SHX Text BB-15A Women's
AutoCAD SHX Text
BB-44B
AutoCAD SHX Text
BB-44
AutoCAD SHX Text
BC-46 TR
AutoCAD SHX Text
BF-11
AutoCAD SHX Text
BLDG #3 SP-CH MGMT
AutoCAD SHX Text BF-003 Inv-Mgmt
AutoCAD SHX Text
STAIR #1
AutoCAD SHX Text BE-28 Loading Dock
AutoCAD SHX Text
BD-81 TLT
AutoCAD SHX Text
STAIR #22
AutoCAD SHX Text
STAIR #13
AutoCAD SHX Text
BB-17A
AutoCAD SHX Text
BB-15-A1
AutoCAD SHX Text BB-62 Armory
AutoCAD SHX Text
STAIR #14
AutoCAD SHX Text
STAIR #4
AutoCAD SHX Text
BD-63A TLT
AutoCAD SHX Text BD-20 EMS Chief
AutoCAD SHX Text
BD-21 EMS
AutoCAD SHX Text BD-10A Mail
AutoCAD SHX Text BE-20 Linen
AutoCAD SHX Text BD-11 WD-Prop
AutoCAD SHX Text
BB-56
AutoCAD SHX Text BB-30 SPS Asst Chief
AutoCAD SHX Text
BB-44A
AutoCAD SHX Text
BD-23 EMS
AutoCAD SHX Text BD-22 Biomed
AutoCAD SHX Text BD-34 Production
AutoCAD SHX Text BD-60A Soiled
AutoCAD SHX Text
BD-61 LCK-SM
AutoCAD SHX Text BB-09 BLDG #9 Tank room
AutoCAD SHX Text BB-24 Receiving
AutoCAD SHX Text
BE-07
AutoCAD SHX Text
BF-002
AutoCAD SHX Text
BE-47 BIO-HZD
AutoCAD SHX Text BE-31 Whse-Storage
AutoCAD SHX Text
BE-36
AutoCAD SHX Text
BC-85
AutoCAD SHX Text
BE-03
AutoCAD SHX Text
BB-67D
AutoCAD SHX Text BC-70 Stor
AutoCAD SHX Text BE-99 BLDG#1 Switchgear
AutoCAD SHX Text BE-98 BLDG#1 Emergency Gen
AutoCAD SHX Text
BC-77
AutoCAD SHX Text BB-31 Pharm
AutoCAD SHX Text BB-28 Pharm
AutoCAD SHX Text
STAIR #15
AutoCAD SHX Text
BB-82
AutoCAD SHX Text
BB-90C
AutoCAD SHX Text
ELEV #12
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR #7
AutoCAD SHX Text
STAIR #20
AutoCAD SHX Text #7
AutoCAD SHX Text
DN
AutoCAD SHX Text #5
AutoCAD SHX Text
STAIR #2
AutoCAD SHX Text
STAIR #10
AutoCAD SHX Text
STAIRWELL #3
AutoCAD SHX Text BD-65A Spray/Drying
AutoCAD SHX Text
SUB
AutoCAD SHX Text BA-09 Soiled Linens
AutoCAD SHX Text Mech
AutoCAD SHX Text BC-05 Anti-Coag Clinic
AutoCAD SHX Text
ELEV #6
AutoCAD SHX Text #4
AutoCAD SHX Text #8
AutoCAD SHX Text
BC-01
AutoCAD SHX Text BA-42 Office
AutoCAD SHX Text BA-35 Men
AutoCAD SHX Text BA-39 Women
AutoCAD SHX Text BA-37 Jan
AutoCAD SHX Text BA-41 Mech
AutoCAD SHX Text BA-43 Brk Rm
AutoCAD SHX Text BA-45 Office
AutoCAD SHX Text BA-70 Office
AutoCAD SHX Text BA-69 Conf Rm
AutoCAD SHX Text…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .