About this file

Temporary Traffic Control

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
8C2_Sheet_58A.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
11C2_Sheet_284.pdf PDF
1Revised_015000_Temporary_Facilities_and_Controls_-_revised_7-3-14_(3).pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
011100_SECTION__SUMMARY_OF_WORK_-_revised_6-24-14.pdf PDF
Amendment_5_Pkg.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
AirKnife_Exploration.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Supplemental_Utility_Locating_Services.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Subsurface_Exploration.pdf PDF
2012_1121_JEFF_GeoArcheology_study.pdf PDF
AirKnife_Exploration.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Subsurface_Exploration.pdf PDF
Amend_2_Pkg.pdf PDF
Amendment_1_Pkg.pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
JEFF_Draw_2_(76-125).pdf PDF
JEFF_Specification.R1_-revised_5-13-14.pdf PDF
RFP_Clauses.docx DOCX document
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
P14PS00906 _Pre-Sol _Amend__1.docx DOCX document
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michael Van Valkenburgh Associates Inc. Landscape Architects P.C. 16 Court St, 11th Fl, Brooklyn, NY 11241 P 718 243 2044 F 718 243 1293 mvvainc.com

MEMORANDUM OF UNDERSTANDING / 2 PAGES / SENT BY E MAIL

To: DENVER SERVICE CENTER

C/O Phil Lawrence, Chris Lewis From: MVVA Date: 17 April 2014 Project: CAR2015

JEFF 181202

MVVA# 10001.06

Re: Temporary Traffic Control Zone Accessibility Requirements

Cc: Anna Leavey, CAR2015 Vern Remiger, CAR2015 Lonny Boring, GRG Joe Kaiser, BSI

The following notes will be referenced (via this memorandum) in the Division 1 Specifications as supplemental information to bidders.

Temporary Traffic Control (TTC) Zones

1. A wide range of pedestrians might be affected by temporary traffic control (TTC) zones during construction, including the young, elderly, and people with disabilities such as hearing, visual, or mobility. These pedestrians need a clearly delineated and usable travel path.

2. Provisions for usable accessible travel paths for pedestrians shall be incorporated into a TTC plan prepared by the Contractor and approved by the Contracting Officer prior to commencing construction activities.

3. The TTC provisions included in the approved plan shall be applied by the Contractor using capable and qualified persons and with monitoring by the Contracting Officer.

4. The Contractor will provide the approved TTC plan to City Streets, METRO, and MoDOT along with a schedule indicating any sidewalk or street closures such that these entities can provide notifications of closures to the Public.

5. The TTC plan will be developed to address the following requirements:

6. If the TTC zone affects the movement of pedestrians, adequate pedestrian access and walkways shall be provided.

7. If the TTC zone affects an accessible and detectable pedestrian facility, accessibility and detectability shall be maintained along a clearly marked, alternate accessible pedestrian route.

a. If establishing or maintaining an alternate pedestrian route is not feasible during the project, the contractor may decide if an alternate means of providing for pedestrians may be used.

8. Pedestrians shall not be led into conflicts with vehicles, equipment, operations or vehicles moving through or around the worksite.

CAR2015 MVVA#10001.06

Temporary Traffic Control pedestrian accessibility memo, 17 April 2014, Page 2

9. Pedestrians shall be provided with a convenient and accessible path that replicates as nearly as practical the most desirable characteristics of the existing sidewalk(s) or footpath(s).

10. A pedestrian route shall not be severed and/or moved for non-construction activities such as parking for vehicles or equipment.

11. Unless an acceptable route that does not involve crossing the roadway can be provided, pedestrians shall be appropriately directed with advance signing that encourages them to cross the opposite side of the roadway. These signs should be placed at intersections (rather than midblock locations).

12. Access to transit stops shall be maintained.

13. A smooth, continuous hard surface shall be provided throughout the entire length of the temporary pedestrian facility.

14. There shall be no curbs or abrupt changes in grade or terrain that could cause tripping or be a barrier to wheelchair use.

15. The geometry and alignment of the facility shall meet the applicable requirements of the architectural barrier act accessibility standards (ABAAS).

16. The width of the existing pedestrian facility shall be provided for the temporary facility if practical.

17. Traffic control devices and other construction materials and features shall not intrude into the usable width of the sidewalk, temporary pathway, or other pedestrian facility.

18. When it is not possible to maintain a minimum width of 60 inches throughout the entire length of the pedestrian pathway, a 60 x 60-inch passing space shall be provided at least every 200 feet.

19. Blocked routes, alternate crossings, and sign and signal information shall be communicated to pedestrians with visual disabilities by providing devices such as audible information devices, accessible pedestrian signals, or barriers and channelizing devices that are detectable to the pedestrians traveling with the aid of a cane or who have low vision.

20. Where pedestrian traffic is detoured to a TTC signal, the Contractor and Contracting office shall use reasonable judgment to determine if pedestrian signals or accessible pedestrian signals should be considered for crossings along an alternate route.

21. When channelization is used to delineate a pedestrian pathway, a continuous detectable edging shall be provided throughout the length of the facility such that pedestrians using cane detection can follow it.

a. This edging shall protrude at least 6 inches above the surface of the sidewalk or pathway, with the bottom of the edging a maximum of 2.5 inches above the surface.

b. This edging shall be continuous throughout the length of the facility except for gaps at locations where pedestrians or vehicles will be turning or crossing.

c. This edging shall consist of prefabricated or formed-in-place curbing and should be firmly attached to the ground or other devices.

d. Adjacent sections of this edging shall be interconnected such that the edging is not displaced by pedestrian or vehicular traffic or work operations, and such that it does not constitute a hazard to pedestrians, workers or other road users.

22. If a pushbutton is used to provide equivalent TTC information to pedestrians with disabilities, the pushbutton shall be equipped with a locator tone to notify pedestrians with visual disabilities that a special accommodation is available, and to help them locate the pushbutton.