About this file
This is a preventive maintenance and inspection checklist attachment for emergency generator sets located at Fort Meade and Hot Springs VA Medical Centers in South Dakota. The checklist is designed to be completed during October/November preventive maintenance inspections and serves as a standardized reporting tool for contractor performance.
The checklist encompasses 39 inspection and maintenance items covering mechanical components, fluid systems, electrical systems, and safety devices. Key inspection areas include mechanical fasteners and mounts, hoses and clamps, coolant systems, fuel and oil leaks, drive belts, fluid levels, crankcase breather, governor sensitivity, battery condition and charger operation, exhaust systems, safety shutdown circuits, generator bearings, electrical wiring, transfer switches, and day tank operation. Contractors must perform exercise operations to check for unusual vibration or noise, conduct megger readings on rotor and stator windings, clean radiators and compressed air accumulation, and perform sample analysis on oil, coolant, and fuel. Annual load bank testing is required with documentation. Contractors must document findings using a coding system (X=Checked Okay, A=Additional Work Required, R=Required Adjustment/Repair, C=Critical Repair Required, N/A=Not Applicable), include hour meter readings and battery test results, and submit completed reports with recommendations and actions taken to the Facility Point of Contact within 30 days of inspection completion. Oil changes will be scheduled separately based on hour meter readings and require advance approval from the Fort Meade and Hot Springs facility coordinators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26326Q0767 0001.docx | DOCX document | |
| P11-VA BHHCS Emergency Generator Maintenance Chk Lst - Attachment A updated.docx | DOCX document | |
| 36C26326Q0767 SOLICITATION.docx | DOCX document | |
| P11-VA BHHCS Emergency Generator Maintenance Chk Lst - Attachment B.docx | DOCX document | |
| TMS 20939 - VA Privacy Training.pdf | ||
| NARA Records Management Language.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACMENT A
October/November – PREVENTIVE and MAINTENANCE INSPECTION REPORT EMERGENCY GENERATOR SETS - FORT MEADE AND HOT SPRINGS VA MEDICAL CENTERs
FORT MEADE AND HOT SPRINGS, SD
Equipment Location: _____________________________ Date of Inspection: ________________
| Engine: | ________________________________ EE ID #: ____________________ |
| Generator: _______________________________ | Hour Meter Reading: ______________ |
Inspection Data Code X=Checked Okay A=Additional Work Required R=Required Adjustment or Repair C=Critical Repair Required N/A=Not Applicable
______ 1. Check and adjust as required, mechanical fasteners, mounts, braces, and safety devices.
______ 2. Inspect engine and generator mounts.
______ 3. Examine all duct work and louvers.
______ 4. Checked condition of hoses and tighten clamps.
______ 5. Check engine coolant pump and coolant leaks.
______ 6. Check engine antifreeze solution ______degrees.
______ 7. Check engine block heater.
______ 8. Check for fuel or oil leaks.
______ 9. Check and adjust drive belts.
______10. Check all fluid levels.
______ 11. Inspect engine condition.
______ 12. Check crankcase breather.
______ 13. Check governor sensitivity and droop.
______ 14. Lubricate all grease fittings.
______ 15. Inspect starter motor and check solenoid.
______ 16. Clean/inspect battery terminals, read gravity or perform a conductance test, and provide reading ___________
______ 17. Check battery charger for proper operation.
______ 18. Complete general inspection of exhaust system.
______ 19. Check for wet stacking.
______ 20. Check all safety shutdown and alarm circuits.
______ 21. Inspect generator condition.
______ 22. Inspect generator end bearing.
______ 23. Check condition of electrical wiring, secure in holder where broken or loose.
______ 24. Visual inspection of transfer switch and cleaning
______ 25. Check day tank operation.
______ 26. During exercise operation, check for any unusual vibration or noise.
______ 27. Blow out any accumulation of dust in generator and ATS with clean, dry Compressed air.
______ 28. Clean exterior of radiator.
_______29. Take megger reading of main rotor winding and record ____________________
_______30. Take megger reading of main stator winding and record ____________________
_______31. Take megger reading of exciter rotor and record ________________________
_______32. *Change oil per manufacturer’s recommendations
_______33. Change fuel filter(s)
_______34. Change air filter(s)
_______35. Change oil filters(s)
_______36. Take oil sample and provide analysis report.
_______37. Take coolant sample and provide analysis report.
_______38. Take fuel sample and provide analysis report.
_______39. Load bank test annually per requirements and provide test report.
*Oil changes will be addressed and scheduled based on hour meter readings and will be addressed outside the scope of this contract. Contact FM.HS POC’s for approval before commencement of this work.
Comments: ____________________________________________________________________
Report Completed by: ______________________ Company: ____________________________
Submit report with recommendations, actions taken, etc. to Facility POC within 30 days of completion of inspection.