P11 20251216_Replace Chiller Gaskets_Drawings_Bid Set.pdf
PDF 2 MB Posted
- Attached to
- Z1DZ--Replace Gaskets Building 1 in Chilled Water Pipe System at the Northampton VA Medical Center
- Solicitation number
- 36C24126Q0243
About this file
This document set comprises mechanical engineering drawings and specifications for a chiller pipe Victaulic gasket replacement project at Building 1 of the Department of Veterans Affairs Central Western Massachusetts Healthcare System facility located at 421 North Main Street in Leeds, Massachusetts. The project is issued with a date of December 31, 2025, and is identified as VA CWM project with drawing number JC-A LA.
The work involves replacement of Victaulic gaskets in chilled water supply (CHWS) and chilled water return (CHWR) piping throughout the facility, with piping systems ranging from 2 inches to 8 inches in diameter distributed across basement, first floor, second floor (attic) mechanical areas. Key mechanical systems include multiple air handling units (AHUs) with varying capacities (ranging from 4.0 to 105.3 GPM), cabinet unit heaters, heat exchangers, and condensing units with associated refrigerant piping. The specifications establish general mechanical notes requiring contractor compartmentalization of construction areas with temporary environmental controls, coordination with existing building systems, fire-stopping requirements for all penetrations, verification of existing conditions prior to work commencement, and compliance with VA standards and applicable codes. Work in corridors must be performed during non-operational hours unless approved by the Contracting Officer Representative (COR). All equipment shall be guaranteed for a minimum one-year period by the owner, and the contractor is responsible for determining exact demolition extents and providing all necessary offsets, accessories, and supports at no additional cost to the owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126Q0243_3.docx | DOCX document | |
| 36C24126Q0243_2.docx | DOCX document | |
| 36C24126Q0243_1.docx | DOCX document | |
| FAR 852.219-75-Limitation on Subcontracting.pdf | ||
| P07 Wage Determination No. 2015-6115.pdf | ||
| VHA Directive 2011-036- Safety and Heath During Construction.pdf | ||
| 36C24126Q0243.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
CENTRAL WESTERN MASSACHUSETTS
HEALTHCARE SYSTEM
B1 CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
421 NORTH MAIN STREET
LEEDS, MA
BUILDING 1
SITE PLAN
BUILDING 1 CHILLER PIPE VICTAULIC GASKET REPLACEMENT
IS
SU
AN
CE
D
AT
E
LA
TE
ST
R
EV
IS
IO
N
SHEET # SHEET NAME
01 GI001 COVER PAGE, ABBREVIATIONS & LEGENDS 12/31/2025
02 GI002 GENERAL NOTES & INFORMATION 12/31/2025
03 M101 BASEMENT MECHANICAL PLAN 12/31/2025
04 M102 FIRST FLOOR MECHANICAL PLAN 12/31/2025
05 M103 SECOND FLOOR MECHANICAL PLAN 12/31/2025
06 M104 ATTIC MECHANICAL PLAN 12/31/2025
ARCHITECTURAL SYMBOLS
ELEVATION TAG
KEY NOTE
DETAIL NUMBER
SHEET NUMBER
KEY NOTE NUMBER
SHEET LIST
DETAIL NUMBER
SHEET NUMBER
DETAIL CALLOUT
SECTION TAG
DETAIL NUMBER
SHEET NUMBER
CHILLED WATER SUPPLYCHWS
TYPE (A) SUPPLY DIFFUSER/GRILL - 100 CFM
EQUIPMENT TAG
CHILLED WATER RETURNCHWR
AIR CONDITIONING CONDENSATE DRAINCD
HIGH PRESSURE STEAM SUPPLYHPS
HIGH PRESSURE STEAM RETURNHPR
EQUIPMENT NO. 1
(A) 100 CFM
EQ
TYPE (B) SUPPLY DIFFUSER/GRILL - 100 CFM(B) 100 CFM
TYPE (C) SUPPLY DIFFUSER/GRILL - 100 CFM(C) 100 CFM
STEAM TRAPT
LOW PRESSURE STEAM SUPPLYLPS
LOW PRESSURE STEAM RETURNLPR
ISOLATION VALVE ( GATE , BALL, OR BUTTERFLY)
THROTTLING/SHUT-OFF VALVE (GLOBE)
CALIBRATED BALANCING/SHUT-OFF VALVE (CIRCUIT SETTER)
MODULATING CONTROL VALVE ( TWO-WAY & THREE-WAY)
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ARI AMERICAN REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ATC AUTOMATIC TEMPERATURE CONTROL
AWT AVERAGE WATER TEMPERATURE
BLDG BUILDING
CENTERLINE
CC COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
COMP COMPRESSOR
COND CONDENSATE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER REPRESENTATIVE
CP CONDENSATE PUMP, CONTROL PANEL
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CW CITY WATER
D DROP IN DUCT/PIPE (DOWN)
DB DRY BULB TEMPERATURE (°F)
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DN DOWN (DROP IN DUCT/PIPE)
DPS DIFFERENTIAL PRESSURE SENSOR
DW DOMESTIC WATER
DWG DRAWING
DWV DRAIN, WASTE, VENT
DX DIRECT EXPANSION
EQPM EQUIPMENT
°F DEGREES FARENHEIT
H HEIGHT, HUMIDIFIER, HUMIDISTAT
HT HEIGHT
H20 WATER
HC HEATING COIL
HD HEAD
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER, HEAT PUMP
HPR HIGH PRESSURE RETURN (STEAM)
HPS HIGH PRESSURE SUPPLY (STEAM)
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
ID INSIDE DIAMETER
IN INCHES
L LENGTH, LOUVER
LF LINEAR FEET
LPR LOW PRESSURE RETURN (STEAM)
LPS LOW PRESSURE SUPPLY (STEAM)
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MER MECHANICAL EQUIPMENT ROOM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MIN MINIMUM
MOCP MAXIMUM OVER-CURRENT PROTECTION
MOD MOTOR OPERATED DAMPER
MTD MOUNTED
MU MAKE-UP (WATER OR AIR)
NEG NEGATIVE
NC NORMALLY CLOSED, NOISE CRITERIA
NIC NOT IN CONTRACT
NG NATURAL GAS
NO NORMALLY OPEN, NUMBER
NTS NOT TO SCALE
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE (°F)
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OED OPEN ENDED DUCT
ABBREVIATIONS
P PUMP
PD PRESSURE DROP
PH PHASE
PNL PANEL
POS POSITIVE
PRV PRESSURE REDUCING/RELIEF VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
R RISE (IN DUCT/PIPE)
RA RETURN AIR
S SWITCH, SENSOR, SMOKE DETECTOR
SA SUPPLY AIR
SNA SANITARY WASTE
SAT SUPPLY AIR TEMPERATURE (°F)
SD SMOKE DAMPER
SENS SENSIBLE
SF SQUARE FEET
SG SPECIFIC GRAVITY
SP STATIC PRESSURE
SS STAINLESS STEEL
T THERMOSTAT, TRAP (STEAM), TEMPERATURE (°F)
TONS TONS OF REFRIGERATION
TOT TOTAL
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
VA CWM DEPARTMENT OF VETERAN'S AFFAIRS, CENTRAL WESTERN MASS
VIF VERIFY IN FIELD
PIPING LINE TYPE LEGEND
SYMBOL DESCRIPTION
PIPING SYMBOL LEGEND
SYMBOL DESCRIPTION
CL
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
GI001
REVISIONS / ISSUANCES: DATE:
12/31/2025
COVER PAGE, ABBREVIATIONS
& LEGENDS
TRUE NORTH
A. QUALITY OF WORK
1. CONTRACT DOCUMENTS ARE IN PART DIAGRAMMATIC, INTENDED TO CONVEY
SCOPE & ARRANGEMENT OF WORK, AND DO NOT INDICATE ALL OFFSETS, BENDS,
ACCESS PANELS AND SIMILAR PARTS, WHICH MAY BE REQUIRED, THE
CONTRACTOR SHALL INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AND
CEILING HEIGHTS AFFECTING HIS WORK AND PROVIDE ALL NECESSARY OFFSETS,
FITTINGS, ACCESS PANELS AND SIMILAR ACCESSORIES THAT MAY BE REQUIRED
TO PROVIDE A COMPLETE AND OPERATING INSTALLATION AT NO ADDITIONAL
COSTS TO THE OWNER.
2. COORDINATE WORK WITH THE WORK OF ALL OTHER TRADES. COORDINATE THE
LOCATION OF ALL EQUIPMENT, LOUVERS, WALL OPENINGS WITH OTHER TRADES,
ARCHITECTURAL FLOOR PLANS, ELEVATIONS, SECTIONS, DETAILS AND
STRUCTURAL SUPPORTS.
3. CONSULT ELECTRICAL AND STRUCTURAL CONSTRUCTION DRAWINGS FOR
FAMILIARITY WITH CONDITIONS AFFECTING MECHANICAL WORK. VERIFY ALL
SPACES IN WHICH WORK WILL BE PERFORMED BY ON-SITE MEASUREMENTS. DO
NOT SCALE DRAWINGS.
4. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMENSIONS INDICATED
ON THE DRAWINGS, FOR ALL TRADES AT THE SITE PRIOR TO PROCEEDING WITH
ANY WORK. EACH BIDDER IS REQUIRED TO VISIT THE SITE TO BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, AND TO TAKE THESE CONDITIONS
INTO CONSIDERATION WHEN PREPARING THEIR PROPOSALS. EACH BIDDER SHALL
OBTAIN ALL NEEDED INFORMATION INFORMATION AND TAKE ALL REQUIRED
MEASUREMENTS. LACK OF KNOWLEDGE OF THE EXISTING SITE CONDITIONS WILL
NOT BE ALLOWED AS A BASIS FOR EXTRA COMPENSATION.
5. UNACCEPTABLE, DAMAGED OR INCORRECT PRIOR WORK SHALL BE IDENTIFIED,
REPORTED AND REPAIRED OR REPLACED BEFORE STARTING WORK AND INCLUDED
IN SCOPE OF WORK. PROCEEDING WITH THE WORK SHALL CONSTITUTE
ACCEPTANCE OF PRIOR WORK.
6. THE LOCATION OF EXISTING UTILITIES IS SHOWN IN AN APPROXIMATE MANNER.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE SUBMITTING BID OR COMMENCING WORK. THE CONTRACTOR
SHALL PAY FOR AND REPAIR ALL DAMAGES CAUSED BY FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES UNLESS OTHERWISE INDICATED.
7. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL INCLUDE ALL
EQUIPMENT, DEVICES, HARDWARE, MOUNTS, LABOR, RIGGING, SUBCONTRACTS,
ETC., THAT RESULT IN A COMPLETE AND FUNCTIONAL PROJECT.
8. PROVIDE ALL EQUIPMENT, EQUIPMENT PADS, ACCESSORIES, SUPPORTS, FITTINGS
AND ALL OTHER INCIDENTAL MATERIAL NEEDED FOR THE COMPLETE AND
OPERATING INSTALLATION. MINOR ITEMS TO FINISH THE WORK SUCH AS
PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC., SHALL BE PROVIDED
WHETHER OR NOT INDICATED IN THE CONTRACT DOCUMENTS.
9. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED
TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON
THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
10. ALL WORKSMANSHIP, MATERIALS, AND EQUIPMENT SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR AFTER ACCEPTANCE BY THE OWNER (FEDERAL
ACQUISITION REGULATION CLAUSE 52.246-21 WARRANTY OF CONSTRUCTION).
11. COORDINATE WORK WITH THE WORK OF ALL OTHER TRADES. COORDINATE THE
LOCATION OF ALL EQUIPMENT, WALL OPENINGS WITH OTHER TRADES, FLOOR
PLANS, ELEVATIONS, SECTIONS, DETAILS AND STRUCTURAL SUPPORTS.
12. COORDINATE PARTITION AND BUILDING ENVELOPE OPENINGS REQUIRED FOR THE
INSTALLATION OF THIS CONTRACT WORK WITH THE WORK OF OTHER
CONTRACTORS.
13. FURNISH AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE WITH VA
STANDARDS AND GUIDELINES, AND MANUFACTURER'S RECOMMENDED
INSTALLATION RECOMMENDATIONS.
B. CODES/PERMITS
1. WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH VA STANDARDS,
NFPA, ASHRAE, UNDERWRITERS LABORATORIES AND ALL MUNICIPAL, STATE AND
OTHER AUTHORITIES, PUBLIC AND PRIVATE, HAVING JURISDICTION. REPORT ALL
DISCREPANCIES WITH SUCH REGULATIONS TO ENGINEER AND DO NOT PROCEED
WITH ANY WORK UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM THE
ENGINEER.
2. ALL NECESSARY FEES, PERMITS, AND APPROVALS AS REQUIRED BY THE WORK OF
THESE DRAWINGS AND SPECIFICATIONS SHALL BE OBTAINED AND PAID FOR BY
THIS CONTRACTOR.
C. COORDINATION OF WORK
1. COORDINATE THE COMPLETE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ARCHITECTURAL, STRUCTURAL, CIVIL, AND ELECTRICAL WORK - NEW OR EXISTING.
2. COORDINATE ROUGH OPENINGS AND FRAMING REQUIREMENTS FOR ACCESS
PANELS AS REQUIRED OR SHOWN ON DRAWINGS. ACCESS DOORS SHALL BE
PROVIDED IN PARTITIONS OR CEILINGS WHEREVER VALVES, DUCT ACCESS DOORS,
DAMPERS, MECHANICAL UNITS OR EQUIPMENT REQUIRING SERVICING OR
ADJUSTMENT ARE CONCEALED BEHIND PARTITIONS OR CEILINGS. COORDINATE
LOCATIONS OF ALL ACCESS DOORS AND KEYING SYSTEMS.
3. CONFIRM EXACT STRUCTURAL REQUIREMENTS FOR THE MOUNTING AND SUPPORT
OF ALL ACTUAL EQUIPMENT, PIPING AND DUCTWORK SUBMITTED AND APPROVED
TO BE INSTALLED. ALL MOUNTING DETAILS INDICATED ON MECHANICAL DRAWINGS
ARE INTENDED TO CONVEY A GENERAL MEANS OF SUPPORT.
4. PRIOR TO SUBMITTING SHOP DRAWINGS, COORDINATE AND VERIFY ALL DEVICES,
CONTROL AND INSTALLATION REQUIREMENTS WITH THE ROOM DIMENSIONS AND
FINISHES.
5. DISCONNECT AND REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED
APPURTENANCES NO LONGER REQUIRED AND TERMINATE ASSOCIATED SERVICES
AND UTILITIES IN AN APPROVED MANNER, UNLESS OTHERWISE NOTED.
6. WHEN MECHANICAL WORK IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL
CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE
ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH
CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR
WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF
THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
7. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS ARE APPROXIMATE AND THE EXACT LOCATIONS NECESSARY TO
SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE
PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE COR BEFORE
BEING INSTALLED. DO NOT SCALE THE DRAWINGS.
8. COORDINATE LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS
WITH ALL OTHER TRADES INVOLVED. ALL OPENINGS IN FIRE WALLS FOR PIPING,
CONDUIT, ETC., SHALL BE FIRE STOPPED.
9. EXTENT OF DEMOLITION SHOWN ON DRAWINGS FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR FIELD-VERIFYING EXACT EXTENT OF
DEMOLITION TO FACILITATE INSTALLATION OF NEW WORK & MODIFY AS REQUIRED
AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
10. ALL PIPING, CONDUIT, DUCTWORK AND OTHER PENETRATIONS REQUIRED
THROUGH THE BUILDING PARTITIONS OR THE BUILDING ENVELOPE SHALL BE
SEALED IN A WEATHERPROOF AND WATERTIGHT MANNER, UNLESS OTHERWISE
NOTED.
11. PROVIDE FIRE STOPS FOR ALL PIPING AND DUCTWORK PENETRATIONS USING U.L.
RATED ASSEMBLIES.
12. THERMOSTATS AND ALL OTHER WALL MOUNTED MECHANICAL ACCESSORIES
SHALL BE ALIGNED VERTICALLY OR HORIZONTALLY WITH ALL ELECTRICAL
OUTLETS, COMPUTER AND TELEPHONE OUTLETS/JACKS, SWITCHES, PULL
STATIONS, EXIT LIGHTS, WHEN IN CLOSE PROXIMITY. COORDINATION OF THIS
ALIGNMENT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER
AND ALL CONTRACTORS, AND LOCATIONS SHALL BE APPROVED BY THE OWNER.
D. PIPING
1. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
2. PIPING PENETRATIONS OF ALL FLOORS AND FIRED RATED WALLS/PARTITIONS
SHALL BE COMPLETED SEALED WITH FIRE CAULK.
1. THESE NOTES ARE GENERAL IN NATURE AND ARE APPLICABLE TO THE ALL WORK
AREAS WITHIN THE PROJECT SCOPE. REFER TO PLAN PHASING AND
CONSTRUCTION NOTES ON INDIVIDUAL DRAWINGS FOR INFORMATION
PERTAINING TO PORTIONS OF WORK INDICATED.
2. THE PERIOD OF PERFORMANCE FOR THIS PROJECT IS 60 DAYS FROM NTP.
CONTRACTOR SHALL SCHEDULE WORK TO ASSURE INTERRUPTIONS OF SERVICE
IN EXISTING CHILLED WATER SYSTEM OCCUR DURING NON-COOLING MONTHS.
COORDINATE PHASING AND PROJECT CONSTRUCTION SCHEDULE WITH VA COR.
3. OUTSIDE TEMP MUST BE 56°F OR BELOW THROUGHOUT DURATION OF PROJECT.
4. CONDUCT A WALK-THRU WITH COR TO ID ALL GASKETS TO BE REPLACED PRIOR
TO START OF WORK.
5. CONTRACTOR SHALL COMPARTMENTALIZE, WITH TEMPORARY ENVIRONMENTAL
CONTROLS, EACH INDIVIDUAL CONSTRUCTION AREA FOR THE ENTIRE DURATION
OF THE CONSTRUCTION ACTIVITY WITHIN THAT AREA. TEMPORARY
ENVIRONMENTAL CONTROLS WILL BE REQUIRED TO BE INSTALLED AND REMOVED
ON A DAILY BASIS IN MAIN ACCESS CORRIDORS TO ALLOW OCCUPANT ACCESS
DURING OPERATIONAL HOURS, UNLESS OTHERWISE NOTED ON THE PLANS
AND/OR APPROVED BY THE VA COR.
6. TEMPORARY ENVIRONMENTAL CONTROLS SHALL INCLUDE BUT NOT NECESSARILY
BE LIMITED TO: ICRA BARRIERS INCLUDING ANTI-ROOM , SPACE AIR
PRESSURIZATION CONTROLS, AND TEMPORARY EGRESS SIGNAGE. PLACE
CONTROLS PRIOR TO COMMENCING WORK IN ANY CONSTRUCTION AREA.
TEMPORARY ENVIRONMENTAL CONTROLS SHALL BE PROVIDED IN ACCORDANCE
WITH THE SPECIFICATIONS AND SHALL BE COORDINATED WITH AND APPROVED
BY THE VA COR.
7. DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR MOVING
ITEMS ASIDE AS REQUIRED TO ACCESS WORK IN OCCUPIED SPACES;
CONTRACTOR SHALL REPLACE ITEMS AT COMPLETION OF CONSTRUCTION
ACTIVITY. SHOULD REMOVAL OF FURNISHINGS BE REQUIRED TO ACCOMMODATE
WORK ACCESS IN OCCUPIED SPACES; THE VA WILL BE RESPONSIBLE FOR
REMOVAL AND STORAGE. THE VA REQUIRES 30 DAY NOTICE FOR WORK ACCESS
TO OCCUPIED SPACES. COORDINATE WORK CONSTRUCTION ACCESS WITH THE
VA COR.
8. WORK ACTIVITIES IN ANY CONSTRUCTION AREA SHALL NOT COMMENCE UNTIL ALL
MATERIALS REQUIRED TO COMPLETE THE WORK IN THAT AREA ARE ON SITE AND
READY FOR INCORPORATION INTO THE PROJECT.
9. BUILDING 1 SHALL REMAIN OPERATIONAL THROUGHOUT THE PROJECT
CONSTRUCTION. ALL WORK IN CORRIDORS AND OCCUPIED SPACES SHALL BE
PERFORMED DURING NON-OPERATIONAL HOURS UNLESS NOTED ON THE PLANS
AND/OR APPROVED BY THE VA COR.
10. SITE WORK MAY BE EXECUTED DURING NORMAL OPERATIONAL HOURS. ONE WAY
TRAFFIC FLOW MUST BE MAINTAINED FOR SITE ACCESS AROUND BUILDING 1 AT
ALL TIMES DURING NORMAL OPERATIONAL HOURS. ONE LANE OF TRAFFIC FLOW
MUST BE MAINTAINED THROUGH AMBULATORY DROP OFF CIRCLE AROUND FLAG
POLE AT MAIN ENTRANCE TO BUILDING 1 AT ALL TIMES DURING NORMAL NORMAL
OPERATIONAL HOURS. WORK THAT INTERRUPTS THIS TRAFFIC FLOW MUST BE
PREFORMED DURING NON-OPERATIONAL HOURS AND ALL OPEN TRENCHES MUST
BE PLATED DURING OPERATIONAL HOURS TO ALLOW TRAFFIC CIRCULATION. SITE
WORK SCHEDULE SHALL BE COORDINATED WITH AND APPROVED BY THE VA COR.
GENERAL PROJECT PHASING &
CONSTRUCTION NOTES GENERAL MECHANICAL NOTES
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
GI002
REVISIONS / ISSUANCES: DATE:
12/31/2025
GENERAL NOTES & INFORMATION
TRUE NORTH
B260A
B260C
ELEC.
B260
B280
B280D
B280B
B280C
FREEZER
B280A
B282
B280
B271
PATIO
B268
B252
WOMEN'S
B250
MEN'S
B246
B266 B244
ELEC.
B242
ELEC.
B240
B221
B223
B224
B228
B225
B227
B229
B232
B230
MECH.
B222 B116
B114
B112
B110
B108
B108A
MECH.
B106 B104 B103 B102
B171
B171A
B169
B170
B168
B170A
B166 B167
B165
B164
B161 B162
B161B
B161A
B163
B-PC-1
B160
B013
ELEC.
B015
ENG.
B015A
B017
B021 B-EL-1
B040A
B040B
B040C
B040
B060C
MECH.
B060A
MECH.
B060E
B060F
B060 B060D
B060B
B041
B043
B047
B046
B044
B042
B018
ENG.
B016
B014
B012B105
EMR
B107
ENG.
B109
ENG.B111
B113
EMR
B241B243B245
ENG.
CRAWL SPACE
B121
B125B123
B124
B127
B126
B128
B130
B129
ELEC.
B129A
ELEC.
B151DB151C
B151 B151A
B153B
B153D
B153A
CONTROL ROOM
B141
ENG.
EXAM
ROOM
CONTROL ROOM
B151B
EXAM
ROOM
B153
B153C
B152
FIRE
PROT.
B150
B148
B146
B142
B144
B201
B203A
B203
B203B
B203C
B-ME-1
B203D
B2
B204
B260B
TEST
BOOTH
STORAGE
STORAGE
WOMEN'S
MEN'S
HSK.
B-
PC
-2
AUTOVALET
BIO-MED
SHOPPM WORKSHOP
STORAGE
PATIENT
EFFECTS
ELEC. STORAGE
PROSTH
STORAGE
STORAGE
STORAGE
FIRE PUMP
ROOM
NHCU
STORAGE
B-FC-1
FIRE
EQUIP.
B281
B280E
ENG.
B111A
B015
B279
B278
B277 B276
B275
B274
B273
B272
B2
B272A
B162A
B162AB
B100
B226A
B226
FOUNDATION
OF B63
GREENHOUSE
NIC
AHU
B9
NIC
6"
8" CH/R MAINS
6" CH/R UP TO ATTIC
3" CHWS/R
2 1/2" CHWS/R
8"
2 1/2" CHWS/R
AHU
B16
20 GPM
AHU
B15
15 GPM
CU
B11
CU
AHU
AHU
B11
AHU
B1
AHU
B2
AHU
B12
AHU
B10
6" CHWS/R UP
TO ATTIC
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
AIR CONDITIONING CONDENSATE DRAINCD
HIGH PRESSURE STEAM SUPPLYHPS
HIGH PRESSURE STEAM RETURNHPR
STEAM TRAPT
LOW PRESSURE STEAM SUPPLYLPS
LOW PRESSURE STEAM RETURNLPR
ISOLATION VALVE ( GATE , BALL, OR BUTTERFLY)
THROTTLING/SHUT-OFF VALVE (GLOBE)
CALIBRATED BALANCING/SHUT-OFF VALVE (CIRCUIT SETTER)
MODULATING CONTROL VALVE ( TWO-WAY & THREE-WAY)
PIPING LEGEND
SYMBOL DESCRIPTION
PLAN PHASING & CONSTRUCTION NOTES
1. CONTRACTOR SHALL COMPARTMENTALIZE, WITH TEMPORARY
ENVIRONMENTAL CONTROLS, EACH INDIVIDUAL CONSTRUCTION AREA FOR THE
ENTIRE DURATION OF THE CONSTRUCTION ACTIVITY WITHIN THAT AREA.
TEMPORARY ENVIRONMENTAL CONTROLS WILL BE REQUIRED TO BE INSTALLED
AND REMOVED ON A DAILY BASIS IN MAIN ACCESS CORRIDORS TO ALLOW
OCCUPANT ACCESS DURING OPERATIONAL HOURS.
2. ALL WORK IN CORRIDORS SHALL BE PERFORMED DURING NON-OPERATIONAL
HOURS UNLESS APPROVED BY THE VA COR.
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
M101
REVISIONS / ISSUANCES: DATE:
12/31/2025
BASEMENT FLOOR MECHANICAL
PLAN
PROJECT NORTH
TR
UE
N
OR
TH
SCALE:01 BASEMENT FLOOR MECHANICAL PLAN
1/16=1'-0"
1-PC-10
1296 1294
1297 1295
1-PC-9
1-PC-8
1277A
1290A
1290B
1265D
1257A
1254A
1254B
1272A
12601262
1-MC-3
1255 1253
1250 1211
1-PC-7
1-EL-3
1218A
1238A
1231A
1-ME-2
1095A
1095B
1265C 1265B
1019A
1027 1027A 1029
1016A
1-FC-2 1-TC-3
HK
1-PC-6
1-PC-2
1265A
1082A
1084A 1082 doors permanently locked
18"
DN
UP
DN
DN
UP
ELEV.
M101
EXIST. STAIR
S-102
EXIST. STAIR
S-100
POLICE
TREAT
TREAT
TREAT
MH VIEW
MH WAITING
TREAT
TREAT
TREAT
TREAT
HSKP
OFFICE
SUPPLY
STAF TLT
STORAGE
TREAT
CHECK-IN/OUT
PAT. TLT
EXAM
PCMHI EXAM
PAT. TLT
STAFF TLT
EXAM
EXAM
EXAM
CONSULT
CONSULT
EXAM
175 SF
PROCEDURE
EXAM
EXAM
CONSULT
EXAM
EXAM
EXAM
EXAM
EXAM
PCMHI EXAM
PCMHI EXAM
CONSULT
EXAM
EXAM
EXAM
CONSULT
CONSULT
EXAM
1226 PROCEDURE
SHARED
APPT.
SHARED
APPT.
TELE-HEALTH
TELE-HEALTH
PAT. TLT
CORRIDOR
C100
SOILED
UTILITY
STAFF
BREAK
1240LOCKERS
1240A
CONFERENCE
STAFF TLT
STAFF TLT
HSKP
1237 MED EQUIP
LOADING
DOCK
C106
ON CALL
STAFF TLT
ON CALL
IT CLOSET
TEAM WORK
C102
TEAM WORK
C104
CLEAN
UTILITY
MEDS
MEDS
ELEC.
E100
WAITING
VEST.
PUB TLT
1101C
PUB TLT
1101D
BARI TLT
1101A
VENDING
1253 SHARED
APPT. STOR.
PUB TLT
1101B
C106B
CORRIDOR
C101
TLT
1227A
CORRIDOR
C105
CORRIDOR
C103
ELEC
E101
LINEN
SHELL
SPACE
TOILET
1209A
STORAGE
OFFICE
OFFICE
OFFICE
CLOSET
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
1071A
1-PC-3
1-PC-5
1-PC-4
10951-FC-1
13.5"
21"
AHU
20 GPM
CHWS/R
CU
B9
CU
B8
6" CHWS/R UP
& DOWN
CU
B7
CU
B6 CU
B3
REFRIGERANT PIPING
CU
AHU
1-1
21 GPM
REFRIGERANT PIPING
2" CHWS&R
HRU
CU
B5
6" CHWS&R
3" CHWS/R
CU
B4
REFRIGERANT PIPING
CU
B14
CU
B13
CU
B12
CU
B10
AHU
CU
B1
AHU
CU
B2
CU
B3
CU
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
AIR CONDITIONING CONDENSATE DRAINCD
HIGH PRESSURE STEAM SUPPLYHPS
HIGH PRESSURE STEAM RETURNHPR
STEAM TRAPT
LOW PRESSURE STEAM SUPPLYLPS
LOW PRESSURE STEAM RETURNLPR
ISOLATION VALVE ( GATE , BALL, OR BUTTERFLY)
THROTTLING/SHUT-OFF VALVE (GLOBE)
CALIBRATED BALANCING/SHUT-OFF VALVE (CIRCUIT SETTER)
MODULATING CONTROL VALVE ( TWO-WAY & THREE-WAY)
PIPING LEGEND
SYMBOL DESCRIPTION 1. CONTRACTOR SHALL COMPARTMENTALIZE, WITH TEMPORARY
ENVIRONMENTAL CONTROLS, EACH INDIVIDUAL CONSTRUCTION AREA FOR THE
ENTIRE DURATION OF THE CONSTRUCTION ACTIVITY WITHIN THAT AREA.
TEMPORARY ENVIRONMENTAL CONTROLS WILL BE REQUIRED TO BE INSTALLED
AND REMOVED ON A DAILY BASIS IN MAIN ACCESS CORRIDORS TO ALLOW
OCCUPANT ACCESS DURING OPERATIONAL HOURS.
2. ALL WORK IN CORRIDORS AND PLUMBING CHASE 1-PC-6 SHALL BE PERFORMED
DURING NON-OPERATIONAL HOURS UNLESS APPROVED BY THE VA COR.
PLAN PHASING & CONSTRUCTION NOTES
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
M102
REVISIONS / ISSUANCES: DATE:
12/31/2025
FIRST FLOOR MECHANICAL PLAN
PROJECT NORTH
TR
UE
N
OR
TH
SCALE:01 FIRST FLOOR MECHANICAL PLAN
EXAM
OPTOMETRY
EXAM
CHIEF OFFICE
CLEAN INST.
EXAM
OPTOMETRY
EXAM
EYEGLASS
FITTING 2222
PHOTOGRAPHY
OPTOMETRY
EXAM
OFFICE
OPTOMETRY
EXAM
2234A
FAMILY/BARIATRIC
WASHROOM2234
WAITING
RECEPTION
WAITING
2233A
WASHROOM
OFFICE
H.K.
2236B I.T.
DIRTY
INST.
CLEAN LINEN
OXYGEN STOR.
WASHROOM
EXAM
NURSE STATION:
INTAKE/EXIT
INTERVIEW
OFFICE
MAS. OFFICE
MED. PREP.
GENERAL
PROCEDURE
2264A
WASHROOM
CO
RR
STAFF LOUNGE/
LOCKERS
DIRTY
LINEN
CONFERENCE
2242B
ELEC.
CONSULT/ EXAM
EKG/STRESS
TESTING
CORRIDOR
VISUAL FIELDS
KIOSK
CO
RR
OFFICE
GENERAL
OFFICE
OFFICE (FUTURE
EXAM/
CONSULT)
SHOE STOR.
SHOE SHOP
EXAM
EXAM
EXAM
CHIEF OFFICE
CONSULT/ EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLEAN SUPPY
CARDIO EQUIP.
ADMIN. OFFICE
ADMIN. OFFICE
EXAM
WASHROOM
CORRIDOR
CO
RR
2242A
ELEC.
2236A
ELEC.
STAIRS
TOILET
TOILET
CORRIDOR
CORRIDOR2-TC-2
SECRETARY
WAITING ROOM
ULTRA SOUND
CHANGING/
TOILET
STAFF
PHYSICIAN
CORRIDOR
STAIRS
RADIOLOGIST
2WA-1
EMERG.
ELEC.
2WA-2
ELEC.
2-ME-2
STOR.
RADIOLOGIST
2108A
TOILET
VEST.21142120
X-RAY ROOM
OFFICE
EXAM
CORRIDOR
RESP.
CLINIC 2158
PULM.
LAB
RESPIRATORY
THERAPY
EKG/EEG
2154A
STORAGE
STORAGE
WOMEN'S
MEN'S
STAIRS
STORAGE
CORRIDOR
LAB
TECH. AREA
TESTING
STORAGE
FILE
ROOM
EMPLOYEE
BREAK ROOM
OFFICE
LAB
2132A
STORAGE
OFFICE
OFFICE
CONF.
ROOM
PATHOLOGY
TOILET
2126A
PHLABOT.
ROOMS
TOILET 2121
OFFICE
2118A
2-PC-10
2-PC-11
2-PC-14
2-EL-2
2WA-3
2WA-4
2WA-5
2WA-6
2WA-7
2WA-8
2WA-9
2WA-10
2WA-12
2WA-13
2WC-P
2WC-38
2WC-39
2WC-40 2WC-41
2WC-42
2WB-43
2WB-60 2WB-64
2WB-65
2WB-66
2WB-67
2WB-69
2WB-70
2WB-71
2WC-372WA-18
2WB-61 2WB-62
2WB-68
2WB-44
2WB-45
2WB-46
2WB-47
2WB-50
2WB-51
2WB-52
2WB-55
2WB-58
2WB-59
2WB-57
2WB-56
2WB-81
2WB-80
2WB-79
2WB-78
2WB-77 2WB-76
2WB-75
2WB-74
2WB-73
2WB-722WA-19
2WA-20
2WA-21
2WA-22
2WA-23
2WA-24
2WA-25
2WA-26
2WA-27
2WA-28
2WA-29
2WA-30
2WA-31
2WA-32
2WA-33
2WA-34
2WA-35
2WA-36
2WA-15
WAITING
DILATION
OPTOMETRY
EXAM
ELECTICAL
PRE-TEST
OFFICE
SUPPORT
OPTOMETRY
EXAM
WASHROOM
LOW VISION
EXAM
TRAINING: LOW VISION/
POLYTRAUMA
VIST
WASHROOM
BROS
2239A
BROS STOR.
STOR.
2201A
WASHROOM
CO
RR
2-PC-9
2-PC-8
DN
2WB-54
2WB-54
2WB-48
2WB-49
AHU
HP
6" CHWS/R UP & DOWN
ACT CEILING AHU
CHW PIPE RISERS TO ATTIC
CHW PIPE RISERS TO ATTIC
AHU
PC1
63 GPM
NIC
2 1/2" CHWS/R UP TO
ATTIC SPACE
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
AIR CONDITIONING CONDENSATE DRAINCD
HIGH PRESSURE STEAM SUPPLYHPS
HIGH PRESSURE STEAM RETURNHPR
STEAM TRAPT
LOW PRESSURE STEAM SUPPLYLPS
LOW PRESSURE STEAM RETURNLPR
ISOLATION VALVE ( GATE , BALL, OR BUTTERFLY)
THROTTLING/SHUT-OFF VALVE (GLOBE)
CALIBRATED BALANCING/SHUT-OFF VALVE (CIRCUIT SETTER)
MODULATING CONTROL VALVE ( TWO-WAY & THREE-WAY)
PIPING LEGEND
SYMBOL DESCRIPTION
PLAN PHASING & CONSTRUCTION NOTES
1. CONTRACTOR SHALL COMPARTMENTALIZE, WITH TEMPORARY ENVIRONMENTAL
CONTROLS, EACH INDIVIDUAL CONSTRUCTION AREA FOR THE ENTIRE DURATION
OF THE CONSTRUCTION ACTIVITY WITHIN THAT AREA. TEMPORARY
ENVIRONMENTAL CONTROLS WILL BE REQUIRED TO BE INSTALLED AND REMOVED
ON A DAILY BASIS IN MAIN ACCESS CORRIDORS TO ALLOW OCCUPANT ACCESS
DURING OPERATIONAL HOURS.
2. ALL WORK IN CORRIDORS AND PLUMBING CHASE 2-PC-10 SHALL BE PERFORMED
DURING NON-OPERATIONAL HOURS UNLESS APPROVED BY THE VA COR.
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
M103
REVISIONS / ISSUANCES: DATE:
12/31/2025
SECOND FLOOR MECHANICAL
PLAN
PROJECT NORTH
TR
UE
N
OR
TH
SCALE:01 SECOND FLOOR MECHANICAL PLAN
DOWN
DOWN
MECHANICAL ROOM
CATWALK CATWALK
ELEVATOR
SHAFT
VACANT
FLAT ROOF
SOUTH PENTHOUSE
METAL
WOOD
44" METAL DOOR
ACCESS TO FLAT ROOF
DOOR
DOOR
WOOD
DOOR
METAL
DOOR
FIRE
PUMP
ROOM
TOP OF
ENTRANCE DOOR TO
ATTIC ON SECOND
FLOOR
DOWN
ENTRANCE DOOR TO
ATTIC ON SECOND
FLOOR CA
TW
AL
K
ELEVATOR
SHAFT
TOP OF
FIRE
PUMP
ROOM
CH
W
S
CH
W R
6"CHWS&R2"CHWS&R
2"CHWS&R
2"CHWS&R
EXG 11
2"CHWS&R
CHWS
CHWR
CHWS
CHWR6"CHWS&R
EXG 2"CHWS&R
6"CHWS&RDP
S
CONTROLS
SERVER
2"CHWS&R
2"CHWS&R
2"CHWS&R
6"CHWS&R
6"CHWS&R6"CHWS&R
2"CHWS&R
2"CHWS&R
3" CHWS&R
2"CHWS&R
2"CHWS&R
RS RLRL RS
RL
RS
CH
W
S
CH
W R
RL
RS
RL
RS
2"CHWS&R
AHU
1E
41.7 GPM
2" CHWS&R
CU
4"RL & 12"RS DN TO HEAT PUMP
HP-1 IN IT ROOM 2238B BELOW
6" CHWS&R DN TO
SECOND FLOOR
AHU
2E
38.1 GPM
AHU
22 GPM
AHU
22.2 GPM
2" FOR MENTAL HEALTH
AHU ON FIRST FLOOR
BCU
4.0 GPM
BCU
4.0 GPM
1" CHWS&R
AHU
2A
34.1 GPM AHU
A1
AHU
23.5 GPM
AHU
16.7 GPM
AHU
25.7 GPM
CONTROLS
SERVER
AHU
PC2
32.5 GPM
AHU
23.5 GPM
CU
REFRIG.
PIPING
AHU
1A
105.3 GPM
CU
A1
CU
AHU
A3
20.0 GPM
2" CHWS&R DOWN
4"CHWS&R
4"CHWS&R
4"CHWS&R
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
AIR CONDITIONING CONDENSATE DRAINCD
HIGH PRESSURE STEAM SUPPLYHPS
HIGH PRESSURE STEAM RETURNHPR
STEAM TRAPT
LOW PRESSURE STEAM SUPPLYLPS
LOW PRESSURE STEAM RETURNLPR
ISOLATION VALVE ( GATE , BALL, OR BUTTERFLY)
THROTTLING/SHUT-OFF VALVE (GLOBE)
CALIBRATED BALANCING/SHUT-OFF VALVE (CIRCUIT SETTER)
MODULATING CONTROL VALVE ( TWO-WAY & THREE-WAY)
PIPING LEGEND
SYMBOL DESCRIPTION
PLAN PHASING & CONSTRUCTION NOTES
1. CONTRACTOR SHALL COMPARTMENTALIZE, WITH TEMPORARY
ENVIRONMENTAL CONTROLS, EACH INDIVIDUAL CONSTRUCTION AREA FOR THE
ENTIRE DURATION OF THE CONSTRUCTION ACTIVITY WITHIN THAT AREA.
TEMPORARY ENVIRONMENTAL CONTROLS WILL BE REQUIRED TO BE INSTALLED
AND REMOVED ON A DAILY BASIS IN MAIN ACCESS CORRIDORS TO ALLOW
OCCUPANT ACCESS DURING OPERATIONAL HOURS.
2. WORK IN ATTIC MAY BE EXECUTED DURING NORMAL OPERATIONAL HOURS.
CONTRACTOR SHALL COORDINATE SCHEDULE WITH THE VA COR.
COMPARTMENTALIZATION CONTROLS SHALL BE INSTALLED AROUND THE
PORTION OF THE ATTIC WHERE WORK IS OCCURRING.
CHILLER PIPE VICTAULIC
GASKET REPLACEMENT
VA CWM
JC-A LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
M104
REVISIONS / ISSUANCES: DATE:
12/31/2025
ATTIC FLOOR MECHANICAL PLAN
PROJECT NORTH
TR
UE
N
OR
TH
SCALE:01 ATTIC FLOOR MECHANICAL PLAN
| Sheets and Views |
| GI001 |
| GI002 |
| M101 |
| M102 |
| M103 |
| M104 |
File details come from the government source that posted it. Updated .