This is a Performance Work Statement (PWS) for janitorial and custodial services at Camp Butler National Cemetery in Springfield, Illinois for Fiscal Year 2026.
The contract requires comprehensive custodial services across nine contract line items (CLINs) with varying frequencies: (0001) daily janitorial services for administration and maintenance buildings including trash removal from multiple facilities (12 months); (0002) weekend-only public restroom cleaning on Saturdays and Sundays (52 weeks); (0003) bi-annual HVAC register and grille cleaning (2 jobs); (0004) monthly light fixture cleaning (12 months); (0005) quarterly external window cleaning April through September (4 jobs); (0006) holiday janitorial services at the Public Information Building (12 months); (0007) weekday janitorial services at the shelter (12 months); (0008) bi-annual floor scrubbing and cleaning for ceramic and wood floors (2 jobs); and (0009) bi-annual floor stripping and waxing (2 jobs). The contractor must provide all personnel, equipment, supplies, and materials to maintain a clean, neat, professional appearance meeting National Shrine standards. Work is performed during normal federal business hours (7:30 a.m. to 4:00 p.m. Monday through Friday), with exceptions for Memorial Day and weekend public restroom services. The contract minimum is one base year with four optional one-year extensions exercisable at VA's discretion based on fund availability. Green cleaning products and processes are required, with preference for USDA bio-based products and Green Seal certified cleaners. The contractor must submit a Quality Control Plan within 14 days of award, weekly progress reports, and safety data sheets for all materials. Performance standards allow no more than four valid defects monthly for facility and restroom cleaning services, zero defects for periodic and grounds cleaning, and one valid defect monthly for quality control procedures, with remedies including re-performance within two hours for daily services or one day for periodic services. The estimated facility size is 2,700 square feet, primarily vinyl composite tile flooring.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Camp Butler National Cemetery
5063 Camp Butler Road
Springfield, Illinois 62702
Performance Work Statement
Janitorial Contract For FY26
GENERAL INFORMATION
1.
a. Scope of Work: This is a performance-based contract for cemetery custodial services at Camp
Butler National Cemetery, Camp Butler, Illinois and hereafter referred to as “Camp Butler” or
“Cemetery.” The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities of “custodial services” described herein, which are required to maintain sanitation and an aesthetic appearance of the Cemetery Administration facility, and public and staff restrooms.
b. This Performance Work Statement describes the basic objectives of the Camp Butler National
Cemetery Custodial Program. The Performance Based Service Contract provides potential
Offerors the flexibility to develop cost-effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the Offeror’s understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained in the
Statement of Work that the Government traditionally provides to prospective Offerors. Minimum acceptable levels of performance to meet the minimum requirements are outlined in the “Services
Summary” contained in Attachment 1.
CLIN/Service breakdown:
Janitorial Services at Administration and Maintenance Buildings to include: pick up all outside and inside garbage.
Maintenance Building, Office Building, Committal Shelter, Restrooms, Public Information Building, Individual Cemetery bins.
MO
0002 Weekend Janitorial Services at Public Restrooms (Only Saturday and Sundays)
52 WK
0003 Bi-Annual Cleaning HVAC registers and grilles at Administration Buildings and Maintenance Building
JB
0004 Monthly Cleaning of Light Fixtures.
Quarterly cleaning of external windows (April-September)
0006 Janitorial Services at Public Information Building (Holiday)
Janitorial Services at Shelter (Weekdays)
(Bi-Annual) Scrub and Clean Floors, Ceramic and Wood Floors Maintenance and Administration Building
(Bi-Annual) Strip and Wax floors in Maintenance and Administration Building
2. THE NATIONAL CEMETERY ADMINISTRATION MISSION:
The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures performed by the
Contractor have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, the Contractor’s strict adherence to the
Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential.
3. BACKGROUND:
a. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans.
b. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The
National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation’s freedom and way of life.
4. CONTRACT OBJECTIVES:
a. To use an innovative and creative approach to manage the Cemetery’s custodial operations at the
Camp Butler National Cemetery to maintain the high standards of appearance as a National
Shrine, in accordance with best commercial practices and the requirements identified in this solicitation.
b. To have the Contractor perform to its Technical Performance Approach focused on criteria designed to maintain a satisfactory facility condition and present a clean, neat and professional appearance.
c. The minimum length of the contract is planned for one base period with up to four (4) one- year options individually exercised at VA’s discretion and dependent on the availability of funds.
5. DESCRIPTION OF SERVICE:
The Contractor shall furnish all personnel, supervision, professional expertise, equipment, tools, materials, services, and quality control necessary to ensure that non-personal custodial services are performed at the Cemetery, in a manner that will maintain a satisfactory facility condition and present a clean, neat and professional appearance. The Contractor shall accomplish all cleaning tasks to meet the requirements of this PWS and the Service Summary (SS). Maximum cleaning frequencies are established in Attachment 2. Estimated square footages are established in Attachment 3. All work performed by the
Contractor shall be performed in accordance with all applicable laws, regulations, and commercial practices. All work will be done during normal Federal workdays*, during the following Cemetery workday hours: between 7:30 a.m. and 4:00 p.m. Monday through Friday. (* The two (2) exceptions are
Memorial Day, which may be a workday for Federal employees, but not for the Contractor; and weekend services to public restrooms throughout the cemetery).
Areas to be cleaned:
i. Administration Building (Admin Bldg. Public Information Center (PIC))
ii. Maintenance Building: break room, kitchen, and common areas; locker rooms and restrooms; foreman’s office
iii. Public Restrooms
iv. Cemetery Grounds (Trash Cans, Committal Shelter)
a. FACILITY CLEANING SERVICES
i. Non-Carpeted Floors (Hard Floors: Ceramic Tile, Concrete, etc.). Hard floors shall be maintained free of grit, soil, dust, scuff and heel marks, stains, spills, debris, litter and other foreign matter by effective daily cleaning. Cleaning shall be accomplished by the most appropriate method (vacuum, sweep, dust mop, damp mop, wet mop, spot clean, etc.) and with cleaning solutions if applicable, for the specific floor type. After cleaning, floor surfaces to include grout shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.
Baseboards, corners, and wall/floor edges shall also be clean. Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning. A “Wet Floor” signs shall be used when the floor is wet.
ii. Entrances and Entrance Platforms are to be cleaned daily: as a minimum, vacuuming, sweeping and trash removal.
iii. Carpeted Floors. Carpets shall be maintained free of soil, dirt, debris, litter and other foreign materials through effective daily vacuuming. Efficient vacuum cleaners shall offer high airflow, high efficiency filtration, and an adjustable rotating brush agitation for more effective soil removal. Any spots and/or spills shall be removed by the carpet manufacturer’s approved methods or other commercially accepted practices as soon as noticed. All tears, burns, and raveling shall be brought to the attention of the Contracting
Officer’s Representative (COR). Area and throw rugs shall also receive this service.
Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning.
Plastic protectors under desks shall be cleaned.
iv. Dusting Horizontal Surfaces. Dust office furniture, file cabinets, and all other horizontal office furniture and accessories, including pictures, fire extinguishers, and items in the foyer. Low dusting includes surfaces within 6 feet of the floor and must be free of dust, lint, cobwebs, and litter. High dusting includes surfaces above 6 feet up to 10 feet.
Surfaces include items such as tables, shelves, bookcases, storage lockers, windowsills, handrails, pictures, clocks, window blinds, ceiling fans, light fixtures, and overhead air registers. Waiting room chairs will be dusted, window blinds dusted and vacuumed weekly.
v. Spot Clean Vertical Surfaces. Spot clean all doors, door frames, and areas around light switches. Thoroughly clean soiled wall coverings and chairs throughout the contract coverage area. Clean the outside surface of microwaves and refrigerators in Admin Bldg.
and Manit Bldg. Computer screens will not be cleaned with any products, only dusted.
vi. Windows, Interior Glass, and Entrance Glass. All interior window surfaces, interior glass, entrance glass (inside and out), and entrance door glass, including glass indoors, partitions, walls, display cases, and directory boards shall show no traces of film, dirt, smudges, water, or other foreign matter. Exterior glass doors and exterior glass entranceway in the Admin
Bldg. shall be cleaned daily.
vii. Clean Floor (Walk-Off) Mats. Vacuum and/or clean interior and exterior floor mats. Mats shall be free of all visible lint, litter, debris, soil and other foreign matter. Soil and moisture underneath mats shall be removed and mats returned to their normal location.
viii. Trash and Recyclables Collection/Removal. All trash and recycling containers shall be emptied daily, trash transported and disposed of in designated area(s), recyclables collected and placed in designated area(s), and containers returned to their original locations. (Note:
All cardboard is classified as recyclable and should be treated as such.) The shredder bins shall be emptied and treated as recycling no less than weekly or when the bin(s) are full.
The Contractor shall provide and replace any obviously soiled, worn or torn plastic liners, but no less than twice per week. Trash and recycled receptacles shall be left clean, free of foreign matter and free of odors.
ix. Submittal of Facility Defects. When routine facility defects (e.g. dripping faucet, loose door, loose window frames, etc.) are found, they shall be reported to the COR.
x. Closing Procedures: Arrange furniture to original position. Report any damage or unusual circumstances. Straighten janitorial closet, if utilized. The Contractor shall turn off lights, except those designated to be remain on, after competition of cleaning duties. Contractors will not be left alone in complex building facilities or for cleaning after hours, with the exception of public restroom facilities.
b. RESTROOMS/LOCKER ROOMS CLEANING SERVICES
i. Clean and Disinfect. All surfaces of sinks, toilets, urinals, lavatories, showers, shower mats, dispensers, plumbing fixtures and faucets, exposed pipes, partitions, dispensers, walls, stalls, stall doors, entry doors (including handle, kick plates, ventilation grates, metal guards), light fixture covers, and other such surfaces shall be cleaned and disinfected using a germicidal detergent. Restrooms shall have a clean scent or no odor at all. Showers, toilets, and urinals will be free of spots, water spots, scale buildup, soap scum, odors, and any other deposits. Mirrors shall be clean and have no streaks or other removable matter.
Partitions shall be smudge, stain free. Vents (within 72 inches of the floor) shall be clean.
Restroom sinks, countertops, and fixtures shall be free from water and scale deposits, soil, streaks, and other removable matter. Walls and grout below six feet shall be free of all film, spots, and detergent buildup.
ii. Restroom Floor Care. All floor surfaces shall be maintained in accordance with paragraph
4.a. by effective routine cleaning. Moveable items shall be tilted or moved to sweep and damp mop underneath. Grout on the wall and floor tiles shall be free of dirt, scum, mildew, and residue.
iii. Stock Restroom Supplies. The contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, paper towels, and hand soap do not run out.
Supplies shall be stored in designated areas. If supplies run out prior to the next service date, the contractor shall refill within two (2) hours of notification. The contractor shall provide soap dispenser refills, toilet tissue, and hand towel refills.
iv. Drinking Fountains. (if applicable) The contractor shall clean all facility drinking fountains: one outside of Public Restroom. All porcelain and polished metal surfaces, including the orifices and drain, as well as exterior surfaces of fountains shall be cleaned and disinfected. Drinking fountains shall be free of streaks, stains, spots, smudges, scale, and other obvious soil.
v. Restroom Trash Removal. All trash containers in restrooms and locker rooms, including sanitary napkin disposal containers, shall be emptied, trash disposed, and containers returned to or reassembled in their original locations. The Contractor shall provide and replace any obviously soiled, worn or torn plastic trash can liners, daily. Trash receptacles shall be left clean, free of foreign matter and free of odors.
vi. Restroom Checklists. The Contractor’s employee(s) on duty shall sign off daily on the restroom checklists, which are generally located in the foyers or attached to the doors of the public restrooms and staff restrooms.
c. PERIODIC CLEANING SERVICES (Services performed on a monthly, semi-annual, and annual basis).
i. Semi-Annual Hard Floor Maintenance (To be performed in April and September).
Ceramic Tile shall be cleaned, scrubbed, stripped, sealed, waxed, and polished as required for the appropriate surface to maintain, protect and ease normal routine floor cleanings.
After periodic maintenance, floor surfaces shall have a uniform clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.
ii. Semi-Annual and Monthly Carpet Restorative Cleaning (To be performed in April and
September). Carpets shall be bonnet cleaned monthly or as needed. Carpets shall be deep cleaned semi-annually in order to remove embedded soil from carpet fibers. Deep cleaning shall employ an effective technique and/or method to address soil suspension, soil extraction and drying. After deep cleaning, the carpeted area shall show an improvement in visible appearance. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs, and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath and returned to their original location after the carpet has dried.
iii. Semi-Annual Cleaning of Air Registers, Diffusers, and Grilles (To be performed in April and October). Includes the outside part accessible to cleaning, without removal of registers, diffusers or grilles that are cleaned as part of everyday or weekday cleaning. This cleaning is an addition to cleaning of the outside fixture performed as part of the routine cleaning.
iv. Monthly Light Fixture Cleaning (To be performed 15th of the month, unless the day falls on a weekend or federal holiday). Ceiling lights, emergency lights, patio lights, outside entrance and all lights (except desk and table lights) shall have their covers removed and the Contractor shall clean the light inside and out. This cleaning is an addition to cleaning of the outside fixture performed a part of the routine cleaning.
v. Quarterly Window Exterior Cleaning (To be performed the 1st workday of the months covering April through September). All exterior glass surfaces that are in integral part of the outer surface of the building shall be cleaned no less than monthly during the designated period and show no traces of film, dirt, smudges, water, or other foreign matter.
d. CEMETERY GROUNDS CLEANING SERVICES
i. Outdoor Trash Removal. All trash containers located throughout the cemetery grounds shall be emptied, trash disposed, and containers returned to or reassembled in their original locations. The Contractor shall provide and replace any obviously soiled, worn or torn plastic trash can liners, daily. Trash receptacles shall be left clean, free of foreign matter, and free of odors.
6.BUILDING SECURITY
i. Will be maintained by the Cemetery Complex Staff. The Contractor will perform cleaning duties during normal business hours. The only exception is the public restrooms open to the public seven days a week, which require cleaning over the weekend.
7.SAFETY
i. The Contractor shall display warning signs that have been approved by the Contracting
Officer’s Representative (COR) in all areas where housekeeping operations may cause traffic obstruction or personnel hazard.
ii. The cleaning of lobbies and corridors resulting in a temporary wet or slippery floor surface shall be accomplished so that it will not be necessary for personnel to cross the wet surface to gain access to other areas.
iii. Contractor personnel shall turn off all lights in unoccupied areas after cleaning is performed. Contractor personnel shall check and ensure encountered areas are locked.
Ensure areas are secured and windows closed and locked. The Contracting Officer or designee shall be notified of any unlocked doors or windows during his/her duty hours.
iv. In the event of any after-hours incidents, the Contractor shall contact the COR or designated cemetery contact and express the nature of the incident, as well as any involved parties.
8. CONTRACTOR FURNISHED EQUIPMENT/SUPPLIES
i. The contractor shall furnish the supplies necessary to perform all services required.
Supplies and equipment shall meet the specifications below and comply with VA, Federal, or State Occupational Safety and Health Standards and Fire regulations.
ii. All items shall be approved by the COR prior to being used. New supplies or changes in previously approved material shall require product literature and may require samples.
iii. Contractor personnel shall not use steel wool, abrasive metal cleaners, or any other cleaning materials or supplies which could cause damage to property. At no time shall chairs, wastebaskets, brooms, mops or any other items normally placed on the floor be placed on any surface of furniture or equipment.
iv. Contractor’s equipment shall be compatible with existing sources of furnished electrical power. All equipment shall comply with current safety standards. All equipment shall be cleaned with a disinfectant-detergent each day prior to storage.
v. Rotary floor polishing, buffing and scrubbing machines, shall be equipped with brush or pad head drive assemblies made of non-porous materials. Equipment will be checked for electrical safety and records maintained.
vi. All electrically operated equipment shall be equipped with quit-type motor, be third-wire grounded, and equipped with an appropriate length of UL approved three-conductor cord.
Extension cords are prohibited.
vii. All wheeled and movable equipment shall be equipped with protective non-marking wheels and rubber bumpers or guards around the entire perimeter. No part of the equipment
(except fixed handles) shall protrude beyond the rubber bumpers.
viii. When not in use, equipment shall be stored in designated areas only. Trash containers shall be washed each day prior to storage.
ix. Supplies and equipment shall not be transported in trash barrels, mop buckets, etc. All material not immediately used shall be properly stored.
x. Supplies and equipment reserved for use in designated areas shall not be transferred to the other areas. All such items assigned shall be plainly marked with the area’s designation.
xi. Floor Polishing Liquid – The liquid shall be synthetic co-polymer plastic (not a wax), water emulsion with a solid content of at least 12 percent, removable by detergent scrubbing, and safe for use on all synthetic, resist scuffing, and water penetration.
xii. Stripping Compound – This product shall be purely synthetic, non-ionic, biodegradable, and contain no animal or vegetable soaps, abrasives, bleach, alcohol, ammonia or other ingredients which would produce any harsh, harmful, or noxious odors or fumes, either in use or in storage. It is permissible to use a special detergent stripper specially designed for use in automatic scrubber equipment, so long as it meets the above requirements.
xiii. Mops – Non-disposable mop heads shall be neutral colored and made of rayon yam.
Cotton yam may be used only if the disinfectant-detergent is not a quat (since cotton neutralizes quats. Mop heads shall be washed in housekeeping closet sinks.)
xiv. Cloths, Impregnated, Dusting and Sweeping – These cloths shall be tubular cotton with 18 percent to 22 percent non-oil impregnation by weigh, and the impregnations compound shall be registered with EPA.
xv. Vacuum Cleaners – All vacuum equipment shall have hospital use micro-static impaction type filtration system, which shall filter out all dust and bacteria particles larger than 0.3 microns. All vacuum equipment (i.e. tank, hose, and bag) shall be cleaned daily with disinfectant-detergent. Vacuum filters shall be cleaned weekly.
xvi. Other Items –
1) Floor polishers shall have a non-porous scrubbing surface to inhibit bacterial growth.
2) Mop Buckets – The double bucket mopping system shall be used. Buckets shall be constructed of nonporous, acid resistant, seamless material.
3) Contractor Equipment – The Cemetery shall not be held responsible for any items of Contractor’s equipment which may be lost, damaged or stolen. The contractor shall tag all contractor owned equipment for identification.
9. GREEN CLEANING
a. The Contractor shall use green cleaning products and processes. Green cleaning is a planned and organized approach to cleaning that is designed to protect the occupants and workers' health and reduce the impact on human health and the environment. Unlike a traditional cleaning program, a green custodial program takes a holistic approach to building cleaning and goes beyond simple appearances to focus on health and the environmental impacts.
b. Green cleaning products and processes include, but are not limited to products containing recycled content, environmentally preferable products and services, vacuum cleaners with HEPA filtration, bio-based products, and products and services that minimize the use of energy, water, and other resources. In addition to compliance with these requirements, the Contractor shall follow all applicable standard industry practices including but not limited to those published by the National Institute of Building Sciences (NIBS), American Society of Testing Materials
(ASTM), and Carpet and Rug Institute (CRI), as well as applicable standards of the
Environmental Protection Agency (EPA).
c. The Contractor shall take every precaution to ensure that if available, only safe and environmentally preferable products are used. Preference must be given to cleaning products that meet the following: United States Department of Agriculture (USDA) designated bio-based products, Green Seal certified (Standard GS-37 for Commercial and Institutional Cleaners, Comprehensive Procurement Guidelines (CPG)), and applicable Executive Orders.
d. The Contractor shall give preference to supplies and products that are "environmentally preferable". The list of Comprehensive Procurement Guideline (CPG) items and their associated
Recovered Materials Advisory Notices (RMAN’s) are available at http://www.epa.gov/cpg.
Items such as trash bags are on the CPG list. Information on CPG items can be found at:
http://www.epa.gov/cpg/products.htm. This includes concentrated and ready-to-use cleaning chemicals (spray bottles must be labeled with the contents) that use ecologically sound packaging, are phosphate-free, non-corrosive, non-combustible, non-poisonous, non-reactive, and non-aerosol; contain no carcinogens, mutagens and teratogens; contain no ozone-depleting substances; and are bio-based and fully biodegradable. Such products must have lower toxicity, and reduced potential for skin, eye, and respiratory irritation than comparable products used for the same purpose and must contain no unnecessary dyes or fragrances. Concentrates are preferable compared to ready-to-use products and should be used wherever possible.
http://www.epa.gov/cpg http://www.epa.gov/cpg/products.htm
Furthermore, dilution control equipment (use equipment or systems consistent with those specified or recommended by the manufacturer of the concentrated products) should be employed to ensure correct dilutions of concentrates and to protect workers from exposure to concentrated chemicals. Preference must be given to cleaning products by meeting the following Green Seal
Standards: GS-37 for Commercial and Institutional Cleaners for those product categories covered by this Standard and GS-34 for Degreasers
(http://www.greenseal.org/findaproduct/index.cfm#cleaners).
e. The Contractor must give preference to floor finishes and floor maintenance products that are free of metals, such as zinc, arsenic, lead, cadmium, cobalt, chromium, mercury, nickel, or selenium.
10. CHEMICAL STORAGE AND SAFTEY DATA SHEETS
a. The Contractor shall furnish to the COR all Safety Data Sheets (SDS) for any materials used in the performance of this contract. All new products used during the life of the contract must have
SDS provided to the COR prior to bringing these products on site and being used. The Contractor shall use only commercially available products that meet Federal, State, and local codes. These requirements shall include those identified in Executive Order 13423. The COR must contact the
Contractor immediately if any item is deemed inappropriate for use under this contract
b. Contractor shall maintain the SDS in a location accessible to all employees and shall advise the
COR of their location. The SDS shall be available for inspection by the COR on request.
c. Contractors shall store chemicals and cleaning supplies in an area designated by the COR (see paragraph 13, USE OF CEMETERY FACILITIES). Contractors shall provide spill containers for all liquids, and ALL CONTAINERS shall be clearly markers as to content.
11. STANDARDS OF EMPLOYEE CONDUCT:
Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 901.
a. Contractor personnel shall be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks. Clothing shall be presentable and suitable for the work while maintaining proper appearance and decorum indicative for a National Shrine.
Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Garments, which have a message, slogan or printing of any kind other than the Contractor’s business attire, are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements. Uniform shirts and hats are acceptable as long as they meet the other attire requirements and are uniform among all Contractor employees
b. Behavior and language must be appropriate, reverent, and respectful at all times. The
Contractor’s personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government premises. Playing radios and/or electronic games/devices shall only be done at lunchtime and in a designated break area. Due to the sensitive mission of the Cemetery, Contractor employees will come into daily contact with grieving individuals, therefore Contractor employees will exercise and exhibit absolute decorum, courtesy, and respect while within the cemetery or at its perimeter or entrances. Inquiries from http://www.greenseal.org/findaproduct/index.cfm#cleaners
Cemetery visitors shall be politely referred to Government Cemetery staff. Gratuities of any kind are strictly prohibited.
c. The Contractor’s personnel shall consume food and beverage only within areas designated by the
COR. Intoxication, and violence or criminal acts of any kind will not be tolerated and is cause for immediate removal from Government property. Use or sale of intoxicating beverages and/or drugs is strictly prohibited, and use of tobacco products is only allowed in specific areas designated by the COR.
12. PARKING AND VA REGULATIONS:
Contractor employees may park privately owned vehicles in the area designated for parking by the COR.
It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. The Cemetery will not validate or make reimbursement for parking violations of the
Contractor’s employees under any conditions. Smoking is prohibited inside any buildings at the
Cemetery. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation/summons answerable in the United States
(Federal) District Court, or other appropriate jurisdiction/agency.
13. USE OF CEMETERY FACILITIES:
a. The Cemetery shall provide the contractor space for supplies and equipment storage.
b. The Government shall not be responsible for any loss, damage, or theft of Contractor items.
Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
c. Electricity WILL be furnished by the Government for Contractor’s use. Phone service will NOT be provided by the Government for the Contractor’s use.
14. SUPERVISION AND TRAINING:
a. Contract Manager. The Contractor shall establish and maintain an office through which the
Contract Manager or alternate(s) can be contacted during work hours. The Contract Manager shall be an individual with a minimum of three (3) years of experience in commercial cleaning practices to properly oversee and understand the work being performed by Contractor staff. The
Contract Manager or alternate shall be available during standard duty hours to meet at the
Cemetery within one (1) hour with the Government personnel designated by the CO to discuss problem areas. The Contractor shall provide the COR telephone number(s) where surveillance results and complaints can be reported. The Contractor shall also provide to the COR the names and phone/pager numbers of Contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept and updated by the Contractor whenever personnel changes occur. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract. The Contract
Manager will speak fluent English.
b. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the
Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contacting Officer (CO) for final resolution;
however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and is later found invalid and/or unreasonable by the Contracting Officer.
c. The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. Training shall be accomplished within the first thirty (30) days of employment, with refresher courses on an annual basis. OSHA standards shall be observed by the Contractor in all work performed. Contractor shall ensure that appropriate safety equipment is used by Contractor personnel and shall be used as prescribed by
OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices.
The following OSHA and NFPA standards and codes are to be adhered to, and records will indicate by name and date when employees are trained in the following:
i. National Fire Protection Association (NFPA): 10-1998 Standard for Portable Fire
Extinguishers
ii. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health
Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical
Safety and Portable Electric Equipment.
iii. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA
241.
iv. Hazard Communications (OSHA, HCS, 29 Code, FR 1910.1200)
v. Hazard spills/Waste Handling
vi. Universal Precautions (OSHA, 29 CFR Part 1910.1030)
vii. Equipment Operations Training (Utility Training)
viii. Initial Environmental Management System (EMS) awareness training and annual EMS awareness refresher training if the contract is greater than one (1) year. The COR or designated appointee will be responsible for providing the EMS training, as well as providing the method of training. Individual documentation processes will be established by the COR or designated appointee.
15. INSPECTION AND CLEANING OF CEMETERY FACILITIES:
a. The Contractor will perform a weekly inspection. During this inspection the appearance of the
Cemetery will be observed, and any deficiencies noted within the scope of the contract will be corrected as soon as practicable. Items that need correcting outside the scope of the contract will be reported to the COR or his/her representative.
b. The Contractor will be required to submit inspection reports and work accomplished to the COR weekly. The COR is located at the Camp Butler National Cemetery. The inspection forms will be provided to the Contractor. (See “Work Summary and Progress Report”, Attachment 4)
16. QUALITY ASSURANCE:
a. The Government COR shall conduct surveillance activities and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. These surveillance activities shall be accomplished in a manner which is timely to ensure no defects are initiated after Contractor has provided the services. The COR will utilize the Contractor’s work schedule to plan their inspections and surveillance activities. The COR will record inspection and surveillance results which then become the official National Cemetery
Administration record of the Contractor’s performance.
b. ACTIONS:
i. Normally, the COR will verbally advise or give a written inspection report to the
Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
ii. If the Government created any of the discrepancies, these will not be counted against the
Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the organizational person responsible requesting corrective action be taken.
iii. When the Contractor is not meeting the acceptable limits of satisfactory performance, a
CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as work performance is less than satisfactory.
iv. When a CDR is issued for a service, the Contracting Officer and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.
v. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered, to include a determination on whether continued performance by the contractor is feasible.
vi. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO with a Contract Discrepancy
Report (CDR) for issuance to the Contractor. The Contractor shall respond to the CDR
IAW instructions provided and return it to the CO within ten (10) calendar days of receipt.
The CO will have ten (10) calendar days to respond back to the Contractor with acceptance or rejection of the Contractors’ response to the CDR.
c. PERFORMANCE EVALUATION MEETING:
i. The issuance of a Contract Discrepancy Report (CDR) found at Attachment 5 may be cause for the scheduling of a meeting between the Contractor, Contracting Officer, and the COR.
A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, Contracting Officer, and the COR will sign minutes of the meeting(s).
ii. Should the Contractor not concur with the minutes, they will so state their objections in writing to the Contracting Officer, within ten calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written. The Contracting Officer will notify the Contractor of the decision in writing within ten calendar days of submission of any objections.
17. CONTRACTOR’S QUALITY CONTROL PLAN (QCP):
The Contractor shall submit a Quality Control Plan for Contracting Officer and COR acceptance within
14 calendar days after contract award to assure the requirements of this contract are provided as specified.
Any changes thereafter must also be provided to Contracting Officer and COR for acceptance. The
Contracting Officer will review the QCP and list any needed clarifications, and return it to Contractor for response, if necessary. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:
a. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections.
b. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.
c. Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract.
d. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting intermediate supervisory responsibilities and overall management responsibilities for ensuring total acceptable performance.
e. On-site records identifying the character, physical capabilities, certifications and ongoing training of each employee performing services under this contract.
f. A log to account for all requests for immediate service. The log shall indicate the date and time of services, and description of results and completion of these services.
g. On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract.
18. REPORTING AND RECORD KEEPING. The Contractor Superintendent or his designee shall provide the COR with the following documentation:
a. The Contractor Superintendent shall provide WEEKLY with an accurate written report identifying all work that took place within the previous seven calendar days. The contractor shall document services performed, indicate the location where work was to be performed, and provide information to the COR as required.
b. SUBMITTALS - The Contractor shall submit the following documents or information in accordance with the table below.
Submittal Frequency Submittal Schedule
Work Plan/Staffing Plan As Revised With Proposal
Emergency Contacts As Revised Prior to Beginning Work
Contractor Quality Control Plan As Revised Within 14 calendar days after contract award
Safety Data Sheets (See FAR Clause
52.223-3)
As Needed Prior to Chemical Use
Weekly Report and Rework List Weekly Weekly
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Attachment 1 through Attachment 7
Attachment 1 Performance Work Requirements Summary
Attachment 2 Maximum Cleaning Frequencies
Attachment 3 Estimated Square Footages and Floor Finishes
Attachment 4 Work Summary and Progress Report
Attachment 5 Contract Discrepancy Report (CDR)
Attachment 6 Site Map
ATTACHMENT 1
SERVICES SUMMARY
1. The purpose of this exhibit is to:
a. List the contract requirements considered most critical to acceptable contract performance.
b. Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory.
c. Define the procedure the Government shall use in reducing the Contractor’s monthly payment if satisfactory performance is not rendered.
2. The Government's quality assurance procedures are based on actual performance of the contract, and all areas will be reviewed periodically, (e.g. weekly, monthly, quarterly, and semi-annually).
3. The criteria for acceptable and unacceptable performance are as follows:
a. Contract requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
b. If the quality of work does not comply with the contract requirements the COR will initiate, and the Contractor shall be required to complete a Contract Discrepancy Report (CDR).
c. The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The contractor will not be paid for services not rendered in accordance with the standards set forth in this contract.
SERVICES SUMMARY (Continued)
Performance Objective PWS Para Performance
Threshold
Remedy Method of
Assessment
SS-1
Facility Cleaning Service
i. Non-Carpeted Floors
ii. Carpeted Floors
iii. Entrances/Parking Areas
iv. Dusting
vi. Windows and Glass
vii. Floor/Walk-Off Mats
viii. Trash Removal
5.a., inclusive
No more than 4 valid defects per month
Re-performance
Within 2 hours of notification
Periodic
Validation, customer complaint
SS-2
Restrooms/Locker Rooms
Cleaning Services
i. Clean and Disinfect
ii. Floors
iii. Supplies
iv. Drinking Fountains
v. Trash Removal
5.b., inclusive
No more than 4 valid defects per month
Re-performance
Within 2 hours of notification
Periodic
Validation, customer complaint
SS-3
Periodic Cleaning Services
i. Hard Floor Maintenance
ii. Carpet Cleaning
iii. Air Registers/Grills
iv. Light Fixtures
v. Window Exteriors
5.c, inclusive.
0 defects per month
Re-performance
Within 1 day of notification or a mutually acceptable timeframe to the COR, customer and contractor.
Periodic
Validation, customer complaint
SS-4
Cemetery Grounds
Cleaning Services
i. Trash removal
5.d, inclusive
0 defects per month
Re-performance
Within 1 day of notification or a mutually acceptable timeframe to the COR, customer and contractor.
Periodic
Validation, customer complaint
SS-4
Quality Control
Inspection procedures are followed and documented in accordance with Contractor’s
Quality Control Plan
(incorporated into contract after award).
15 1 valid defect per month
The contractor shall provide a written
Corrective Action
Report.
Periodic
Validation, customer complaint
ATTACHMENT 2
MAXIMUM CLEANING FREQUENCIES
PWS Ref. (5.) Item Maximum Frequency a.i. & b.ii. - Hard floor sweep and damp mop Daily a.iii. - Carpet vacuuming and spot cleaning Daily a.v. & a.iv. - General dusting and spot cleaning Daily a.vi. - Interior and entrance window/glass door cleaning Daily a.vii. - Floor (walk-off) mat cleaning Daily a.viii. - Trash removal and receptacle spot cleaning/disinfection Daily a.vii.
- Plastic liner replacement
When worn/torn, but no less than twice weekly b.i. & b.v. - Clean and disinfect restrooms Daily b.iii.
- Stock restroom supplies
When low, but no less than twice per week b.iv. - Clean drinking fountains Daily c.i. - Hard floor maintenance Semi-annually (April & September) c.ii. - Carpet maintenance (bonnet) Monthly c.ii. - Carpet maintenance (shampooing) Semi-annually (April & September) c.iii. - Cleaning of air registers, diffusers, and grilles Semi-annually (April & October) c.iv. - Light fixture cleaning (with cover off) Monthly c.v. Pick up all the outside and inside garbage. (Maint. Building, Office
Building, Shelter, Restrooms, Individual Cemetery bins)
Daily c.vI. - Window exterior cleaning Quarterly
ATTACHMENT 3
ESTIMATED SQUARE FOOTAGES AND FLOOR FINISHES
Building / Area Estimated Area (square feet) Floor Finish
Main Office Area
Reception’s Office 310 Vinyl Composite
Tile
Operational Center 210 VCT
Hallways 33 VCT
Director’s Office 89 VCT
Staff’s Restroom 39 VCT
Public Restrooms
Men’s Restroom 126 VCT
Women’s 126 VCT
Maintenance Building
Unisex Restroom 39 VCT
Men’s Restroom with lockers 170 VCT
Vestibule 134 VCT
Break/Kitchen Area 259 VCT
Hallway 50 VCT
Foreman’s Office 119 VCT
Grand Total Square Footage All Areas = 2,700 sf
ATTACHMENT 4
WORK SUMMARY & PROGRESS REPORT
Period
Covered
From:
To:
Cemetery Location: Contractor Information:
Camp Butler National Cemetery
Project Title:
Custodial Services
Contract No:
Inspection / Acceptance: The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights:
1. Within a reasonable time after the defect was discovered or should have been discovered; and
2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
WORK COMPLETED & SUBMITTED FOR ACCEPTANCE
(This form is not to be used as an Invoice)
1 Monthly Custodial Services (Admin. And Maintenance buildings)
Quantity /
Unit Month
Date
Completed:
2 Weekend restroom cleaning
Quantity /
Unit Week
Date(s)
Completed:
HVAC register and grille cleaning at Administration Buildings and Maintenance Building
Quantity /
Unit Job
Date
Completed:
Monthly Light Fixture cleaning
Unit Month
Date
Completed:
External window cleaning (quarterly)
Unit Job
Date(s)
Completed:
Janitorial Services at Public Information Building (Holiday)
Date
Completed:
Janitorial Services at Shelter (Weekdays)
Date(s)
Completed:
8 (Bi-annual) Scrub and Clean Floors, Ceramic and Wood Floors Quantity/Unit Job
Maintenance and Administration Building Date(s)
Completed:
(Bi-annual) Strip and wax floors in maintenance and administration buildings
Quantity/Unit Job
Date(s)
Completed
Report below any circumstances which may have adversely affected work progress such as weather, strikes, delays by the Government, etc.
Signature of
Contractor: Date Signed
Signature of Cemetery
Director / COR Date Signed
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.
Duplicate Form as Necessary
ATTACHMENT 5
Contract Discrepancy Report
Contract Number:
Report No. for this Discrepancy:
To: (Contractor/Manager’s Name)
From: (Name of COR)
5. Dates
5a. Prepared:
5b. Returned by Contractor:
5c. Action Complete:
Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)
Signature of Contracting Officer or COR:
8a. To: (Contracting Officer and/or COR)
8b. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence: (attach additional sheet if necessary.)
10a. Signature of Contractor Representative:
10b. Date:
11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)
12. Government Actions: (Reduced payment, cure notice, show cause, other)
13. Close Out
Name Title Signature Date
a. Contractor
b. COR
c. CO
ATTACHMENT 6 SITE MAP