This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs National Cemetery Administration Contracting Services for solicitation 36C78626Q50230. The amendment, numbered 0002, announces a site visit scheduled for Wednesday, July 29, 2026 at 10:00 a.m. and provides responses to solicitation questions submitted by offerors.

The document addresses questions and answers regarding janitorial and facility maintenance services at a cemetery location. Key clarifications include: the facility contains 17 trash bins in the main cemetery portion and 2 in the annex/expansion area; staffing levels (one or two cleaners per shift) are the offeror's responsibility to determine based on facility requirements; contractors must provide their own vehicles for exterior trash removal as the government provides none; trash receptacles are located throughout the grounds in visually prominent areas along cemetery roads; the temporary Maintenance Office is government-owned and the contractor is responsible for initial floor finish and maintenance; janitorial services are billed monthly as a 12-month unit covering daily cleaning requirements; and estimated consumable usage includes approximately 1.5 boxes of paper towels monthly, 96 rolls of toilet paper yearly, 250 33-gallon trash bags every 6 months, 1,000 small trash liners every 6 months, 6 hand soap dispensers every 6 months for the Administrative Office, and 12 hand soap refills yearly for the Maintenance Building. The amendment also clarifies that while SDVOSB prime offerors may reference subcontractor experience, proposals demonstrating direct prime contractor experience are strongly encouraged and preferred in technical and past-performance evaluations.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78626Q50230

X 1

The purpose of this amendment is to:

(1) Answer Solicitation questions.

Site visit will be held on Tuesday Wednesday, July 29, 2026 @ 10:00 a.m.

Any additional questions will be gathered and answered together after question period ends.

April Graves

Contracting Officer

For purposes of the technical and past-performance evaluation, may an SDVOSB prime offeror rely upon relevant experience and past performance of a proposed similarly situated SDVOSB subcontractor, joint-venture member, or identified key personnel? If so, please advise how that experience should be presented in the quotation.

Offerors are strongly encouraged to demonstrate their own relevant experience and capabilities. Reliance on subcontractor experience to meet these requirements is discouraged and may not be considered sufficient in the evaluation of proposals. Preference will be given to proposals wherein the prime contractor clearly illustrates its direct experience and ability to successfully perform the required work without significant dependence on subcontractor past performance.

We would like to know how many trash bins are in the facility.

17 trash bins in the main portion of the cemetery and 2 trash bins in the Annex/expansion side of the cemetery.

Would one cleaner be enough per shift or 2 would be needed? We would like to know how many worker the incumbent had on site for each shift.

Quoters are responsible for evaluating the staffing needs based on the requirements of the facility and scope of work outlined in the contract. It is up to the quoter to determine whether one cleaner per shift is sufficient or if two cleaners per shift are necessary to meet the cleaning standards and workload.

For exterior trash removal throughout the cemetery grounds, is the contractor required to provide a UTV or other vehicle? The cemetery will not provide any vehicles. Any vehicles for performance of work will be provided by the vendor.

Is there a site map identifying the locations of the outdoor trash receptacles?

We do not have a map identifying the locations of the outdoor trash receptacles. I can note that 2 trash cans are at the expansion/annex site at this time, 1 is located at the committal shelter, and approximately

16 are located throughout the cemetery grounds. They are all in visibly prominent areas, right along cemetery roads.

The current Maintenance Office is a temporary mobile unit. If the permanent Maintenance Building reopens during the contract period, will the contractor be required to clean both locations? The government may recompete the requirement if/when the building reopens. There is no anticipated plan of reopening at the moment.

The temporary Maintenance Office currently has no floor finish on the VCT flooring. Will the contractor be responsible for applying the initial floor finish, or is that the responsibility of the company leasing the mobile unit? The temporary maintenance office is cemetery owned. The contractor is responsible for initial finish and maintenance of the finish of the floor.

The pricing schedule lists janitorial services using a unit of 12 months, while the PWS describes daily cleaning requirements. Please confirm the required cleaning frequency for the Administration and

Maintenance Buildings.

The PWS requirement of 12 months is for the billing of daily cleaning requirements. Each month, the contractor will be required to perform the daily cleaning tasks, but this will be billed as a single unit at the end of the month.

Are historical consumable usage quantities available for items such as toilet paper, paper towels, hand soap, and trash liners?

Paper Towels:

• Estimated usage: About 1.5 boxes per month (each box contains 8,000 towels).

Toilet Paper:

• Estimated usage: Approximately 96 rolls per year.

33-Gallon Trash Bags:

• Estimated usage: 250 bags every 6 months.

Small Trash Liners:

• Estimated usage: 1,000 bags every 6 months.

Hand Soap (Administrative Office):

• Estimated usage: 6 dispensers every 6 months.

Hand Soap Refills (Maintenance Building):

• Estimated usage: 12 refills per year.