P09 OR Air Handlers Preliminary Class III-IV Precautions (002).pdf

PDF 103 KB Posted

Attached to
Z1DA--667-18-121 Upgrade & Replace Surgery HVAC System & Roofing Federal contract opportunity
Solicitation number
36C25622R0065
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document outlines infection control precautions for a construction project to upgrade and replace the surgery HVAC system and roofing at the Overton Brooks VA Medical Center in Shreveport, Louisiana. During construction, strict measures must be maintained including critical barriers, negative air pressure isolation of the worksite, sealed openings, and designated waste transport routes. Temporary filters may be required if work is near clean air intakes. Upon project completion, the work area must be thoroughly cleaned and the HVAC system restored before terminal cleaning. The related federal contract opportunity is solicitation number 36C25622R0065 for project 667-18-121 issued by the Department of Veterans Affairs Veterans Health Administration VISN 16.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--667-18-121 Upgrade & Replace Surgery HVAC System & Roofing, newest first.
File Type Posted
15 VA Shreveport Surgery Roof Asbestos Report.pdf PDF
Above 3rd Floor Surgery Ceiling 3.jpg JPG image
Above 3rd Floor Surgery Ceiling 1.jpg JPG image
Pre-Bid RFIs 667-18-121 Surgery HVAC Roofing.pdf PDF
Above 3rd Floor Surgery Ceiling 2.jpg JPG image
36C25622R0065 0002.pdf PDF
CONDENSATE DRAIN PIPING.pdf PDF
Site Visit Sign In Sheet 667-18-121 Upgrade Surgery HVAC Roofing.pdf PDF
S06 36C25622R0065 0001.pdf PDF
S02 OR HVAC and Roof - Drawings.pdf PDF
36C25622R0065 EXHIBIT C R1.docx DOCX document
36C25622R0065 EXHIBIT B R1.docx DOCX document
36C25622R0065 EXHIBIT F R1.docx DOCX document
36C25622R0065 EXHIBIT E R1.docx DOCX document
36C25622R0065 VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
S02 OR HVAC and Roof - Specifications.pdf PDF
P07 WD - LA20220031 Mod 2 dated 2-25-2022.txt TXT text file
36C25622R0065 Solicitation FINAL.pdf PDF
36C25622R0065 EXHIBIT D R1.docx DOCX document
P09 OR Air Handlers Preliminary ICRA (002).pdf PDF
P09 OR HVAC and Roof - REVISED SOW.docx DOCX document
36C25622R0065 EXHIBIT A R1.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Control Precautions for Class III/IV Projects

Maintain control measures until ALL work is completed.

Exceptions must be approved by Infection Prevention on a case by case basis.

Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required. Project: OR Air Handlers Preliminary Precautions 667-18-121

During Construction Project Upon Completion of Project

C L

A S

S I

II

/I

V

1. Complete all critical barriers (i.e. sheetrock, plywood, cover for debris chute)

2. Implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) when tie-in construction begins for access to highest risk areas.

3. Maintain negative air pressure between 4West worksite access and OR/Invasive Radiology within work site with filtration and pressure monitoring.

4. Seal holes, pipes, conduits, and punctures.

5. Strictly minimize construction personnel access to the 4W corridor due to ongoing diagnostic and invasive patient care activities. Preferred access is via the 4West stairwell adjacent to 4W31.

6. If AHU dismantling and installment is within 25 feet of clean air intake for the building, external filters must be installed and routinely changed.

7. Construction Waste Transport

a. If an external trash chute is utilized, ensure that placement is not within 25 feet of a clean air intact. If so, external filters must be installed and routinely changed.

b. Clean outside of waste transport container when visibly soiled.

c. Waste removed through the facility MUST be in tightly covered containers before leaving construction area.

d. Containers without tight fitting solid lids MUST have covering taped in place.

e. Debris removal MUST utilize only the designated construction route.

8. Block off and seal air vents if HVAC system is removed or isolated. Isolate HVAC system in area where work is being done if required to prevent contamination of adjacent areas.

9. Place dust mat at entrance and exit of work area.

10. Coordinate construction personnel access to 3W Operating

Room area with Surgery/OR leadership in advance.

1. Wipe work surfaces with cleaner/disinfectant.

2. Handle construction waste the same as during construction.

3. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and

Infection Prevention & Control

Department and thoroughly cleaned by the owner’s

Environmental Services Dept.

4. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

5. Vacuum work area with HEPA filtered vacuums.

6. Wet mop area with cleaner/disinfectant.

7. Upon completion, restore

HVAC system where work was performed.

8. Schedule EMS Terminal Clean once all is completed.

Preliminary

2/2/2022

X Vickie L. Moore

Vickie L. Moore MS, CIC, VHA-CM

Infection Prevention Program Manager

Signed by: VICKIE L. MOORE 193380

File details come from the government source that posted it. Updated .