P01 - Specs - 528A6-24-612 Connect PIV to Fire Alarm System.pdf
PDF 13 MB Posted
- Solicitation number
- 36C24226B0016
About this file
This document is a comprehensive technical specification for a federal construction project (Specification Section 00 01 10) at the Bath VA Medical Center in Bath, New York. The project, numbered 528A6-24-612, involves connecting Post Indicator Valves (PIVs) to the fire alarm system and involves three primary scopes of work: 1) Installing bollard protection for 22 PIVs by removing existing bollards, surveying locations, and installing new protective barriers, 2) Adding radio-based system supervision for PIVs to integrate with existing Johnson Controls/Honeywell Verifire fire alarm systems, and 3) Updating the fire alarm system in Building 78 (Community Living Center) to support 11 separate zones, including 9 living spaces, an attic, and a crawlspace, with new voice alarm capabilities.
The specification provides extensive technical details across multiple sections, including requirements for electrical installations, fire detection and alarm systems, concrete work, earthwork, and vehicle barriers. The project involves complex integration with existing infrastructure, requiring careful coordination with VA medical facility operations. Key technical challenges include working around legacy underground systems, protecting valves from equipment and vehicle impacts, and implementing system changes in an active healthcare environment. The project aims to enhance fire safety monitoring and response capabilities across the VA Medical Center's campus, with specific attention to modernizing fire alarm zoning and supervision methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
528A6-24-612 BATH VAMC 5JUN2025
SECTION 00 01 10 TABLE OF CONTENTS
TABLE OF CONTENTS 00 01 00 1 OF 18
Document includes listing of all specifications available from VA Master Specification Listing Technical Information Library available at https://vatilms.va.gov/vatilms/reports/VA%20Spec
Pertinent project detailed specifications are included in contract. All listed specifications are part of contract and provided on as needed basis.
Other specifications that may be needed than listed are to be approved through the submittal process.
Specifications with page numbers are those provided in contract documents.
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 19
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 21
01 32 00 Construction Documentation 48
01 32 16.01 Architectural and Engineering CPM Schedules
01 32 16.13 Network Analysis Schedules – Major Construction Project Design-Bid-Build
01 32 16.15 Project Schedules 60
01 32 16.16 Network Analysis Schedules (Design-Build Only)
01 32 16.17 Network Analysis Schedules – Major Design/Build Projects
01 33 23 Shop Drawings, Product Data, and Samples 68
01 35 26 Safety Requirements 88
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 45 35 Special Inspections
01 57 19 Temporary Environmental Controls https://vatilms.va.gov/vatilms/reports/VA%20Spec
TABLE OF CONTENTS 00 01 00 2 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
01 58 16 Temporary Interior Signage
01 74 19 Construction Waste Management
01 81 13 Sustainable Construction Requirements
01 81 13.02 Sustainability Certification Requirements – LEED V4 BD+C: New Construction and Major Renovation
01 81 13.03 Sustainability Certification Requirements – LEED V4 BD+C: Healthcare
01 81 13.12 Sustainability Certification Requirements – LEED V4.1 BD+C: New Construction and Major Renovation
01 81 13.13 Sustainability Certification Requirements – LEED V4.1: Healthcare
01 81 13.14 Sustainability Certification Requirements – LEED V4.1 BD+C: Data Centers
01 81 13.15 Sustainability Certification Requirements – LEED V4.1 BD+C: Warehouses and Distribution Centers
01 81 13.21 Sustainability Certification Requirements – GREEN
GLOBES
01 91 00 General Commissioning Requirements
01 91 00.01 DVA/USACE Projects General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys
02 41 00 Demolition
02 65 00 Underground Storage Tank Removal
02 82 11 Traditional Asbestos Abatement
02 82 13.13 Glovebag Asbestos Abatement
02 82 13.19 Asbestos Floor Tile and Mastic Abatement
02 82 13.21 Asbestos Roofing Abatement
02 82 13.31 Asbestos Transite Abatement
02 82 13.41 Asbestos Abatement for Total Demolition Project
02 83 33.13 Lead-Based Paint Removal and Disposal
TABLE OF CONTENTS 00 01 00 3 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
DIVISION 03 – CONCRETE
03 23 00 Stressing Tendons
03 30 00 Cast-in-Place Concrete
03 30 53 (Short-Form) Cast-in-Place Concrete
03 37 13 Shotcrete
03 41 13 Precast Concrete Hollow Core Planks
03 41 33 Precast Structural Pretensioned Concrete
03 45 00 Precast Architectural Concrete
03 51 13 Cementitious Wood Fiber Decks
03 51 16 Gypsum Concrete Roof Decks
03 52 00 Lightweight Concrete Roof Insulation
03 55 11 Gypsum Concrete Floor Decks
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 162
04 05 13 Masonry Mortaring 168
04 05 16 Masonry Grouting
04 20 00 Unit Masonry
04 72 00 Cast Stone Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 21 00 Steel Joist Framing
05 31 00 Steel Decking
05 36 00 Composite Metal Decking
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications 173
05 51 00 Metal Stairs
TABLE OF CONTENTS 00 01 00 4 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry
06 16 63 Cementitious Sheathing
06 20 00 Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing
07 08 00 Facility Exterior Closure Commissioning
07 08 00.01 DVA/USACE Projects Facility Exterior Closure Commissioning
07 11 13 Bituminous Dampproofing
07 12 00 Built-Up Bituminous Waterproofing
07 13 00 Sheet Waterproofing
07 13 52 Modified Bituminous Sheet Waterproofing
07 14 21 Latex Mastic Deck Covering
07 18 13 Pedestrian Traffic Coatings
07 21 13 Thermal Insulation
07 21 23 Loose-Fill Insulation
07 22 00 Roof and Deck Insulation
07 24 00 Exterior Insulation and Finish Systems
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable
07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding
07 31 13 Asphalt Shingles
07 31 26 Slate Shingles
07 31 29.13 Wood Shingles
07 32 13 Clay Roof Tiles
07 40 00 Roofing and Siding Panels
07 51 00 Built-Up Bituminous Roofing
07 51 13.11 Hot-Applied Built-Up Asphalt Roofing
07 51 13.13 Cold-Applied Built-Up Asphalt Roofing
TABLE OF CONTENTS 00 01 00 5 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing
07 54 16 Ethylene Interpolymer (KEE) Roofing
07 54 19 Polyvinyl-Chloride (PVC) Roofing
07 54 23 Thermoplastic Polyolefin (TPO) Roofing
07 56 00 Fluid-Applied Roofing
07 57 13 Sprayed Polyurethane Foam Roofing
07 60 00 Flashing and Sheet Metal
07 61 16 Batten Seam Copper Roofing
07 71 00 Roof Specialties
07 72 00 Roof Accessories
07 81 00 Applied Fireproofing
07 84 00 Firestopping 180
07 92 00 Joint Sealants
07 95 13 Expansion Joint Cover Assemblies
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 11 73 Sliding Metal Fire Doors
08 14 00 Interior Wood Doors
08 17 10 Integrated Door Assemblies
08 31 13 Access Doors and Frames
08 32 13 ICU Sliding Glass Doors
08 33 00 Coiling Doors and Grilles
08 33 13 Coiling Counter Doors
08 34 53 Security Doors and Frames
08 34 59 Vault Doors and Day Gates
08 35 13.13 Accordion Folding Doors
TABLE OF CONTENTS 00 01 00 6 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
08 36 13 Sectional Doors
08 38 16 Flexible Traffic Doors
08 41 13 Aluminum-Framed Entrances and Storefronts
08 42 33 Revolving Door Entrances
08 44 13 Glazed Aluminum Curtain Walls
08 51 13 Aluminum Windows
08 51 13.11 Side-Hinged Aluminum Windows
08 51 23 Steel Windows
08 51 69.11 Aluminum Storm Windows
08 56 19 Pass Windows
08 56 53 Blast Resistant Windows
08 56 59 Service and Teller Window Units
08 56 66 Detention Window Screens
08 63 00 Metal-Framed Skylights
08 71 00 Door Hardware
08 71 13 Automatic Door Operators
08 71 13.11 Low Energy Power Assist Door Operators
08 80 00 Glazing
08 90 00 Louvers and Vents
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes
09 06 00 Schedule for Finishes
09 22 16 Non-Structural Metal Framing
09 23 00 Gypsum Plastering
09 24 00 Portland Cement Plastering
09 26 00 Veneer Plastering
09 29 00 Gypsum Board
09 30 13 Ceramic/Porcelain Tiling
09 51 00 Acoustical Ceilings
09 54 23 Linear Metal Ceilings
TABLE OF CONTENTS 00 01 00 7 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
09 63 13 Brick Flooring
09 63 40 Stone Flooring
09 65 13 Resilient Base and Accessories
09 65 16 Resilient Sheet Flooring
09 65 19 Resilient Tile Flooring
09 66 13 Portland Cement Terrazzo Flooring
09 66 16 Terrazzo Floor Tile
09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4)
09 67 23.50 Resinous Terrazzo Flooring (RES-5)
09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B)
09 68 00 Carpeting
09 68 21 Athletic Carpeting
09 69 00 Access Flooring
09 72 16 Vinyl-Coated Fabric Wall Covering
09 72 31 Polypropylene Fabric Wall Covering
09 78 23 Phenolic Interior Wall Paneling
09 84 33 Sound-Absorbing Wall Units
09 91 00 Painting
09 94 19 Multicolor Interior Finishing
09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards
10 11 23 Tackboards
10 11 33 Glassboards (Magnetic & Non-Magnetic)
TABLE OF CONTENTS 00 01 00 8 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
10 13 00 Directories
10 14 00 Signage
10 21 13 Toilet Compartments
10 21 16 Shower and Dressing Compartments
10 21 23 Cubicle Curtain Tracks
10 22 13 Wire Mesh Partitions
10 22 19 Demountable Partitions
10 22 26.13 Accordion Folding Partitions
10 25 13 Patient Bed Service Walls
10 26 00 Wall and Door Protection
10 28 00 Toilet, Bath, and Laundry Accessories
10 44 13 Fire Extinguisher Cabinets
10 75 00 Flagpoles
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment
11 12 00 Parking Control Equipment
11 17 36 Package Transfer Units
11 26 00 Unit Kitchens
11 40 11 Custom Fabricated Food Service Equipment
11 40 21 Food Service Equipment-Utility Distribution System
11 41 00 Food Storage Equipment
11 41 21 Walk-In Coolers and Freezers
11 44 00 Food Cooking Equipment
11 48 00 Cleaning and Disposal Equipment
11 53 13 Laboratory Fume Hoods
11 53 23 Laboratory Refrigerators
11 53 53 Biological Safety Cabinets Laminar Airflow Stations
11 53 61 Custom Fabricated Laboratory Equipment
11 53 71 Solution Warming Cabinets
11 71 01 Medical Washing and Sterilizing Equipment
TABLE OF CONTENTS 00 01 00 9 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
11 71 02 Laboratory Washing and Sterilizing Equipment
11 73 00 Ceiling Mounted Patient Lift System
11 78 00 Mortuary Equipment
11 78 13 Mortuary Refrigerators
11 79 13 Hydrotherapy Equipment
11 82 19 Packaged Incinerators
DIVISION 12 – FURNISHINGS
12 22 16 Drapery Track and Accessories
12 24 00 Window Shades
12 24 21 Lightproof Shades
12 31 00 Manufactured Metal Casework
12 32 00 Manufactured Wood Casework
12 34 00 Manufactured Plastic Casework
12 35 70.21 Medication Cabinet
12 36 00 Countertops
12 56 70.11 Suspended Table
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components
13 17 23 Therapeutic Pools
13 17 23.11 Therapeutic Pool Accessories
13 19 13 Kennel Enclosures and Gates
13 21 29 Constant Temperature Rooms
13 21 49 Audiology Booth
13 34 19 Metal Building Systems
13 49 00 Radiation Protection
DIVISION 14– CONVEYING EQUIPEMENT
TABLE OF CONTENTS 00 01 00 10 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
14 12 11 Traction and Winding Drum Dumbwaiter
14 21 00 Traction Elevator – New
14 21 10 Traction Elevator – Modernization
14 21 11 Traction Cartlift
14 24 00 Hydraulic Elevator – New
14 24 10 Hydraulic Elevator – Modernization
14 24 11 Hydraulic Cartlift
14 91 33 Gravity Soiled Linen Chutes
14 91 82 Gravity Trash Chutes
14 92 00 Pneumatic Tube System
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System
21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression Systems
21 12 00 Manual Dry Standpipe Systems
21 13 13 Wet-Pipe Sprinkler Systems
21 13 16 Dry-Pipe Sprinkler Systems
21-22-00 Clean Agent Fire Suppression Systems
21-30-13 Electric-Driven, Fire Pumps
21-30-16 Diesel-Driven, Fire Pumps
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
22 05 12 General Motor Requirements for Plumbing Equipment
22 05 19 Meters and Gages for Plumbing Piping
22 05 23 General-Duty Valves for Plumbing Piping
22 05 33 Heat Tracing for Plumbing Piping
22 07 11 Plumbing Insulation
TABLE OF CONTENTS 00 01 00 11 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
22 08 00 Commissioning of Plumbing Systems
22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems
22 11 00 Facility Water Distribution
22 11 23 Domestic Water Pumps
22 12 16 Facility Elevated, Potable-Water Storage Tanks
22 13 00 Facility Sanitary and Vent Piping
22 13 23 Sanitary Waste Interceptors
22 13 29 Sanitary Sewerage Pumps
22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps
22 13 33 Packaged, Submersible Sewerage Pump Units
22 14 00 Facility Storm Drainage
22 14 29 Sump Pumps
22 14 33 Packaged, Pedestal Drainage Pump Units
22 14 36 Packaged, Submersible, Drainage Pump Units
22 15 00 General Service Compressed-Air Systems
22 31 11 Water Softeners
22 33 00 Electric Domestic Water Heaters
22 34 00 Fuel-Fired Domestic Water Heaters
22 35 00 Domestic Water Heat Exchangers
22 40 00 Plumbing Fixtures
22 42 26 Commercial Disposers
22 61 13.74 Dental Compressed-Air Piping
22 61 19.74 Dental Compressed-Air Equipment
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
22 62 19.74 Dental Vacuum and Evacuation Equipment
22 63 00 Gas Systems for Laboratory and Healthcare Facilities
22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities
22 67 19.16 Reverse-Osmosis Water Equipment
22 67 21 Water Dealkalizing System
TABLE OF CONTENTS 00 01 00 12 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam Generation
23 05 11 Common Work Results for HVAC
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
23 05 51 Noise and Vibration Control for Boiler Plant
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 08 00 Commissioning of HVAC Systems
23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems
23 08 11 Demonstrations and Tests for Boiler Plant
23 09 11 Instrumentation and Control for Boiler Plant
23 09 23 Direct-Digital Control System for HVAC
23 10 00 Facility Fuel Systems
23 11 23 Facility Natural-Gas Piping
23 21 11 Boiler Plant Piping Systems
23 21 13 Hydronic Piping
23 21 23 Hydronic Pumps
23 22 13 Steam and Condensate Heating Piping
23 22 23 Steam Condensate Pumps
23 23 00 Refrigerant Piping
23 25 00 HVAC Water Treatment
23 31 00 HVAC Ducts and Casings
23 34 00 HVAC Fans
23 36 00 Air Terminal Units
TABLE OF CONTENTS 00 01 00 13 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
23 37 00 Air Outlets and Inlets
23 38 13 Commercial-Kitchen Hoods
23 40 00 HVAC Air Cleaning Devices
23 50 11 Boiler Plant Mechanical Equipment
23 51 00 Breechings, Chimneys, and Stacks
23 52 25 Low-Pressure Water Heating Boilers
23 52 28 Low-Pressure Steam Boilers
23 52 33 Water Tube Boilers
23 52 39 Fire Tube Boilers
23 56 00 Solar Energy Heating System
23 57 33 Geothermal Energy – Direct Use
23 64 00 Packaged Water Chillers
23 65 00 Cooling Towers
23 72 00 Air-to-Air Energy Recovery Equipment
23 73 00 Indoor Central-Station Air-Handling Units
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units
23 81 00 Decentralized Unitary HVAC Equipment
23 81 23 Computer-Room Air-Conditioners
23 81 43 Air-Source Unitary Heat Pumps
23 81 46 Water-Source Unitary Heat Pumps
23 81 49 Ground-Source Heat Pump
23 82 00 Convection Heating and Cooling Units
23 82 16 Air Coils
23 84 00 Humidity Control Equipment
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System
DIVISION 26 – ELECTRICAL
TABLE OF CONTENTS 00 01 00 14 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
26 05 11 Requirements for Electrical Installations 188
26 05 13 Medium-Voltage Cables
26 05 19 Low-Voltage Electrical Power Conductors and Cables 201
26 05 26 Grounding and Bonding for Electrical Systems 209
26 05 33 Raceway and Boxes for Electrical Systems 218
26 05 36 Wireways for Radiology Equipment
26 05 39 Underfloor Raceways for Electrical Systems
26 05 41 Underground Electrical Construction
26 05 73 Overcurrent Protective Device Coordination Study
26 08 00 Commissioning of Electrical Systems
26 08 00.01 DVA/USACE Projects Commissioning of Electrical Systems
26 09 23 Lighting Controls
26 11 16 Secondary Unit Substations
26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
26 13 13 Medium-Voltage Circuit Breaker Switchgear
26 13 16 Medium-Voltage Fusible Interrupter Switches
26 20 11 Isolated Power Systems
26 22 00 Low-Voltage Transformers
26 23 00 Low-Voltage Switchgear
26 23 13 Generator Paralleling Controls
26 24 13 Distribution Switchboards
26 24 16 Panelboards 232
26 24 19 Motor Control Centers
26 25 11 Busways
26 26 00 Power Distribution Units for Static Uninterruptible Power Systems
26 27 26 Wiring Devices 239
26 29 11 Motor Controllers
26 29 21 Enclosed Switches and Circuit Breakers
26 32 13 Engine Generators
26 33 53 Static Uninterruptible Power Supply
TABLE OF CONTENTS 00 01 00 15 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
26 35 26 Harmonic Filters
26 36 23 Automatic Transfer Switches
26 41 00 Facility Lightning Protection
26 42 00 Cathodic Protection
26 43 13 Surge Protective Devices
26 51 00 Interior Lighting
26 55 71 Medical and Surgical Lighting Fixtures
26 56 00 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Raceways and Boxes for Communications Systems
27 05 61 Leased Space, Communication Equipment and Systems
27 08 00 Commissioning of Communications Systems
27 08 00.01 DVA/USACE Projects Commissioning of Communications Systems
27 10 00 Control, Communication and Signal Wiring
27 11 00 Telecommunications Room Fittings
27 15 00 Communications Structured Cabling
27 31 00 Voice Communications Switching and Routing Equipment
27 31 31 Voice Communications Switching and Routing Equipment - Extension
27 32 41 Two-Way Radio Equipment and Systems
27 41 31 Master Antenna Television Equipment and Systems
27 51 16 Public Address and Mass Notification Systems
27 51 23 Intercommunications and Program Systems
27 52 23 Nurse Call and Code Blue Systems
27 52 41 Miscellaneous Medical Systems
27 53 19 Distributed Radio Antenna (Within Building) Equipment and System
TABLE OF CONTENTS 00 01 00 16 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 05 26 Grounding and Bonding for Electronic Safety and Security
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
28 08 00 Commissioning of Electronic Safety and Security Systems
28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems
28 13 00 Physical Access Control System
28 13 16 Physical Access Control System and Database Management
28 13 53 Security Access Detection
28 16 00 Intrusion Detection System
28 23 00 Video Surveillance
28 26 00 Electronic Personal Protection System
28 31 00 Fire Detection and Alarm 296
28 52 31 Emergency Call System
DIVISION 31 – EARTHWORK
31 20 00 Earthwork
31 20 11 Earthwork (Short Form) 323
31 23 19 Dewatering
31 23 23.33 Flowable Fill
31 32 23 Pressure Grouting Soil Stabilization
31 62 00 Driven Piles
31 63 16 Auger Cast Grout Piles
TABLE OF CONTENTS 00 01 00 17 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
31 63 26 Drilled Caissons
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 336
32 12 16 Asphalt Paving
32 14 16 Brick Unit Paving
32 17 23 Pavement Markings
32 31 13 Chain Link Fences and Gates
32 31 40 High Security Fences and Gates
32 84 00 Planting Irrigation
32 90 00 Planting
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems
33 08 00.01 DVA/USACE Projects Commissioning of Site Utility Systems
33 10 00 Water Utilities
33 30 00 Sanitary Sewer Utilities
33 40 00 Storm Sewer Utilities
33 46 13 Foundation Drainage
33 51 00 Natural-Gas Distribution
33 63 00 Steam Energy Distribution
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 354
34 75 13.13 Active Vehicle Barriers
DIVISION 48 – Electrical Power Generation
TABLE OF CONTENTS 00 01 00 18 OF 18
SECTION NO DIVISION AND SECTION TITLES PAGE/
Req’d
48 14 00 Solar Energy Electrical Power Generation System
48 15 00 Wind Energy Electrical Power Generation System
SECTION 00 01 15 LIST OF DRAWINGS
LIST OF DRAWINGS 00 01 15 1 OF 2
The drawings listed below accompanying this specification form a part of the contract.
DRAWING NO TITLE
PLANNING
G001 COVER SHEET& DRAWING INDEX
G002 STATION MAP OF PROJECT AREAS
G003 9, 10, 14
G004 BLDG 15, 16
G005 BLDG 17, 18
G006 BUILDINGS 24, 29A
G007 BLDG 30, 33
G008 BLDG 34, 35
G009 BUILDING 39, 41
G010 BUILDINGS 44, 75
G011 BLDG 76, 78
G012 BLDG 84, 92
G013 BLDG 103, 104
ARCHITECTURAL
A001 ASSEMBLY DETAILS
https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=f7f37664-1399-37f8-8c24-b39b6b0c02a6 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=99acd684-fe57-34ee-bbd7-293ebf4619c0 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=02c1da59-afa2-3780-8a0e-bbf13b038ae8 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=25f68a28-8e02-309d-822f-df8afcb9c269 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=8396937c-5258-33b4-ba91-4241f1689535 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=d2368d0a-054e-3c20-81dd-5a91134c940f https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=3dd8bbb0-330e-363d-ab98-9dd542b66c6a https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=fbd16e0b-008e-3de3-988e-d394db1205ad https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=9df1a354-bbe6-3385-9517-22b1cc4b5a33 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=f2e64d03-bf0d-38b6-b7d8-bfb09b3884fe https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=b5520943-d536-3f96-82e9-409d3fcde3ed https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=2537689d-23b9-3b1e-937b-2350c062c18b https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=fbfbba8d-d103-38f5-baed-8d573ef87893 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=1f38c3d1-c7af-3cb6-bf57-1b6a2cb17060
LIST OF DRAWINGS 00 01 15 2 OF 2
DRAWING NO TITLE
CIVIL
C001 BOLLARD DETAILS, 24
C002 BOLLARD DETAILS, 30, 39, 41, 44
C003 BOLLARD DETAILS, 75, 103
CD001 CIVIL DEMOLITION
ELECTRICAL
E001 WIRELESS SENSING WIRING
E002 ANNUNCIATOR PANEL
E003 AA PANEL SLC AND SPEAKER WIRING
E004 JVDC AND DIGITAL AUDIO LOOP WIRING
E005 DIGITAL AUDIO AMP WIRING
FA001 NOTES AND OPERATIONS GRID
FIRE
FA002 BLDG 78 SPEAKER NAC I/O POWER
FA101 1ST FLOOR DEVICE LOCATIONS
FA102 2ND FLOOR DEVICE LOCATIONS
FA103 3RD FLOOR DEVICE LOCATIONS
https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=5ae83c03-71e3-317d-af6e-a1bb5ebfda58 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=d88aa46a-46ad-3e48-bb03-2447cfd1e661 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=a0df3c2a-bf18-377f-a2cc-c0af0efa2f46 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=e64c51ab-c3d7-374a-8c94-18ca2c238213 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=5f478fb7-148d-3335-9227-b6a6acc3cb92 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=864109a2-54f9-31b4-8514-6e7533788ca4 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=ae037c2a-aedd-364e-b0af-7420ee37b7f7 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=3fb80f2f-52c9-3b5c-b6c1-91e0ada1aa92 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=cd1d876e-81d5-332a-892e-33cb98725e34 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=bfc642b3-6fc9-3b93-8b84-1b908c955c2d https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=9d955b72-b2e7-3869-b2f0-99a0fac0f213 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=81c62f06-afc0-3d45-87d4-8643609f393e https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=a3101cc6-e462-3e5c-96d2-30101207a2f1 https://acc.autodesk.com/build/sheets/projects/bc1507a8-b706-47f8-b323-7bc03bdb2c2b?entityId=c47d5781-ead1-33f5-adea-0e6110b437b5
PROJECT 528A6-24-612 BATH VAMC 16JUN2025
SECTION 01 00 00 GENERAL REQUIREMENTS
GENERAL REQUIREMENTS 01 00 00 1 OF 27
TABLE OF CONTENTS
TABLE OF CONTENTS
SAFETY REQUIREMENTS
GENERAL
1.1 GENERAL INTENTION
1.2 DESIGNER ENGINEER
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA – SOIL CONDITIONS
1.12 LAYOUT OF WORK
1.13 AS-BUILT DRAWINGS
1.14 WARRANTY MANAGEMENT
1.15 USE OF ROADWAYS
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.17 TEMPORARY USE OF EXISTING ELEVATORS
1.18 TEMPORARY TOILETS
1.19 AVAILABILITY AND USE OF UTILITY SERVICES for contractor purposes
GENERAL REQUIREMENTS 01 00 00 2 OF 27
1.20 INSTRUCTIONS
1.21 GOVERNMENT-FURNISHED PROPERTY SECTION NOT USED IN THIS CONTRACT
1.22 CONSTRUCTION SIGN NOT REQUIRED IN THIS CONTRACT
1.23 HISTORIC PRESERVATION NOT REQUIRED IN THIS CONTRACT
SUBMITTAL LIST
REFERENCED SPECIFICATIONS
APPENDICES ................................................................ NOT USED IN THIS CONTRACT.
SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
GENERAL
1.1 GENERAL INTENTION
A. Contractor shall completely prepare for project operations, including demolition, repair, and install of post indicator valve support (PIV) equipment and additional fire control panels and annunciators in building 78, furnish labor and materials and perform work for 528A6-24-612 Connect PIV’s to Fire Alarm System as required by drawings and specifications.
B. The project is to update the Bath VAMC fire alarm system by incorporating the following as required by these specifications.
1. Bollard protection of post indicator valves
2. Post indicator valves sensor integration into the fire alarm monitoring system
3. Zone voice alarms into building 78 the community living center residence.
C. Visits to the site by Bidders may be made only by appointment with the Contracting Officers.
D. Bath VAMC Non-Recurring Maintenance Engineering Section will render technical services during construction.
GENERAL REQUIREMENTS 01 00 00 3 OF 27
1.2 DESIGNER ENGINEER
A. Bath VAMC facilities engineering and maintenance will render certain technical services during construction. Such services shall be considered as advisory to the contracting officer and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
B. Before placement, installation, and commissioning of work subject the Contractor shall notify the COR in sufficient time to enable testing and commissioning personnel to be present at the site in time for field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, Post Indicator Valve (PIV) bollard protection. Work includes:
1. Removal, including underground portions, of existing bollards to be replaced.
2. Preparation of new bollard locations including survey for locations and conflicting underground utilities.
3. Installation of bollard protection.
4. Return of surrounding areas to project specified and/or previous conditions.
B. ITEM II, Integration of post indicator valves (PIV) to fire control panel systems
1. Supply, installation and configuration of radio switch and supporting communication equipment.
2. Connection to signaling line circuits (SLC) of fire alarm systems, to include wall penetrations, fire conduit, and panel installation.
3. Configuration and programming of existing Johnson Controls
“Verifire” based systems for new equipment.
4. Support of post project documentation.
C. ITEM III, Installation and integration of zone voice alarms into building 78 the community living center residence.
1. Supply, install, wire, and connect new fire control panels.
GENERAL REQUIREMENTS 01 00 00 4 OF 27
2. Supply, install, wire, and connect new annunciators.
3. Configure and program fire alarm system for new equipment in all panels and monitoring locations.
4. Ensure conditions around new equipment similar to exiting.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. Below are items to address and how contractor will maintain and methods used to maintain.
1. Actions and Personnel Accountability.
a. Knowledge of all staff and subcontractors’ whereabouts on station at all times.
b. Clearly identifying and limiting access to construction locations and storage areas.
c. Having prepared information on all staff and sub-contractors for
Bath VA police legitimate requests, and it’s update and availability processes.
d. Emergency response actions and accountability of all personnel.
2. General Contractor to ensure that all sub-contractors working on the project and their employees also comply with these regulations.
B. Access to Bath VA Station:
1. All employees of general contractor and subcontractors shall comply with VA station regulations and policies.
2. General Contractor to maintain accurate rolls of employees, sub-contractors, and visitors and their vehicles, personal or business, to be on station. This list will be available when requested by Bath Station police or contract representatives. May be used for parking or access passes.
GENERAL REQUIREMENTS 01 00 00 5 OF 27
3. General Contractor’s employees shall not enter the Bath Station without photo identification, state drivers’ license or equivalent. They may be subject to inspection of their personal effects including tools and vehicles when entering or leaving the project site.
C. Photography of project and VA premises is allowed under guidance of the Contracting Officer’s Representative. Veterans will not be photographed.
D. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a Bath Station emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
E. Key Control:
The General Contractor shall work with contracting officers technical representative to either provide duplicate keys and lock combinations or trade Bath station locks and keys for the purpose of station access to construction site and items for appropriate reasons when no construction personnel are available.
F. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
G. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
H. Motor Vehicle Restrictions
All contractor vehicles will be parked within contractor designated zones and personal vehicles in designated and marked parking areas for the public.
1.6 OPERATIONS AND STORAGE AREAS
A. FAR 52.236-10 Operations and Storage Areas
1. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer, plan on primary contractor area to be northeast side of railroad tracks on station. The
GENERAL REQUIREMENTS 01 00 00 6 OF 27
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
2. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
3. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. Roads will be policed and cleaned daily from usage by contractor.
B. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
2. Do not store materials and equipment in other than assigned areas.
GENERAL REQUIREMENTS 01 00 00 7 OF 27
3. Schedule delivery of materials and equipment to immediate construction working areas in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
4. All involved buildings will be occupied during performance of work immediate areas of alterations will be vacated.
C. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, and a schedule defining the duration of the work with milestone subtasks. The contractor will also have responsibility to support and follow the interim life safety plan of project.
The work to be outlined shall include, but not be limited to:
a. List of planned phases and major steps of work breakdown structure
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof.
a. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
b. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center
Director, COR and Contractor, as follows:
1) Phase I: Bollards and PIV protection measures
2) Phase II: Connection of PIV sensors and sensors to fire alarm system
3) Phase III: Installation of Community Living Center
(CLC)(Bldg.78) fire speaker systems and control panels
GENERAL REQUIREMENTS 01 00 00 8 OF 27
4) Phase IV; Reprogramming of fire systems for new hardware and fire control zones in CLC (Bldg. 78).
3. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.
4. Contractor shall permit access to VA personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.
a. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
5. Coordinate alteration work in areas occupied by VA so that Medical
Center operations will continue during the construction period.
D. Construction Barriers or Keep Out zones: Before exterior construction operations begin, Contractor shall provide a construction barrier to prevent veterans or VA staff from entering outdoor construction work zones,
1. Barriers around the construction area
2. Fasten barriers to terminal posts and to line posts top and bottom to prevent accidental or wind blowing conditions from moving them.
3. Remove the barriers when directed by COR.
E. When a construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain interior spaces a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, GENERAL REQUIREMENTS 01 00 00 9 OF 27
a. Contractor shall make arrangements for pre-inspection of site with the Fire Department that responds to an alarm from
Contractor.
b. During fire alarm programming fire watch or other fire detection means will need to be provided.
3. Contractor shall maintain the exterior property like similar and adjacent grounds for mowing and upkeep.
F. Utilities Services:
1. Maintain existing utility services for Medical Center at all times.
2. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
3. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.
a. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
b. Request shall state reason, date, exact time of, and approximate duration of such interruption.
c. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center.
d. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
5. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished VA contracting and station will be appraised and means will be arranged for de-energization. Refer to specification sections below for additional requirements.
GENERAL REQUIREMENTS 01 00 00 10 OF 27
1) 26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
2) 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
3) 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
6. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
7. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the VA and not the Contractor.
8. Abandoned Lines:
a. All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned are required to be entirely removed, sealed, capped or plugged at the main, branch or panel they originate from.
b. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
G. Traffic Flow
1. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
a. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
b. Reference section 1.15 Use of Roadways
H. Coordination
1. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways.
1.7 ALTERATIONS
A. Survey
1. Before any interior work is started, the Contractor shall make a thorough work survey with the COR of areas of buildings in which
GENERAL REQUIREMENTS 01 00 00 11 OF 27
work to occur and areas which are anticipated routes of access, facilities to be used, and other administrative and housekeeping functions.
2. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
3. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc.
4. Shall note any discrepancies between drawings and existing conditions at site.
5. Shall designate areas for working space, materials storage and routes of access to areas within buildings where work to occur and which have been agreed upon by Contractor and COR.
6. Photos and summary notes with negotiated protection measures from above to be stored and organized in Autodesk Construction Cloud
Photos section. See 01 32 00 CONSTRUCTION DOCUMENTATION.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the COR, to be in such condition that their use is impossible or impractical, shall be negotiated between Contractor and
Contracting Officer whom will supply. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled
"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Before expected partial or final inspection date, the
Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures;
and, will form basis for determining extent of repair work
GENERAL REQUIREMENTS 01 00 00 12 OF 27
required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
2. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
B. Reserved items
1. There are no reserved items as this time.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
C. PCB Transformers and Capacitors
1. There are no transformers or capacitors containing hazardous materials planned as part of this project.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
A. FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
1. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging
GENERAL REQUIREMENTS 01 00 00 13 OF 27
vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the
Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
2. The Contractor shall protect from damage all existing improvements and utilities
a. at or near the work site.
b. The Contractor shall repair any damage to those facilities, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work.
c. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
B. Temporary Environmental Controls, not used at this time.
C. FAR clause 52.236-7, Permits and Responsibilities"
1. The Contractor shall, without additional expense to the
Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work.
2. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence.
3. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
D. The Bath VAMC maintains a National Pollutant Discharge Elimination
System (NPDES) permit for the station.
1. The Contractor is considered under the permit and has extensive responsibility for compliance with permit requirements.
GENERAL REQUIREMENTS 01 00 00 14 OF 27
2. The contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified.
3. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
a. Designating areas for equipment maintenance and repair;
b. Providing waste receptacles at convenient locations and provide regular collection of wastes;
c. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
d. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;
and
e. Providing adequately maintained sanitary facilities.
E. Contractor will provide letter on measures to meet requirements above in a Storm Water Pollution Prevention Plan, SWPPP.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.
1. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR.
2. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed.
3. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract
1. Deliver work complete and undamaged.
GENERAL REQUIREMENTS 01 00 00 15 OF 27
2. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good or better condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1. FAR 52.243-4 Changes
a. The Contracting Officer may, at any time, without…
This is the start of the file's text. The full file is on GovTribe.