P01_SOW Att 14_Project 607-CSI-106 Renovate for Cath Lab 100CD Drawings Volume 3 2024.pdf

PDF 14 MB Posted

Attached to
Request for SF330's for Project Number: 607-397 - Expand Specialty Care - Madison
Solicitation number
36C77624R0032
Issued by

About this file

This document outlines a pre-solicitation for architectural and engineering services. The Veterans Health Administration Program Contracting Activity Central is seeking statements of qualifications from firms interested in providing design services for the development of complete construction documents including drawings, specifications, and reports, as well as construction period services for Project #607-397 to expand specialty care at the VA Medical Care Center in Madison, Wisconsin. The anticipated award will be a firm fixed price contract procured according to Selection of Architects and Engineers statute, FAR subpart 36.6, VAAR 836.6, and VAAM M836.6. Construction contracts will not be awarded to the designing firm or its affiliates per FAR 36.209. Interested parties should submit SF330 forms to the Department of Veterans Affairs Technology Acquisition Center Austin by the anticipated solicitation date.

View the file

Other files

File Type Posted
Amendment 3 for Questions and Answers for 36C77624R0032-0003.pdf PDF
Amendment 2 to extend due date and change CS for 36C77624R0032-0002.pdf PDF
PPQ 607-397 Expand Specialty Care Madison WI.docx DOCX document
Amendment 1 for Questions and Answers for 36C77624R0032-0001.pdf PDF
p01_SOW Att 10_Post Award Specs-Drawings Review Checklist_ 2022.11.17.docx DOCX document
p01_SOW Att 04_Sensitive Infrastructure Data Classification Memo FOUO.pdf PDF
P01_SOW Att 20_607-14-105 VOL3 2016.pdf PDF
P01_SOW Att 13_Project 607-CSI-106 Renovate for Cath Lab 100CD Drawings Volume 2 2024.pdf PDF
P01_SOW Att 01_VHA Req DIV 01 Spec Section List.pdf PDF
P01_SOW Att 11_Building Materials Survey.pdf PDF
P01_SOW Att 17_607-14-120 VOL3 2016.pdf PDF
p01_SOW Att 08_VHA Supplemental Contract Reqs Combating COVID-19_12-14-21.pdf PDF
P01_SOW Att 21_607-14-120 VOL4 2016.pdf PDF
P01_SOW Att 12_Project 607-CSI-106 Renovate for Cath Lab100CD Drawings Volume 1 with estamp 2024.pdf PDF
SF 330 Request 607-397 Expand Special Care - Madison.pdf PDF
P01_SOW Att 09_Project Area Map-Pic-Drawing.pdf PDF
p01_SOW Att 03_HEFP SEP Design Alerts 1-9 and 11-12.pdf PDF
P01_SOW Att 02_PG 18-15 AE Submission Instructions Volume C.pdf PDF
p01_SOW Att 06_VHA Directive 1013 Seasonal Influenza 09-19-2022.pdf PDF
P01_SOW Att 16_607-14-120 VOL2 2016.pdf PDF
P01_SOW Att 18_607-14-105 VOL1 2016.pdf PDF
P01_SOW_Expand Specialty Care_607-397_FINAL.pdf PDF
p01_SOW Att 07_VHA Directive 1061 Prevention of Legionella Disease 09-26-2022.pdf PDF
P01_SOW Att 15_607-14-120 VOL1 2016.pdf PDF
P01_SOW Att 22_607-14-120 VOL5 2016.pdf PDF
P01_SOW Att 19_607-14-105 VOL2 2016.pdf PDF
p01_SOW Att 05_01 32 16.01_A-E CPM Schedule.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Table of Contents

Final Site Preparation Support Document The equipment components shown in this drawing package are based on the current proposed purchase and are subject to change if modifications are made to the configuration.

www.healthcare.philips.com

Transport Details ------------------------------------ AD1 Equipment Details -------------------------- AD2 - AD6

Site Layout ---------------------------------------------- A1 Equipment Legend ------------------------------------ AL General Notes ----------------------------------------- AN

Section A - Equipment Plan

Check List -------------------------------------------- CHK Remote Service Network --------------------- N1 - N2

Electrical Details ---------------------------- ED1 - ED5 Raceway & Conduit Information ------------- E2 - E4 Electrical Layout ---------------------------------------- E1 Electrical Legend ---------------------------- EL1 - EL2 Electrical Notes ---------------------------------------- EN

Section E - Electrical Plan

Support Details ------------------------------ SD1 - SD3 Support Layout - Ceiling ---------------------- S2 - S3 Support Layout - Floor & Wall ---------------------- S1 Support Legend ---------------------------------------- SL Support Notes ------------------------------------------ SN

Section S - Support Plan

Equipment Layout ------------------------------------- A2 Elevation View ----------------------------------------- A3

Revision History Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project

Rev. Date Revision Descriptions By

00 8/27/2020 Created Preliminary Site Preparation Document using User Needs Checklist, Quote 1-2AYMPFG Rev. 2, and the provided CAD file. CRF

A 1/13/2022 Updated drawing using OA 6600538585.010000 and the provided CAD file. CRF

B 9/15/2022 Request Cancelled. VS

C 1/13/2023 Created Final Site Preparation Support Document per Order #: 6600538585.010000. Added RCP. VS

D 3/24/2023 Added Skytron booms layout per PM request. Red clouded changes. VS

E 5/18/2023 Updated isocenter to 11'-0", moved 1'-0" to the left booms and soffit per PM request. Changes have been clouded in red, but do not include the previous revisions. VS

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AutoCAD SHX Text

95% CONSTRUCTION DOCUMENTS

AN

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Minimum Site Preparation Requirements

A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled by the customer before the delivery and installation of equipment can begin.

1. Walls to be painted or covered, baseboards installed, floors to be tiled and/or covered, ceiling shall have grid tiles and luminaires installed and operational.

2. Doors and windows, especially radiation protection barriers, installed and finished with locksets operational.

3. All electrical convenience outlets, raceways, wireways, auxiliary fittings, knockouts, cable connectors, terminal and power distribution blocks, cable openings, chase nipples, junction boxes and pull boxes installed and operational.

4. A private supply mains branch circuit with overcurrent protective circuit breaker and manual operable circuit disconnect means shall be present and operational. Definition of "Private supply" means an end-leave of the hospital distribution system after the last overcurrent protective disconnect means from which all equipment included in the Azurion ground domain is powered.

Note that only equipment included in the Azurion certification and equipment with which the Azurion has a compatibility statement are allowed to be inside the Azurion ground domain. All other electrical equipment is not allowed to have a functional connection to the Azurion system and shall have no direct galvanic connection to prevent ground loops. 3rd party equipment that does not have a function connection with the Azurion system, but that is intended to be used inside the same patient area as the Azurion System shall be grounded to the PCB inside the ERB with a ground bonding of <= 200 mOhm for plugable equipment.

5. Philips does not allow 3rd party equipment inside our cabinets.

6. 120V convenience outlets operational.

7. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.

8. All contractor supplied cables pulled and terminated.

9. A dust-free environment in and around the procedure room.

10. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications.

11. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditional failure.

12. All plumbing installed and finished.

13. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.

14. Clear door openings for moving equipment into the building must be 42" (1067mm) W x 82" (2083mm) H min. 48" (1219mm) W x 82" (2083mm) H rec., Or larger contingent on an 8'-0" (2438mm) corridor width.

15. Countertop is 30" (765mm) for seated height and 36" (915mm) for standing height.

Note Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.

Remote Service Diagnostics Medical imaging equipment to be installed by Philips Medical is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote Service Network (RSN) connectivity. All cost with this feature are the responsibility of the customer.

(22.0)

Remote Control of Room Lighting

The control of customer lighting must incorporate an electrical isolation system such as demonstrated on Sheet ED3. Lighting scheme is the responsibility of the customer.

(12.0)

General Conditions

1. Planning, Design, and Implementation Process The multidisciplinary project team should be assembled as early as possible in the design process. The multidisciplinary team should include administrators, clinicians, infection preventionists, architects and other design professionals, facility managers, safety officers, security managers, users of equipment, and support staff relevant to the areas affected by the project as well as those with knowledge of the organization's functional goal for the project. Inclusion of patient advocates/consumers, A/E consultants, and construction specialists should be considered. FGI 2018 APPENDIX A1.2-1.2

2. Responsibility The customer shall be solely responsible, at their expense for preparation of site. Philips required specifications and any required MEP, construction and structural alterations shall be incorporated into customer's design and construction documents. Compliance with all safety, electrical, and building design codes relevant to the build out of the clinical area for Philips equipment and its installation is the customer's responsibility. Sufficiency of such plans and specifications, specifically including, but not limited to the accuracy of the dimensions described therein, shall be the sole responsibility of the customer. The customer shall advise Philips of conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work. This shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin.

3. Permits Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and shall bear any expense in obtaining same or in complying with any related rules, regulations, ordinances and statutes.

4. Radiation Protection The customer or their contractor, at their own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection and testing.

5. Asbestos and Other Toxic Substances Philips assumes that there is no hazardous material contained in project site. The customer is responsible for the removal of any materials, including but not limited to asbestos, deemed hazardous by local authorities, the EPA, OSHA, or any other authority having jurisdiction over the work. If such materials are discovered at any time that the work is proceeding, the work will immediately cease, the owner will be notified, and the work will again proceed after the owner has removed all of the hazardous material from the job site.

6. Labor In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.

7. Schedule The customer or general contractor shall provide Philips with a project/construction schedule with milestones to assist in the coordination of delivery of Philips supplied products and primary equipment.

8. Extended Installation or Turnkey Work by Philips Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between Philips and the customer for room preparation, then additional work required for the equipment will not be represented on these drawings. Some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract work scope and these drawings, the turnkey contract work scope shall govern.

9. Infection Control and Interim Life Safety Measure Compliance with all Infection Control and Interim Life Safety Measures shall be the sole responsibility of the customer. The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures (ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.

(21.0)

HVAC Requirement for General Equipment Locations

*Average heat emission during clinical use Data applicable for basic system:

Large monitor + 4 x small monitor in Monitor Ceiling Suspension 1 workstation + 2 x small monitor in Control Room

Add 1705 BTU/hr for additional large monitor Add 273 BTU/hr for additional small monitor Add 1024 BTU/hr for additional workstation See AL sheet for additional heat load in case of UPS

Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.

Heating, ventilation, and air conditioning requirements must maintain temperature at 59°F (15°C) to 86°F (30°C) as well as a non-condensing relative humidity at 20-80% with 10% maximum variation. These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).

(23.0)

Operation

Temperature 59°F (15°C) to 86°F (30°C)

Temperature gradient Max. 1°F / Minute (0.5°C / Minute)

Humidity (non-condensing) Humidity shall be stable within 10% 20% to 80%

Exam Room *6479 BTU/hr

Equipment Room *8184 BTU/hr

Control Room *1705 BTU/hr

Electrical Requirements Mains 40E Cabinet

Maximum Rated Power: 100kW

Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 6 AWG, 90°C or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:

Minimum 4 AWG for 80A circuit breaker rating.

Nominal Line Voltage: 480 VAC, 60 Hz

Branch Power Requirement: 100 kVA (System only; verify UPS power requirements)

Circuit Breaker: 3 phase, Type D 80A with long-time delay

(20.1)

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AL

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

A ME Certeray iX Generator Cabinet 320 - AD3

A MA Mains 40E Cabinet 826 - AD3

A DB Documentation Box - Mounted on Wheels (Final location to be coordinated with customer and/or local Philips Service)

176 - AD4

A ATY Exam Room Auxiliary Box 7 - AD4

A MB Image 40E Cabinet 441 - AD3

A TV 58" + (2) 27" LCD Monitor Suspension 596 - AD4

A MSA Angio Diagnost 7 with Pivot and Tilt 999 - AD2

A SP C-Arc Stand 2755 - AD2

Furnished by Philips and installed by Third PartyH

Weight (lbs)

Heat Load (BTU/hr)

Detail SheetEquipment Designation

Description

Equipment Legend

Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

A VB1 Video Connection Box 2.2 - AD4

A VB9 Video Connection Box 2.2 - AD4

A INT IntraSight- Workstation (Integrated with FlexSpot) 83 - AD5

A SYNC SyncVision (Integrated with FlexSpot) 71 - AD5

A CY Control Room Connection Box 115 - AD6

B TV2 Live/Reference Slave Monitor (To be mounted on third party boom - Not Shown)

B TV3 Live/Reference Slave Monitor (To be mounted on third party boom - Not Shown)

D BC Schneider Galaxy VS Battery Cabinet 2220 - AD5

D UPS Schneider Galaxy VS - 80 kVA UPS 551 7000 AD5

D RAP Remote Alarm Panel (for Schneider Galaxy VS

UPS)

25 - AD5

A MR Peripheral 40E Cabinet with CRC + Extension 386 - AD3

Furnished by Philips and installed by Third PartyH

Weight (lbs)

Heat Load (BTU/hr)

Detail SheetEquipment Designation

Description

Equipment Legend

Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

Items not on Philips Quote/Order

A IC Injector Room Console 11 - AD6

A RIC Injector Remote Panel 7 - AD6

A INJ Medrad Universal T-Rail Bracket for Injector Head (Not shown on plan)

A VB10 Video Connection Box 2.2 - AD4

B A Skytron Boom: Anesthesia - - -

B B Skytron Boom: X-Ray Shield / Light - - -

B C Skytron Boom: X-Ray Shield / Light - - -

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

Clea / Table

AD

Ta bl e Fl oo r P la te

'-2

13 16

1' -8

1 2"

7"

7' -9

1 2"

2' -6

13'-11"

9' -9

3 8"

9 9 16"

22'-4"

2'-0 5 16"

7' -1

1"

8' -3

7 8"

3'-6"

1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'

.5 m

1m 1.

5m 2m

2.

5m

3m 3.

5m

1'-2"

1' -7

1 8"

8 1 16"

71 4"

8'-6 9 16"

1' -8

7 16

4' -3

13 16

'-5

5 16

1'-81 8"

'-1

3 8"

18'-71 8"

Soffit

Soffit

1'-33 8"

9' -2

1 8"

9" Recommended Minimum

2'-8"

11'-0"

'-2

16"

2' -9

9 16

1' -5

7 8"

1'-10 1 16"

2'-10 3 16" 2'-10 1

16"

5' -9

7 8"

A1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Site Layout 3/8" = 1'-0"

Required Unistrut Height: 9' - 6 3 16", +3

8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.

Walls

Soffit

Existing (to be removed)

Beams or other building construction elements

Legend

* Counters and cabinetry shown to be supplied and installed by contractor.

General Notes

* Field to verify all room dimensions.

* Refer to A.D.A. Guidelines for doors and clearances. Verify all other applicable code(s) with the architect of record.

Sliding doors are recommended due to make the maintenance of the cabinets more feasible.

Planning Issues and Considerations

It is customer's responsibility to design the soffit.!

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

Exact location to be coordinated by Customer and local Philips service.

DB

VB8VB3 VB4 VB5 VB6 VB7

AD

Ta bl e Fl oo r P

ATY

1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'

.5 m

1m 1.

5m 2m

2.

5m

3m 3.

5m

VB1VB2

SYNC

INTCY

IC

RIC

RAP

Equipment closet doors to be hung from ceiling mounted track, no floor tracks allowed

ME

MA

MB

MR

UPS

BC

M

SA

Safety Zone

Safety Zone

SP

C eiling Inlet

TV

C ei lin g

In le t

VB

A

B C

11'-0"

'-2

Possible soffit location

VB

Sa fe ty Z on e

Sa fe ty Z on e

A2 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Source Location Displayed

VB1 INT Control FlexVision

VB2 SYNC Control FlexVision

VB3 TBD TBD FlexVision

VB4 TBD TBD FlexVision

VB5 TBD TBD FlexVision

VB6 TBD TBD FlexVision

VB7 TBD TBD FlexVision

VB8 TBD TBD FlexVision

VB9 TBD Exam FlexVision

VB10 TBD Exam FlexVision

Equipment Layout 3/8" = 1'-0"

Required Unistrut Height: 9' - 6 3 16", +3

8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.

General Notes

* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework.

Architect to coordinate with Philips Project Manager to reflect final placement on Philips drawings.

* The customer shall advise Philips of existing and/or new conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work. Refer to sheet - AN line #2 of General Conditions for additional information.

Verify quantity and designation of Live/Reference slaving monitors with local Philips Service.

Planning Issues and Considerations

Exact equipment configuration to be verified with local Philips Sales. [9] Video Boxes are listed on order, but [10] are shown. [1] Video box is listed on back of monitor, but [2] are shown.

Potential collision of equipment with noted door / wall.

Exact equipment configuration to be verified with local Philips Sales. Medrad Injector table mount is not listed on order, but is shown.

View of patient may be limited. Verify with customer requirement.

Recommend a more direct access between control room and exam room.

Verify with customer requirement.

Architect to modify reflected ceiling plan to accommodate system ceiling equipment, Unistrut, and electrical ceiling boxes.

Third Party Items - It is the customer's responsibility to interface and coordinate all non-Philips' item(s) / equipment to ensure full functionality and movement of all equipment.

It is customer's responsibility to design the soffit.

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

Elevation check needed

Standard cable duct

<5 7 8" b ot to m o f

Fl ex

Ar m c ab le du ct a rm

Min. distance for booms Use this area only when boom arm can fit between bottom of standard cable duct and vertical arm.

To p of ve rti ca l a rm

Finished Ceiling

Elevation check needed

Min. distance for boomsUse this area only when boom can fit between bottom of rails and of vertical arm.

To p of ve rti ca l a rm x-ax is

C en te r l in e of Tr an sv er sa l m ov em en t

Vertical Arm

No fly zone

No fly zone

2'-103 8"

[873mm]

9' -6

3 16

[2

0m m

1' -6

1 2"

[4 m m

Fi ni sh ed fl oo r t o bo tto m o f u pp er d ec k he ig ht

4'-615 16"

[1396mm] 4'-615

16"

[1396mm] 2'-101

4"

[869mm]

1 16

[1 m m

1' -6

1 2"

[4 m m

5'-3"

[1600mm] 5'-3"

[1600mm]

Patient Right Patient Left

A3 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Elevation View 1" = 1'-0"

General Notes

* Finished ceiling height is not the same as unistrut height as illustrated on SD1 Philips Fixing Block for Philips Ceiling Rails (Clip Rails) detail.

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AD1

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Detail - FlexArm Ceiling (C-ARM) Transport Details

(19.0)

Transport Possibilities

Crate Pallet Kick Wheels Wide Kick Wheels Small Height 77.95" (1980mm) 76.22" (1936mm) 69.02" (1753mm) 77.76" (1975mm)

Weight 2050 lbs (930 kg) 1940 lbs (880 kg) 2061 lbs (935 kg) 1764 lbs (800 kg)

7'-25 8"

[2200mm]

'-0

11 16

[5

0m m

7'-25 8"

[2200mm]

'-0

5 8"

[4

3m m

10'-913 16"

[3298mm]

'-1

1 16

[4

9m m

6'-3 9 16"

[1919mm]

'-1

1 16

[4

8m m

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AD2

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

7'-10 9 16"

[2402mm]

3'-111 4"

[1200mm] 81 4"

[2 m m

1' -7

11 16

[5 m m

11'-07 8"

[3375mm]

Floor Plate

Ceiling Inlet

'-1

011 16

[4

9m m

'-1

03 4"

[4

0m m

32'-85 8"

[9973mm]

1'-1013 16"

[580mm]

1'-1013 16"

[580mm] Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.

Front (Not site specific)

(22.0)

MSA

Angio Diagnost 7 Weight Heat Dissipation

999 lbs - BTU/hr

Side (Not site specific)

Top (Not site specific)

'-0

5 16

[5

0m m

'-9

3 8"

[4

1m m

3' -1

7 16

[9 m m

1' -5

3 4"

[4 m m

5°

10'-97 8"

[3299mm]

1'-47 8"

[428mm]

90°

5' -5

3 16

[1

6m m

3'-1013 16"

[1190mm]

11'-9 5 16"

[3590mm]

31'-811 16"

[9669mm]

Optional Table Pivot

(-90, +180 degrees)

Front (Not site specific)

(22.0)

SP

FlexArm Stand

Weight Heat Dissipation

2755 lbs - BTU/hr

Indicates equipment movement

11 16

[1 7m m

1' -5

3 16

[4 m m

7'-101 2"

[2400mm]

7'-101 2"

[2400mm]

30'-01 8"

[9147mm]

1' -7

9 16

[4 m m

9'-21 4"

[2800mm]

Right (Not site specific)

3'-61 8"

[1070mm]

28'-2 9 16"

[8600mm]

7' -3

1 4"

[2

6m m

2' -0

[6 m m

2' -0

[6 m m

3' -2

1 8"

[9 m m

3' -2

1 16

[9 m m

11'-9 5 16"

[3589mm]

13'-93 8"

[4200mm]

Cable Duct 8'-6 9

16"

[2605mm]

3'-61 8"

[1069mm]

5'-01 4"

[1531mm]

7'-1 9 16"

[2173mm]

2'-71 2"

[800mm]

120°

Minimum space required to avoid C-Arm collision with finished floor

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AD3

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover CRC Extension

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[276mm]

6 5 16"

[160mm]

CRC Cover

1'-95 8"

[550mm]

(19.0)

MA

Mains 40E Cabinet

Weight Heat Dissipation

826 lbs - BTU/hr

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]

1'-95 8"

[550mm]

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover

CRC Cover

(19.0)

MB

Image 40E Cabinet Weight Heat Dissipation

441 lbs - BTU/hr

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]

1'-95 8"

[550mm]

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

Front

CRC Cover

CRC Cover

(19.0)

ME

Certeray iX Generator 40E Cabinet Weight Heat Dissipation

320 lbs - BTU/hr

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover CRC Extension

Top

'-9

15 16

[3

0m m

Side

3'-415 16"

[1040mm]

1'-93 4"

[553mm]

1'-0 9 16"

[319mm]

CRC Cover

3'-7 5 16"

[1100mm]

(23.0)

MR

Peripheral 40E Cabinet Weight Heat Dissipation

386 lbs - BTU/hr

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AD4

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -M

ID

E

0X

E D at e

D ra w n:

/9

/2

Q uo te

O rd er

A zu rio n

C

F le xA rm m m

A

D

05.27.2022

1- 2A

YM

PF

G R ev .3

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

W M

S M id dl et on

M em or ia l V et er an s H os pi ta l

M ad is on

, W I

R oo m : C

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

D ra w n

By : V an es sa S al as

Pr oj ec t M an ag er : F lo rin

C ar p

C on ta ct

N um be r:

(2

) 2

-3

Em ai l:

flo rin .c ar p@ ph ilip s.

co m

Front

Top

Side

9 16

[6 5m m

16"

[195mm]

1 4"

[2 m m

(19.0)

ATY

Auxiliary Box Weight Heat Dissipation

7 lbs - BTU/hr

Front

Top

Side

1'-95 8"

[550mm]

4' -0

[1

0m m

3' -8

1 16

[1

0m m

1'-1 3

16"

[335mm]

(19.0)

DB

Documentation Box

Weight Heat Dissipation

176 lbs - BTU/hr

1' -1

3 16

[3 m m

Front

Top

Side

2"

[242mm]

9 7 16"

[240mm]

3 16

[5 5m m

Front

Top

Side

360°

15'-23 4"

[4642mm]

'-2

[4

8m m

25'-71 8"

[7800mm]

10'-415 16"

[3174mm]

18'-1115 16"

[5789mm]

23'-03 8"

[7019mm]

1' -3

3 4"

[4 m m

2' -1

3 16

[6 m m

For swing labs, 2700mm long ceiling rails are delivered. Maximum longitudinal column travel = 2100mm.

Weight shown is total weight including monitors, suspension, cabling, and options.

Bearing Forces:

(Tension) Tmax = 661 lbs/support (Shear) Vmax = 150 lbs/support

(19.0)

TV

58" + (2) 27" LCD Monitor Suspension Weight Heat Dissipation

596 lbs - BTU/hr

2' -0

[6 m m

6' -1

03 8"

[2

3m m

(21.0)

VB1

VB10

Video Connection Box Weight Heat Dissipation

2.2 lbs - BTU/hr

RENOVATE FOR CATH LAB

POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

25% Schematic Design 06.29.2022 6.9.23

Project Number

Building Number

607-CSI-106

33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski

50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .