P01_SOW Att 12_Project 607-CSI-106 Renovate for Cath Lab100CD Drawings Volume 1 with estamp 2024.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77624R0032
About this file
This document outlines a request for Standard Form 330 submissions for an architect-engineering contract opportunity. The Veterans Health Administration Program Contracting Activity Central is seeking proposals for design and construction period services for Project Number 607-397 to expand specialty care at the VA Medical Care Center in Madison, Wisconsin. The firm fixed price contract will be for the development of complete construction documents including drawings, specifications, and reports. Proposals are due in accordance with the Selection of Architects and Engineers statute and Federal Acquisition Regulation subpart 36.6. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING RAMP
BLDG #15
FLAG
'D' WING
CH
IL
LE
R
PL
AN
T
BLDG #19
'C ' W
IN
G
'G ' W
IN
G
'A' WING
'B' CORE
SWITCHGEAR
LAUNDRY
EMER. GENERATOR
WELL
PUMPHOUSE
MENTAL
HEALTH
CLINIC
ENTRANCE
MAIN
/LOBBY
BLDG #7
BLDG #12
BLDG #1
BLDG #2
BLDG #13
BLDG #3
BLDG #5
BL
DG
ELEC.
ENTRANCE
OLD MAIN
BLDG #22
MRI
COMMUNITY LIVING CENTER
HOSPICE
MENTAL HEALTH
EMERGENCY
UNIVERSITY OF
WISCONSIN
HOSPITAL
CO
NNEC
TI
NG C
ORR
ID
OR
BLDG #27
BLDG #17
OLD
BLDG #14
BLDG 20
SERVICE ENCLOSURE
CONTRACTOR PARKING
CONNECTING CORRIDOR
BLDG 21
ROOFTOP UNIT
'B' WING
BLDG 18
BL
DG
'D' WING
'A' WING
'B' WING
BLDG #1
'G' WING
BLDG #3
'C ' W
IN
G
'B' CORE
TITLE SHEET
SITE PLAN-CAMPUS
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
WILLIAM S MIDDLETON VA MEDICAL CENTER
MADISON, WISCONSIN
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 6.9.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023
G001
RENOVATE FOR CATH LAB
Consultants
PROJECT #607-CSI-106
BUILDING 1 -GENERAL ARRANGEMENT
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text Area of Work
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text %%UQA/QC Consultants
AutoCAD SHX Text Henneman Engineering
AutoCAD SHX Text 1232 Fourier Drive, Suite 101, AutoCAD SHX Text Madison, Wisconsin 53717
AutoCAD SHX Text Phone: (608) 833-7000
AutoCAD SHX Text Fax: (608) 833-6996
AutoCAD SHX Text %%UMechanical, Plumbing, Electrical, and Structural
AutoCAD SHX Text USFin
AutoCAD SHX Text 9245 Calumet Ave
AutoCAD SHX Text Munster, IN 46321
AutoCAD SHX Text Phone: (219) 836-2120
AutoCAD SHX Text Suite 205
AutoCAD SHX Text Fax: (219) 836-1129
AutoCAD SHX Text E001 SYMBOLS, ABBREVIATIONS AND NOTES -(ELECTRICAL) SYMBOLS, ABBREVIATIONS AND NOTES -(ELECTRICAL) E002 ELECTRICAL AND MOTOR SCHEDULE ELECTRICAL AND MOTOR SCHEDULE ED100 FOURTH FLOOR - ELECTRICAL POWER, COMM, SPECIAL SYSTEMS FOURTH FLOOR - ELECTRICAL POWER, COMM, SPECIAL SYSTEMS ED101 FOURTH FLOOR - LIGHTING DEMOLITION PLANS FOURTH FLOOR - LIGHTING DEMOLITION PLANS EP101 FOURTH FLOOR - ELECTRICAL POWER NEW WORK FOURTH FLOOR - ELECTRICAL POWER NEW WORK ET101 FOURTH FLOOR - ELECTRICAL COMMUNICATIONS NEW WORK FOURTH FLOOR - ELECTRICAL COMMUNICATIONS NEW WORK ET102 FOURTH FLOOR - ELECTRICAL NURSES CALL SYSTEM NEW WORK FOURTH FLOOR - ELECTRICAL NURSES CALL SYSTEM NEW WORK - ELECTRICAL NURSES CALL SYSTEM NEW WORK EL101 FOURTH FLOOR - LIGHTING NEW WORK FOURTH FLOOR - LIGHTING NEW WORK EP500 ELECTRICAL POWER AND LIGHTING DETAILS ELECTRICAL POWER AND LIGHTING DETAILS ET500 ELECTRICAL COMMUNICATIONS DETAILS ELECTRICAL COMMUNICATIONS DETAILS DETAILS EP600 ELECTRICAL SYSTEM AND RISER DIAGRAMS ELECTRICAL SYSTEM AND RISER DIAGRAMS EP601 ELECTRICAL PANEL SCHEDULES CWING ELECTRICAL PANEL SCHEDULES CWING ELECTRICAL PANEL SCHEDULES CWING EP602 ELECTRICAL PANEL SCHEDULES AWING ELECTRICAL PANEL SCHEDULES AWING FA101 FOURTH FLOOR - ELECTRICAL FIRE ALARM NEW WORKFOURTH FLOOR - ELECTRICAL FIRE ALARM NEW WORK
AutoCAD SHX Text %%UGeneral Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%uElectrical Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text G001 TITLE SHEET TITLE SHEET G002 LIFE SAFETY FLOOR PLAN LIFE SAFETY FLOOR PLAN PLAN G003 PHASING CONSTRUCTION PLANPHASING CONSTRUCTION PLAN
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UArchitectural Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UMechanical Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text M001 SYMBOLS, ABBREVIATIONS AND NOTES (MECHANICAL & PLUMBING) SYMBOLS, ABBREVIATIONS AND NOTES (MECHANICAL & PLUMBING) MD101 FOURTH FLOOR PLAN- HVAC DUCTWORK DEMOLITION FOURTH FLOOR PLAN- HVAC DUCTWORK DEMOLITION MD102 FOURTH FLOOR PLAN- HVAC PIPING DEMOLITION FOURTH FLOOR PLAN- HVAC PIPING DEMOLITION M101 FOURTH FLOOR PLAN- HVAC DUCTWORK NEW WORK FOURTH FLOOR PLAN- HVAC DUCTWORK NEW WORK M102 FOURTH FLOOR PLAN- HVAC PIPING NEW WORK FOURTH FLOOR PLAN- HVAC PIPING NEW WORK M103 FIFTH AND ROOF FLOOR PLAN- PLUMBING DEMOLITION AND NEW WORK FIFTH AND ROOF FLOOR PLAN- PLUMBING DEMOLITION AND NEW WORK M500 MECHANICAL DETAILS - SHEET 1 MECHANICAL DETAILS - SHEET 1 M501 MECHANICAL DETAILS - SHEET 2 MECHANICAL DETAILS - SHEET 2 M600 MECHANICAL SCHEDULES MECHANICAL SCHEDULES M700 CONTROLS SYSTEM FLOW DIAGRAM AND POINTS LIST CONTROLS SYSTEM FLOW DIAGRAM AND POINTS LIST M701 DEMOLITION - AIR FLOW DIAGRAM AND CONTROLS - WEST DEMOLITION - AIR FLOW DIAGRAM AND CONTROLS - WEST M702 NEW UPGRADES - AIR FLOW DIAGRAM AND CONTROLS - WEST NEW UPGRADES - AIR FLOW DIAGRAM AND CONTROLS - WEST M703 DEMOLITION - AIR FLOW DIAGRAM AND CONTROLS - EAST DEMOLITION - AIR FLOW DIAGRAM AND CONTROLS - EAST M704 NEW UPGRADES - AIR FLOW DIAGRAM AND CONTROLS - EASTNEW UPGRADES - AIR FLOW DIAGRAM AND CONTROLS - EAST
AutoCAD SHX Text Area of Work
AutoCAD SHX Text 4th Flr. CATH LAB
AutoCAD SHX Text A001 ARCHITECTURAL ABBREVIATIONS SYMBOLS, + MOUNTING HEIGHTS ARCHITECTURAL ABBREVIATIONS SYMBOLS, + MOUNTING HEIGHTS AD101 PARTIAL THIRD FLOOR DEMOLITION PHASING PLAN PARTIAL THIRD FLOOR DEMOLITION PHASING PLAN AD102 DEMOLITION PLAN- FOURTH FLOOR PLAN DEMOLITION PLAN- FOURTH FLOOR PLAN A101 CONSTRUCTION FLOOR PLAN-FOURTH FLOOR PLAN CONSTRUCTION FLOOR PLAN-FOURTH FLOOR PLAN A102 ENLARGED CONSTRUCTION FLOOR PLAN ENLARGED CONSTRUCTION FLOOR PLAN A201 REFLECTED CEILING PLAN REFLECTED CEILING PLAN A601 INTERIOR ELEVATION INTERIOR ELEVATION A701 FLOOR FINISH PLAN FLOOR FINISH PLAN A702 FINISH SCHEDULE AND LEGEND FINISH SCHEDULE AND LEGEND A751 EQUIPMENT FLOOR PLAN EQUIPMENT FLOOR PLAN A752 EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE A901 PARTITION TYPES PARTITION TYPES A902 DOOR SCHEDULE, ELEVATIONS AND DETAILS DOOR SCHEDULE, ELEVATIONS AND DETAILS A903 WALL PENETRATION DETAILS WALL PENETRATION DETAILS A921 CEILING AND PLAN DETAILS CEILING AND PLAN DETAILS A931 MILLWORK DETAILS MILLWORK DETAILS I601 INTERIOR SIGNAGE FLOOR PLANS, SCHEDULES AND DETAILSINTERIOR SIGNAGE FLOOR PLANS, SCHEDULES AND DETAILS
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UPlumbing Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text P001 PLUMBING DETAILS, NOTES, SYMBOLS AND ABBREVIATIONS PLUMBING DETAILS, NOTES, SYMBOLS AND ABBREVIATIONS P100 THIRD FLOOR PLAN- PLUMBING DEMOLITION AND NEW WORK THIRD FLOOR PLAN- PLUMBING DEMOLITION AND NEW WORK PD101 FOURTH FLOOR PLAN- PLUMBING DEMOLITION FOURTH FLOOR PLAN- PLUMBING DEMOLITION P101 FOURTH FLOOR PLAN- PLUMBING NEW WORK FOURTH FLOOR PLAN- PLUMBING NEW WORK PL500 PLUMBING DETAILS PLUMBING DETAILS MGD101 FOURTH FLOOR PLAN - MEDICAL GAS DEMOLITION FOURTH FLOOR PLAN - MEDICAL GAS DEMOLITION MG101 FOURTH FLOOR PLAN - MEDICAL GAS NEW WORK FOURTH FLOOR PLAN - MEDICAL GAS NEW WORK P701 MEDICAL GAS RISER DIAGRAMS - EXISTING/DEMOLITION MEDICAL GAS RISER DIAGRAMS - EXISTING/DEMOLITION P702 MEDICAL GAS RISER DIAGRAMS - NEW WORKMEDICAL GAS RISER DIAGRAMS - NEW WORK
AutoCAD SHX Text %%UArchitectural
AutoCAD SHX Text PFB Architects,LLC-Chicago 33 North LaSalle St. Suite 3600 Chicago, IL 60602 Phone: (312) 376-3100
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UStructural Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text S001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES SD100 FOURTH FLOOR - STRUCTURAL DEMOLITION WORK PLAN FOURTH FLOOR - STRUCTURAL DEMOLITION WORK PLAN S101 FOURTH FLOOR - STRUCTURAL NEW WORK PLAN FOURTH FLOOR - STRUCTURAL NEW WORK PLAN S102 FOURTH FLOOR -STRUCTURAL NEW WORK PLAN FOURTH FLOOR -STRUCTURAL NEW WORK PLAN S500 STRUCTURAL DETAILS - SHEET 1STRUCTURAL DETAILS - SHEET 1
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UEnvironmental Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text HA104 FOURTH FLOOR- C-WING - ASBESTOS ABATEMENTFOURTH FLOOR- C-WING - ASBESTOS ABATEMENT
AutoCAD SHX Text %%UFire Protection Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text FD100 FOURTH FLOOR - FIRE SPRINKLER DEMOLITION PLAN FOURTH FLOOR - FIRE SPRINKLER DEMOLITION PLAN FP101 FOURTH FLOOR - FIRE PROTECTION NEW WORKFOURTH FLOOR - FIRE PROTECTION NEW WORK
AutoCAD SHX Text 3RD Flr. CLINIC
AutoCAD SHX Text %%UPhilips Equipment Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text PH001 PHILIPS DESIGN DRAWINGS - COVER SHEET -C1 PHILIPS DESIGN DRAWINGS - COVER SHEET -C1 SECTION A-EQUIPMENT PLAN PH100 PHILIPS DESIGN DRAWINGS - GENERAL NOTES SHEET -AN PHILIPS DESIGN DRAWINGS - GENERAL NOTES SHEET -AN PH101 PHILIPS DESIGN DRAWINGS - EQUIPMENT LEGEND-AL PHILIPS DESIGN DRAWINGS - EQUIPMENT LEGEND-AL PH102 PHILIPS DESIGN DRAWINGS - SITE LAYOUT-A1 PHILIPS DESIGN DRAWINGS - SITE LAYOUT-A1 PH103 PHILIPS DESIGN DRAWINGS - EQUIPMENT LAYOUT -A2 PHILIPS DESIGN DRAWINGS - EQUIPMENT LAYOUT -A2 PH104 PHILIPS DESIGN DRAWINGS - EQUIPMENT ELEVATION VIEW- A3 PHILIPS DESIGN DRAWINGS - EQUIPMENT ELEVATION VIEW- A3 PH105 PHILIPS DESIGN DRAWINGS - TRANSPORT DETAILS- AD1 PHILIPS DESIGN DRAWINGS - TRANSPORT DETAILS- AD1 PH106 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD2 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD2 PH107 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD3 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD3 PH108 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD4 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD4 PH109 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD5 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD5 PH110 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD6 PHILIPS DESIGN DRAWINGS - EQUIPMENT DETAILS- AD6 SECTION S-SUPPORT PLAN PH200 PHILIPS DESIGN DRAWINGS - SUPPORT NOTES - S1 PHILIPS DESIGN DRAWINGS - SUPPORT NOTES - S1 PH201 PHILIPS DESIGN DRAWINGS - SUPPORT LEGEND- SL PHILIPS DESIGN DRAWINGS - SUPPORT LEGEND- SL PH202 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- FLOOR AND WALL - S1 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- FLOOR AND WALL - S1 PH203 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- CEILING - S2 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- CEILING - S2 PH204 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- CEILING - S3 PHILIPS DESIGN DRAWINGS - SUPPORT LAYOUT- CEILING - S3 PH205 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD1 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD1 PH206 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD2 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD2 PH207 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD3 PHILIPS DESIGN DRAWINGS - SUPPORT DETAILS- SD3 SECTION E -ELECTRICAL PLAN PH300 PHILIPS DESIGN DRAWINGS - ELECTRICAL NOTES - EN PHILIPS DESIGN DRAWINGS - ELECTRICAL NOTES - EN PH301 PHILIPS DESIGN DRAWINGS - ELECTRICAL LEGEND- EL1 PHILIPS DESIGN DRAWINGS - ELECTRICAL LEGEND- EL1 PH302 PHILIPS DESIGN DRAWINGS - ELECTRICAL LEGEND- EL2 PHILIPS DESIGN DRAWINGS - ELECTRICAL LEGEND- EL2 PH303 PHILIPS DESIGN DRAWINGS - ELECTRICAL LAYOUT -E1 PHILIPS DESIGN DRAWINGS - ELECTRICAL LAYOUT -E1 PH304 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E2 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E2 PH305 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E3 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E3 PH306 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E4 PHILIPS DESIGN DRAWINGS - RACEWAY AND CONDUIT INFORMATION- E4 PH307 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED1 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED1 PH308 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED2 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED2 PH309 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED3 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED3 PH310 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED4 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED4 PH311 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED5 PHILIPS DESIGN DRAWINGS - ELECTRICAL DETAILS- ED5 PH400 PHILIPS DESIGN DRAWINGS - REMOTE SERVICE NETWORK - N1 PHILIPS DESIGN DRAWINGS - REMOTE SERVICE NETWORK - N1 PH401 PHILIPS DESIGN DRAWINGS - REMOTE SERVICE NETWORK - N2 PHILIPS DESIGN DRAWINGS - REMOTE SERVICE NETWORK - N2 PH402 PHILIPS DESIGN DRAWINGS - CHECKLIST -CHK (FOR INTERNAL USE ONLY)PHILIPS DESIGN DRAWINGS - CHECKLIST -CHK (FOR INTERNAL USE ONLY)
AutoCAD SHX Text
VOLUME 1
AutoCAD SHX Text
VOLUME 2
AutoCAD SHX Text
VOLUME 3
CATH
LAB
C4109
CONTROL
ROOM
C4110SCRUB
ANTE-ROOM
C4111
EQUIPMENT
ROOM
C4109A
CLEAN
UTILITY
C4112
SOILED
UTILITY
C4151
OFFICE
B4147
RECOVERY 1
C4159B
RECOVERY 2
C4159C
RECOVERY
AREA
C4159
TLT
C4159A
STRESS
ROOM
C4150A
MEDS
NOURISH
C4159E
NURSE
STATION
C4159D
IT ROOM
C4109B
BREAK
ROOM
A4042
DSPECT
C4150C
VITREOUS CHINA
C_SINKSCAMERTON
K-12867
FEC
BUSINESS
OCCUPANCY
BUSINESS
OCCUPANCY
HEALTH CARE
OCCUPANCY
HEALTH CARE
OCCUPANCY
SZ-1A-4
SZ-1C-4 SZ-1B-4SZ-1D-4
E
EW EW
EWEW
EWEW
EW/SH
E
E
SZ-1C-4
SZ-1D-4 SZ-1C-4
SZ-1C-4 SZ-1B-4
SZ-1B-4
SZ-1B-4
SZ-1A-4
TR
AV
EL
D
IS
TA
NC
E:
'-8
CODE COMPLIANCE DATA
3. CONSTRUCTION TYPE: TYPE I (332) FULLY SPRINKLERED
1. AMBULATORY INPATIENT - 150 GSF/OCC
3. BUSINESS AREAS - 150 GSF/OCC
2. STORAGE & MECHANICAL EQUIP. RMS - 500 GSF/OCC
C. STORAGE ROOMS OVER 50 S.F.: SMOKE RESISTIVE
4. ALL GLAZING IN DOORS, SIDE LIGHTS AND CORRIDOR GLAZING WITHIN RATED
PARTITIONS SHALL BE APPROVED SAFETY GLAZING SET IN APPROVED
METAL FRAMES.
3. ALL STAIRS ARE CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS
2. ALL EXIT DOORS ARE 1 3/4" THICK HOLLOW METAL "B" LABEL DOORS
1. ALL EXIT DOORS ARE KEYLESS AND SWING IN THE DIRECTION OF EXIT
TRAVEL
EXCEPTION - SECTION 7.4.1.4.2 - NOT REQ WHEN OCC LOAD LESS
THAN 50).
2. MAXIMUM TRAVEL DISTANCE: 100' WITH 2 HOUR SMOKE
1. MINIMUM NUMBER OF EXITS: 2 (500 OR LESS OCCUPANT LOAD)
D. CORRIDORS: SHALL BE CONTIGUOUS TO EXITS AND SHALL FORM A BARRIER TO
SMOKE
B. ELEVATOR SHAFT ENCLOSURE: 2 HOURS
A. STAIRWAY ENCLOSURE: 2 HOURS
A. PRIMARY STRUCTURAL FRAME: 3-HOURS
B. BEARING WALLS (INTERIOR & EXTERIOR) 3-HOURS
C. SUPPORTING ROOF STRUCTURE: 1-HOUR
D. FLOOR CONSTRUCTION & SECONDARY MEMBERS: 2-HOURS
E. ROOF CONSTRUCTION AND SECONDARY MEMBERS: 1 1/2-HOURS
4. BUILDING HEIGHT: 8-STORIES ABOVE STREET LEVEL
2. OCCUPANCY CLASSIFICATION:
HOSPITAL OCCUPANCY
1. TYPE OF PROJECT: HOSPITAL
FIRE, LIFE, SAFETY 101 - NFPA 101-2018 EDITION
BUILDING CLASSIFICATION:
FIRE RESISTIVE REQUIREMENTS:
1. FIRE RATINGS:
SEPARATION REQUIREMENTS:
1. FIRE SEPARATIONS:
OCCUPANCY CALCULATIONS:
EXITING CALCULATIONS:
4. MINIMUM EXIT WIDTH: 42 INCHES
3. MAXIMUM DEAD END CORRIDOR: 30'
5. EXIT CAPACITY: OCCUPANTS PER EXIT UNIT STAIRS: (INSTITUTIONAL) 0.3" /OCC
SPRINKLERED DOORS: (INSTITUTIONAL) 0.2" /OCC SPRINKLERED
CODE COMPLIANCE NOTES:
(SPRINKLERED)
LIFE SAFETY FLOOR PLAN1 SCALE: 1/16"=1'-0"
N
LCBP
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
B A
C
B-Core
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023 100% Construction Documents 06.09.2023
CATH
LAB
C4109
CONTROL
ROOM
C4110SCRUB
ANTE-ROOM
C4111
EQUIPMENT
ROOM
C4109A
CLEAN
UTILITY
C4112
SOILED
UTILITY
C4151
OFFICE
B4147
RECOVERY 1
C4159B
RECOVERY 2
C4159C
RECOVERY
AREA
C4159
TLT
C4159A
STRESS
ROOM
C4150A
MEDS
NOURISH
C4159E
NURSE
STATION
C4159D
IT ROOM
C4109B
BREAK
ROOM
A4042
DSPECT
C4150C
VITREOUS CHINA
C_SINKSCAMERTON
K-12867
FEC
LC
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
B A
C
B-Core
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023 100% Construction Documents 06.09.2023
PHASING CONTRUCTION PLAN
BP
PHASING NARRATIVE
PHASE 1:
PHASE 1 INCLUDES THE CONSTRUCTION OF THE DSPECT ROOM (C4150C), SOILED
UTILITY (C4151) AND CLEAN UTILITY (C4112). PHASE 1 CONSTRUCTION
ACCOMMODATES PHASE 2 WORK AND DOES NOT REQUIRE SHUTDOWN OF THE
CURRENT DSPECT ROOM, CATH LAB AND SUPPORT SPACE.
PHASE 2:
PHASE 2 INCLUDES THE CONSTRUCTION OF THE NEW CATH LAB (C4109), CONTROL
ROOM (C4110), SCRUB ROOM (C4111), EQUIPMENT ROOM (C4109A) AND STAFF LOUNGE
(A4042). THIS ALLOWS THE NEW CATH LAB TO COME ONLINE BEFORE THE EXISTING
CATH LAB IS TAKEN OFFLINE DURING PHASE 3.
PHASE 3:
THIS PHASE WORK INCLUDES CONSTRUCTION OF THE NEW RECOVERY BAYS (C4159)
AND OFFICE AREA (B4147).
PHASING AND CONSTRUCTION LEGEND
PHASING LEGEND
PHASE 1
CONSTRUCTION
PHASE 2
CONSTRUCTION
PHASE 3
CONSTRUCTION
CONSTRUCTION BARRIER LEGEND
PHASE 1 CONSTRUCTION BARRIER
PHASE 2 CONSTRUCTION BARRIER
PHASE 3 CONSTRUCTION BARRIER
ITEMS TO BE DEMO
REMOVE EXISTING CEILING
12" 0 1' 5' 10' 20'
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - C-WING - ASBESTOS ABATEMENT1
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS
PIPE INSULATION 142 LF
TRANSITE PANEL 50 SF
SHEET FLOORING AND ADHESIVE 210 SF
CERMIC FLOOR TILE AND ADHESIVE 30 SF
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
CONTAINING MATERIAL TO BE REMOVED
C4110 PIPE INSULATION 12 LF
C4112 SHEET FLOOR WITH ACM ADHESIVE 190 SF
PIPE INSULATION ASSUMED IN PIPE CHASE 20 LF
C4112A CERAMIC FLOOR TILE WITH ACM ADHESIVE 30 SF
BELOW PIPE
PIPE INSULATION ASSUMED IN CHASE 30 LF
C4112B SHEET FLOOR WITH ACM ADHESIVE 20 SF
C4150 PIPE INSULATION ASSUMED IN PIPE CHASE 20 LF
C4150A TRANSITE PANEL 25 SF
C4150B TRANSITE PANEL 25 SF
SUMMARY OF ESTIMATED QUANTITY OF INSULATION
AND ACM ADHESIVE TO BE WORKED
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 6.9.23
Project Number
Building Number
607-CSI-106
B A
C
B-Core
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
50% Design Development 10.14.2022 65% Construction Documents 1.27.2023 95% Construction Documents 5.5.2023 100% Construction Documents 6.9.2023
HA104
AutoCAD SHX Text B4147
AutoCAD SHX Text
CARIO REHAB CHARTING
AutoCAD SHX Text
165 SF
AutoCAD SHX Text B4147A
AutoCAD SHX Text
CARIO REHAB CHARTING
AutoCAD SHX Text
32 SF
AutoCAD SHX Text B4106
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
76 SF
AutoCAD SHX Text C4161
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
776 SF
AutoCAD SHX Text B4148
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
46 SF
AutoCAD SHX Text B4110A
AutoCAD SHX Text
DATA CLOSET
AutoCAD SHX Text
74 SF
AutoCAD SHX Text C4109
AutoCAD SHX Text
NUCLEAR CARDIO
AutoCAD SHX Text
610 SF
AutoCAD SHX Text C4110
AutoCAD SHX Text
SOILED UTIL ROOM CATH
AutoCAD SHX Text
86 SF
AutoCAD SHX Text C4111
AutoCAD SHX Text
CLEAN STORAGE
AutoCAD SHX Text
86 SF
AutoCAD SHX Text C4112
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
97 SF
AutoCAD SHX Text C4113B
AutoCAD SHX Text
OFFICE, PHYSICIAN
AutoCAD SHX Text
149 SF
AutoCAD SHX Text C4113
AutoCAD SHX Text
EXERCISE ROOM
AutoCAD SHX Text
360 SF
AutoCAD SHX Text C4113A
AutoCAD SHX Text
OFFICE, SUPRV.
AutoCAD SHX Text
100 SF
AutoCAD SHX Text C4113C
AutoCAD SHX Text
MUSE ROOM
AutoCAD SHX Text
62 SF
AutoCAD SHX Text C4134A
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
72 SF
AutoCAD SHX Text C4133
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
229 SF
AutoCAD SHX Text C4134
AutoCAD SHX Text
LAB
AutoCAD SHX Text
282 SF
AutoCAD SHX Text C4135
AutoCAD SHX Text
LAB
AutoCAD SHX Text
435 SF
AutoCAD SHX Text C4136
AutoCAD SHX Text
LAB
AutoCAD SHX Text
45 SF
AutoCAD SHX Text C4137
AutoCAD SHX Text
LAB
AutoCAD SHX Text
43 SF
AutoCAD SHX Text C4160
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
776 SF
AutoCAD SHX Text C4140
AutoCAD SHX Text
STORAGE, EQUIPMENT
AutoCAD SHX Text
125 SF
AutoCAD SHX Text C4139
AutoCAD SHX Text
LAB
AutoCAD SHX Text
158 SF
AutoCAD SHX Text C4138
AutoCAD SHX Text
MECH ROOM
AutoCAD SHX Text
23 SF
AutoCAD SHX Text C4143
AutoCAD SHX Text
MECH
AutoCAD SHX Text
4143 SF
AutoCAD SHX Text C4141
AutoCAD SHX Text
LAB
AutoCAD SHX Text
2539 SF
AutoCAD SHX Text C4142
AutoCAD SHX Text
LAB
AutoCAD SHX Text
137 SF
AutoCAD SHX Text C4144B
AutoCAD SHX Text
ELEC VAULT
AutoCAD SHX Text
136 SF
AutoCAD SHX Text C4144A
AutoCAD SHX Text
ELEVATOR MACHINE
AutoCAD SHX Text
90 SF
AutoCAD SHX Text C4144B
AutoCAD SHX Text
ELEC VAULT
AutoCAD SHX Text
136 SF
AutoCAD SHX Text C4149C
AutoCAD SHX Text
OFFICE, STAFF
AutoCAD SHX Text
78 SF
AutoCAD SHX Text C4146
AutoCAD SHX Text
LAB, RESEARCH
AutoCAD SHX Text
220 SF
AutoCAD SHX Text C4148
AutoCAD SHX Text
HSKP CLOSET
AutoCAD SHX Text
15 SF
AutoCAD SHX Text C4147
AutoCAD SHX Text
LAB, RESEARCH
AutoCAD SHX Text
220 SF
AutoCAD SHX Text C4149A
AutoCAD SHX Text
TOILET, STAFF
AutoCAD SHX Text
50 SF
AutoCAD SHX Text C4149B
AutoCAD SHX Text
TOILET, STAFF
AutoCAD SHX Text
50 SF
AutoCAD SHX Text C4149
AutoCAD SHX Text
LAB, RESEARCH
AutoCAD SHX Text
440 SF
AutoCAD SHX Text C4150
AutoCAD SHX Text
OFFICE, CARDIO
AutoCAD SHX Text
340 SF
AutoCAD SHX Text C4150A
AutoCAD SHX Text
EXAM/TREATMENT
AutoCAD SHX Text
122 SF
AutoCAD SHX Text C4150B
AutoCAD SHX Text
EXAM/TREATMENT
AutoCAD SHX Text
115 SF
AutoCAD SHX Text C4150C
AutoCAD SHX Text
VIEW/COMPUTER ROOM
AutoCAD SHX Text
105 SF
AutoCAD SHX Text C4151
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
324 SF
AutoCAD SHX Text C4156
AutoCAD SHX Text
CARDIAC CATH LAB
AutoCAD SHX Text
595 SF
AutoCAD SHX Text C4158
AutoCAD SHX Text
SCRUB ROOM
AutoCAD SHX Text
141 SF
AutoCAD SHX Text C4158A
AutoCAD SHX Text
CONTROL ROOM
AutoCAD SHX Text
58 SF
AutoCAD SHX Text C4159
AutoCAD SHX Text
CARDIAC CATH LAB
AutoCAD SHX Text
734 SF
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS CONTAINING TRANSITE BEHIND HEAT CONVECTORS. ABATEMENT CONTRACTOR REQUIRED TO DEMO TO ACCESS. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO DEMO TO ACCESS.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text A. CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES FOR DEMOLITION MEASURES. B. WHERE DEMOLITION OF PIPING INSULATION OCCURS, IT IS WHERE DEMOLITION OF PIPING INSULATION OCCURS, IT IS ASSUMED TO BE ASBESTOS CONTAINING. SEE MECHANICAL DEMOLITION PLANS FOR EXACT LOCATIONS. IN ANY AREAS WHERE DEMOLITION IS LIKELY TO CAUSE A DISTURBANCE TO THE ASBESTOS CONTAINING INSULATION, DEMOLITION SHALL BE SCHEDULED WITH THE ABATEMENT THE CONTRACTOR. C. DETERMINATION OF WHERE REGULATED AREAS ARE DETERMINATION OF WHERE REGULATED AREAS ARE ESTABLISHED AND ENCLOSURES ARE CONSTRUCTED WILL BE MADE IN THE FIELD AND BASED ON WORK AREAS AND AMOUNT OF ASBESTOS REMOVAL. D. LOCATION OF PERSONNEL DECONTAMINATION FACILITY LOCATION OF PERSONNEL DECONTAMINATION FACILITY WILL NEED TO BE DETERMINED IN THE FIELD AND COORDINATED WITH THE GENERAL CONTRACTOR. E. EXHAUST OF HEPA FILTERED EXHAUST FANS WILL NEED EXHAUST OF HEPA FILTERED EXHAUST FANS WILL NEED TO BE COORDINATED WITH THE VA REPRESENTATIVE AND THE GENERAL CONTRACTOR.
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text REMOVE ASBESTOS CONTAINING PIPE INSULATION. INVESTIGATE PIPE CHASE AND REMOVE ANY PIPE INSULATION. REMOVE NON-ACM SHEET WITH ACM ADHESIVES. REMOVE NON-ACM CERAMIC TILE WITH ACM ADHESIVE. POSSIBLE 50LF OF EXTRA PIPE INSULATION HIDDEN IN WALLS/CHASER.
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
AREAS OF WORK-FOURTH FLOOR & 3RD FLOOR
AutoCAD SHX Text
FOURTH FLOOR-CWING ABATEMENT PLAN
SANITARY NAPKIN
DISPOSAL
SURFACE MTD TOILET
PAPER DISPENSER
3'- 0"
MA
X.
TO
T
/O G
RA
B
BA
R
1'- 6"
M
IN
3'-6" MIN.
7"- 9"
2'- 6"
3"
NURSE PULL CORD
NOTE:
1. REAR GRAB BAR SHALL NEVER BE SPLIT.
ADA ROOMS MUST HAVE 3'-0" GRAB BAR.
2. FLUSH HANDLES SHALL BE ON WIDE SIDE OF
TOILET ROOM OR STALL.
3. ALL TOILETS SHOULD BE WALL MOUNTED.
ADJACENT
WALL
3'-0"
1'-0"
MIN.
1'-6"
1'- 6"
M
AX
1'-
5" M
IN
WALL MOUNTED
WATER CLOSET W/
FULL RING SEAT
AND COVER
HA
ND
D
RY
ER
3'- 6"
4" 1'-
6"
5'- 0"
S
TA
ND
AR
D 4'-
0" A
DA
C
OM
PL
IA
NT
DOORS/HARDWARE/FLAT GOODS
KICKPLATE
HINGE
MANUAL DOOR
OPENER
SW
IT
CH
, T
HE
RM
OS
TA
T, HU
MI
DS
TA
T, B
RO
W N
PH
ON
E
JA
CK
HA
ND
S
AN
IT
IZ
ER
DI
SP
EN
SE
R
ARMOR PLATE
1'- 0"
4'- 0"
1'- 6"
MI
N.
7'- 6"
EQ
UA
L
EQ
UA
L
5"
1"
2'-
1"
2"
3'- 5"
CEILING LINE
4'- 0"
PA
PE
R
TO
W
EL
DI
SP
EN
SE
R
ADA COMPLIANT MOUNTING HEIGHTS
4'- 0"
M
AX
TO
P
OF
H
AN
DL
E
PA
PE
R
TO
W
EL
DI
SP
EN
SE
R
SO
AP
D
IS
PE
NS
ER
CL
CL
CL
HINGE CL
HINGE CL
CL
CL
SA
NI
TA
RY
N
AP
KI
N
DI
SP
EN
SE
R
7'- 6"
CL
W
AL
L C
LO
CK
COIN SLOT
FA
CI
AL
T
IS
SU
E
DI
SP
EN
SE
R
SU
RF
AC
E
MO
UN
TE
D
PA
PE
R
TO
W
EL
D
IS
PE
NS
ER
CO
AT
H
OO
KS
SU
RF
AC
E
MO
UN
TE
D
HA
IR
O R
HA
ND
D
RY
ER
UT
ILI
TY
S
HE
LF
SO
AP
D
IS
H
UT
ILI
TY
S
HE
LF
AN
D
TO
W
EL
B
AR
TO
W
EL
B
AR
3'- 0"
M
AX
2'
-7 3/
8" M
IN
W
AT
ER
F
OU
NT
AI
N
W
AS
TE
R
EC
EP
TA
CL
E
MA
ILB
OX
S
LO
T
3'- 0"
2'- 4"
ME
DI
CI
NE
C
AB
IN
ET
3'- 8"
MA
X.
T O
BO
TT
OM
O
F
SH
EL
F
ACCESSIBLE WALL MOUNTED TOILET
MOUNTING HEIGHTS AND LOCATIONS
CO
AT
H
OO
KS
VA
CU
UM
B
RE
AK
ER
S
CL
5'- 0"
IN
TE
RI
OR
W
AL
L M
OU
NT
ED
R
OO
M
SI
GN
AG
E
CL
5'- 0"
MI
N.
BU
ILD
IN
G
EN
TR
AN
CE
SY
MB
OL
O
F
AC
CE
SS
IB
ILI
TY
5'- 0"
MI
N.
SI
GN
AG
E
OR
P
LA
QU
E W
/ T
AC
TI
LE
C
HA
RA
CT
ER
CL
SE
AT
C
OV
ER
D
IS
PE
NS
ER
CL
W
AL
L M
OU
NT
ED
F
IR
E
EX
TI
NG
UI
SH
ER
C
AB
IN
ET
ST
RO
BE
LI
GH
T
EL
EC
TR
IC
AL
O
UT
LE
T, P
HO
NE
JA
CK
, D
AT
A
OU
TL
ET
SH
OW
ER
CU
RT
AI
N
RO
D
SH
OW
ER
H
EA
D
AN
D
VA
LV
ES
5'-
9"
3'- 4"
CL
6'-
0" M
IN
6'-
6" M
AX
CL
4'- 0"
MA
X.
TH
ER
MO
ST
AT
H
VA
C
CO
NT
RO
LS
FI
RE
A
LA
RM
P
UL
L S
TA
TI
ON
CL
PU
SH
B
UT
TO
N
SW
IT
CH
O
R W
AL
L
OU
TL
ET
A
BO
VE
C
OU
NT
ER
SA
FE
TY
S
W
IT
CH
ES
MO
TO
R
ST
RA
IT
S
W
AL
L A
ND
A
LL
EM
ER
GE
NC
Y
TE
LE
PH
ON
ES
FI
RE
H
OS
E
RA
CK
OR
V
AL
VE
EL
EC
TR
IC
AL
PA
NE
L O
R
CA
BI
NE
T
5'- 0"
6'- 8"
EL
EC
TR
IC
AL
P
AN
EL
OR
C
AB
IN
ET
4'- 0"
PO
W
ER
PA
NE
L
6'- 8"
1'- 0"
MI
N.
1'-0"
2'-3" MIN.CL
HINGE
MANUAL DOOR
OPENER
EQ
UA
L
EQ
UA
L
5"
3'- 5"
CL
CL
HINGE CL
HINGE CL
5'- 0"
RO
OM
D
ES
IG
NA
TI
ON
S
IG
NA
GE
RE
FE
R
TO
S
IG
NA
GE
D
ET
AI
L
CL
DOOR SIGNAGE
1'-6"
CLEAR
1'-0"
CLEAR
MANUAL DOOR
OPENER
PULL SIDE
PUSH SIDE
CLEARANCE REQUIREMENTS FOR
DOORS WITH A CLOSER AND LATCH
1'-2"
ADJACENT
WALL
" M
AX
" M
IN
" M
AX
1'-10"
BRASSFAUCETBANCROFTK-10577-4
1'- 9"
M
IN
1'-
1" M
AX
FAUCETS SHALL BE LEVER
OPERATED, PUSH TYPE, OR
ELECTRONICALLY CONTROLLED
MIRROR
EXPOSED PIPES SHALL
BE EITHER INSULATED
OR CONFIGURED TO
PROTECT AGAINST
CONTACT
1'-2" CL
TO
C
EN
TE
R
OF
R
OL
L
AB
OV
E
FL
R.
2'-5" MAX.
2'- 9"
M
IN
. T O
T/ O
GR
AB
B
AR
HINGE
MANUAL DOOR
OPENER
EQ
UA
L
EQ
UA
L
5"
3'- 5"
CL
HINGE CL
HINGE CL
5'- 0"
RO
OM
D
ES
IG
NA
TI
ON
S
IG
NA
GE
RE
FE
R
TO
S
IG
NA
GE
D
ET
AI
L
CL
.CL
CL
HINGECL
HINGECL
HINGECL
DOUBLE DOOR SIGNAGE
INACTIVE DOOR
BOTTOM FACE OF
REFLECTIVE SURFACE
M-14A
OFFICE
101-1
2A3A
A000
EQUIPMENT / FURNITURE TAG
PRECAST CONCRETE
CERAMIC TILE
PLYWOOD
CONSTRUCTION KEY NOTE
BRICK
ALUMINUM
FINISHED WOOD
BATT INSULATION
DOOR AND FRAME
CARPET
WALL TYPE TAG
EARTH
DOOR TAG
ROOM NAME AND NUMBER
GLASS
ACOUSTICAL TILE
MORTAR / SETTING BED
CONCRETEDRYWALL
MEMBRANE
GASKET
STEEL / STAINLESS STEEL
ELEVATION
DETAIL GRAVEL / GRANULAR FILL
A000
CONCRETE MASONRY UNITSEALANT AND BACKER ROD
RIGID INSULATION
SECTION1
WOOD BLOCKING
SYMBOLS
ARCHITECTURAL
MATERIAL SYMBOLS
ARCHITECTURAL
1A DEMOLITION KEY NOTE
WALLS (NEW)
VISION LITE TAG107-A
A000
ROOF LADDER
ROUGH OPENING
ROOM
RACK
ROUND HEAD
REVERSE, REVISION
REQUIRED
REINFORCING
REGLET
REFRIGERATOR
RECEPTACLE
RELATIVE TO
ROOF DRAIN
RUNNER CHANNEL
RADIUS, RISER
REINFORCED CONCRETE PIPE
QUARRY TILE
POLY VINYL CHLORIDE
PAPER TOWEL DISPENSER
PRESSURE TREATED
PORTABLE
PLYWOOD
PLASTIC LAMINATE
PLUMBING
PLASTER
PLATE, PROPERTY LINE
PAN HEAD
PASSAGE
PARTITION
PAINT
OPERATING ROOM
OPPOSITE
OPENING
INSTALLED
OWNER FURNISHED OWNER
OVERHEAD CABINET
OPPOSITE HAND, OVAL HEAD
DIMENSION
OUTSIDE DIAMETER, OVERALL
VERTICALLY)
ON CENTER (HORIZONTALLY &
INSTALLED
OWNER FURNISHED CONTRACTOR
OVERALL
NOT TO SCALE
NOMINAL
NOT IN CONTRACT
MIXING VALVE
MULLION
MANHOLE
MASONRY WALL REINFORCING
MOUNTED
METAL THRESHOLD
MEAN SEA LEVEL
METAL STUD, METAL STAIR
MOISTURE RESISTANT MOP RACK
MOVABLE PARTITION
MASONRY OPENING
MOULDING
MISCELLANEOUS
MIRROR
MINIMUM
MEDICAL GAS VALVE BOX
MEDICAL GAS OUTLET
MEDICAL GAS ALARM
MANUFACTURER
MANUFACTURED
METAL
MEDICAL PREPARATION
MEDICINE CABINET
MECHANICAL
METAL CASED OPENING
MACHINE BOLT
MAXIMUM
MATERIAL
MASONRY
MACHINERY
LIGHT WEIGHT
MLDG.
FIRE ALARM
ELECTRIC WATER COOLER
EXTERIOR, EXTRUDED
EXPANSION
EXISTING
EXISTING TO REMAIN
EXPOSED STRUCTURE
EQUIVALENT
EQUIPMENT
EQUAL
ELECTRIC PANEL
ELEVATION OR ELEVATOR
ELECTRICAL
ELEVATION
EXPANSION JOINT
EXHAUST FAN
EXPANSION BOLT
DRAWINGS
DOOR
DOWN
DISPENSER
DIMENSION
DIAGONAL
DIAMETER
DRINKING FOUNTAIN
DETAIL
DEPARTMENT
COUNTER CENTER
CERAMIC TILE
COLD ROLLED
CONCRETE PLASTER
CORRIDOR
CONTINUOUS
CONSTRUCTION
CONCRETE
COMMOM
COLUMN
CASED OPENING
CONCRETE MASONRY UNIT
CLOSET
CEILING
CLEAR
CUBICLE CURTAIN TRACK
CENTER LINE
CONTROL JOINT
CAST IRON
CORNER GUARD
CATCH BASIN
CEMENT PLASTER
INSTALLED
CONTRACTOR FURNISHED CONTRACTOR
CHANNEL
CABINET
CARPET
BUILT-UP ROOF
BOTTOM
BEAM
BUILDING
BOARD
BROOM FINISH CONCRETE
ACOUSTICAL TILE
ARCHITECTURAL
ARCHITECT
APPROPRIATE, APPROXIMATE
ACCESS PANEL, ACOUSTICAL PANEL
ANNUNCIATOR
ANNODIZE
AND
ALUMINUM
ALTERNATE
ACOUSTICAL LAY-IN PANEL
AIR HANDLER UNIT
ABOVE FINISH FLOOR
ADJUSTABLE, ADJACENT
ACOUSTICAL
AIR CONDITIONING
ANCHOR BOLT
R.L.
R.O.
RM.
RK.
R.H.
REV.
REQ'D.
REINF.
REG.
REF.
RECEP.
RE.
R.D.
R.C.
R.
R.C.P.
Q.T.
P.V.C.
P.T.D.
P.T.
PORT.
PLYWD.
P. LAM.
PLUMB.
PLAS.
PL.
P.H.
PASS.
PART'N., PTN.
PT.
O.R.
OPP.
OPNG.
O.F.O.I.
O.H. CAB.
O.H.
O.D.
O.C. (H.V.)
O.F.C.I.
O.A.
N.T.S.
NOM.
N.I.C.
M.V.
MULL.
M.H.
M.W.R.
MTD.
M.T.
M.S.L.
M.S.
M.R.
M.P.
M.O.
MISC.
MIR.
MIN.
M.G.V.B.
M.G.O.
M.G.A.
MFR.
MFD., MFG.
MTL.
MED. PREP.
MED. CAB.
MECH.
M.C.O.
M.B.
MAX.
MAT'L., MTL.
MAS.
MACH.
LT. WT.
F.A.
E.W.C.
EXT.
EXP.
EXIST.
E.T.R.
E.S.
EQUIV.
EQUIP.
EQ.
E.P.
ELEV.
ELEC.
EL.
E.J.
E.F.
E.B.
DWGS
DR.
DN.
DISP.
DIM.
DIAG.
DIA.
D.F.
DTL.
DEPT.
CTR.
C.T.
C.R.
C.P.
CORR.
CONT.
CONST.
CONC.
COM.
COL.
C.O.
C.M.U.
CLO.
CLG.
CL.,CLR.
C.C.T.
C.L.
C.I.
C.I.
C.G.
C.B.
CEM. PLAS.
C.F.C.I.
CH.
CAB.
CP.
B.U.R.
BOT.
BM.
BLDG.
BD.
B.F.C.
A.T.
ARCHL.
ARCH.
APP.
A.P.
ANNUN.
ANOD.
ALUM.
ALT.
A.L.P.
A.H.U.
A.F.F.
ACOUST.
A/C A.B.
YARD
WELD WIRE MESH
WHEEL CHAIR
WELD RESILIENT SHEET
WELED WIRE FABRIC
WALL HANDRAIL, WATER HEAT
WHERE OCCURS
WOOD SCREW, WEATHER-STRIP
WASTE RECEPTACLE
WATERPROOFING
WROUGHT IRON
WINDOW DIMENSION
WOOD
WHEEL CHAIR
WATER CLOSET
WITH
WIDTH
VINYL WALL COVERING
VINYL TRANSITION STRIP
VERIFY IN FIELD
VESTIBULE
VERTICAL(LY)
VINYL COMPOSITION TILE
VINYL BASE
VINYL
UTILITY
UNLESS NOTED OTHERWISE
UNDERCUT OR UNDER COUNTER
TYPICAL
TYPEWRITER WELL
THIN SET
TREATMENT
TREAD
TOILET PAPER HOLDER
TOILET PAPER DISPENSER
TOP OF STEEL
TOILET
THRESHOLD
THICK(NESS)
TEMPERED
TELEPHONE
TOILET COMPARTMENT
TOGGLE BOLT, TOWEL BAR
TONGUE AND GROOVE
TABLE
STATION
STAINLESS STEEL
SUSPENDED
STRUCTURAL
STORAGE
STEEL
SPECIFICATIONS
SPECIMEN PASS BOX
SPACE
SHEET METAL SCREW
SHEET METAL
SIMILAR
SHEET
SHELVING, SHELF
SECTION
SEALANT
SOAP DISPENSER
SOLID CORE WOOD
SCHEDULE
SOUND ATTENUATION BLANKET
LOW POINT
LOCATION
LEAD LINED
LOCKER
LINEAR FEET
LABEL
LAVATORY
LAMINATE
LABORATORY
LADDER, LENGTH, ANGLE
KILOWATT
KITCHEN
KNEE SPACE
KICK PLATE
KEENE'S CEMENT
HOINT
JANITOR
INVERT
INTERIOR
INSULATION
INCH
INSIDE PIPE DIAMETER
INVERT ELEVATION
INSIDE DIAMETER
AIR CONDITIONING
HEATING, VENTILATION &
HEAT STRENGTHENED
HAND RAIL
HOUR
HARDWARE
HEATING
HIGH POINT
HOLLOW METAL
HARDBOARD
HANDICAPPED, HOLLOW CORE
HOSE BIBB
HEIGHT
GYPSUM
GYPSUM WALLBOARD
GYPSUM SHEATHING
GRADE
GALVANIZED METAL STUD
GALVANIZED METAL LATH
GLASS
GENERAL CONTRACTOR
GRAB BAR
GALVANIZED
GAGE, GAUGE
FUTURE
FURRING
FOOTING
FOOT
FLOOR SINK
FIRE RATED/RETARDANT
FLUORESCENT
FLOOR, FLOORING
FINISH
FULL HEIGHT PARTITION
FLAT HEAD METAL SCREW
FIRE HOSE CABINET
FLAT HEAD
FINISH FLOOR
FIRE EXTINGUISHER
FLOOR DRAIN
YD.
WW. M.
WH. CH.
W.R.S.
W.W.F.
W.H.
W.O.
W.S.
W.R.
W.P.
W.I.
W.D.
WD.
W/C W.C.
W/ W.
V.W.C.
V.T.S.
V.I.F.
VEST.
VERT.
V.C.T.
V.B.
V.
UTIL.
U.N.O.
U.C.
TYP.
T.W.
T.S.
TREAT.
TR., T.
T.P.H.
T.P.D.
T.O.S.
TOIL.
THRESH.
TH.
TEMP.
TEL.
T.C.
T.B.
T. & G.
TA.
STA.
S.S.
SUSP.
STRUCT.
STOR.
STL.
SPECS.
S.P.B.
SP.
S.M.S.
S.M.
SIM.
SHT.
SH.
SEC.
SEAL.
S.D.
S.C.W.
SCHED.
S.A.B.
LT.
L.P.
LOC'N., LOC.
L.L.
LKR.
L.F.
LBL.
LAV.
LAM.
LAB.
L.
KW.
KIT.
K.S K.P.
K.C.
JT.
JAN.
INV.
INT.
INSUL.
IN.
I.P.D.
I.E.
I.D.
H.V.A.C.
H.S.
H.R.
HR.
HW., HDWE.
HTG.
H.P.
H.M.
HBD.
H.C.
H.B.
HT.
GYP.
G.W.B.
G.S.
GR.
G.M.S.
G.M.L.
GL.
G.C.
G.B.
GALV.
GA.
FUT.
FURR.
FTG.
FT.
F.S.
FR.
F.R.
FLOUR.
FL., FLR.
FIN.
F.H.P.
F.H.M.S.
F.H.C.
F.H.
F.F.
F.E.C.
F.D.
SCREEN
FURRING CHANNEL
SCRN.
F.C.
CEM. PLAS.
ARCHITECTURAL ABBREVIATIONS
ADJ.
AT
CERAMIC TILE
WALLS (EXISTING)
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023
LC BP
K-2031GREENWICHLAVATORYVITREOUS CHINA
K-2031GREENWICHLAVATORYVITREOUS CHINA VITREOUS CHINAC_TOILETSKINGSTONK-4330
K-2031GREENWICHLAVATORYVITREOUS CHINA VITREOUS CHINAC_TOILETSKINGSTONK-4330
K-2031GREENWICHLAVATORYVITREOUS CHINA
K-2031GREENWICHLAVATORYVITREOUS CHINA
K-2031GREENWICHLAVATORYVITREOUS CHINA
K-4915BARDONC_URINALSVITREOUS CHINA
VITREOUS CHINAC_TOILETSKINGSTONK-4330
VITREOUS CHINAC_TOILETSKINGSTONK-4330
VITREOUS CHINAC_TOILETSKINGSTONK-4330
LC
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
B A
C
B-Core
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023 100% Construction Documents 06.09.2023
GENERAL PHASING DEMOLITION NOTES
1. GENERAL CEILING DEMOLITION FOR PLUMBING WORK ABOVE CEILING DURING
CONSTRUCTION OF THE CATH LAB AND RECOVERY AREA ON THE FOURTH FLOOR, THIS
AREA WILL REQUIRE CEILING DEMOLITION TO COMPLETE PLUMBING WORK. CONTRACTOR
SHALL COORDINATE WORK WITH THE VA COR FOR SHUT DOWNS IN THIS AREA PRIOR TO
DEMOLITION. CONTRACTOR SHALL EVALUATE ANY CONFLICTS IN EXISTING MECHANICAL
DUCT WORK THAT CAN IMPACT THE ROUTING OF DRAINS OR MEDICAL GASES AND
THEREFORE SHOULD BE ADJUSTED. REFER TO PLUMBING DRAWINGS FOR FURTHER
INFORMATION.
2. CONTRACTOR IS REQUIRED TO COMPLY WITH VA INFECTION PROTOCOLS DURING
CONSTRUCTION IN FOR NAY ALL 3rd FLOOR AREA. CONTRACTOR TO PROVIDE TEMPORARY
BARRIERS, TENTS, HEPA FILTRATION, ETC, IN COMPLIANCE WITH VA REQUIREMENTS.
DEMOLITION LEGEND
REMOVE EXISTING CEILING
NOT IN CONTRACT
SCOPE AREA OUTLINE
PARTIAL THIRD FLOOR DEMOLITION PLAN
BP
2A
2A
2A 2A
3A
3A
1A
1A
1A
4A
1B
2G
2C
2B
1A
1A
1B
1B
1B
1E
2A
3B
3A 3B
4A
4A
5A
5A
6A
6A
5B
2B
2B5C
3D3E
1A
3E
2A
5D
4A
4B4E
2D
2D
2A
1D
1D
1E
3C
3E
2E
4B 3A
3B
3E
4A
6F
1B
2A
5A
2A
2F
2G
6B
1E
1A 3A 3B
3E
2D
2F 2G
6B1A
3A 3B
3B
3A 3B
6E6E
6A
3A
1B 1B
2G
3A
6G
3B
5D
6H
1D
6I
2D
6A
2G
4D
1E
1E
3F
6C
6D
4C
2A
6G
6'-0"
MIN.
6'-0"
MIN.
6'-0"
MIN.
6'-0"
MIN.
6'- 0"
MI
N.
2G
6J
3'-21 4"
3A
6K 6K
1C
1C
LC
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
B A
C
B-Core
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023 100% Construction Documents 06.09.2023
GENERAL DEMOLITION NOTES
1. DASHED LINE INDICATES EXISTING CONSTRUCTION TO BE REMOVED AND DISCARDED,
UNLESS OTHERWISE NOTED. DASHED WALLS INCLUDE ANY AND ALL WALL MOUNTED
EQUIPMENT, FIXTURES, MILLWORK, CASEWORK, SHELVES, AND WALL MOUNTED
SPECIALTIES. REMOVAL OF WALL ASSEMBLIES REQUIRE ITEMS SUCH AS CONDUIT,
OUTLETS, RAILINGS, WALL BASES, PIPING, AND PLUMBING FIXTURES TO BE REMOVED AND
REROUTED. REFER TO RESPECTIVE TRADE DEMOLITION DRAWINGS FOR TRADE RELATED
ITEMS. ALL EQUIPMENT (DURING SHUT-DOWN & RENOVATION) TO BE DISCONNECTED (i.e.
POWER, WATER, GAS, ETC.)
2. REMOVE WALL ASSEMBLIES, NOTED FOR DEMOLITION, TO UNDERSIDE OF STRUCTURE
ABOVE UNLESS NOTED OTHERWISE. REMOVE ALL ELECTRICAL, PLUMBING, AND OTHER
UTILITIES LINES IF FOUND IN WALLS, VERIFY ALL SUCH ITEMS IN FIELD. REFER TO MEP
PLANS FOR TRADE SPECIFIC DEMOLITION.
3. FOR THE ENTIRE CONSTRUCTION ZONE, STRUCTURAL ITEMS SHALL NOT BE CORED OR
DISTURBED IN ANY MANNER UNLESSNOTED OTHERWISE.
4. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE FACILITY AND THOROUGHLY
FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS.
5. SCHEDULE DEMOLITION WORK WITH THE OWNER TO MINIMIZE DISRUPTION OF SERVICES
AND PROVIDE FOR THE UNINTERRUPTED FUNCTIONING OF THE FACILITY. NOTIFY OWNER IN
WRITING 48 HRS PRIOR TO BEGINNING OF DEMOLITION WORK.
6. CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF WORK BY OTHER TRADES
SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. REFER TO MECHANICAL,
PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR ADDITIONAL CUTTING
REQUIREMENTS. SUCH CUTTING AND PATCHING INCLUDES BUT IS NOT LIMITED TO, CEILING
REMOVAL AND REPLACEMENT, CUTTING AND PATCHING OF GYPSUM WALLBOARD, PLASTER,
MASONRY PARTITIONS, CONCRETE SLAB, ETC.
7. REMOVE EXISTING FINISHES AS NECESSARY IN ALL AREAS TO RECEIVE NEW FINISHES. ALL
EXISTING SURFACES ARE TO BE PATCHED AND PREPARED TO RECEIVE NEW SCHEDULED
FINISH. REFER TO ROOM FINISH SCHEDULE IN SHEET A702. CONTRACTOR TO INCLUDE 1/8"
SKIM COAT FLOOR PREP IN THEIR BASE BID FOR ALL FLOORING TRADES FOR ALL FLOORING
AREAS IN THE PROJECT SCOPE.
8. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR
DEMOLITION WORK REQUIRED IN EACH DISCIPLINE.
9. ALL ITEMS TO BE DEMOLISHED SHALL BE VERIFIED WITH OWNER PRIOR TO DISCARDING.
ITEMS REJECTED BY OWNER SHALL BE DISPOSED OF IN A LEGAL MANNER IN ACCORDANCE
WITH LOCAL AUTHORITIES.
10. ALL HOLES AND INDENTATIONS SHALL BE PATCHED AND/OR REPAIRED WITH A MATERIAL
MATCHING ADJOINING SURFACES.
11. IN AREAS OF RENOVATION, EXISTING HOLLOW METAL DOOR FRAMES ARE TO BE SANDED TO
BARE METAL, CLEANED AND PREPARED TO BE REPAINTED.
12. IN AREAS WHERE EXISTING CONSTRUCTION THAT JOINED FLOOR IS TO BE REMOVED,
EXISTING FLOOR IS TO BE GROUND OR FILLED AS REQUIRED TO BRING LEVEL WITHIN
SPECIFICATION TOLERANCES. WHERE EXISTING WALL CONSTRUCTION IS REMOVED AND
SPACES TO EITHER SIDE OF EXISTING PARTITION WALL WILL BECOME UNITED, FLOOR IS TO
BE GROUND OR FILLED AS REQUIRED TO BRING LEVEL WITHIN SPECIFICATION TOLERANCES.
13. VERIFY EXTENT OF DEMOLITION AT ALL INTERIOR AND PERIMETER COLUMNS W/ MEP
DEMOLITION SHEETS.
14. CONTRACTOR TO REMOVE ALL WALL MOUNTED FURNITURE U.N.O. CONTRACTOR TO
INQUIRE WITH OWNER IF FURNITURE IS TO BE SALVAGED OR DISCARDED.
15. UNLESS OTHERWISE NOTED; REMOVE EXISTING FLOOR, WALL FINISH AND BASE. REMOVE
EXIST. ACOUSTIC CEILING SYSTEM INCLUDING TILES, METAL TEES, EDGE ANGLES, SUPPORT
WIRES, CUBICLE CURTAIN TRACKS AND CEILING MOUNTED DEVICES. REMOVE EXISTING GYP
BD. CEILINGS.
16. PROTECT ALL EXISTING EXISTING DOORS AND GLAZING SCHEDULED TO REMAIN DURING
DEMOLITION AND CONSTRUCTION. ANY / ALL DAMAGE INCURRED DURING DEMOLITION /
CONSTRUCTION SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER.
17. HEAT DETECTOR COVERAGE IN SPACE DURING DEMO FOR CONTINUOUS MONITORING.
18. ALL DEMOLISHED CARD READERS SHALL BE SALVAGED AND RETURNED TO THE OWNER
19. FOLLOWING DEMO, CONTRACTOR TO SUPPORT REMAINING ABOVE CEILING UNSUPPORTED
EQUIPMENT AND UTILITIES.
DEMOLITION LEGEND
ITEMS TO BE REMOVED
ITEMS TO REMAIN
REMOVE EXISTING CEILING
NOT IN CONTRACT
TEMPORARY CONSTRUCTION BARRIER
DEMOLITION KEY NOTES
PARTITIONS
1A DEMO EXISTING PARTITION IN ITS ENTIRETY UP TO STRUCTURAL DECK WHERE INDICATED
REMOVE ANY ELECTRICAL FIXTURES IN THE WALLS. REMOVE ALL ELECTRICAL AND
MECHANICAL ASSEMBLIES LOCATED IN THIS PARTITION . REFER TO MEP DRAWINGS FOR
MORE INFORMATION
1B CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION BARRIER WITH 36" DOOR
DOOR AT ENTRY TO CONSTRUCTION AREA. PROVIDE WALK OFF MAT.CONTRACTOR TO
COMPLY WITH FACILITY ICRA POLICY. REFER TO DEMOLITION SPECIFICATION FOR
ADDITIONAL INFORMATION.
1C DEMO EXISTING METAL STUD AND GYPSUM BOARD PARTITION AS INDICATED AND PREP
FOR NEW DOOR AND FRAME. REFER TO A101 FOR ADDITIONAL INFORMATION.
1D DEMO EXISTING GYPSUM BOARD CEILING SOFFIT AND FRAMING SYSTEM.
1E. CONTRACTOR SHALL REMOVE INTERIOR LAYER OF DRYWALL. FRAMING SHALL REMAIN IN
AREAS NOT IN DEMO. CONTRACTOR TO TAKE CARE NOT TO DAMAGE EXISTING METAL
STUDS. REPLACE ANY DAMAGED STUDS FOLLOWING DEMOLITION ACTIVITIES. PREPARE
EXISTING AND NEW FRAMING TO RECEIVE NEW DRYWALL AND FINISHES. CONTRACTOR
SHALL INSTALL LEAD LINED DRYWALL THROUGHOUT THE CATH LAB SIDE. REFER TO A101
FOR MORE INFORMATION.
OPENINGS:
2A. DEMO EXISTING DOOR, DOOR FRAME AND DOOR HARDWARE.
2B. REMOVE EXISTING VISION LITE WINDOW, FRAME, ROLLER SHADES.
2C REMOVE EXISTING VISION LITE WINDOW AND PREP WALL FOR NEW ALL INFILL. REFER TO
A101 FOR NEW PARTITION EXTENT.
2D. CONTRACTOR SHALL PROTECTS DOORS DURING CONSTRUCTION TO AVOID DAMAGE. IN
CASE OF ANY DAMAGE, G.C. SHALL REPLACE DOOR AT NO EXTRA COST.
2E. CONTRACTOR SHALL REMOVE AND RELOCATE EXISTING SLIDING DOOR. PROTECT FRAME
AND GLAZING DURING RELOCATION PROCESS. REFER TO A101 FOR NEW DOOR LOCATION.
2F. REMOVE GLAZING, EXISTING WINDOW FRAMES REMAIN. PREP WINDOW FOR NEW
NEW SPANDREL GLAZING AND BACK PAN. REFER TO A201 AND DETAIL 5/A921 FOR MORE
INFORMATION.
2G. DEMO EXISTING ROLLER SHADE AND ALL ASSOCIATED HARDWARE.
FINISHES:
3A. REMOVE EXISTING ACOUSTIC CEILING SYSTEM INCLUDING TILES, METAL TEES, EDGE
ANGLES, SUPPORT WIRES, CUBICLE CURTAIN TRACKS AND ALL CEILING MOUNTED
DEVICES.
3B. REMOVE EXISTING RESILIENT FLOORING. CONTRACTOR SHALL LEVEL FLOOR PREP FOR
NEW FLOORING FINISH.
3C REMOVE EXISTING VCT FLOORING AND WALL BASE. PREP AREA FOR NEW FINISH, REFER
TO FINISH SCHEDULE FOR MORE INFORMATION.
3D REMOVE WALL PROTECTION AND CRASHCART GUARD AS REQUIRED TO ACCOMMODATE
NEW WALL CONSTRUCTION. CONTRACTOR SHALL MATCH ANY DAMAGE RESULTING FROM
FINISH REMOVAL.WALL PROTECTION AND CRASHCART GUARD SHOULD BE MODIFIED TO
TO ACCOMMODATE NEW WALL. REFER TO A701 FOR MORE INFO
3E DEMO CORNER GUARDS WHERE IN CONFLICT.
3F REMOVE EXISTING CERAMIC TILE FLOORING AND WALL BASE. PREP AREA FOR NEW FINISH.
REFER TO FINISH SCHEDULE FOR MORE INFORMATION.
CASEWORK:
4A. REMOVE EXISTING COUNTERTOP, BASE CABINETS UPPER CABINETS AND ASSOCIATED
PLUMBING FIXTURES. REFER TO PLUMBING DEMO FOR ADDITIONAL INFORMATION.
4B. CONTRACTOR TO REMOVE SYSTEMS FURNITURE, OFFICE FURNITURE AS REQUIRED FOR
NEW CONSTRUCTION.REMOVE ALL ASSOCIATED ELECTRICAL FIXTURES ON WALLS
4C. CONTRACTOR SHALL REMOVE EXISTING LOCKERS.
4D. REMOVE REFRIGERATOR. CONTRACTOR SHALL TURN OVER TO VA FACILITIES.
4E REMOVE WALL CABINETS. PATCH AND PAINT WALL TO MATCH ADJACENT WALL FINISH.
PLUMBING & ELECTRICAL:
5A. REMOVE EXISTING PLUMBING FIXTURE, PIPING, HANGERS, CARRIERS, AND TOILET
ACCESSORIES. REFER TO PLUMBING DRAWINGS FOR RELATED WORK.
5B EXISTING ELECTRICAL PANEL TO REMAIN. CONTRACTORS SHALL PROTECT PANEL DURING
DEMOLITION TO AVOID ANY DAMAGE. REFER TO ELECTRICAL DRAWINGS FOR MORE
INFORMATION.
5C REMOVE THE X-RAY IN USE LIGHT AND ALL ASSOCIATED ELECTRICAL COMPONENTS.
5D RELOCATE EXISTING ELECTRICAL PANELS AND ALL ASSOCIATED ELECTRICAL
COMPONENTS. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION.
MISCELLANEOUS:
6A SELECTIVELY REMOVE EXISTING SYSTEM FURNITURE. CONTRACTOR SHALL COORDINATE
WITH V.A. COR FOR STORAGE RELOCATION.
6B REMOVE AND RELOCATE HIGH DENSITY STORAGE PER V.A. DIRECTION. CONTRACTOR SHALL
COORDINATE WITH COR DURING RELOCATION PROCESS. CONTRACTOR IS RESPONSIBLE FOR
REMOVING FLOOR RAIL SYSTEM. REFER TO A751 FOR MORE INFORMATION.
6C REMOVE EXISTING X-RAY ILLUMINATOR AND PREP WALL FOR NEW WALL INFILL.
6D CONTRACTOR SHALL PROTECT EXISTING DOOR PUSH PLATE. CONTRACTOR SHALL NOT BLOCK
THE PUSH PLATE AFTER INSTALLING THE TEMPORARY CONSTRUCTION BARKIER. COORDINATE
WITH VA COR FOR INSTALLATION.
6E. COORDINATE VENDOR REMOVAL OF CATH LAB EQUIPMENT. CONTRACTOR IS RESPONSIBLE
FOR REMOVAL OF ALL REMAINING CONDUIT, TROUGHS, FLOOR PLATES AND COMPONENTS
ANCHORED TO THE BUILDING STRUCTURE AND ALL OF THE OVERHEAD UNISTRUT SYSTEM
(RAILS, POSTS, SLAB CONNECTIONS, ETC).
6F. REMOVE EXISTING EXPANSION JOINT COVER AND PREPARE AREA FOR NEW EXPANSION JOINT
COVER. CONTRACTOR TO REPAIR/REPLACE ANY DISPLACE FIRE SAFING REFER TO A102 FOR
MORE INFORMATION.
6G. CONTRACTOR SHALL DEMO EXISTING MEDGAS OUTLETS AND ASSOCIATED PIPING SYSTEM.
REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
6H. COORDINATE VA REMOVAL OF EXISTING PYXIS EQUIPMENT
6I. COORDINATE VENDOR REMOVAL OF ALL EXISTING PHILLIPS RACKS AND MISCELLANEOUS
EQUIPMENT.
6J. REMOVE DOOR FLOOR PIVOTS AND ALL ASSOCIATED HARDWARE.
6K EXISTING EXPANSION JOINT COVER CAN REMAIN IN THIS LOCATION OF IT DOES NOT CONFLICT
WITH THE NEW WALL LAYOUT.
DEMOLITION FLOOR PLAN
CATH
LAB
C4109
CONTROL
ROOM
C4110SCRUB
ANTE-ROOM
C4111
EQUIPMENT
ROOM
C4109A
CLEAN
UTILITY
C4112
SOILED
UTILITY
C4151
OFFICE
B4147
RECOVERY 1
C4159B
RECOVERY 2
C4159C
RECOVERY
AREA
C4159
TLT
C4159A
STRESS
ROOM
C4150A
MEDS
NOURISH
C4159E
NURSE
STATION
C4159D
IT ROOM
C4109B
BREAK
ROOM
A4042
DSPECT
C4150C
VITREOUS CHINA
C_SINKSCAMERTON
K-12867
FEC
A102
A102
A102
A102
A102
LC
RENOVATE FOR CATH LAB
POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
25% Schematic Design 06.29.2022 06.09.23
Project Number
Building Number
607-CSI-106
33 North LaSalle Street, Suite 3600 Chicago, IL 60602 Phone: 312.376.3100 POC: Thomas C. Jeziorski
B A
C
B-Core
50% Design Development 10.14.2022 65% Construction Documents 01.27.2023 95% Construction Documents 05.05.2023 100% Construction Documents 06.09.2023
CONSTRUCTION FLOOR PLAN
BP
1. REFER TO EQUIPMENT VENDOR SITE SPECIFIC DRAWINGS FOR EQUIPMENT
REQUIREMENTS. SITE SPECIFIC DRAWINGS DETAIL CONTRACTOR REQUIREMENTS FOR
EQUIPMENT INSTALLATION.
2. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS GOVERN. ALL PARTITION
LOCATIONS SHALL BE AS SHOWN ON PARTITION PLAN. IN CASE OF CONFLICT NOTIFY
ARCHITECT. PARTITION PLAN BY ARCHITECT TAKES PRECEDENCE OVER ALL OTHER
PLANS.
3. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH WITH NO
VISIBLE JOINTS. PATCH AND REPAIR SURFACES TO MATCH ADJACENT OR ADJOINING
SURFACES WHERE REQUIRED. ALL SURFACES SHALL BE ALIGNED AND SANDED
SMOOTH.
4. ALL PARTITIONS ARE DIMENSIONED FROM FINISH FACE OF GYPSUM BOARD TO FINISH
FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. ALL DIMENSIONS MARKED
"CLEAR" OR "CLR" SHALL BE MAINTAINED, SHALL NOT VARY MORE THAN ± 1/8"
WITHOUT WRITTEN INSTRUCTIONS FROM THE ARCHITECT AND SHALL ALLOW FOR
THICKNESSES OF ALL WALL FINISHES, U.O.N.
5. DIMENSIONS MARKED +/- MEAN A TOLERANCE NOT GREATER NOR SMALLER THAN 2
INCHES FROM INDICATED DIMENSION, U.O.N. VERIFY FIELD DIMENSIONS EXCEEDING
TOLERANCE…