P-Sheets.pdf

PDF 4 MB Posted

Attached to
Y1PC--Dallas National Cemetery
Solicitation number
36C10F20R0056
Issued by

About this file

This document includes construction drawings and specifications for a federal construction project along with a related solicitation notice. The construction project is for Phase 4 expansion of the Dallas-Fort Worth National Cemetery in Dallas, Texas, and includes additional gravesites, cemetery improvements such as a new administration building and maintenance building renovation, as well as site development across approximately 56 acres. The solicitation is seeking proposals from Service-Disabled Veteran-Owned Small Businesses for the design-build construction work, with a bonding capacity up to $50 million. Proposals are due approximately 30 days after the request for proposal is posted on SAM.gov in June 2020. The contract scope includes all labor, materials, and services to execute the construction in accordance with the drawings, specifications and other requirements over a 900 calendar day performance period.

View the file

Other files

File Type Posted
ATTACHMENT 2_PAST PERF QUEST 02.docx DOCX document
LI-Sheets.pdf PDF
CS-Sheets 3 of 3.pdf PDF
G-Sheets.pdf PDF
CD-Sheets.pdf PDF
A-Sheets.pdf PDF
E-Sheets.pdf PDF
CG-Sheets 1 of 2.pdf PDF
S-Sheets.pdf PDF
ATTACHMENT 3 - Dallas Pre-Proposal Inquiry (PPI) Form.docx DOCX document
B-Sheets.pdf PDF
DALLAS WAGE RATES.pdf PDF
I-Sheets.pdf PDF
36C10F20R0056_3.docx DOCX document
F-Sheets.pdf PDF
Base Bid Specification Package.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ABBREVIATIONS, NOTES &

SYMBOLS

P-001

AHTM BH

L

K

J

H

G

F.5

F

E

D

C

B.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

B

MA

STOR

11.1 13.1

K.9

BREEZE-

WAY

UNIFORM

ELEC

WOMEN

LOCKER

MEN

LOCKER

GENERAL

FOREMAN

GROUNDS

FOREMAN

MAINT

OFFICE

PLANS

BREAK

ROOM

ADMIN

OFFICE

ASST

DIRECTOR

BUDGET

OFFICE

DIRECTOR

OFFICE

WORK

LEADER

INTERM

FOREMAN

CORRIDOR

STOR

OPERATIONS

CENTER

GENERAL

OFFICE

ENTRY

JAN

TOILET

TOILET

NORTH

VICINITY MAP

SCALE 1"=1000'

R I O

G R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINT FACILITY

DEMOLITION PLAN

PD110

AHTM WH

L

K

J

H

G

F.5

F

E

D

C

B.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

B

11.1 13.1

K.9

BREEZE-

WAY

UNIFORM

ELEC

ENTRY

TRAINING

ROOM

MULTI-USE

TRAINING

COMPUTER

TRAINING

GROUNDS

FOREMAN

INTERMENT

FOREMAN

GENERAL

FOREMAN

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

BREAK

CORRIDOR

M. LOCKER

W. LOCKER

CUST

STOR

6 7

K

J

H

ELEC

GENERAL

FOREMAN

HALL

NORTH

VICINITY MAP

SCALE 1"=1000'

R

AND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILTY

OVERALL PLAN

PP110

ENTRY

OPERATIONS

CENTER

TOILET

TOILET

LOBBY

RECEPTION

CONF

TOILET

TOILET

CORRIDOR

BREAK

MECH

STOR

OPEN

OFFICE

BUDGET

OFFICE

ADMIN

OFFICE

ASST

DIRECT

CEMETERY

DIRECT

ASST

DIRECT

TELECOM

H G F E D C B A

1FBR

F

B R

1FBR

F

B R

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

SANITARTY AND VENT PLAN

PP121

ENTRY

OPERATIONS

CENTER

TOILET

TOILET

LOBBY

RECEPTION

CONF

TOILET

TOILET

CORRIDOR

BREAK

MECH

STOR

OPEN

OFFICE

BUDGET

OFFICE

ADMIN

OFFICE

ASST

DIRECT

CEMETERY

DIRECT

ASST

DIRECT

TELECOM

H G F E D C B A

1FBR

F

B R

1FBR

F

B R

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

DOMESTIC WATER PLAN

PP122

UNIFORM

CORRIDOR

M. LOCKER

W. LOCKER

CUST

10 11 12 13 14 1511.1 13.1

G

F.5

F

E

D

G

F.5

F

E

D

10 11 12 13 14 1511.1 13.1

UNIFORM

CORRIDOR

M. LOCKER

W. LOCKER

CUST

BREEZ

WAY

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

STOR

5 6 7 8

G

F.5

F

E

D

G

F.5

F

E

D

5 6 7 8

BREEZ

WAY

HALL

TELECOM

TOILET

TOILET

WORK

LEADERS

HONOR

GUARD

STOR

STOR

NORTH

VICINITY MAP

SCALE 1"=1000'

R

A

ND DR

MOUNTAIN CREEK PKWY

L O

N E S

T A R

C

IR

R O A D

R O A D

2 ROAD 1

ROAD 1

R O

A D

ROAD 3

R O A D

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILTY

ENLARGED PLANS

PP401

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

MAINTENANCE FACILITY

RISER AND FLOW DIAGRAMS

P-601

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

ADMINISTRATION

RISER AND FLOW DIAGRAMS

P-602

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of

Construction and Facilities

Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DALLAS, TEXAS

916CM2012

DALLAS - FORT WORTH

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

MKEC Engineering, Inc.

Ken Kallenbach

(316) 684-9600

Architect:

TK-Architecture, LLC

Tom Kapels

(719) 325-9303

Irrigation:

Aqua Engineering

Bob Beccard

(970) 372-6104

RCDD:

APOGEE Consulting

Jim Ezekiel

(919) 535-3878

MEP:

Miller Remick

Tom Chapman

(856) 429-4000

Cost Estimating:

MOCA Cost Engineering

Todd Waddle

(850) 389-8131

Surveying, Water Wells & Treatment:

Fabre Engineering & Surveying

Frank Fabre

(850) 433-6438

Geotechnical Engineering:

Terracon Consultants

Jennifer Peters

(210) 907-7648

PHASE 4 DEVELOPMENT

03-31-2020

OF 246

BID DOCUMENTS

PLUMBING

DETAILS & SCHEDULES P-701

File details come from the government source that posted it. Updated .