Original 1930 Steam Drawing for Reference.pdf

PDF 1 MB Posted

Attached to
Z2DA--Replace Building 1 Heat Exchanger Federal contract opportunity
Solicitation number
36C24426B0021
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This is a technical architectural drawing depicting a basement plan with duplex vacuum pump systems. The document is dated 1930 and serves as a reference drawing for an original building's mechanical systems.

The drawing shows the layout and piping configuration for dual vacuum pumps located in the basement, with detailed annotations regarding system components and modifications. Key elements highlighted in red include notes on water storage capacity, pump removal status, capped lines, and components no longer in place. The plan identifies specific equipment such as the 1" non-return trap, 28" strainer, pump oil catch basin, P.V. steam line, and connections to various traps throughout the building. Section B-B provides additional detail on the vacuum return system configuration. The drawing references related steam and return line continuations shown on a basement plan and indicates that the vacuum system is currently used for a package connection from a trench. The document is marked as drawing number 2-7-2-048 from "Total Direct Radiation 999" and is drawn to a scale of 8"=1'0". This appears to be a historical facility documentation or reference drawing rather than a solicitation document requiring contractor response.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Replace Building 1 Heat Exchanger, newest first.
File Type Posted
36C24426B0021 0003.docx DOCX document
Heat exchanger schedule.pdf PDF
36C24426B0021 0002.docx DOCX document
36C24426B0021 0001.docx DOCX document
Sign-In Sheet_ Site Visit 06222026_.pdf PDF
542-25-112 Combined Specifications_rev4-3-2026.pdf PDF
36C24426B0021.docx DOCX document
submittal register.pdf PDF
SAM.gov Wage Rates.pdf PDF
Mechanical Room Pit Part Plan.pdf PDF
Construction Safety Standards.pdf PDF
Request 302 - PCRA Replace heat exchanger building 1.pdf PDF
GEMS Contractor training.pdf PDF
Mechanical Room Overview Drawing.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .