Ordering_Procedures - CAO 5 MAY.pdf

PDF 278 KB Posted

Attached to
Remanufacture of the F-16 Accessory Drive Gearbox (ADG) and Jet Fuel Starter (JFS)
Solicitation number
FA825226R0073
Issued by

About this file

This document is the Ordering Procedures guide for a Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ) established by the Department of the Air Force, Ogden Air Logistics Complex, Hill AFB, Utah. The MAC IDIQ (Solicitation No. FA8252-26-R-0073, effective May 7, 2026) supports the 419 Supply Chain Management Squadron and covers the overhaul and remanufacturing of three National Stock Numbers (NSNs), specifically the F-16 C/D Accessory Drive Gearbox (ADG) and F-16 Jet Fuel Starter (JFS) to serviceable "A" condition. The work involves complete or substantial tear-down into component parts, restoration of Shop Replaceable Units (SRUs) to nearly new condition, and delivery of all units to specified Government locations. All facilities, parts, materials, equipment, and services required for inspection and restoration are contractor-furnished.

Orders are issued as Firm-Fixed Price (FFP) contracts through a competitive fair opportunity process. The Procuring Contracting Officer issues Fair Opportunity Proposal Requests (FOPRs) to all qualified contractors unless an exception applies. Contractors must propose on 90 percent of FOPRs for NSNs they are qualified to repair or face potential negative performance ratings. Evaluation criteria are established at the delivery order level using methods on the best value continuum, including price-only competition, Lowest-Price Technically Acceptable (LPTA), or tradeoff methodologies. Evaluation factors may include technical acceptability (Supply Chain Risk Management plans, adherence to requirements), price, and past performance. Protests are limited to orders exceeding $35 million in value or those increasing contract scope, period, or maximum value. New contractors must complete a First Article requirement unless a waiver is approved, and onboarding opportunities allow continuous addition of qualified contractors to the awardee pool throughout the contract term.

View the file

Other files

File Type Posted
QandA - Additional.pdf PDF
SPI_ALL.pdf PDF
Q and A 6-17-26.pdf PDF
FA825226R0073-0003.pdf PDF
Ordering_Procedures - Updated 19 MAY.pdf PDF
SOW_Final 29 APR_2026.pdf PDF
FA8252-26-R-0073-0002.pdf PDF
1. FA8252-26-R-0073-0001.pdf PDF
3. FA8252-26-R-0073 Solicitation Change Highlights.pdf PDF
2. Revised Ordering Procedures - Dated 19 May 2026.pdf PDF
4. Ordering Procedures Change Highlights - Updated 19 May.pdf PDF
PKGRQMT_REPORT.pdf PDF
CAV_AF.pdf PDF
RQR_F16_ADG_2024_1_PN_ONLY.pdf PDF
ITMDESC_REPORT_ALL.pdf PDF
SPI_ALL.pdf PDF
Failure_factors_ADG.pdf PDF
GOVERNMENT FURNISHED MATERIAL APPENDIX.pdf PDF
Agency Affirmative Procurement Statement.pdf PDF
Failure_factors_JFS.pdf PDF
SOW_Final_13_Apr_26_Updated.pdf PDF
Packaging_SOW.pdf PDF
RDL_REPORT_ALL.pdf PDF
IUID_ALL.pdf PDF
Ombudsman.pdf PDF
FA8252-26-R-0073 Solicitation.pdf PDF
cdrls.pdf PDF
RQR_F16_JFS_2025.pdf PDF
Notice_of_Intent_to_Participate.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 MAY 2026 ORDERING PROCEDURES 1

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS COMPLEX, HILL AFB, UTAH 84056-5820

MULTIPLE AWARD CONTRACT (MAC)

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)

ORDERING PROCEDURES

Revision Record

Date Changes

5 May 2026 Initial Release

Solicitation No. Date

FA8252-26-R-0073 7 May 2026

1.0 These procedures implement the requirements for Fair Opportunity competition as established in the basic IDIQ contract's Statement of Work (SOW). All procedures herein are governed by and subordinate to the terms of the basic IDIQ contract. This Ordering

Guide provides the procedures for placing orders against the scope of work defined in the contract's Statement of Work (SOW). The SOW defines the technical requirements, while this guide defines the ordering process.

2.0 SCOPE OF WORK: This MAC IDIQ was established to facilitate essential remanufacturing of supplies. This requirement will cover 3 National Stock Numbers

(NSNs), fulfilling USAF/Navy/FMS requirements for existing and future assets in support of 419 Supply Chain Management Squadron (SCMS). The scope of this MAC

IDIQ includes but is not limited to the overhaul/remanufacture of the F-16 C/D

Accessory Drive Gearbox (ADG) and F-16 Jet Fuel Starter (JFS), to a serviceable “A” condition as detailed in the Statement of Work and Solicitation Package. This overhaul includes complete or substantial tear-down into component parts. The overhaul processes used by the contractor shall bring service life back to the reconditioned items that would resemble the originally manufactured item. The Shop Replaceable Units (SRU(s)) will be restored to a nearly new condition (but not necessarily cosmetically new) in a facility owned and/or operated by the contractor.

The contractor shall furnish all facilities, parts, materials, equipment and services required to inspect and restore requirements to a serviceable condition. Orders issued under this MAC IDIQ will utilize Firm-Fixed Price pricing arrangements. Evaluation criteria will be established at the delivery order level; evaluation criteria may consist of any available evaluation methods on the best value continuum, i.e., price only competition, lowest-price technically acceptable (LPTA), tradeoff, industrial base consideration, available capacity, etc.

3.0 CONTRACT TYPE: Firm Fixed Price (FFP)

5 MAY 2026 ORDERING PROCEDURES 2

4.0 ORDERING: The procedures for selecting contractors for delivery order awards under this contract are governed by RFO 16.507 (IAW CLASS DEVIATION 2026-O0045). Unless otherwise specified in a Fair Opportunity Proposal Request (FOPR), the following defines the process by which fair opportunity will be afforded, how delivery orders will be processed and priced, and how delivery orders will be awarded.

4.1 The 419 SCMS and Procuring Contracting Officer (PCO) of the AFSC OL_H/PZAC, Supply Chain, reserves the right to restrict use of this contract. No decentralized ordering authority shall be granted to any office or organization.

4.2 Delivery orders may be issued from the date the basic IDIQ contract is awarded until the last day of the basic IDIQ contract ordering period or option expiration. However, delivery orders issued during the contract period may be completed in accordance with (IAW) the terms of the delivery order after the basic contract period or option period have expired.

4.3 All delivery orders are subject to the terms and conditions of this contract. The

Government reserves the right to incorporate additional clauses, as appropriate, into

FOPR’s and resulting individual delivery order awards.

5.0 PROTESTS: IAW RFO 16.508(a)(10)(i) (IAW CLASS DEVIATION 2026-O0045), no protest under RFO Subpart 33.1 (IAW CLASS DEVIATION 2026-O0026) is authorized in connection with the issuance or proposed issuance of a delivery order, except for:

1) a protest on grounds that the order increases the scope, period, or maximum value of the contract; or

2) a protest of an order valued in excess of $35 million.

6.0 OMBUDSMAN: If a contractor believes it was not fairly considered for a particular delivery order, the contractor may present the matter to the PCO. The contractor may appeal the explanation or decision of the PCO to the Ombudsman. The Ombudsman will review the contractor’s complaint and, in coordination with the PCO, verify that the contractor was afforded a fair opportunity to be considered for the delivery order.

7.0 FAIR OPPORTUNITY PROCESS: When the Government requires work under this

MAC IDIQ, a FOPR will be issued to qualified vendors. The contractor shall be responsible for all tasks involved with the essential overhaul of F-16 ADG and F-16 JFS as specified by the applicable end item TOs, manufacturer's specifications, or other directives such as Time Compliance Technical Orders (TCTOs). The government will provide a copy of the most current TO IAW TO 00-5-1, Chapter 6.4, Contractor requirements. Submission requirements can be researched and processed at https://www.dla.mil/Logistics-Operations/Services/JCP/ and applicable Contract Data

Requirements Lists (CDRLs). Further details regarding delivery order requirements can be found in the documents attached to the basic IDIQ contract, as well as any documents referenced when the Fair Opportunity Proposal Request (FOPR) is issued. Unless the

Procuring Contracting Officer (PCO) determines that an exception to fair opportunity applies, the Fair Opportunity Proposal Request (FOPR) will outline all submission requirements. This will include the pricing arrangement, proposal due date, evaluation

5 MAY 2026 ORDERING PROCEDURES 3

criteria, relevant attachments, and any FOPR-specific provisions or clauses. For each delivery order, notification of the FOPR shall be provided to each of the contractors qualified for the NSN via direct electronic communication, typically email. Contractors shall keep an up-to-date email address on file with the PCO and 419 SCMS at all times;

backup points of contact are encouraged.

8.0 PARTICIPATION: Contractors who are awarded an IDIQ contract for this effort will be required to propose to 90 percent of Fair Opportunity Proposal Requests (FOPRs) issued for NSNs that they are qualified for unless otherwise determined by the PCO. Failure to submit a proposal response to 90 percent of FOPRs issued for NSNs that a contractor is qualified to repair may result in a marginal or unsatisfactory Contractor Performance

Assessment Reporting (CPARS) rating in the “management” category. Exceptions will be limited and determined on a case-by-case basis by the PCO.

8.1 INTENT OF FAIR OPPORTUNITY PROPOSAL REQUEST: The Government’s intent is to obtain proposals within the scope outlined in the SOW attached to the basic

IDIQ contract. The Government will only request proposals from contractors who are qualified to remanufacture the NSN.

8.2 REQUIREMENTS DOCUMENTS: The work required for each delivery order will be referenced in the FOPR. The Government delivery order will list the required submittal information and delivery, when applicable.

8.3 FAIR OPPORTUNITY EXCEPTIONS: To satisfy the contracting agency’s Small

Business Administration contracting goals, the PCO may consider such factors as achievement of Section 8(a), Service Disabled Veteran Owned Business (SDVOB), Economically Disadvantaged Woman Owned Small Business Concern (WDWOSB), Woman Owned Small Business Concerns (WOSB), and HUB Zone goals. Individual delivery orders may be further set-aside for participation exclusively by all awardees in the specified socio-economic group. The Government also reserves the right to set aside delivery orders for other authorized socio-economic programs approved for the

RFO or R-DFARS. If a Small Business graduates from its current Small Business status, it will no longer be eligible to compete for Small Business set-asides.

8.3.1 All eligible and qualified contractors, unless a delivery order is set-aside for small businesses, will be provided a fair opportunity to compete for a delivery order under this basic IDIQ unless the following (RFO 16.507-6) exceptions apply:

1. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

2. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.

3. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order

5 MAY 2026 ORDERING PROCEDURES 4

already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

4. It is necessary to place an order to satisfy a minimum guarantee.

5. For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.

6. In accordance with section 1331 of Public Law 111-240 (15 U.S.C.

644(r)), contracting officers may, at their discretion, set aside orders for any of the small business concerns identified in RFO 19.000(a)(3).

When setting aside orders for small business concerns, the specific small business program eligibility requirements identified in FAR Part

19 apply.

9.0 PROPOSAL PROCESS: The PCO will issue a FOPR, as needed, to all contractors qualified for a specific NSN, unless a fair opportunity exception exists. The FOPR will include a due date for proposal submission, a list of deliverables required, and any additional data, as appropriate. The FOPR will also include specific instructions for the submission of proposals. The amount of time for proposal submission will be based on the complexity and urgency of the requirement and will be stated in the individual FOPRs. If contractors are unwilling to propose on a requirement they are qualified to repair, the contractor shall submit a “no proposal” reply in response to the FOPR. All “no proposal” responses shall include a brief statement as to why the contractor is unwilling to perform.

“No proposals” will impact the offeror’s participation ratio addressed in section 7.0 of this document.

9.1 PRICE ONLY PROPOSALS: Price only proposals shall include, at a minimum, a complete unit price and total cost for all priced line items identified at the delivery order level. Information other than cost and pricing data may be required.

9.2 CLARIFICATION OF PROPOSALS: Upon completion of initial evaluations, the

PCO will issue the delivery order to the contractor whose proposal provides the best value, IAW the evaluation criteria, to the Government. Whenever possible, award will be made without negotiations. If negotiations requiring proposal revisions are required, each proposing vendor will be requested to provide a final proposal revision.

9.3 PROPOSAL PREPARATION: The contractor shall assume all costs associated with preparation for the delivery order under the proposal process as an indirect charge. The

Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver or otherwise incur costs except as authorized by duly executed delivery orders. FOPRs for proposals will indicate funds availability. The Government may request proposals with no assurance of funding and provide no assurances that delivery orders will be issued.

5 MAY 2026 ORDERING PROCEDURES 5

9.4 RESOLUTION OF ISSUES: In the event issues pertaining to a proposed FOPR cannot be resolved to the satisfaction of the PCO, the PCO reserves the right to withdraw and cancel the proposed FOPR. In such event, the contractors shall be notified in writing of the PCO’s decision. This decision is final and conclusive and shall not be subject to the disputes clause or the contract dispute act.

9.5 UNAUTHORIZED WORK: The contractor is not authorized at any time to commence delivery order performance prior to issuance of a signed delivery order, or other written approval provided by the PCO to begin work.

10.0 EVALUATION OF PROPOSALS: The Government intends to select the most advantageous, responsive and responsible offerors’ proposal IAW the evaluation criteria set forth in the individual FOPRs; evaluation criteria may consist of any available evaluation methods on the best value continuum, i.e., price only competition, lowest-price technically acceptable (LPTA), tradeoff, industrial base consideration, available capacity, etc.

The basis of award for each delivery order will be stated in the FOPR in Sections L & M.

Contractors shall provide a price proposal in response to the FOPR. Contractors shall respond within the number of calendar days stated in the FOPR by submitting a proposal to the PCO IAW with the requirements stated in the FOPR. The Government reserves the right to either extend or shorten the number of days allowed for FOPR response, after a

FOPR has been released.

9.1.1 GOVERNMENT REVIEW: Upon receipt of the contractor’s proposal, the

Government will review the proposal for completeness and accuracy. After evaluation, the Government may clarify and or negotiate with the contractor on any aspect of the provided proposal as specified in the evaluation criteria in the

FOPR. The Government may unilaterally accept the contractor’s initial proposal without clarifications. If proposal revisions are required or requested following the receipt of proposals, the Government will issue a revision notice.

Such notices will specify requested revisions and timeframes for completing such changes.

9.2 AWARD NOTIFICATION: The PCO will provide notice to unsuccessful offerors the same day as the delivery order is awarded. For orders exceeding the threshold established in RFO 16.507, see post award notices and debriefing procedures IAW RFO

16.507-5.

10.0 SOLE-SOURCE ORDERING PROCEDURES: In the event it becomes necessary to negotiate with one contractor on a sole-source basis, the following procedures will be used:

10.1 CIRCUMSTANCES PERMITTING SOLE SOURCE ORDERS: All qualified vendors will be given a fair opportunity to submit a proposal on requirements they are qualified for unless the PCO determines one of the exceptions at RFO 16.507-6 apply as detailed in section 7.3 of this document. When an exception is applicable the contractor

5 MAY 2026 ORDERING PROCEDURES 6

will be responsible for preparing a detailed cost proposal. A detailed cost proposal will be required when modifications involving increasing funds to a delivery order are needed.

10.2 REQUIREMENTS FOR COST AND PRICING DATA (10 U.S.C. 2306a AND 41

U.S.C. CHAPTER 35): Unless an exception applies, or a waiver has been granted, cost or pricing data is required at the thresholds contained in RFO 15.403-3. When required, the contractor shall submit to the PCO the following in support of any proposal:

10.2.1 Cost or pricing data in the format designated by the PCO in the FOPR

10.2.2 A certificate of current cost or pricing data, in the format specified in FAR

15.406-2 certifying that to the best of its knowledge and belief, the cost or pricing data were accurate, complete and current as of the date of agreement on price, or, if applicable, an earlier date agreed upon between parties that is as close as practicable to the date of agreement on price.

10.3 SUBCONTRACTOR PROPOSALS: If required under a FOPR, the contractor, to the maximum extent possible, shall submit competitive subcontractor proposals. In the event the contractor is limited to one proposal, the Government may evaluate costs using an Independent Government Cost Estimate (IGCE), local market conditions and/or any other means determined by the PCO. The contractor will require any subcontractor or prospective subcontractor to submit to the prime contractor or appropriate subcontractor tier cost or pricing data in the format designated by the PCO.

10.3.1 GOVERNMENT REVIEW: Upon receipt of the contractor’s proposal, the

Government will review the proposal for completeness and accuracy. After evaluation, the Government may clarify and/or negotiate with the contractor on any aspects of the provided proposal. The Government may unilaterally accept the contractor’s initial proposal without negotiations.

11.0 CYBER SECURITY REQUIREMENTS: In accordance with the Statement of Work

(SOW), the Contractor shall implement a plan for supply chain cybersecurity and provide a copy to the U.S. Government..

12.0 ONBOARDING PROCEDURES: The Government intends to establish the awardee pool by competitively awarding multiple-award IDIQ contracts. The contract will allow continuous onboarding opportunities. All onboarding opportunities will be made public on the government point of entry prescribed at the time of posting. Onboarding will allow new contractors to qualify, and if approved, be awarded an IDIQ contract and first order.

Onboarding will also allow current contractors of the MAC IDIQ to qualify for additional

NSNs. All contractors must qualify IAW Repair Qualification Requirements (RQR) and submit a letter of intent to participate in order to be considered for award. Current contractors will not be required to recompete during onboarding, unless they wish to qualify on an additional NSN. Once onboarding is complete, added awardees will be included in the awardee pool and to compete on future delivery orders. For their initial delivery order, new contractors shall be required to complete a First Article (FA) in accordance with the basic SOW. Should a First Article Waiver be approved, a limited

5 MAY 2026 ORDERING PROCEDURES 7

production order (3- Accessory Drive Gearbox or 3- Jet Fuel Starter) may be fulfilled as an alternative (see section L- Instructions, Conditions, and Notices to Offerors) of the request for proposal. The ordering period for new awardees will coincide with the initial awardees’ ordering period and shall not extend the overall term of the ordering period or the basic IDIQ contract ordering period.

13.0 OFF-BOARDING PROCEDURES: Contractors who no longer wish to participate or comply with the terms and conditions set forth in the basic IDIQ contract, may request to be off-boarded at any time during the lifetime of the contract. Contractors must provide written notification to the PCO if they wish to be removed from the MAC IDIQ. If a contractor seeks to terminate their contract against the Government’s best interest, the

Government can refuse, pursue a T4D, Termination for Convenience (T4C) or negotiate a settlement as applicable.

Attachments:

Attachment 1: Fair Opportunity Proposal Request (FOPR) Template

Attachment 2: Fair Opportunity Decision Document (FODD) Template

5 MAY 2026 ORDERING PROCEDURES 8

Attachment 1: Fair Opportunity Proposal Request (FOPR) Template

Fair Opportunity Proposal Request (FOPR)

Request for Proposals for a Task/Delivery Order Under the [Insert IDIQ Contract Name] IDIQ

Contract

FOPR NUMBER: [Insert FOPR Number]

PROJECT TITLE: Remanufacture of Accessory Drive Gearboxes (ADGs)

IDIQ CONTRACT NUMBER: [Insert Master IDIQ Contract Number]

ISSUED TO: All Eligible Contract Holders under the [Insert IDIQ Contract Name] IDIQ

DATE OF ISSUANCE: [Insert Date]

QUESTIONS DUE DATE: [Insert Date and Time]

PROPOSAL DUE DATE: [Insert Date and Time]

1.0 REQUIREMENT DESCRIPTION

The Government is seeking proposals for the firm-fixed-price (FFP) remanufacture of Accessory Drive

Gearboxes (ADGs) and for FFP support services, as detailed in the CLIN structure below. This requirement will be performed in accordance with the base IDIQ contract and the attached Statement of

Work (SOW) Addendum 1.

The primary requirements for this order include:

• Remanufacture of [Insert Quantity, e.g., "Ten (10)"] ADGs, NSN [Insert NSN].

• Associated engineering and logistics support services.

• Delivery of all units to: [Insert Delivery Address/DODAAC]

Period of Performance: The anticipated period of performance is from [Start Date] to [End Date].

2.0 PROPOSAL INSTRUCTIONS

2.1 Governing Documents

This FOPR is subject to the terms and conditions of the [Insert IDIQ Contract Name] IDIQ contract. All proposals must be prepared in accordance with the base contract, including, but not limited to, Section L

(Instructions, Conditions, and Notices to Offerors), Section M (Evaluation Factors for Award), and the master Statement of Work (SOW). The instructions herein are supplementary to the base contract and are intended to provide order-specific guidance.

5 MAY 2026 ORDERING PROCEDURES 9

2.2 Submission Requirements

Proposals shall be submitted electronically via email to the points of contact listed below no later than the

Proposal Due Date specified above.

• Contracting Officer: Leslie Trice (leslie.trice@us.af.mil)

• Contract Specialist: Sara Tibbetts (sara.tibbetts@us.af.mil)

Your proposal for this specific order must include the following:

1. Notice of Intent: A brief statement confirming your intent to propose on this order.

2. Technical Volume:

• Supply Chain Risk Management (SCRM) Plan: Your SCRM plan tailored to the specific risks and requirements of this order.

• Minimum Order Guarantee Path: Confirmation of the path your company will follow to meet the minimum order guarantee, as defined in Section L, paragraph B.3.f of the base contract.

3. Price Volume:

• Completed CLIN Schedule: A completed version of the CLIN schedule in Section 5.0 of this FOPR, with proposed pricing for all line items.

3.0 EVALUATION FACTORS FOR AWARD

The Government intends to award a single task order to the responsible offeror who provides the best value. The evaluation process will follow the Lowest Price Technically Acceptable (LPTA) methodology described in the base IDIQ contract.

Proposals will be evaluated as follows:

1. Technical Evaluation (Acceptable / Unacceptable):

• The proposal will be evaluated to confirm that a compliant SCRM Plan has been submitted.

• The proposal will be checked for adherence to all other solicitation requirements, including the Minimum Order Guarantee path.

• A proposal must be rated "Acceptable" to be considered for award.

2. Price Evaluation: The prices for all technically acceptable proposals will be evaluated for fairness and reasonableness. Award will be made to the offeror with the lowest total evaluated price among all technically acceptable proposals.

3. Responsibility Determination: As stated in the base contract, the Government will assess past performance via Government databases (e.g., CPARS) as part of its determination of contractor responsibility pursuant to RFO 9.104.

4.0 QUESTIONS

All questions regarding this FOPR must be submitted in writing to the Contract Specialist by the

Questions Due Date. The Government will provide responses to all eligible contract holders.

5 MAY 2026 ORDERING PROCEDURES 10

5.0 CONTRACT LINE ITEM (CLIN) SCHEDULE

Offerors shall complete the following schedule and include it in their Price Volume.

CLIN Description Qty Unit Unit

Price

Total

Price

0001 FFP: First Article Unit - Remanufactured ADG, NSN [Insert

NSN] (Note 1)

1 EA

0002 FFP: Production Units - Remanufactured ADG, NSN [Insert NSN] [X] EA

0003 FFP: Data Deliverables IAW CDRLs 1 LO

TOTAL EVALUATED PRICE

Note 1: CLIN 0001 is to be priced only by offerors who do not meet the requirements for a First Article

Waiver and are proposing the First Article unit as their minimum guarantee.

6.0 ATTACHMENTS

1. SOW Addendum 1 - [Insert Title]

2. Contract Data Requirements List (CDRLs)

5 MAY 2026 ORDERING PROCEDURES 11

Attachment 2: Fair Opportunity Decision Document (FODD) Template

Fair Opportunity Decision Document (FODD)

For The Placement of an Order Under a Multiple-Award IDIQ Contract

CONTROL NUMBER: [Insert Task/Delivery Order Number]

PROJECT TITLE: Accessory Drive Gearbox (ADG) Remanufacturing

SOLICITATION NUMBER: [Insert Solicitation/Request for Task Order Proposal Number]

1.0 Introduction and Authority

This document records the fair opportunity decision for the placement of an order under the [Insert IDIQ

Contract Name/Number] Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The procedures used comply with Federal Acquisition Regulation RFO 16.507, which governs the fair opportunity process. All eligible contract holders under the specified IDIQ were provided a fair opportunity to be considered for this order.

2.0 Requirement Summary

The Government requires the remanufacture of [Specify Quantity and Type, e.g., "five (5) Accessory

Drive Gearboxes (ADGs), NSN XXX-XX-XXX-XXXX"] in accordance with the Statement of Work

(SOW) dated FEB 2026. This order includes [Briefly describe the key aspects, e.g., "the specified remanufacturing services and associated data deliverables"]. The total estimated value of this order is

[Insert Estimated Value].

3.0 Fair Opportunity Process

On [Insert Date], a Request for Task Order Proposal (RFTOP) was issued to all [Number] contract holders under the IDIQ. Proposals were due by [Insert Due Date].

The following contract holders submitted proposals by the deadline:

• [Offeror A Name]

• [Offeror B Name]

• [Offeror C Name]

The following contract holders did not submit a proposal:

• [Offeror D Name] ("No-bid" notice received)

• [Offeror E Name] (Did not respond)

5 MAY 2026 ORDERING PROCEDURES 12

4.0 Evaluation Methodology

In accordance with Section M of the base IDIQ contract and the RFTOP, the award decision for this order is based on a determination of the best value to the Government. The evaluation factors for this fair opportunity competition were:

1. Technical Acceptability:

o Supply Chain Risk Management (SCRM) Plan approach for this specific order.

o Confirmation of proposal's adherence to the correct Minimum Order Guarantee path

(First Article vs. production units).

2. Price: The total evaluated price for the order.

3. Past Performance: A review of recent and relevant past performance information from

Government databases (e.g., CPARS), as stipulated in the base contract for determining contractor responsibility.

Award will be made to the responsible offeror who submits a technically acceptable proposal with the lowest evaluated price.

5.0 Summary of Proposals and Evaluation

The proposals from all participating offerors were evaluated as follows:

Contractor Factor 1: Technical Evaluation Factor 2: Past Performance

Factor 3:

Total

Evaluated

Price

[Offeror A]

Acceptable. The proposal included a compliant SCRM plan and correctly identified the path for the minimum order guarantee.

Satisfactory Confidence.

CPARS ratings are generally

Satisfactory to Very Good with no adverse reports.

$[Insert Price]

[Offeror B]

Unacceptable. The offeror’s SCRM plan for this order failed to address cybersecurity risks, rendering the proposal technically unacceptable.

Neutral Confidence. No recent or relevant past performance history found.

$[Insert Price]

[Offeror C]

Acceptable. The proposal included a compliant SCRM plan and correctly identified the path for the minimum order guarantee.

Substantial Confidence.

CPARS ratings are consistently

Very Good to Exceptional.

$[Insert Price]

6.0 Rationale for Selection (Trade-Off Decision)

[Offeror B]'s proposal was rated technically unacceptable and is therefore ineligible for award.

The proposals from [Offeror A] and [Offeror C] were both determined to be technically acceptable and both offerors were deemed responsible, with satisfactory or better past performance records.

5 MAY 2026 ORDERING PROCEDURES 13

According to the Lowest Price Technically Acceptable (LPTA) evaluation methodology established for this acquisition, the contract holder with the lowest price among the technically acceptable proposals represents the best value to the Government.

• [Offeror A]'s Price: $[Insert Price]

• [Offeror C]'s Price: $[Insert Price]

[Offeror A] submitted the lowest evaluated price among all technically acceptable proposals.

7.0 Recommendation for Award

Based on the evaluation described above, it is determined that [Offeror A] provides the best value to the

Government. It is recommended that Task Order [Insert Task/Delivery Order Number] be awarded to

[Offeror A] in the amount of $[Insert Price].

PREPARED BY:

[Name], Contract Specialist

[Date]

CONCURRED BY:

[Name], Program Manager

APPROVED BY:

[Name], Contracting Officer

File details come from the government source that posted it. Updated .