FA8252-26-R-0073-0002.pdf
PDF 11 MB Posted
- Solicitation number
- FA825226R0073
About this file
This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract that extends the proposal deadline for a Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the remanufacture of F-16 Accessory Drive Gearbox (ADG) and Jet Fuel Starter (JFS) components. The amendment, effective June 8, 2026, formally extends the proposal submission deadline from June 8, 2026 at 4:00 PM MST to June 19, 2026 at 4:00 PM MST. The Department of the Air Force, Directorate of Contracting (AFSC PZACB) at Hill Air Force Base, Utah, issued this amendment (FA8252-26-R-0073-0002) with Sara C. Tibbetts identified as the contracting officer. Offerors must acknowledge receipt of this amendment by one of three methods—completing and returning the amendment, acknowledging receipt on each copy of the offer submitted, or submitting separate written communication—prior to the extended deadline, or risk rejection of their proposal.
The underlying contract is a 10-year IDIQ effort consisting of a five-year base period (July 2026 through July 2031) plus one five-year option period (July 2031 through July 2036) with an estimated ceiling of $96,124,000. Minimum annual quantities are 10 ADGs and 14 JFS units, with maximum annual quantities of 30 ADGs and 42 JFS units. The contract requires remanufacture of ADG (NSN 2835-01-208-0169-RP) and JFS (NSNs 2835-01-308-3769-RP and 2835-01-689-2101-RP) components used in the F-16 C/D Aircraft Secondary Power System. The solicitation includes multiple contract line items covering first article testing, yearly overhaul requirements across all contract years, over-and-above work, commonly missing parts, required modifications, beyond economical remanufacture evaluations, no-fault evaluations, travel, counterfeiting protection planning, and contract data requirements. Sources must be qualified prior to award in accordance with FAR Part 9.202(a), with the contract allowing for on-ramping of qualified sources.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NUMBER
PAGE OF PAGES
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE
(X)
4. REQUISITION/PURCHASE REQUISITION NUMBER3. EFFECTIVE DATE
1. CONTRACT ID CODE
FA8252-26-R-0073-0002
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFSC PZACB
6050 GUM LANE BLDG 1215
HILL AIR FORCE BASE UT 84056-5825
BUYER: Sara C Tibbetts/PZAC sara.tibbetts@us.af.mil Phone: (801) 775- 6967 Fax: (000) 000-0000 No Collect Calls
FA8252
FD20202600073 01
JS
X
FA825226R0073
8-JUN-2026
XX
X 1
FMS REQUIREMENT
ROUTINE FAST PAY PROCEDURES APPLY
FA8252-26-R-0073-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
FROM: June 8, 2026 at 4:00pm MST
TO: June 19, 2026 at 4:00pm MST
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report (DD250).
MULTIPLE AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) TYPE
CONTRACT
REMANUFACTURE OF THE F-16 ACCESSORY DRIVE GEARBOX (ADG)
AND
JET FUEL STARTER (JFS) PARTS
General This is a multiple-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The Government is not obligated to place any orders with a specific awardee, only to meet the total minimum order quantity for the contract among all awardees. All awardees will be provided a fair opportunity to be considered for each task order in accordance with Revolutionary Far Overhaul
(RFO) 16.507.
Minimum Order Guarantee
General Precedence Rule:
1. Qualified on Both (No First Article 'Bid B'):
2. Qualified on a Single Item (No First Article 'Bid B'):
or
3. First Article ('Bid A') Required:
NOTE:
Contract Minimum/Maximum Quantities and Ceiling The estimated minimum and maximum quantities shown below apply to the IDIQ contract as a whole and not to individual awardees. The total estimated ceiling for all orders under this IDIQ contract is $96,124,000.
Item Description Minimum Annual Quantity Maximum Annual Quantity Accessory Drive Gearbox 10 30 Jet Fuel Starter 14 42
Period of Performance The Period of Performance consists of one five-year base period and one five-year option period, as detailed below.
Base Period (5 Years) Period Start Date End Date Year 1 JUL 2026 JUL 2027 Year 2 JUL 2027 JUL 2028 Year 3 JUL 2028 JUL 2029 Year 4 JUL 2029 JUL 2030 Year 5 JUL 2030 JUL 2031
Option Period 1 (5 Years) Period Start Date End Date Year 1 JUL 2031 JUL 2032 Year 2 JUL 2032 JUL 2033 Year 3 JUL 2033 JUL 2034 Year 4 JUL 2034 JUL 2035 Year 5 JUL 2035 JUL 2036
Critical Guidance for Offerors Potential offerors are strongly advised to thoroughly review all sections of this solicitation.
Particular attention should be paid to the following:
-Section L: Instructions, Conditions, and Notices to Offerors -Section M: Evaluation Factors for Award -Ordering Guidance
-Failure Factor Guidance
Please be advised that the Depot Failure Factor Report will be provided to offerors during the proposal process. This report outlines common failures for the Accessory Drive Gearbox (ADG) and Jet Fuel Starter (JFS) as identified by the Ogden Depot. This document is provided for reference only. It is critical to note that items listed in this report will not be eligible for separate reimbursement under the 'Over & Above CLIN'. All costs associated with these potential failures must be incorporated into the contractor's proposal for the remanufacture of both the ADG and
JFS.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Funds will only be made available once all qualified candidates for award are identified.
Accessory Drive Gearbox (ADG) - First Article
Bid A - First Article Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG First Article Test Report Data
Bid A - First Article Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Type / Ship To Quantity (U/I) *ARO IAW CDRL
B001 _ Req No / Pri
Required Delivery
Proposed Delivery
ADG Overhaul - YEAR 1
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
ADG Overhaul - YEAR 1
Bid B - First Article NOT Required
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Over and Above
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
ADG Over and Above
Bid B - First Article NOT Required Title Number Date Tailoring
ADG Commonly Missing Parts (Price List)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Required Modifications (Price List)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Beyond Economical remanufacture Evaluation (BER)
Bid B - First Article NOT Required Item No.
ADG Beyond Economical remanufacture Evaluation (BER)
Bid B - First Article NOT Required
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
ADG No-Fault Evaluation
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Jet Fuel Starter (JFS) First Article
Bid A - First Article Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Jet Fuel Starter (JFS) First Article
Bid A - First Article Required
NSN:
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri Required Delivery
Proposed Delivery
TAC: F3RS
JFS First Article Test Report Data
Bid A - First Article Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Type / Ship To Quantity (U/I) *ARO *ARO IAW
CDRL B001
_ Req No / Pri
JFS First Article Test Report Data
Bid A - First Article Required Required Delivery
Proposed Delivery
JFS Overhaul - YEAR 1
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
JFS Overhaul - YEAR 1
Bid B - First Article NOT Required Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 1
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
JFS Overhaul (Legacy) - YEAR 1
Bid B - First Article NOT Required
Proposed Delivery
TAC: F3RS
JFS Over and Above
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
JFS Commonly Missing Parts (Price List)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Title Number Date Tailoring
JFS Beyond Economical Remanufacture Evaluation (BER)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
JFS No-Fault Evaluation
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Travel
Bid B - First Article NOT Required
Quantity U/I Est Unit Cost Total Estimated Cost
Travel
Bid B - First Article NOT Required CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Data - Countefeit Protection Plan (CPP)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Type / Ship To Quantity (U/I) IAW DD1423-1 Req No / Pri Required Delivery
Proposed
Data - CDRLs A001-A010 (DD1423)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
*ARO IAW DD1423 Exhibit A001 Through A009 and A011 through A012
ADG Overhaul - YEAR 2
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
ADG Overhaul - YEAR 2
Bid B - First Article NOT Required
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 2
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
JFS Overhaul - YEAR 2
Bid B - First Article NOT Required
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 2
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
JFS Overhaul (Legacy) - YEAR 2
Bid B - First Article NOT Required
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 3
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
ADG Overhaul - YEAR 3
Bid B - First Article NOT Required Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 3
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
JFS Overhaul - YEAR 3
Bid B - First Article NOT Required
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 3
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
JFS Overhaul (Legacy) - YEAR 3
Bid B - First Article NOT Required Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 4
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
TAC: F3RS
JFS Overhaul - YEAR 4
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 4
Bid B - First Article NOT Required
JFS Overhaul (Legacy) - YEAR 4
Bid B - First Article NOT Required
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 5
Bid B - First Article NOT Required
ADG Overhaul - YEAR 5
Bid B - First Article NOT Required
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 5
Bid B - First Article NOT Required Item No.
JFS Overhaul - YEAR 5
Bid B - First Article NOT Required
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 5
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
JFS Overhaul (Legacy) - YEAR 5
Bid B - First Article NOT Required
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG First Article (Option 1)
Bid A - First Article Required Item No.
NSN:
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Applicability:
IUID Required:
Physical Item Markings:
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri Required Delivery
Proposed Delivery
TAC: F3RS
ADG First Article Test Report Data (Option 1)
Bid A - First Article Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Type / Ship To Quantity (U/I) *ARO IAW CDRL
B001 _ Req No / Pri
Required Delivery
ADG Overhaul - YEAR 6 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Over and Above (Option 1)
Bid B - First Article NOT Required
ADG Over and Above (Option 1)
Bid B - First Article NOT Required
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Commonly Missing Parts (Price List) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Required Modifications (Price List) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
ADG Required Modifications (Price List) (Option 1)
Bid B - First Article NOT Required
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Beyond Economical remanufacture Evaluation (BER) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
ADG No-Fault Evaluation (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
ADG No-Fault Evaluation (Option 1)
Bid B - First Article NOT Required Quality Assurance:
Title Number Date Tailoring
Jet Fuel Starter (JFS) First Article (Option 1)
Bid A - First Article Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Applicability:
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri Required Delivery
Proposed Delivery
TAC: F3RS
JFS First Article Test Report Data (Option 1)
Bid A - First Article Required Item No.
Quantity U/I Unit Price
JFS First Article Test Report Data (Option 1)
Bid A - First Article Required
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Type / Ship To Quantity (U/I) *ARO *ARO IAW
CDRL B001
_ Req No / Pri
Required Delivery
Proposed Delivery
JFS Overhaul - YEAR 6 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
JFS Overhaul - YEAR 6 (Option 1)
Bid B - First Article NOT Required
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 6 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
JFS Overhaul (Legacy) - YEAR 6 (Option 1)
Bid B - First Article NOT Required Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
JFS Over and Above (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
JFS Commonly Missing Parts (Price List) (Option 1)
Bid B - First Article NOT Required Item No.
JFS Commonly Missing Parts (Price List) (Option 1)
Bid B - First Article NOT Required Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
JFS Beyond Economical Remanufacture Evaluation (BER) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
JFS No-Fault Evaluation (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
JFS No-Fault Evaluation (Option 1)
Bid B - First Article NOT Required Quality Assurance:
Title Number Date Tailoring
Travel (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Est Unit Cost Total Estimated Cost
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Data - Countefeit Protection Plan (CPP) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Type / Ship To Quantity (U/I) IAW DD1423-1 Req No / Pri
Data - Countefeit Protection Plan (CPP) (Option 1)
Bid B - First Article NOT Required Proposed Delivery
Data - CDRLs A001-A010 (DD1423) (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price
CLIN ACRN ACRN Total
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
*ARO IAW DD1423 Exhibit A001 Through A009 and A011 through A012
ADG Overhaul - YEAR 7 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Limitations of Liability:
ADG Overhaul - YEAR 7 (Option 1)
Bid B - First Article NOT Required
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 7 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
JFS Overhaul - YEAR 7 (Option 1)
Bid B - First Article NOT Required Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 7 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
JFS Overhaul (Legacy) - YEAR 7 (Option 1)
Bid B - First Article NOT Required Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 8 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
ADG Overhaul - YEAR 8 (Option 1)
Bid B - First Article NOT Required
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 8 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
JFS Overhaul - YEAR 8 (Option 1)
Bid B - First Article NOT Required
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 8 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
JFS Overhaul (Legacy) - YEAR 8 (Option 1)
Bid B - First Article NOT Required Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 9 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
ADG Overhaul - YEAR 9 (Option 1)
Bid B - First Article NOT Required
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 9 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
JFS Overhaul - YEAR 9 (Option 1)
Bid B - First Article NOT Required
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul (Legacy) - YEAR 9 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
JFS Overhaul (Legacy) - YEAR 9 (Option 1)
Bid B - First Article NOT Required
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
Proposed Delivery
TAC: F3RS
ADG Overhaul - YEAR 10 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
ADG Overhaul - YEAR 10 (Option 1)
Bid B - First Article NOT Required Required Delivery
Proposed Delivery
TAC: F3RS
JFS Overhaul - YEAR 10 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
Required Delivery
JFS Overhaul - YEAR 10 (Option 1)
Bid B - First Article NOT Required
TAC: F3RS
LJFS Overhaul (Legacy) - YEAR 10 (Option 1)
Bid B - First Article NOT Required Item No.
Quantity U/I Unit Price Amount
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Priority:
Limitations of Liability:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
Applicability:
IUID Required:
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO After Receipt of Carcass
Req No / Pri
LJFS Overhaul (Legacy) - YEAR 10 (Option 1)
Bid B - First Article NOT Required Proposed Delivery
TAC: F3RS
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE:
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE:
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE:
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE:
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
AA
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
RFO/rDFARS (Formerly FAR/DFARS) CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NO.
ALT NO/
DEV NO
RFO/rDFARS CLAUSE TITLE YEAR-
MO
SECTION
252.203-
CD 2026-
O0031
203.171-4(a)
Requirements Relating to Compensation of Former DoD Officials. 2011-09 SEC I
252.203-
Prohibition on Persons Convicted of Fraud or Other Defense-Contract- Related Felonies.
2023-01 SEC I
252.203-
CD 2026-
O0031
203.970
Requirement to Inform Employees of Whistleblower Rights. 2022-12 SEC I
252.203-
Agency Office of the Inspector General. 2019-08 SEC I
252.203-
Display of Hotline Posters. 2023-01 SEC I
252.203-
CD 2026-
O0031
203.171-4(b)
Representation Relating to Compensation of Former DoD Officials. 2022-09 SEC K
252.204-
Billing Instructions-Cost Vouchers 2023-05 SEC G
252.204-
Notice on the Use of the Supplier Performance Risk System. 2023-03 SEC L
252.205-
Provision of Information to Cooperative Agreement Holders. 2024-10 SEC I
252.209-
Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
2019-05 SEC I
252.211-
Use of Government-Assigned Serial Numbers. 2010-09 SEC I
252.215-
Cost Estimating System Requirements. 2025-01 SEC I
252.215-
Supplies and Services Provided by Nontraditional Defense Contractors. 2023-01 SEC L
252.216-
Postaward Debriefings for Task Orders and Delivery Orders. 2025-10 SEC I
252.222-
Restrictions on the Use of Mandatory Arbitration Agreements. 2023-01 SEC I
252.223-
Prohibition of Hexavalent Chromium. 2023-01 SEC I
252.225-
Qualifying Country Sources as Subcontractors. 2022-03 SEC I
252.225-
Report of Intended Performance Outside the United States 2025-10 SEC L
252.225-
Report of Intended Performance Outside the United States and Canada - Submission after Award.
2024-07 SEC I
252.225-
Identification of Expenditures in the United States. 2005-06 SEC I
252.225-
Restriction on Acquisition of Certain Articles Containing Specialty Metals. 2023-01 SEC I
252.225-
Preference for Certain Domestic Commodities. 2022-04 SEC I
252.225-
Restriction on Acquisition of Ball and Roller Bearings. 2023-01 SEC I
252.225-
Trade Agreements. 2024-02 SEC I
252.225-
Export-Controlled Items. 2013-06 SEC I
252.225-
Representation Regarding Business Operations with the Maduro Regime. 2022-05 SEC K
252.225-
Prohibition Regarding Business Operations with the Maduro Regime. 2023-01 SEC I
252.225-
Preaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.
2022-08 SEC K
252.225-
Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.
2023-01 SEC I
252.225-
Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region-Representation.
2023-06 SEC K
252.225-
Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06 SEC I
252.226- Utilization of Indian Organizations, Indian-Owned Economic Enterprises, 2023-01 SEC I
7001 and Native Hawaiian Small Business Concerns.
252.226-
Drug-Free Work Force. 2024-08 SEC I
252.228-
Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehicles.
2019-11 SEC I
252.231-
Supplemental Cost Principles 1991-12 SEC G
252.232-
Electronic Submission of Payment Requests and Receiving Reports. 2018-12 SEC G
252.232-
Levies on Contract Payments. 2006-12 SEC I
252.232-
Payments in Support of Emergencies and Contingency Operations. 2013-05 SEC I
252.243-
Pricing of Contract Modifications. 1991-12 SEC I
252.243-
Requests for Equitable Adjustment. 2022-12 SEC I
252.245-
Contractor Property Management System Administration 2025-01 SEC I
252.245-
Management and Reporting of Government Property. 2024-01 SEC I
252.246-
Contractor Counterfeit Electronic Part Detection and Avoidance System. 2023-01 SEC I
252.246-
Sources of Electronic Parts. 2023-01 SEC I
252.247-
Transportation of Supplies by Sea. 2024-10 SEC I
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. 2014-05 SEC I
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
2024-09 SEC K
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. 2020-06 SEC I
52.203-13 Contractor Code of Business Ethics and Conduct. 2021-11 SEC I
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation.
2017-01 SEC L
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01 SEC I
52.203-3 Gratuities. 1984-04 SEC I
52.203-5 Covenant Against Contingent Fees. 2014-05 SEC I
52.203-6 Restrictions on Subcontractor Sales to the Government. 2020-06 SEC I
52.203-7 Anti-Kickback Procedures. 2020-06 SEC I
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
2014-05 SEC I
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards.
(Deviation 2026-00038)
2026-02 SEC I
52.204-13 System for Award Management-Maintenance. (Deviation 2026-00038) 2026-02 SEC I
52.204-19 Incorporation by Reference of Representations and Certifications. 2014-12 SEC I
52.204-7 System for Award Management-Registration. (Deviation 2026-00038) 2026-02 SEC L
52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts).
2024-08 SEC L
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-00038)
2026-02 SEC I
52.209-3 ALT I First Article Approval-Contractor Testing. (Alternate I) 1997-01 SEC I
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or
Voluntarily Excluded. (Deviation 2026-00038)
2026-02 SEC I
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation 2026-00038)
2026-02 SEC I
52.210-1 Market Research. (Deviation 2026-00038) 2026-02 SEC I
52.211-5 Material Requirements. (Deviation 2026-00038) 2026-02 SEC I
52.214-34 Submission of Offers in the English Language. 1991-04 SEC L
52.214-35 Submission of Offers in U.S. Currency. 1991-04 SEC L
52.215-1 Instructions to Offerors-Competitive Acquisition. (Deviation 2026-00038) 2026-02 SEC L
52.215-1 ALT I Instructions to Offerors-Competitive Acquisition. (Deviation 2026-00038) (Alternate I)
2026-02 SEC L
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. 2011-08 SEC I
52.215-15 Pension Adjustments and Asset Reversions. (Deviation 2026-00038) 2026-02 SEC I
52.215-16 Facilities Capital Cost of Money. 2003-06 SEC L
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions. (Deviation 2026-00038)
2026-02 SEC I
52.215-19 Notification of Ownership Changes. (Deviation 2026-00038) 2026-02 SEC I
52.215-2 Audit and Records-Negotiation. (Deviation 2026-00038) 2026-02 SEC I
52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data. (Deviation 2026-00038)
2026-02 SEC L
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications. (Deviation 2026-00038)
2026-02 SEC I
52.215-8 Order of Precedence-Uniform Contract Format. (Deviation 2026-00038) 2026-02 SEC I
52.216-11 Cost Contract – No Fee 1984-04 SEC I
52.216-22 ALT II Indefinite Quantity. (Deviation 2026-00038) (Alternate II) 2026-02 SEC I
52.216-27 Single or Multiple Awards. 1995-10 SEC L
52.216-8 Fixed Fee. 2011-06 SEC I
52.217-5 Evaluation of Options. (Deviation 2026-00038) 2026-02 SEC M
52.219-16 Liquidated Damages-Subcontracting Plan. (Deviation 2026-00038) 2026-02 SEC I
52.219-31 Notice of Small Business Reserve. 2020-03 SEC L
52.219-8 Utilization of Small Business Concerns. (Deviation 2026-00038) 2026-02 SEC I
52.219-9 Small Business Subcontracting Plan. (Deviation) 2026-02 SEC I
52.222-19 Child Labor-Cooperation with Authorities and Remedies. (Deviation 2026- 00038)
2026-03 SEC I
52.222-35 Equal Opportunity for Veterans. (Deviation 2026-00038) 2026-02 SEC I
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-00038) 2026-02 SEC I
52.222-37 Employment Reports on Veterans. (Deviation 2026-00038) 2026-02 SEC I
52.222-40 Notification of Employee Rights Under the National Labor Relations Act.
(Deviation 2026-00038)
2026-02 SEC I
52.222-50 Combating Trafficking in Persons. (Deviation 2026-00038) 2026-02 SEC I
52.222-54 Employment Eligibility Verification. (Deviation 2026-00038) 2026-02 SEC I
52.226-7 Drug-Free Workplace. 2024-05 SEC I
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2024-05 SEC I
52.228-7 Insurance-Liability to Third Persons. 1996-03 SEC I
52.229-12 Tax on Certain Foreign Procurements. 2021-02 SEC I
52.229-3 Federal, State, and Local Taxes. 2013-02 SEC I
52.232-1 Payments. 1984-04 SEC I
52.232-17 Interest. 2014-05 SEC I
52.232-22 Limitation of Funds. (Deviation 2026-00038) 2026-02 SEC I
52.232-23 Assignment of Claims. 2014-05 SEC I
52.232-25 Prompt Payment. 2017-01 SEC I
52.232-33 Payment by Electronic Funds Transfer-System for Award Management. 2018-10 SEC I
52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 SEC I
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2023-03 SEC I
52.232-8 Discounts for Prompt Payment. 2002-02 SEC I
52.233-1 Disputes. (Deviation 2026-00038) 2026-02 SEC I
52.233-1 ALT I Disputes. (Deviation 2026-00038) (Alternate I) 2026-02 SEC I
52.233-2 Service of Protest. (Deviation 2026-00038) 2026-02 SEC L
52.233-3 Protest after Award. (Deviation 2026-00038) 2026-02 SEC I
52.233-3 ALT I Protest after Award. (Deviation 2026-00038) (Alternate I) 2026-02 SEC I
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-00038) 2026-02 SEC I
52.240-90 Security Prohibitions and Exclusions Representations and Certifications.
(Deviation 2026-00038)
2026-02 SEC K
52.240-93 Basic Safeguarding of Covered Contractor Information Systems.
(Deviation 2026-00038)
2026-02 SEC I
52.242-1 Notice of Intent to Disallow Costs. 1984-04 SEC I
52.242-13 Bankruptcy. 1995-07 SEC I
52.242-15 Stop-Work Order. 1989-08 SEC F
52.242-15 ALT I Stop-Work Order. (Alternate I) 1984-04 SEC F
52.242-17 Government Delay of Work. 1984-04 SEC F
52.242-3 Penalties for Unallowable Costs. (Deviation 2026-00038) 2026-02 SEC I
52.242-5 Payments to Small Business Subcontractors. 2017-01 SEC I
52.243-1 Changes-Fixed-Price. (Deviation 2026-00038) 2026-02 SEC I
52.244-6 Subcontracts for Commercial Products and Commercial Services.
(Deviation 2026-00038)
2026-02 SEC I
52.245-1 Government Property. 2021-09 SEC I
52.245-9 Use and Charges. 2012-04 SEC I
52.246-16 Responsibility for Supplies. 1984-04 SEC E
52.246-2 Inspection of Supplies-Fixed-Price. 1996-08 SEC E
52.246-23 Limitation of Liability. 1997-02 SEC I
52.246-26 Reporting Nonconforming Items. 2024-08 SEC I
52.246-4 Inspection of Services-Fixed-Price. 1996-08 SEC E
52.247-15 Contractor Responsibility for Loading and Unloading. 1984-04 SEC I
52.247-29 F.o.b. Origin. 2006-02 SEC F
52.247-30 F.o.b. Origin, Contractor's Facility. 2006-02 SEC F
52.247-34 F.o.b. Destination 1991-01 SEC F
52.249-2 Termination for Convenience of the Government (Fixed-Price). 2012-04 SEC I
52.249-8 Default (Fixed-Price Supply and Service). 1984-04 SEC I
52.253-1 Computer Generated Forms. (Deviation 2026-00038) 2026-02 SEC I
52.232-11 Extras. 1984-04 SEC I
52.208-90 Government Supply Sources. (Deviation 2026-00038) 2026-02 SEC I
52.211-15 Defense Priority and Allocation Requirements. 2008-04 SEC I
52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial). (Deviation 2026-00038)
2026-02 SEC I
52.215-23 Limitations on Pass-Through Charges. (Deviation 2026-00038) 2026-02 SEC I
52.219-9 ALT IV Small Business Subcontracting Plan. (Deviation 2026-00038) (Alternate
IV)
2026-02 SEC I
52.219-13 Notice of Set-Aside Orders 2020-03 SEC I
52.219-33 Nonmanufacturer Rule. (Deviation 2026-00038) 2026-02 SEC I
52.222-1 Notice to the Government of Labor Disputes. (Deviation 2026-00038) 2026-02 SEC I
52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation.
(Deviation 2026-00038)
2026-02 SEC I
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment. (Deviation 2026-00038)
2026-02 SEC I
52.222-56 Certification Regarding Trafficking in Persons Compliance Plan. (Deviation 2026-00038)
2026-02 SEC L
52.229-6 Taxes-Foreign Fixed-Price Contracts. 2013-02 SEC I
52.230-2 Cost Accounting Standards. (Deviation 2026-00038) 2026-02 SEC I
52.230-3 Disclosure and Consistency of Cost Accounting Practices. (Deviation 2026-00038)
2026-02 SEC I
52.230-4 Disclosure and Consistency of Cost Accounting Practices-Foreign Concerns. (Deviation 2026-00038)
2026-02 SEC I
52.230-6 Administration of Cost Accounting Standards. (Deviation 2026-00038) 2026-02 SEC I
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-00038) 2026-02 SEC I
52.244-5 Competition in Subcontracting. 2024-08 SEC I
52.246-24 Limitation of Liability-High-Value Items. 1997-02 SEC I
52.247-48 F.o.b. Destination-Evidence of Shipment. 1999-02 SEC F
252.217-
Over and Above Work. 1991-12 SEC I
52.222-90 DEV 2026-
00038
Addressing DEI Discrimination by Federal Contractors. (Deviation 2026- O0038)
2026-04 SEC I
252.215-
DEV 2026-
00048
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data. (DEVIATION 2026-00048)
2026-03 SEC L
252.215-
DEV 2026-
00048
Notification to Offerors-Postaward Debriefings. (DEVIATION 2026-00048) 2026-03 SEC L
252.219-
ALT I DEV
2026-00037
Small Business Subcontracting Plan (DoD Contracts). ALTERNATE I
(DEVIATION 2026-00037)
2026-02 SEC I
252.219-
DEV 2026-
00037
Small Business Subcontracting Plan (DoD Contracts). (DEVIATION 2026- 00037)
2026-02 SEC I
52.215-12 DEV 2022-
00001
Subcontractor Certified Cost or Pricing Data (DEVIATION 2022-00001) 2021-10 SEC I
52.223-23 DEV 2025-
00004
Sustainable Products and Services. (DEVIATION 2025-00004) 2025-03 SEC I
52.244-6 DEV 2025-
00003
Subcontracts for Commercial Products and Commercial Services.
(DEVIATION 2025-00003)
2025-03 SEC I
52.211-11 Liquidated Damages-Supplies, Services, or Research and Development. 2000-09
252.204-
CD 2026-
O0043
240-372-3(b)
Control of Government Personnel Work Product 1992-04
RFO/rDFARS (Formerly FAR/DFARS) CLAUSES IN FULL TEXT
CLAUSE
NO
RFO/rDFARS CLAUSE TITLE ALT NO/ DEV
NO
YEAR-
MO
252.204-
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.
2021-05
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR
SERVICES-REPRESENTATION (MAY 2021)
The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument."
(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission,"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .