Optional Products and Services Cost Response.pdf

PDF 173 KB Posted

Attached to
5th District Court of Appeal Security Upgrades
Solicitation number
ITN-14562
Issued by
Leon County, Florida

About this file

This is an Optional Products and Services Cost Response Form for the 5th District Court of Appeal Security Upgrades project, prepared by the Office of the State Courts Administrator (OSCA) in Florida. The form provides vendors with the opportunity to propose optional commodities and services that may enhance, improve, or streamline the security upgrade project at the 5th District Court of Appeal building located in Daytona Beach, Florida. These optional offerings will not be evaluated until after the technical reply evaluation process is completed and will have no impact on technical or cost evaluation scores. The form accommodates up to 20 optional tasks with corresponding labor, materials, and equipment costs, as well as up to 26 optional materials with manufacturer specifications and part numbers.

The form is structured to allow vendors to itemize optional products and services separately from the primary contract submission, with detailed cost breakdowns by category and total contract value calculations. Optional products and services may be considered by OSCA at its sole discretion as part of the "best value" determination for contract award. Vendors must attach supporting materials documenting any optional products and services offered and are expressly prohibited from referencing these optional offerings in the technical reply volume. The form requires vendor signature, date, printed name, title, and company information for submission.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPTIONAL PRODUCTS AND SERVICES COST RESPONSE FORM

Based on the nature of the services being procured under this Initiation to Negotiate, Vendors may elect to offer commodities and services they feel will enhance, improve, or streamline the Security Upgrades for the 5th District Court of Appeal Project. Optional products and services will not be seen by the evaluators until AFTER the Reply evaluation process has been completed and will not have any effect on either the technical or cost evaluation scores. At the sole discretion of the OSCA, any or all of the optional products and services may be factored into the “best value” determination the OSCA will use to award the Contract arising from this ITN.

Materials supporting the products and services offered on this form must be attached to the form.

NO REFERENCE TO THESE OPTIONAL PRODUCTS AND SERVICES MAY BE INCLUDED

IN THE TECHNICAL REPLY (VOLUME ONE).

TABLE 1: OPTIONAL PRICE BY TASK/DELIVERABLE

ID # TASK DESCRIPTION

QUANTITY LABOR

COST

MATERIALS

COST

EQUIPMENT

COST

TOTAL

CONTRACT

PRICE

No.

Units

Unit Measure

TOTAL CONTRACT VALUE

TABLE 2: OPTIONAL MATERIALS STANDARDS/SPECIFICATION LIST

Signed by:

Date:

Printed Name:

Title:

Company: ______________________________________________________________________________

LINE

DESCRIPTION MANUFACTURER PART NO. ASM

STANDARD

QUANTITY

OPTIONAL PRODUCTS AND SERVICES COST RESPONSE FORM

TASK DESCRIPTION1:
No Units1:
Unit Measure1:
LABOR COST1:
MATERIALS COST1:
EQUIPMENT COST1:
TASK DESCRIPTION2:
No Units2:
Unit Measure2:
LABOR COST2:
MATERIALS COST2:
EQUIPMENT COST2:
TASK DESCRIPTION3:
No Units3:
Unit Measure3:
LABOR COST3:
MATERIALS COST3:
EQUIPMENT COST3:
TASK DESCRIPTION4:
No Units4:
Unit Measure4:
LABOR COST4:
MATERIALS COST4:
EQUIPMENT COST4:
TASK DESCRIPTION5:
No Units5:
Unit Measure5:
LABOR COST5:
MATERIALS COST5:
EQUIPMENT COST5:
TASK DESCRIPTION6:
No Units6:
Unit Measure6:
LABOR COST6:
MATERIALS COST6:
EQUIPMENT COST6:
TASK DESCRIPTION7:
No Units7:
Unit Measure7:
LABOR COST7:
MATERIALS COST7:
EQUIPMENT COST7:
TASK DESCRIPTION8:
No Units8:
Unit Measure8:
LABOR COST8:
MATERIALS COST8:
EQUIPMENT COST8:
TASK DESCRIPTION9:
No Units9:
Unit Measure9:
LABOR COST9:
MATERIALS COST9:
EQUIPMENT COST9:
TASK DESCRIPTION10:
No Units10:
Unit Measure10:
LABOR COST10:
MATERIALS COST10:
EQUIPMENT COST10:
TASK DESCRIPTION11:
No Units11:
Unit Measure11:
LABOR COST11:
MATERIALS COST11:
EQUIPMENT COST11:
TASK DESCRIPTION12:
No Units12:
Unit Measure12:
LABOR COST12:
MATERIALS COST12:
EQUIPMENT COST12:
TASK DESCRIPTION13:
No Units13:
Unit Measure13:
LABOR COST13:
MATERIALS COST13:
EQUIPMENT COST13:
TASK DESCRIPTION14:
No Units14:
Unit Measure14:
LABOR COST14:
MATERIALS COST14:
EQUIPMENT COST14:
TASK DESCRIPTION15:
No Units15:
Unit Measure15:
LABOR COST15:
MATERIALS COST15:
EQUIPMENT COST15:
TASK DESCRIPTION16:
No Units16:
Unit Measure16:
LABOR COST16:
MATERIALS COST16:
EQUIPMENT COST16:
TASK DESCRIPTION17:
No Units17:
Unit Measure17:
LABOR COST17:
MATERIALS COST17:
EQUIPMENT COST17:
TASK DESCRIPTION18:
No Units18:
Unit Measure18:
LABOR COST18:
MATERIALS COST18:
EQUIPMENT COST18:
TASK DESCRIPTION19:
No Units19:
Unit Measure19:
LABOR COST19:
MATERIALS COST19:
EQUIPMENT COST19:
TASK DESCRIPTION20:
No Units20:
Unit Measure20:
LABOR COST20:
MATERIALS COST20:
EQUIPMENT COST20:
LABOR COSTTOTAL CONTRACT VALUE:
MATERIALS COSTTOTAL CONTRACT VALUE:
EQUIPMENT COSTTOTAL CONTRACT VALUE:
DESCRIPTION1:
MANUFACTURER1:
PART NO1:
ASM STANDARD1:
QUANTITY1:
DESCRIPTION2:
MANUFACTURER2:
PART NO2:
ASM STANDARD2:
QUANTITY2:
DESCRIPTION3:
MANUFACTURER3:
PART NO3:
ASM STANDARD3:
QUANTITY3:
DESCRIPTION4:
MANUFACTURER4:
PART NO4:
ASM STANDARD4:
QUANTITY4:
DESCRIPTION5:
MANUFACTURER5:
PART NO5:
ASM STANDARD5:
QUANTITY5:
DESCRIPTION6:
MANUFACTURER6:
PART NO6:
ASM STANDARD6:
QUANTITY6:
DESCRIPTION7:
MANUFACTURER7:
PART NO7:
ASM STANDARD7:
QUANTITY7:
DESCRIPTION8:
MANUFACTURER8:
PART NO8:
ASM STANDARD8:
QUANTITY8:
DESCRIPTION9:
MANUFACTURER9:
PART NO9:
ASM STANDARD9:
QUANTITY9:
DESCRIPTION10:
MANUFACTURER10:
PART NO10:
ASM STANDARD10:
QUANTITY10:
DESCRIPTION11:
MANUFACTURER11:
PART NO11:
ASM STANDARD11:
QUANTITY11:
DESCRIPTION12:
MANUFACTURER12:
PART NO12:
ASM STANDARD12:
QUANTITY12:
DESCRIPTION13:
MANUFACTURER13:
PART NO13:
ASM STANDARD13:
QUANTITY13:
DESCRIPTION14:
MANUFACTURER14:
PART NO14:
ASM STANDARD14:
QUANTITY14:
DESCRIPTION15:
MANUFACTURER15:
PART NO15:
ASM STANDARD15:
QUANTITY15:
DESCRIPTION16:
MANUFACTURER16:
PART NO16:
ASM STANDARD16:
QUANTITY16:
DESCRIPTION17:
MANUFACTURER17:
PART NO17:
ASM STANDARD17:
QUANTITY17:
DESCRIPTION18:
MANUFACTURER18:
PART NO18:
ASM STANDARD18:
QUANTITY18:
DESCRIPTION19:
MANUFACTURER19:
PART NO19:
ASM STANDARD19:
QUANTITY19:
DESCRIPTION20:
MANUFACTURER20:
PART NO20:
ASM STANDARD20:
QUANTITY20:
DESCRIPTION21:
MANUFACTURER21:
PART NO21:
ASM STANDARD21:
QUANTITY21:
DESCRIPTION22:
MANUFACTURER22:
PART NO22:
ASM STANDARD22:
QUANTITY22:
DESCRIPTION23:
MANUFACTURER23:
PART NO23:
ASM STANDARD23:
QUANTITY23:
DESCRIPTION24:
MANUFACTURER24:
PART NO24:
ASM STANDARD24:
QUANTITY24:
DESCRIPTION25:
MANUFACTURER25:
PART NO25:
ASM STANDARD25:
QUANTITY25:
DESCRIPTION26:
MANUFACTURER26:
PART NO26:
ASM STANDARD26:
QUANTITY26:
Date:
Printed Name:
Title:
Company:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:

File details come from the government source that posted it. Updated .