OPF-L_DRAFT Attachment J.4 - DRAFT SOW PSPEC Cross-Ref Matrix.pdf

PDF 1 MB Posted

Attached to
PRE-SOLICITATION NOTICE FOR ORGANIC PRECISION FIRES - LIGHT (OPF-L)
Solicitation number
M67854
Issued by

About this file

This document is a draft cross-reference matrix for a statement of work and performance specification related to the Organic Precision Fires - Light (OPF-L) pre-solicitation. The matrix requires offerors to map requirements from the statement of work and performance specification documents to their proposals, and indicate whether their solution meets or exceeds each requirement. It includes over 100 individual requirements across numerous categories such as program management, testing, training, environmental operation, and logistics. Offerors are also asked to explain how their solution exceeds any requirements and provide supporting documentation filenames. The pre-solicitation notice identifies the solicitation number as M67854 and indicates it is being issued by the United States Marine Corps for the OPF-L program. Interested parties are advised that attachments included are in draft form and subject to change.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft - Attachment J.6

Requirement Title/Description

SOW

Para

P-Spec Para

Proposal Reference

Para

Meet or Exceed

Requirement

If Exceed Requirement, Explain how it exceeds the requirement. If supporting documentation is provided, please list File name here as well.

REQUIREMENT 3

Production. 3.1.1 Program Management and Data Management. 3.2 Schedule Planning. 3.2.1 Subcontractor Management. 3.2.2 Quality Management. 3.2.3 Data Management. 3.2.4 Program Manager. 3.2.5 Meetings, Formal Reviews, Conferences and Audits. 3.3 Contractor Responsibilities. 3.3.1 Post Award Conference (PAC). 3.3.2 In Process Reviews. 3.3.3 System Requirements Review (SRR). 3.3.4 Critical Design Review (CDR). 3.3.5 Test Readiness Review (TRR). 3.3.6 Production Readiness Review (PRR). 3.3.7 Physical Configuration Audit (PCA). 3.3.8 Provisioning Guidance Conference (PGC). 3.3.9 Provisioning Conference (PC). 3.3.10 Security Requirements. 3.4 Document Markings Requirements. 3.4.1 Configuration Management 3.5 Product Baseline. 3.5.1 Product Description (PD). 3.5.2 Configuration Status Accounting (CSA). 3.5.3 Control/Accountability. 3.5.4 Engineering Change Proposals. 3.5.5 Requests for Variance. 3.5.6 Notices of Revision (NOR). 3.5.7 Notification of Changes to Commercial Equipment/Software. 3.5.8 Environmental, Safety, and Occupational Health (ESOH) 3.6 System Safety. 3.6.1 Hazard Management. 3.6.2 Safety Assessment Report. 3.6.3 Software System Safety Engineering and Analysis. 3.6.4 Functional Hazard Analysis (FHA). 3.6.5 Material Safety Data Sheets. 3.6.6 Support of Government Safety Certification. 3.6.7 Explosive Safety. 3.6.8 Cybersecurity. 3.7 Radio Frequency Spectrum Compatibility 3.8 Testing. 3.9 Government Verification Testing. 3.9.1 Contractor Test Support for Government Testing. 3.9.2 Contractor Training for Government Testing. 3.9.3 Familiarization Training for Government Testing. 3.9.4 Contractor Acceptance Testing. 3.9.5 Contractor Support for Government Operational Testing (OT). 3.9.6 Special Purpose Support Equipment (SPSE). 3.9.7 Production 3.1 Change in Production Facility Location or Break in Production Line. 3.10.1 Qualification/Verification of Suppliers. 3.10.2 Supportability 3.11 Integrated Logistics Support (ILS). 3.11.1 Contractor Logistics Support. 3.11.2 Warranty. 3.11.3 Government Property. 3.12 Government Property Management (GPM). 3.12.1 Government Furnished Property (GFP). 3.12.2 Deliveries 3.13 Packaging, Handling, Storage and Transportation. 3.13.1 Preservation and Packaging (P&P). 3.13.2 Development of Marking Requirements. 3.13.3 Hazardous Materials. 3.13.4 Signed Receipts. 3.13.5 Ammunition Data Cards (ADC). 3.13.6 Failure Reporting, Analysis and Corrective Actions System. 3.14 Provisioning Technical Documentation. 3.15 Provisioning Parts List (PPL). 3.15.1 Special Tools and Test Equipment List (TTEL). 3.15.2

OPF-L SOW & PERFORMANCE SPECIFICATION CROSS-REFERENCE MATRIX

Offeror: _________________________

DRAFT

SOW

Para

P-Spec Para

Proposal Reference

Para

Meet or Exceed

Requirement

If Exceed Requirement, Explain how it exceeds the requirement. If supporting documentation is provided, please list File name here as well.

OPF-L SOW & PERFORMANCE SPECIFICATION CROSS-REFERENCE MATRIX

Offeror: _________________________

Bill of Materials. 3.15.3 Engineering Data For Provisioning. 3.15.4 Copyright Release. 3.15.5 Operator Technical Publications. 3.15.6 Item Unique Identification Marking Plan 3.16 Training 3.17 Training Developers and Instructors. 3.17.1 Training Material. 3.17.2 Job Aids. 3.17.3 Training Conduct. 3.17.4 Training Verification. 3.17.5 Training Material Changes. 3.17.6 Course Conduct Information Package (Trainee and Training Course Completion Data). 3.17.7 Demilitarization/Disposal Procedures. 3.18

REQUIREMENTS 3

Interoperability 3.1.

Ground Launch (T). 3.1.1.

Single Marine Packable GCS (T). 3.1.2.

Single Marine Packable AUR (T). 3.1.3.

Single Marine Packable System (O). 3.1.4.

Radio (T). 3.1.5.

Antenna (T). 3.1.6.

GPS Device (T). 3.1.7.

GPS Device (O). 3.1.8.

Position, Navigation and Timing (O). 3.1.9.

One-Person Operation (T). 3.1.10.

Ground Control Station Weight (T). 3.1.11.

Ground Control Station Weight (O). 3.1.12.

PPE (T). 3.1.13.

Gloves (T). 3.1.14.

Loitering Munition (LM) 3.2.

Range (T). 3.2.1.

Range (O). 3.2.2.

Warhead Integration (T). 3.2.3.

Warhead Removable (O). 3.2.4.

Warhead Integration (O). 3.2.5.

Probability of Hit (T). 3.2.6.

Probability of Hit (O). 3.2.7.

Circular Error Probability for Stationary Targets (T). 3.2.8.

Circular Error Probability for Stationary Targets (O). 3.2.9.

Loiter Time (T). 3.2.10.

Loiter Time (O). 3.2.11.

Removable Battery (O). 3.2.12.

Battery Life (T). 3.2.13.

Battery Life (O). 3.2.14.

AUR Weight (T). 3.2.15.

AUR Weight (O). 3.2.16.

Fuzing System (T). 3.2.17.

Prelaunch Fuze Selection (T). 3.2.18.

Inflight Fuze Selection (O). 3.2.19.

Fuzing Indicator (O). 3.2.20.

Select Target (T). 3.2.21.

EO/IR Sensor (T). 3.2.22.

EO/IR Sensor Control (O). 3.2.23.

Daytime Detection (T). 3.2.24.

Nighttime Detection (O). 3.2.25.

Daytime Identification (T). 3.2.26.

Nighttime Identification (O). 3.2.27.

Modify Target (T). 3.2.28.

Sustain Lock (T). 3.2.29.

Safety (T). 3.2.30.

Battery Certification (T). 3.2.31.

AUR Label (T). 3.2.32.

LM Identification (T). 3.2.33.

LM Identification in Flight (T). 3.2.34.

AUR BIT (T). 3.2.35.

Laser Systems (T). 3.2.36.

GCS 3.3.

GCS Battery Life (T). 3.3.1.

Stationary Control (T). 3.3.2.

SOW

Para

P-Spec Para

Proposal Reference

Para

Meet or Exceed

Requirement

If Exceed Requirement, Explain how it exceeds the requirement. If supporting documentation is provided, please list File name here as well.

OPF-L SOW & PERFORMANCE SPECIFICATION CROSS-REFERENCE MATRIX

Offeror: _________________________

GCS (T). 3.3.3.

Encryption (T). 3.3.4.

C2 Launch Command (T). 3.3.5.

Data Input (T). 3.3.6.

Prelaunch LM Loss of Link Location Designation (T). 3.3.7.

Inflight LM Loss of Link Location Designation (O). 3.3.8.

Control of LMs (T). 3.3.9.

Simultaneous Control of LMs (O). 3.3.10.

Abort Attack (T). 3.3.11.

Single Operator Action (T). 3.3.12.

Time Remaining to Abort (O). 3.3.13.

Disarm Warhead (T). 3.3.14.

Redirect Abort (T). 3.3.15.

Predetermined Ditch Location (T). 3.3.16.

Modify Ditch Location (T). 3.3.17.

Arm Warhead (T). 3.3.18.

Re-attack (T). 3.3.19.

Rearm Warhead (T). 3.3.20.

Self-Destruct (O). 3.3.21.

Establish Flight Path (T). 3.3.22.

LM Flight Path (T). 3.3.23.

Reprogram Flight Path (T). 3.3.24.

Saved Flight Paths (O). 3.3.25.

Flight Path Display (T). 3.3.26.

Employment 3.4.

Start-up Time (T). 3.4.1.

Self-Contained AUR (T). 3.4.2.

Airframe Recovery (O). 3.4.3.

Attack Angle Selection (O). 3.4.4.

Environmental Operation 3.5.

Low Pressure (Altitude) (T). 3.5.1.

Cold Operating Temperature (T). 3.5.2.

Hot Operating Temperature (T). 3.5.3.

Cold Storage Temperature (T). 3.5.4.

Hot Storage Temperature (T). 3.5.5.

Temperature Shock (T). 3.5.6.

Rain – Non-Operational (T). 3.5.7.

Rain – Operational (T). 3.5.8.

Humidity (T). 3.5.9.

Salt Fog (T). 3.5.10.

Rust and Corrosion (T). 3.5.11.

Sand (T). 3.5.12.

Dust (T). 3.5.13.

Seven Foot (2.1 m) Drop (T). 3.5.14.

Seven Foot (2.1 m) Drop (O). 3.5.15.

Immersion (T). 3.5.16.

Transportation Vibration – Aircraft (T). 3.5.17.

Transportation Vibration – Cross-Country (T). 3.5.18.

Transportation Vibration – Maritime (T). 3.5.19.

Freeze/Thaw (T). 3.5.20.

Contact with Chemicals, Fluids and POL (T). 3.5.21.

Five Foot Drop (1.5 m) (T). 3.5.22.

Five Foot Drop (1.5 m) (O). 3.5.23.

Insensitive Munitions (T). 3.5.24.

Electromagnetic Environmental Effects (T). 3.5.25.

HERP (T). 3.5.26.

HERF (T). 3.5.27.

HERO (T). 3.5.28.

Radiated Susceptibility (T). 3.5.29.

Radiated Emissions (T). 3.5.30.

Personnel-Borne Electrostatic Discharge (T). 3.5.31.

Helicopter-Borne Electrostatic Discharge (T). 3.5.32.

System Survivability 3.6.

Electromagnetic Spectrum (EMS) (T). 3.6.1.

Mitigate EMS Attacks (O). 3.6.2.

Packaging, Handling, Storage, and Transportation (PHS&T) 3.7.

Packaging (T). 3.7.1.

Ground Transportable (T). 3.7.2.

Air Transportable (T). 3.7.3.

Sea Transportable (T). 3.7.4.

SOW

Para

P-Spec Para

Proposal Reference

Para

Meet or Exceed

Requirement

If Exceed Requirement, Explain how it exceeds the requirement. If supporting documentation is provided, please list File name here as well.

OPF-L SOW & PERFORMANCE SPECIFICATION CROSS-REFERENCE MATRIX

Offeror: _________________________

40 Foot (12 m) Drop (T). 3.7.5.

40 Foot (12 m) Drop (O). 3.7.6.

Fire Safety (T). 3.7.7.

Hazard Classification (T). 3.7.8.

Logistics 3.8.

Mean Time To Repair Mission Essential Function Failures (MTTRmeff) (T). 3.8.1.

Mission Reliability (T). 3.8.2.

Mission Reliability (O). 3.8.3.

Training and Simulation (T). 3.8.4.

Cyber 3.9.

Cyber (T). 3.9.1.

Ancillary Equipment 3.10.

Carry Equipment (T). 3.10.1.

Battery Charger (T). 3.10.2.

Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.

File details come from the government source that posted it. Updated .