This document outlines the government test and evaluation plan for the Organic Precision Fires - Light (OPF-L) program solicitation. The testing will evaluate a loitering munition system and is broken into multiple phases. Phase 1 includes E3/radiation hazard testing, basic safety sequence testing, arena testing, and electrostatic discharge testing at various facilities from FY25 Q1 through Q2. Phase 2 involves performance testing, delta performance testing, environmental testing, packaging testing, insensitive munitions testing, and a field user evaluation from FY25 Q4 through FY26. Testing will utilize inert, live, and modified munitions and validate requirements like accuracy, endurance, and control capabilities. The document specifies test locations, planned munition quantities, objectives, and timelines. Vendors must support testing events with personnel and deliver munitions, batteries, payloads, and other equipment as outlined.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft - Attachment J-3 – Page 1 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Attachment J-3: T&E Support
Test Scope and Locations
July 2023
1.1 Scope of Planned Government Testing:
1.1.1 E3/Radiation Hazard (HERO/HERP/HERF/E3) Testing
Radiation hazard testing and analysis will be performed early in the testing sequence for safety purposes. Hazards of Electromagnetic Radiation to Ordnance (HERO) testing will be performed to characterize the robustness and the safety of the OPF-L system in its operational environment.
Radio Frequency (RF) emissions from co-located radios and other emitters must not cause a safety hazard to the ordnance, nor cause a mission essential function in the OPF-L system to malfunction. HERO testing will subject the OPF-L ordnance to RF emissions.
Hazards of Electromagnetic Radiation to Personnel (HERP) / Hazards of Electromagnetic Radiation to Fuel (HERF) testing and analysis will be conducted to characterize the type and amount of Electric and Magnetic Field (EMF) emissions of the OPF-L system during operation.
Since the OPF-L system has an RF data link, the expectation is that there will be RF emissions during operations. The acceptable limit for these emission on personnel and fuel will be analyzed to ensure that they are within safe limits.
Electromagnetic Environmental Effects (E3) testing will be required to establish a characterization of E3 on the OPF-L system. The test program will be tailored by working with Naval Surface Warfare Center Dahlgren Division (B52) from tests and requirements in MIL- STD-461 and MIL-STD-464. It will be determined which requirements are most critical to meet to ensure that a system is safe in the expected electromagnetic environment as part of the test plan development. The OPF-L system will also be subject to Personnel Borne Electrostatic Discharge (PESD) and Helicopter ESD (HESD) requirements and testing to support operations with Marines and transport via rotary wing assets.
HERO/HERP/HERF/E3 Testing is planned for FY25 Q1-Q2 at the Naval Surface Warfare Center, Dahlgren Division (NSWCDD). It is planned for the first phase of testing to help characterize the safety of the system early before other test events can occur.
ESD testing is planned for FY25 Q1-Q2 at the Naval Surface Warfare Center, Indian Head Division (NSWCIHD). After testing is complete, the articles under test will undergo physical inspection by Government test personnel and then returned to the vendor to determine if any damage had occurred that was not uncovered by the Built-In-Test (BIT).
These test series will require an instrumented Loitering Munition (LM) configuration with an inert payload with an inert fully functioning fuze.
1.1.2 Performance Testing
Performance Testing includes LM flight performance, munition performance, and Ground Control Station (GCS) performance for the intended functionality. This will include testing on the range with inert and live rounds. As this program is focused on obtaining non-developmental items, the performance of the vendor solutions will be quantified IAW User requirements and system specifications. Performance Testing will evaluate the functions of the system through flight cards against stationary targets, characterizing aspects of the system. In addition, lab testing and analysis will be performed to supplement range testing through Night Vision Labs to determine the system’s ability to Detect and Identify. If available, a vendor-provided model of
Draft - Attachment J-3 – Page 2 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Draft - Attachment J-3 – Page 3 are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
sensor capabilities would aid in the determination of performance parameters. Performance testing will include, but not be limited to, evaluating the following parameters:
a. Munition accuracy [Probability of Hit (PoH) and Circular Error Probable (CEP)] against stationary targets
b. Battery life of munition and ground control station
c. Loiter time/munition endurance/max speed/max range
d. GCS capability to plan and execute missions, abort missions, plan lost link scenarios, etc.
e. Munition sensor target discrimination
Detailed test plans and flight cards are under development. Testing will begin with flying inert rounds to help ensure that system capabilities are understood. Close coordination with range and system safety will occur to ensure that there are clear contingency plans for when a LM loses link with the GCS, or otherwise undergoes a fault (e.g., loses GPS). The GCS control and mission planning capabilities will be determined during this time. Data in loiter time, range, and endurance can also be collected with an inert round to help bound the remainder of the flight cards. This includes characterization of limitations of the battery as well as the radio. Data on reliability of the LMs can also be gathered during these flight tests. The intent is for each round to finish its flight either through engagement of a target or with an intentional abort/ditch to exercise the capability.
The vendor will need to provide 1 Operator to support each Performance test event for the full duration of each test event. This Operator will be responsible to assist the Government Operator with subject matter expertise, technical support, and assisting with data collection.
Performance Testing is planned for FY25 Q1-Q2 at Yuma Proving Ground (YPG). The duration is expected to be 14 calendar days.
Delta Performance Testing is planned for FY25 Q4-FY26 Q1 at YPG. The duration is expected to be 14 calendar days. This test event will be an opportunity to test lower priority flight cards, additional attributes of the vendor solution, and to fly assets that have gone through some level of environmental testing.
1.1.3 Basic Safety Series Testing
Limited environmental testing and analysis will be performed in a basic safety series to characterize the robustness of the OPF-L system in the operational environment without loss of mission essential function or introduction of safety hazards. Deficiencies will not preclude further testing and evaluation but may inform training and employment planning of the system during fielding. These tests are intended to focus on the safety of the OPF-L system while in a transportation configuration IAW MIL-STD-2105D. The test sequence will include, but not be limited to:
a. 28 day temperature and humidity
b. Transportation Vibration for Fixed Wing Aircraft
c. 4 day temperature and humidity
d. 12 meter (40’) drop, then ensuring the LM is safe to transport and dispose of
Draft - Attachment J-3 – Page 4 are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
The government may reserve the right to fire the LM after this sequence of testing, as it is intended to simulate a life cycle of the round from delivery to fielding.
This will help identify any potential limitations with safe shipment of the OPF-L.
Basic Safety Series Testing is planned for FY25 Q1-Q2 at YPG. Performing these tests early will help to inform the limits of the system survivability as it pertains to safe transport to other test ranges and events as part of the test program.
1.1.4 Arena Testing
Arena testing will be performed to characterize the effectiveness of the warhead against personnel targets. The data from this testing will be used to inform measures of effectivity and lethality for anti-personnel rounds.
Arena testing is planned for FY25 Q1-Q2 at NSWCDD.
1.1.5 Harmonized Insensitive Munitions Testing and Hazard Classification
Harmonized Insensitive Munitions (IM) and Hazard Classification (HC) testing will focus on testing for safety of the warhead IAW MIL-STD-2105D. IM testing will include, but not be limited to, the following tests:
a. Slow Heating/Slow Cook Off
b. Fast Heating/Fast Cook Off
c. Bullet impact
d. Sympathetic Detonation (unconfined)
e. Thermal Stability
Harmonized IM and HC testing is planned for FY25 Q4-FY26 Q1 at NSWCDD.
1.1.6 Environmental Testing
Environmental testing and analysis will be performed to characterize the robustness of the OPF- L system in a representation of the operational environment without loss of mission essential function or introduction of safety hazards. This testing will subject the system in different configurations to different environmental conditions. This series of testing will inform the suitability of the system for the operational environment, as well as to identify any limitations.
Environmental testing may include, but not be limited to:
a. Low temperature operation
b. Icing
c. Blowing rain
d. Freezing rain
e. Temperature shock
f. High temperature operations
g. Humidity
h. Solar Radiation
i. Blowing Sand and Dust
j. Salt spray/salt fog
k. 5’ drop
l. Altitude
Environmental testing is planned for FY25 Q4-FY26 Q2 at YPG.
The OPF-L system is expected to be transported via other means such as rotary wing and ground transportation. The system will also be subject to a series of transportation vibration tests vibration profiles simulating rotary wing (e.g. CH-53, MV-22) and ground (e.g. JLTV, MTVR, ACV, etc.) transportation vibration in accordance with MIL-STD-810.
1.1.7 Packaging, Handling, Storage and Transportation (PHS&T) Testing and Analysis
Packaging, Handling, Storage and Transportation (PHS&T) testing will be performed to ensure that the OPF-L system, in various packaging configurations, can be safely handled, shipped, and transported without degradation of its mission essential capabilities or introducing safety hazards. The packaging configuration should meet the requirements for Level A Fleet-Issue Unit Load Level (Navy) IAW MIL-STD 1660. Testing will be prioritized based on the expectations for employment of the system, as the system is expected to be fielded in a limited capacity.
PHS&T testing with rounds in the packaging may include, but not be limited to:
a. Limited environmental testing of transportation configuration
b. Loose Cargo Shock and Vibration
c. 7’ drop
Additional testing/analysis may be required on the packaging itself to determine the safety and suitability of the items. The level of testing or analysis required will be determined by the vendor solution selected. In lieu of OPF-L system hardware, mass simulators will be developed to use during testing. PHS&T testing on the packaging itself may include, but not limited to:
a. Fire safety
b. Palletized testing (assuming the PHS&T Center will develop the palletized load with vendor input regarding vendor packaging)
Depending on the results of drop and vibration testing on the system without packaging, additional testing or analysis may be required to characterize the risk of transporting the system.
PHS&T testing is planned for FY26 Q2-Q3 at YPG.
1.1.8 Lithium Battery Certification
Lithium (Li) Battery testing and analysis will be required to support Li Battery Certification.
Depending on the facility, Li Battery Certification applies to all Navy and Marine Corps events and activities involving Li battery-powered devices intended for use or transportation on Navy/Marine Corps facilities, submarines, ships, vessels, and aircraft. Li Battery Certification will be required for all Li batteries within their specific system even when the battery has been approved in another system. Li Battery testing and analysis will be performed as early as possible once systems have been identified and will be coordinated with NSWC Crane. The scope of testing and analysis will be determined once a system, battery type, and battery configuration have been identified. Additional spare batteries may be required for government
Draft - Attachment J-3 – Page 5 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the
Draft - Attachment J-3 – Page 6 are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
analysis and test. Portions of the testing and analysis may be accepted if adequate data is available from a trusted test agency, as deemed by the Government.
1.1.9 Fuze Testing and Analysis
As the OPF-L vendor solution has not yet been selected, it is currently unknown what type of fuze or initiator will be used by the system. If the system under test has a fuze that has undergone testing as part of another program, the OPF-L program will coordinate with the Navy Fuze and Initiation System Technical Review Panel (FISTRP) to determine what data is available from previous test or analysis, and whether additional testing and/or analysis may be required. If the system has a new fuze that has not been previously reviewed by a recognized Department of Defense fuze and initiation system review board, the OPF-L program will schedule a FISTRP technical assistance meeting to determine the required testing and/or analysis to be conducted.
1.1.10 Cybersecurity Testing and Analysis
The goal of cybersecurity test and evaluation is to identify and mitigate exploitable system vulnerabilities, impacting operational resilience of military capabilities before system deployment to include safety, survivability, and security. Early discovery of system vulnerabilities can facilitate remediation and reduce impact on cost, schedule, and performance.
The vendor will be required to support a Cyber Table Top (CTT) to inform government cybersecurity experts on the characteristics of the system. The vendor will need to support cybersecurity scans to ascertain attack surface, and to support a Cooperative Vulnerability and Penetration Assessment (CVPA). The vendor will need to provide information on their system to support the Interim Authorization to Test (IATT) and Authorization to Operate (ATO) processes led by the Government. The system will also undergo Adversarial Assessment (AA), which will have minimal vendor involvement. The vendor may also need to assist in recovering a system that has undergone cybersecurity attack during Cybersecurity testing.
1.1.11 Field User Evaluation
The OPF-L test program will also perform a Field User Evaluation (FUE) to support Operational Assessment. The FUE is a test activity run by representative operators with minimal vendor involvement. The intent is to determine the suitability of the solution in the field for use by Marines with minimal vendor support.
- FUE, will be conducted at a CONUS location, with YPG being the most probable facility.
- The duration will be not greater than 6 weeks.
- The vendor will provide maintenance and operator instructor support in an on-call capacity who will provide solicited guidance and recommendations.
- The event will be run by Government test personnel.
- This event will also validate the quality of vendor training package.
- The vendor will need to provide one Subject Matter Expert to support the event for the full duration. This SME will be responsible to be on-call to assist the Government Operator with subject matter expertise and technical support.
Draft - Attachment J-3 – Page 7 are in DRAFT form and are subject to change. The final versions will be released with the
Figure 1: Government Test Event Overview
Draft - Attachment J-3 – Page 8 are in DRAFT form and are subject to change. The final versions will be released with the
Figure 2: Phase 1 Government Test Events
Draft - Attachment J-3 – Page 9 are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Figure 3: Phase 2 Government Test Events
DRAFT
Figure 4: Government Testing Asset Allocation per Test Event
Draft - Attachment J-3 – Page 10 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Test Munition Production
Monthly - Planned 2514 0 0 0 0 0 0 0 0 0 0 0 22 15 15 15 15 15 15 15 0 15 15 20 20 20 17 20 0 0 0 0 0 21 30 35 40 Inert 664 13 11 13 17 20 Live 1850 22 15 2 4 15 15 15 2 15 15 20 20 20 21 30 35 40
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
E3/Radiation Hazard Testing (live) 6 - - - - - - - - - - - 6 - - - - - - - - - - - - - - - - - - - - - - - - Spares - E3/Radiation Hazard Testing (live) 2 - - - - - - - - - - - 2 - - - - - - - - - - - - - - - - - - - - - - - - Basic Safety Sequence Testing (live) 10 - - - - - - - - - - - 10 - - - - - - - - - - - - - - - - - - - - - - - - Spares - Basic Safety Sequence Testing (live) 3 - - - - - - - - - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - Arena Testing (live) 14 - - - - - - - - - - - - 14 - - - - - - - - - - - - - - - - - - - - - - - Spares - Arena Testing (live) 3 - - - - - - - - - - - - - 3 - - - - - - - - - - - - - - - - - - - - - - Performance Testing (inert) 21 - - - - - - - - - - - - - - 21 - - - - - - - - - - - - - - - - - - - - - Spares - Performance Testing (inert) 3 - - - - - - - - - - - - - - 3 - - - - - - - - - - - - - - - - - - - - - Performance Testing (live) 16 - - - - - - - - - - - - - - - 16 - - - - - - - - - - - - - - - - - - - - Spares - Performance Testing (live) 4 - - - - - - - - - - - - - - - 4 - - - - - - - - - - - - - - - - - - - - Delta Performance Testing (inert) 6 - - - - - - - - - - - - - - - - 6 - - - - - - - - - - - - - - - - - - - Spares - Delta Performance Testing (inert) 5 - - - - - - - - - - - - - - - - 5 - - - - - - - - - - - - - - - - - - - Delta Performance Testing (live) 5 - - - - - - - - - - - - - - - - - 5 - - - - - - - - - - - - - - - - - - Spares - Delta Performance Testing (live) 2 - - - - - - - - - - - - - - - - - 2 - - - - - - - - - - - - - - - - - - Environmental Testing (live) 35 - - - - - - - - - - - - - - - - - - - - 35 - - - - - - - - - - - - - - - Spares - Environmental Testing (live) 9 - - - - - - - - - - - - - - - - - - - - - 9 - - - - - - - - - - - - - - PHS&T (live) 4 - - - - - - - - - - - - - - - - - - - - - 4 - - - - - - - - - - - - - - Spares - PHS&T (live) 1 - - - - - - - - - - - - - - - - - - - - - 1 - - - - - - - - - - - - - - Harmonized IM and Hazard Class Testing (live) 15 - - - - - - - - - - - - - - - - - - - - - - 15 - - - - - - - - - - - - - Spares - Harmonized IM and Hazard Class Testing (live) 3 - - - - - - - - - - - - - - - - - - - - - - 3 - - - - - - - - - - - - - Field User Evaluation (live) 36 - - - - - - - - - - - - - - - - - - - - - - - - 36 - - - - - - - - - - - Spares - Field User Evaluation (live) 9 - - - - - - - - - - - - - - - - - - - - - - - - 9 - - - - - - - - - - - Field User Evaluation (inert) 24 - - - - - - - - - - - - - - - - - - - - - - - - - - 24 - - - - - - - - - Spares - Field User Evaluation (inert) 6 - - - - - - - - - - - - - - - - - - - - - - - - - - 6 - - - - - - - - -
2QTotal
FY24 FY25 FY26
3Q 4Q 1Q 2Q1Q 2Q 3Q 4Q 1Q 3Q 4Q
Total
FY24 FY25 FY26
1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
Inert Flight Card Test Objective Configuration 1 Range Setup (telemetry, instrumentation.) TBD - YPG need Operational 2 Range Setup (telemetry, instrumentation.) TBD - YPG need Operational 3 Range Setup (telemetry, instrumentation.) TBD - YPG need Operational 4 Flight Card 6 - Ditch Safe ditch for Safety Operational 5 Flight Card 6 - Ditch Safe ditch for Safety Operational 6 Flight Card 7 - Loss of Link LoL validation for Safety Operational 7 Flight Card 7 - Loss of Link LoL validation for Safety Operational 8 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational 9 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational
10 Flight Card 5 - Control C2 Software Validation Operational 11 Flight Card 5 - Control C2 Software Validation Operational 12 Flight Card 5 - Control Angle of Attack Operational 13 Flight Card 5 - Control Angle of Attack Operational 14 Flight Card 5 - Control Angle of Attack Operational 15 Flight Card 5 - Control Angle of Attack Operational 16 Flight Card 11 - Abort Abort Attack, then ditch Operational 17 Flight Card 11 - Abort Abort Attack, then re-engage Operational 18 Flight Card 3 - Loiter Time Characterize vendor limits Operational 19 Flight Card 3 - Loiter Time Characterize vendor limits Operational 20 Flight Card 4 - Range and Endurance Characterize vendor limits Operational 21 Flight Card 4 - Range and Endurance Characterize vendor limits Operational 22 Flight Card 2a - Launch/Flight/Target/Attack Moving Target Low Speed Characterize vendor limits Operational 23 Flight Card 2a - Launch/Flight/Target/Attack Moving Target Low Speed Characterize vendor limits Operational 24 Flight Card 8 - Max Speed and Loiter Characterize vendor limits Operational 25 Flight Card 8 - Max Speed and Loiter Characterize vendor limits Operational
Figure 5: Notional Inert LM Flight Card Overview
Draft - Attachment J-3 – Page 11 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Draft - Attachment J-3 – Page 12 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Live Flight Card Test Objective 1 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational 2 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational 3 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational 4 Flight Card 1 - Launch/Flight/Target/Attack Stationary Target Base mission Operational 5 Flight Card 11 - Abort Abort Attack, then re-engage Operational 6 Flight Card 11 - Abort Abort Attack, then re-engage Operational 7 Flight Card 11 - Abort Abort Attack, then re-engage Operational 8 Flight Card 11 - Abort Abort Attack, then re-engage Operational 9 Flight Card 5 - Control Angle of Attack Operational
10 Flight Card 5 - Control Angle of Attack Operational 11 Flight Card 5 - Control Angle of Attack Operational 12 Flight Card 5 - Control Angle of Attack Operational 13 CEP CEP Operational 14 CEP CEP Operational 15 CEP CEP Operational 16 CEP CEP Operational 17 Flight Card 5 - Control Angle of Attack Operational 18 Flight Card 5 - Control Angle of Attack Operational 19 Flight Card 5 - Control Angle of Attack Operational 20 Flight Card 5 - Control Angle of Attack Operational 21 Flight Card 2a - Launch/Flight/Target/Attack Moving Target Low Speed Operational
Figure 6: Notional Live LM Flight Card Overview DRAFT
Training Activity
Course Content Location Class Size
(Max)
Conduct Period Class Duration
(estimated) Phase 1 Familiarization of Government Test Personnel
OPF-L
Familiarization;
system/subsystem
YPG 30 Must be completed prior to the start of Government
Testing
5 days
Operator Training of Government
Test Personnel
System Operation, Operator
Preventative Maintenance Checks and Services, setup and teardown
YPG 25 (8
operators and 17 observers)
Must be completed prior to the start of Government
Testing
10 days
Phase 2 Familiarization of FUE and
MCOTEA
(optional)
OPF-L
Familiarization;
system/subsystem
TBD 30 Must be completed prior to the start of FUE
5 days
Operator Training of
FUE Marines
System Operation, Operator
Preventative Maintenance Checks and Services, setup and teardown
TBD 12 Must be completed prior to the start of FUE
5 days
Table 1: Contractor Training of Government Personnel (Projected)
Draft - Attachment J-3 – Page 13 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Draft - Attachment J-3 – Page 14 Disclaimer – Interested offerors are advised that attachments included in this announcement are in DRAFT form and are subject to change. The final versions will be released with the solicitation.
Rounds Needed
Component Configuration as Applicable Comments
Delivered Location Containerization Fuze Guidance Warhead
Propelling System
Telemetry
3 Y Inert Live Inert Inert Live/Modified E3/Radiation
Hazard
NSWCDD
5 Y Inert Live Inert Inert Live/Modified Phase 1: ESD NSWCIHD
13 Y Live Live Live Live Live Basic Safety
Sequence
YPG
20 Y Live Live Live Live None Performance Testing
YPG
24 Y Live Live Inert Live None 17 N Mass Mass Live Empty None Arena Testing NSWCDD
10 Spare Batteries Battery
Certification NSWC Crane
18 Y Live Live energetic, no GPS Live Live None
Harmonized IM and HC
NSWCDD
7 Y Live Live Live Live None Delta Performance YPG
11 Y Live Live Inert Live None
44 Y Live Live Live Live Live Environmental
Testing
YPG
5 Y Live Live Live Live Live PHS&T Testing YPG 45 Y Live Live Live Live None Field User
Evaluation
YPG
30 Y Live Live Inert Live None
Table 2: Required Deliverables/Equipment to Support Government Testing DRAFT