The provided file appears to be a zipped collection of technical reports related to the OK FW SQH T501(1) Rehab Riverwalk project at the Sequoyah National Wildlife Refuge. The associated federal contract opportunity involves riverbank and trail rehabilitation located in eastern Oklahoma, approximately 90 miles southeast of Tulsa. The project, managed by the Department of Transportation Federal Highway Administration, focuses on improving visitor access and infrastructure damaged by 2019 flooding.
Key project details include rehabilitating 1,150 linear feet of riverbank and repairing/reconstructing 500 linear feet of 6-foot-wide asphalt trail. Principal work items encompass 2,700 cubic yards of earthwork, 2,700 cubic yards of riprap placement, 60 tons of asphalt concrete pavement, and 195 cubic yards of topsoil. The anticipated project schedule indicates advertisement in September 2025, award in November 2025, and contract completion by January 2026, with a total estimated cost range between $700,000 and $2,000,000. The work will be performed in a grassed upland area with wooded vegetation adjacent to the riverbank.
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary - OK FW SQH T501(1).pdf | ||
| A003 .pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| QnA _11.18.25_LN.pdf | ||
| QnA 11 12 2025.pdf | ||
| 6982AF25B000021.pdf | ||
| OK FW SQH T501(1) Rehab Riverbank and Sandtown Woods Trail_100 Plans_v3.pdf | ||
| OK FW SQH T501(1)_152.04 Furnished Files.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .