Bid Opening Summary - OK FW SQH T501(1).pdf
PDF 120 KB Posted
- Solicitation number
- 6982AF25B000021
About this file
This is a Bid Opening Summary for the OK FW SQH T501(1) Project, specifically the Riverbank & Sandtown Woods Tr Rehabilitation project. The bid opening was scheduled for 11/21/2025 at 2:00 p.m. MST in Lakewood, CO, with one amendment issued on 10/30/2025. Seven contractors submitted bids, ranging from $586,415.00 (Yorkshire Industries) to $2,125,034.05 (McKenzie Construction), with the Engineer's Estimate set at $1,545,000.00. The bids are from construction companies located in various states including Missouri, New York, Oklahoma, Florida, and Washington, DC.
The lowest bid was submitted by Yorkshire Industries at $586,415.00, which is significantly below both the Engineer's Estimate and most other submitted bids. The bids are currently subject to verification, indicating that the final contractor selection has not yet been made. The wide range of bid prices (from $586,415.00 to $2,125,034.05) suggests potential variations in proposed project approaches, contractor capabilities, or understanding of project requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A003 .pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| QnA _11.18.25_LN.pdf | ||
| QnA 11 12 2025.pdf | ||
| OK FW SQH T501(1) Rehab Riverwalk - Pavement Geotech and Hydraulic Reports.zip | ZIP file | |
| 6982AF25B000021.pdf | ||
| OK FW SQH T501(1) Rehab Riverbank and Sandtown Woods Trail_100 Plans_v3.pdf | ||
| OK FW SQH T501(1)_152.04 Furnished Files.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: OK FW SQH T501(1) Project Number: REHAB RIVERBANK & SANDTOWN WOODS TR Bid Opening Date: 11/21/2025 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Jorey Deml
Amendments: (1) _10/30/2025__
Bidder Name Schedule A BID TOTAL
1. Construction Solutions Group St Louis, MO
$1,276,445.00 $1,276,445.00
2. Yorkshire Industries New York, NY
$586,415.00 $586,415.00
3. RKE Contractors Dexter, MO
$1,014,590.67 $1,014,590.67
4. CA Native Muskogee, OK
$1,865,675.00 $1,865,675.00
5. GC Works Miami, FL
$1,436,244.88
$1,436,244.88
6.Stuever Dirtworks Ponca City, OK
$1,217,746.00 $1,217,746.00
7. McKenzie Construction Washington, DC
$2,125,034.05 $2,125,034.05
Engineer’s Estimate $1,545,000.00 $1,545,000.00
*All bids are subject to verification.
| Bid Opening Summary |
| Bid Opening Date: 11/21/2025 Time: 2:00 p.m. MST |
| *All bids are subject to verification. |
File details come from the government source that posted it. Updated .