This document is a Questions and Answers (Q&A) file for the OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail project dated November 12, 2025. The Q&A addresses eight key contractor inquiries, including file accessibility, project timing, tax exemption status, supervisory role configurations, laboratory testing requirements, biological expertise, wildlife considerations, and insurance specifications. Notable details include an estimated Notice to Proceed (NTP) date referenced in document A-3, confirmation that the project requires a qualified biologist at contractor's expense, and no known hawk, owl, or eagle nests in the project area. Contractors are directed to consult Special Contract Requirements, Federal Acquisition Regulation (FAR) clauses, and specific sections for detailed information on taxes, traffic control supervision, and insurance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail
November 12, 2025
Questions Answers 1 One of the files (CFL Riverbank & Sandtown) provided in the zip folder entitled OK FW SQH T501(1)_152.04 Furnished Files.zip is encrypted/corrupted and displays as shown in the attached screenshot. Could you please provide a copy that will display correctly?
A plain-text file that uses tags (the XML format) to store OpenRoads project data and settings.
2 What is the estimated NTP date? See A-3 3 Is this project tax exempt? Please see FAR 52.229-3 Federal, State, and Local Taxes clause. Refer to specific state tax exempt information.
4 Can any supervisory roles (Superintendent, QC, & SSHO) be dual hatted?
See 156.09 Traffic Control Supervisor.
5 SCR - 153.05 Sampling and Testing b) Testing & 154.04B Field Laboratory (Contractor-Furnished):
1. requires a furnished lab on-site for testing. Is this accurate?
It can be either on-site or off-site.
6 The SCR requires a qualified biologist (107.10 e.1.)
1.) Which Pay Item should this requirement fall under?
Costs associated with the biologist are the responsibility of the contractor at no additional cost to the Government.
7 Are there currently any known hawk, owl, or eagle nests within the area scheduled for clearing?
There are no known nests within the project area or directly adjacent to the project area.
8 What are the insurance requirements for the project? Refer to Special Contract Requirements, FP-14 Section 107, and FAR 52.228-5.