OH0189CN - J.W. Peck Building Asbestos Notification Letter (12_2019).pdf
PDF 120 KB Posted
- Attached to
- Cincinnati Elevator Services Federal contract opportunity
- Solicitation number
- Not on record
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 3.pdf | ||
| RFI 2.pdf | ||
| PreProposal Conference Attendance .pdf | ||
| Walk Thru Sign in.pdf | ||
| Pre-Proposal Conference Agenda.pdf | ||
| RFI 1.pdf | ||
| J.13 Hydraulic Elevator Checklist 08-2018.pdf | ||
| OH0028CN - Potter Stewart CTHSE Asbestos Notification Letter (11_2019).pdf | ||
| Contractor Proposal Worksheet - Peck 2.13.20.xls | XLS spreadsheet | |
| Contractor Proposal Worksheet - PSCH 2.13.20.xls | XLS spreadsheet | |
| Contractor Proposal Worksheet - FDA 2.13.20.xls | XLS spreadsheet | |
| J.7 Elevator Inspection Form.pdf | ||
| RFP 47PF0021Q0095.pdf | ||
| GSA527-15e (1).pdf | ||
| J.13 Electric Traction Elevator Checklist 08-2018.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 05/04/2020
Prospective Contractors (bidders), Pursuant to the Code of Federal Regulations all building owners are required to provide notification of the presence, location, and quantity of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities. This notification is provided as a safeguard, to ensure prospective contractors (bidders) are aware of this information.
Asbestos containing material is present in the John Weld Peck Building (OH0189CN) in the following forms, locations, and quantities:
Type Location Quantity
Fittings on Fiberglass Line Throughout Building 21200 ea
Tank Insulation Sub-Basement Mechanical Room 800 sf
Duct Insulation Throughout 19000 sf
Elevator Door Insulation Throughout 1300 sf
Mastic on AHU Supply Duct Throughout Building Supply Duct 13600 sf
Caulk (Painted Grey) Sub-Basement Mechanical Room 10 lf
Roofing Materials Main & Penthouse Roof 67000 sf
Electrical Conduit Putty 3rd Floor West Hall Telephone Closet 100 sf
Interior Window Glazing
Throughout Building Undefined
Mastic on Car Shell Freight Elevator Car Shell 500 sf
Insulation on Converter Tank Penthouse 500 sf
Floor Tile and Mastic Throughout Building 634350 sf
Ceiling Tile 1st & 3rd Floor 5400 sf
Gold HVAC Sealant 7th Floor Hallway Undefined
Mastic Associated with 12”x12” White Floor Tile with Tan Specks
2nd, 7th, and 9th Floor Undefined
Mirror Mastic Throughout Undefined
Fire Doors Throughout Undefined
If you have any questions, please contact Jena Richter at 513/246-4418 or Jennifer.richter@gsa.gov for the procurement.
Denotes material was not tested at the time of the most recent survey. Testing is not feasible in some cases as it would result in damage to the material or its structural components. In other cases, the material or area may not have been accessible. As such, the material must be presumed to be ACM based on its characteristics, age or other technical factors. Material is presumed to be ACM to ensure appropriate precautions and methods are employed when contemplating or executing activity that may disturb the material.
Quantity was not defined at the time of the most recent survey.