Date: 05/04/2020

Prospective Contractors (bidders), Pursuant to the Code of Federal Regulations all building owners are required to provide notification of the presence, location, and quantity of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities. This notification is provided as a safeguard, to ensure prospective contractors (bidders) are aware of this information.

Asbestos containing material is present in the Potter Stewart U.S. Courthouse (OH0028CN) in the following forms, locations, and quantities:

Type Location Quantity

Floor Tile and Mastic Throughout Building 157600 sf

Roof Materials (Core/Flashing)

Roof 90000 sf

Transite Panels

Chiller & Fan Room on Roof 4000 sf

Transite Flue Penthouse on Roof (Extends to Basement) 1000 sf

Paper Wrap Pipe Insulation Along Window Radiator Pipes and Chases 5000 lf

MJP on Paperwrap Along Window Radiator Pipes and Chases 1000 lf

Magblock MJP on Fiberglass Steamline Throughout Steamlines 1000 lf

Magblock on 4" Steamline 9th Floor Fan Room 1000 lf

1' x 1' Ceiling Tile 8th Floor Courtroom 6000 sf

Boiler Stack Insulation 3rd Floor 5000 sf

Flash Tank TSI Sub-basement 1000 sf

If you have any questions, please contact Jena Richter at 513/246-4418 or Jennifer.richter@gsa.gov for the procurement.

Denotes material was not tested at the time of the most recent survey. Testing is not feasible in some cases as it would result in damage to the material or its structural components. In other cases, the material or area may not have been accessible. As such, the material must be presumed to be ACM based on its characteristics, age or other technical factors. Material is presumed to be ACM to ensure appropriate precautions and methods are employed when contemplating or executing activity that may disturb the material.